Loading...
04-076CITY OF SHOREWOOD RESOLUTION NO. 04 - 07 6 A RESOLUTION ACCEPTING BID AND AWARDING CONTRACT FOR 2004 BITUMINOUS OVERLAYS AND APPURTENANT WORK, CITY PROJECT 04-06 WHEREAS, pursuant to an advertisement for bids for local improvements designated as 2004 Bituminous Overlays and Appurtenant Work, City Project No. 04-06, bids were received, opened on September 8, 2004 and tabulated according to law, and such tabulation is attached hereto and made a part hereof as Exhibit A; and WHEREAS, the City Council has determined that Midwest Asphalt Corporation, is the lowest bidder in compliance with the specifications. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Shorewood as follows: 1. That the Mayor and City Administrator/Clerk are hereby authorized and directed to enter into a contract with the firm of Midwest Asphalt Corporation, in the name of the City of Shorewood, 2004 Bituminous Overlays, City Project No. 04-06, according to the plans and specifications on file in the office of the City Administrator /Clerk. 2. That the City Administrator/Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except for the deposits of the successful bidder and the next lowest bidder, which shall be retained until a contract has been signed. ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 1P day of September, 2004. Woody Love, Mayor ATTEST: Craig W awson, City Administrator/Clerk 0 PROJECT: .2004 Bituminous Overlays and Appurtenant Work for Minnetonka Drive and Elmridge Circle City of Shorewood Project No. 04-06 LOCATION: Shorewood, MN WSB PROJECT NO(S).: 1611-00 Bids Opened: Wednesday, September 8, 2004 at 10:00 a.m. Addendum No. Bid Contractor 1 Rec'd. Security Total Bid 1 Midwest Asphalt Corporation X X $63,272.50 2 Wm. Mueller & Sons, Inc. X X $64,595.00 3 Barber Construction Co., Inc. * X X $70,240.00 4 Hardrives, Inc. X X $76,777.25 5 is Bituminous Roadways, Inc. X X $84,732.50 Engineer's Opinion of Cost $63,172.96 I hereby certify that this is a true and correct tabulation of the bids as received on September 8, 2004. Larry Brown, P.E., City Engineer - JZAyu J n Panchyshyn, DepLfty Cle k DENOTES CORRECTED FIGURE " A bid was submitted to the City of Shorewood by Barber Construction Co., Inc. on Tuesday, September 7, 2004. The City inadvertently overlooked Barber Construction's bid during the bid opening held at 10:00 a.m. on Wednesday, September 8, 2004. Barber Construction's bid information is included on this Bid Tabulation indicating them as the • third low bidder. EXHIBIT A