03-025CITY OF SHOREWOOD • RESOLUTION NO.03- 025 A RESOLUTION ACCEPTING THE PROPOSAL FOR ELECTRICAL SERVICES FOR SANITARY SEWER LIFT STATIONS WHEREAS, the Director of Public Works has identified infrastructure that is critical to remain in operation during sustained periods of power outages; and WHEREAS, the firm of Total Construction has submitted a proposal to provide contractual electrical services and appurtenant materials for retrofitting 12 of the City's sanitary sewer lift stations for emergency backup power generation; and WHEREAS, the Director of Public Works has reviewed said proposal for the contracted services and found it to be in order. NOW, THEREFORE BE IT RESOLVED by the City Council of Shorewood, Minnesota: That the work outlined in the proposal submitted by Total Construction and Equipment, Inc. for providing contracted electrical services, dated April 10, 2003, • attached hereto as "Exhibit A," is hereby approved, with the total amount of the contract not to exceed $2,900. Furthermore, the Director of Public Works is hereby ordered to proceed with said improvement project. ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 14th day of April, 2003. (, J WOODY LOVE, MAYOR ATTEST: CRAIGyff. DAV 90- N, CITY ADMINISTRATOR r� U BID PROPOSAL • PROJECT: Misc. work at Lift Stations DATE: April 10`i', 2003 OWNER: City of Shorewood LOCATION: Various Sites ATTN: Larry Brown Dear Larry, Our proposal for equipment and services for the above referenced project is based upon a site visit. During that visit a project description was conducted under your direction. The following is a brief description of the work we will be providing. 1. Check and verify correct rotation on existing 100A Generator Receptacles at the following Lift Stations. Hook-up, test and run City's generator to verify proper operation. Work shall occur at the following Lift Stations: #7, #8, #11, #12, #15, #16, #17, #18, #20 BASE BID --------------------------------------- (per station) $ 136.00 2. Check and verify correct wire size feeding the existing 100A Generator Receptacle. Work shall occur at the following Lift Stations: #8 BASE BID --------------------------------------- (per station) $ 118.00 3. Check and verify correct rotation on existing 100A Generator Receptacles • at the following Lift Stations. Hook-up, test and run City's generator to verify proper operation. Remove existing 200A generator receptacle and dispose of. Furnish and install aluminum blank off plate with tamper proof screws. Work shall occur at the following Lift Stations: #5, #6, #9, #10 BASE BID --------------------------------------- (per station) $ 196.50 • SUB TOTAL BASE BID ----------------------------------------------------------- $ 2,128.00 Greenlee Rotation Meter (see Attached cut -sheet)--------------------------- 141.25 TOTALBID --------------------------------------------------------------------------- 2 269.25 Items NOT included: 1. Premium and/or overtime. 2. City shall deliver Gen Set to sites and provide assistance, as required. We wish to express our gratitude in allowing us this opportunity to submit this proposal. We trust that our offering is clear and meets with your approval. In the event that you have any question or require further clarification, please call our office at 651-451-1384 Sincerely, TOTAL CONSTRUCTION AND EQUIPMENT, INC. Jason Johnson Project Manager • For acceptance, please sign two copies and return one. Quotes are valid for 30 days. ACCEPTED For: RECEIVED By: By: • Date: