01-063n �J C] CITY OF SHOREWOOD RESOLUTION NO. 01 - 063 A RESOLUTION APPROVING A CHANGE ORDER 1 FOR THE TRUNK HIGHWAY 7 & 41 RECONSTRUCTION PROJECT, CITY PROJECT NO. 98-05, S.P. 1008-58 (T.H. 41=12), S.A.P. 206-010-04 WHEREAS, on July 23`d, 2001 the City of Shorewood entered into a contract for construction with Hardrives, Inc. for the Trunk Highway 7 & 41 Reconstruction Project, City Project No. 98-05; and WHEREAS, Hardrives, Inc. has prepared Supplemental Work Orders 1 and 2, attached hereto as Exhibit A and Exhibit B, for additional work outside of the original contract; and WHEREAS, the City Engineer has reviewed said Supplemental Work Orders 1 and 2 and found them to be necessary to complete the project. NOW, THEREFORE BE IT RESOLVED by the City of Shorewood to approve Change Order Number 1 with Hardrives, Inc., that incorporates services outlined in Supplemental Work Orders 1 and 2, attached hereto as Exhibits A and B. ADOPTED by the City Council of the City of Shorewood this 22nd day of October, 2001. WOODY LOVE, MAYOR ATTEST: CRAIG W,,OAWSON,-CITY CLERK/ADMINISTRATOR STATE OF MINNESOTA 'DEPARTMENT OF TRANSPORTATION Page 1 of 1 El WORK ORDER NO. 1 Contractor: Hardrives Inc. S.P. 1008-58 • 14475 Quiram Drive Rogers, MN 55374-9461 City Project No. 1122.00 Location: In Hennepin and Carver Counties at the intersection of T.H. 7 and T.H. 41 In accordance with the terms of the contract, you are hereby authorized and instructed to do the work described herein. Work to be completed: The Contractor shall provide all equipment, materials and labor necessary to adjust three watermain gate valves and adjust one hydrant because of changes in grade due to the reconstruction of T.H. 41 All work will be done in accordance with the pertinent portions of the Special Provisions, the Plan, Mn/DOT Standard Specifications, all municipal codes and as directed by the Engineer. Payment for this work will be at the Negotiated Unit Prices as shown in the Estimate of Costs. Estimate of Costs Increase - Negotiated Unit Price 0em No. Description 04.602 Adjust Gate Valve 2504.602 Adjust Hydrant Group No. 01 - 1000 Unit Unit Quantity Price Amount Each 3.0 $220.00 $ 660.00 Each 1.0 $935.00 $ 935.00 Total Increase this Work Order $1,595.00 Number of attached sheets: None Effect on Contract Time: Contract time will not be revised except as provided under the Contract Provisions of Mn/DOT Specifications 1806. The Cit of Shorewood recommends for approval: By �� Date:- -'ZZ - O % Accepted by: Hardrives Inc. Date: cam: Resident Office File Issued by: Date: SC/"T, 26, goo/ Exhibit A STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Page 1 of 1 WORK ORDER NO. 2 ,Jntractor: Hardrives Inc. S.P. 1008-58 14475 Quiram Drive Rogers, MN 55374-9461 City Project No. 98-05 Location: In Hennepin and Carver Counties at the intersection of T.H. 7 and T.H. 41 In accordance with the terms of the contract, you are hereby authorized and instructed to do the work described herein. Work to be completed: The Contractor shall provide all equipment, materials and labor necessary to place 100 mm polystyrene insulation at the locations where the new storm sewer crosses the inplace watermain. All work will be done in accordance with all applicable Special Provisions, the Plan, Mn/DOT Standard Specifications, all municipal codes and as directed by the Engineer. Payment for this work will be at the Negotiated Unit Price as shown in the Estimate of Costs. Estimate of Costs Increase - Negotiated Unit Price m No. Description 2504.604 100 mm Polystyrene Insulation Group No. 01 - 100% Unit Unit Quantity Price Amount m2 50.0 $33.00 $1,650.00 Total Increase this Work Order $1,650.00 Number of attached sheets: None Effect on Contract Time: Contract time will not be revised except as provided under the Contract Provisions of Mn/DOT Specifications 1806. The Cit of Shorew od recommends for approval: BY - ,G-----� Date: — Accepted by: Issued by: Hardrives Inc. Mn DOT Date : Date: ©" e7Y—e'is / Resident Office File Exhibit B