Loading...
05-060• CITY OF SHOREWOOD RESOLUTION NO.05- 060 A RESOLUTION ACCEPTING BID AND AWARDING CONTRACT FOR BADGER WELL HOUSE IMPROVEMENT PROJECT CITY PROJECT 98-06 WHEREAS, pursuant to an advertisement for bids for local improvements designated as the Badger Well Improvement Project for the City of Shorewood, Minnesota, City Project No. 98-06, bids were received, and opened on, June 15, 2005, and tabulated according to law, and such tabulation is attached hereto and made a part hereof as Exhibit A; and WHEREAS, the City Council has determined that Encomm Midwest. Inc., is the lowest responsible bidder in compliance with the specifications. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Shorewood as follows: 1. That the Mayor and City Administrator/Clerk are hereby authorized and • directed to enter into a contract with Encomm Midwest. Inc., in the name of the City of Shorewood, Project No. 98-06, according to the plans and specifications therefor approved by the City Council on file in the office of the City Administrator/Clerk. • 2. That the City Administrator/Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except for the deposits of the successful bidder and the next lowest bidder, which shall be retained until a contract has been signed. ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 27th day of June, 2005. ATTEST: Woody Love, Mayor 'k 0 Bid Tabulation Project Name: Badger Field Well House Improvements Client: City of Shorewood Project No. 98-06 WSB Project No. 1074-87 Contractor 1 EnComm Midwest 2 Rice Lake Construction Engineer's Estimate Addendum Addendum Addendum Bid Bond No. 1 No. 2 No. 3 Total Bid X X X X $498,894.00 X X X X $579,900.00 $586,000.00 * I hereby certify that this is a true and correct tabulation of the bids as received on June 15, 2005 SKevin F. Newman, P.E. * The engineers estimate includes instrumentation and controls equipment, which were not included as part of this bid. Instrumentation and controls are being furnished directly to the City under a separate contract. KA01074-87\Admin\Construction AdminBid Tab Cart Page Exhibit A C7 U Bid Tabulation Badger Field Well House Improvements 6/15/05 for the City of Shorewood City Project No. 98-06 EnComm Midwest Rice Lake Construction No. Mat. No. Item Units Qty Unit Price Total Price Unit Price Total Price 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 SCHEDULE A - SITE WORK 2021.501 MOBILIZATION LS 2101.605 CLEARING AND GRUBBING ACRE 2104.501 REMOVE CURB AND GUTTER LIN FT 2104.501 REMOVE WATER MAIN LIN FT REMOVE BITUMINOUS 2104.505 PAVEMENT SQ YD SAWING BITUMINOUS 2104.513 PAVEMENT (FULL DEPTH) LIN FT SALVAGE AND REINSTALL 2104.523 HYDRANT ASSEMBLY EACH 2105.501 COMMON EXCAVATION CU YD 2105.507 SUBGRADE EXCAVATION CU YD SELECT GRANULAR BORROW 2105.522 (CV), PLAN QUANTITY CU YD HAUL AND DISPOSE OF 2105.609 CONTAMINATED SOIL TON 2211.501 AGGREGATE BASE CLASS 5 TON TYPE LV 3 WEARING COURSE 2350.501 MIXTURE (B) TON TYPE LV 3 NON WEARING 2350.502 COURSE MIXTURE (B) TON BITUMINOUS MATERIAL FOR 2357.502 TACK COAT GALLON CONNECT TO EXISTING WATER 2504.602 MAIN EACH 2504.602 12" GATE VALVE AND BOX EACH 12" WATER MAIN, D.I.P., CL 52 W/ 2504.602 POLY WRAP LIN FT 2504.608 DUCTILE IRON FITTINGS POUND 2521.607 SIDEWALK SQ YD CONCRETE CURB & GUTTER 2531.501 DESIGN B618 LIN FT 2563.601 TRAFFIC CONTROL LS 2573.502 SILT FENCE, TYPE HEAVY DUTY LIN FT 2575.505 SODDING SQ YD 2571.601 LANDSCAPING LS SITE LIGHTING AND 2545.501 ELECTRICAL LS 1 0.15 300 45 40 135 1 300 25 325 1400 150 30 30 15 1 1 30 700 85 400 1 235 335 1 1 $6,500.00 $6,500.00 $2,000.00 $300.00 $4.00 $1,200.00 $22.00 $990.00 $11.00 $440.00 $5.00 $675.00 $550.00 $550.0C $7.50 $2,250.00 $20.00 $500.00 $14.00 $4,550.0( $47.50 $66,500.0( $17.50 $2,625.0( $66.00 $1,980.0( $70.00 $2,100.01 $4.00 $60.01 $1,350.00 $1,350.01 $1,950.00 $1,950.0 $175.00 $5,250.0 $3.50 $2,450.0 $45.00 $3,825.0 $18.00 $7,200.0 $500.00 $500.0 $4.00 $940.( $4.00 $1,340.( $9,500.00 $9,500.( KA01074-87\Ndmin\Construction Admin\Badger Field Well House Improvements Bid Tab $25,000.00 $25,000.00 $2,000.00 $300.00 $4.00 $1,200.00 $10.00 $450.00 $10.00 $400.00 $6.00 $810.00 $800.00 $800.00 $7.00 $2,100.00 $12.00 $300.00 $12.00 $3,900.00 $26.50 $37,100.00 $16.00 $2,400.00 $75.00 $2,250.00 $72.00 $2,160.00 $4.00 $60.00 $400.00 $400.00 $2,000.00 $2,000.00 $80.00 $2,400.00 $1.00 $700.00 $40.00 $3,400.00 $16.00 $6,400.00 $500.00 $500.00 $3.00 $705.00 $6.00 $2,010.00 $4,500.00 $4,500.00 • • • Bid Tabulation Badger Field Well House Improvements 6/15105 for the City of Shorewood City Project No. 98-06 No. Mat. No. Item Units Qty EnComm Midwest Unit Price Total Price Rice Lake Construction Unit Price Total Price 27 2103.501 BUILDING DEMOLITION LS 1 $7,500.00 $7,500.00 $10,000.00 $10,000.00 28 2564.531 F&cI SIGN PANELS TYPE C SQ FT 2 $75.00 $150.00 $100.00 $200.00 2564.603 4" SOLID LINE WHITE EPDXY LIN FT 250 $1.50 $375.00 $1.00 $250.00 t TOTAL OF SCHEDULE A - SITE WORK 1 $137,800.00 $116,695.00 SCHEDULE B - WELL HOUSE CONSTRUCT WELL HOUSE (INCLUDING MASONRY STRUCTURE, INTERIOR PIPING, CHEMICAL FEED EQUIPMENT, MECHANICAL SYSTEMS, ELECTRICAL SYSTEMS, AND 30 RELATED APPURTENANCES) LS 1 $338,719.00 $338,719.00 $443,065.00 $443,065.00 TOTAL OF SCHEDULE B— WELL HOUSE $338,719.00 $443,066.00 SCHEDULE C- WELL AND WELL PUMP REHABILITATION PUMP REMOVAL AND REINSTALLATION, INCLUDING ELECTRIC MOTOR, DISCHARGE HEAD, COLUMN PIPE, HEADSHAFT, LINESHAFT, LINESHAFT BEARINGS, PUMP BOWL ASSEMBLY, AND OTHER 31 RELATED APPURTENANCES LS 1 $5,450.00 $5,450.00 $5,000.00 $5,000.00 COMPLETE ONE (1) VIDEO 32 SURVEY OF THE ENTIRE WELL LS 1 $1,550.00 $1,550.00 $1,400.00 $1,400.00 WELL ALIGNMENT AND 33 PLUMBNESS TEST LS 1 $450.00 $450.00 $420.00 $420.00 REPLACE TOP COLUMN PIPE 34 SECTION LS 1 $250.00 $250.00 $230.00 $230.00 REPLACE INTERMEDIATE COLUMN PIPE SECTIONS INCLUDING COUPLING 35 RETAINERS EA 10 $395.00 $3,950.00 $360.00 $3,600.00 REPLACE BOTTOM COLUMN 36 PIPE SECTION LS 1 $275.00 $275.00 $250.00 $250.00 LINE SHAFT REPLACEMENT INCLUDING BEARINGS AND 37 RETAINERS LF 250 $29.50 $7,375.00 $26.00 $6,500.00 MOBILIZATION/ DEMOBILIZATION OF SAND 38 REMOVAL EQUIPMENT LS 1 $2,350.00 $2,350.00 $2,100.00 $2,100.00 39 SAND REMOVAL AND DISPOSAL Cy 5 $90.00 $450.00 $85.00 $425.00 K:\01074-87\Admin\Construction Admin\Badger Field Well House Improvements Bid Tab • • Bid Tabulation Badger Field Well House Improvements 6/15105 for the City of Shorewood City Project No. 98-06 No. Mat. No. Item Units Qty EnComm Midwest Unit Price Total Price Rice Lake Construction Unit Price Total Price SAND ANALYSIS, INCLUDING THE TAKING OF SAMPLE, DELIVERY AND TESTING OF THE SAMPLE, AND REPORTING THE 40 RESULTS CY 1 $50.00 $50.00 $30.00 $30.00 ONE CHEMICAL AND ONE BACTERIOLOGICAL ANALYSIS OF THE WELL WATER INCLUDING A TEST FOR SAND, TAKING OF THE SAMPLE, AND DELIVERY OF THE SAMPLE TO THE APPROVED LABORATORY, TESTING AS SPECIFIED, AND 41 PREPARATION OF REPORT LS 1 $100.00 $100.00 $80.00 $80.00 REPORTS - INCLUDING CONDITION OF WELL CASING AND SCREEN, RECOMMENDATIONS AND COSTS FOR WELL PUMP 42 REHABILITATION WORK LS 1 1 $125.00 $125.001 $105.00 $105.00 TOTAL SCHEDULE C- WELL AND WELL PUMP 1 REHABILITATION $22,375.00 $20,140.00 GRAND TOTAL OF BASE BED (SCHEDULES A-C) FOR OWNER OPTION ITEMS - REPLACEMENT OF INDIVIDUAL PARTS OF EXISTING WELL PUMPS 43 REPLACE BOWL ASSEMBLY LS 1 1 $7,150.00 $7,150.001 $6,600.00 $6,600.00 SUBCONTRACTORS Electrical Hymark Electric Hymark Electric Plumbing Northern Plumbing Tech Rice Lake Const. HVAC Environ - Con Environ - Con Earthwork EnComm Midwest Rice Lake Const. Process Piping EnComm Midwest Rice Lake Const. Well and Well PumpEH Renner EH Renner EQUIPMENT SCHEDULE Liquid Chemical Feed Systems LMI Pulsafeeder Chlorination Equipment Capital Controlsi Wallace & Tiernan K:101074-871Admin\Construction Admin\Badger Field Well House Improvements Bid Tab