98-033 . . . . CITY OF SHOREWOOD RESOLUTION NO. 98-033 A RESOLUTION ACCEPTING THE PROPOSAL FOR PROFESSIONAL ENGINEERING SERIVCES AND ORDERING PREPARATION OF PLANS, SPECIFICATIONS, AND ESTIMATES FOR THE INSTALLATION OF EMERGENCY VEHICLE PREEMPTION DEVICES WHEREAS, the City of Shorewood has indicated in the 1998 - 2002 Capital Improvement Program that the addition of Emergency Vehicle Preemption (EVP) devices are desirable at the intersections of County State Aid Highway 19 and Old Market Road with State Trunk Highway 7; and WHEREAS, WSB and Associates, Inc has submitted a proposal to provide Professional Engineering Services for said Improvement and found to be acceptable to the City Council of the City of Shorewood; NOW, THEREFORE BE IT RESOLVED by the City Council of Shorewood, Minnesota: That the proposed improvement be referred to WSB Associates, Inc. for preparation of Project Plans, Specifications, and Construction Estimates in accordance with the proposal submitted and attached hereto as "Exhibit A." ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 27th day of April, 1998. ArrEST: Apr-22-9S 02:24P P.04 Scope of Services . Task 1 - Preliminary Design This cask will involved the review of the eXIstmg signal systetllS to detennine the requirements for the installation of and Emergency Vehicle System. It is assumed that the City will provide base mapping of~he existing signal system at TH 7 and Old r..1arket Road in an electronic format. As built plans will be digiti7ed forthe TH 7 at CSAli 19 intersection layout and wiring diagram. A preliminary design plan will then be completed indication additional hardware and wiring requiremellts. These plans will be reviewed by the City and ~fn/DOT State Aid tor compliance. Task'] - Final Design A. Final EVP Design: following comments lonn the City and Mn/DOT on the preliminary designs, a final designs will be completed incorporating all comments. The design of the EVP Systems will be in confomlance with all applicable state <.uld local electrical codes, Federal and State Manuals on Unifl.:mn Traffic Control Devices GvfUTCD) and Minnesota Dcparnnent or Transportation (}An/DOT) State Aid Standards. . B. Bid Proposal: WSB ...vill provide a set of EVP ::.-pccial provisions (Division SS_ for review by the City of Shorewood and Mn/DOT. Foilowing approval of the spec1al provisions, WSB wiil assemble the bid proposal including City furnished Division S. 15 sets of the bid proposal will be prepared. C. Plan Approval: WSB ",,;11 assist the city in obtaining plan approval from MnlDOT. D. i"feetingslCoordilration: Two meetings will be held, one with the City of Shore wood Staff to review the plan and obtain comments on the tinal designs, the second meeting will be a coordination meeting with Mn/DOT to discuss the project. Task 3 - Construction Services A. Preconstruction Conference: WSB will assist the City in a prceonsuuction conference with representatives from the successful bidder and utility companies. It is assunlcd that the City of Shorewood will take the lead and send out the notices for this conference. B. Shop Drenving Review: Al shop drawing from the Contractor will be submitted through the City and reviewed by WSB to determine their adequacy prior to ordering of equipment . C. Construction Inspect/olt: WSB will assist che City as needed with the day-to-day inspection of the EVP improvements. City of Shore wood Exhibit A . St;:opt! of Servic/!S . Pfafll ........ ",U _u~_J I\I~ J1?11 O!I Exhibit A ,. . C OlnpensatiOll / Schedule . Estimated CQst Bascd on the scope of services, as outlined in Exhibit A the cost to provide such services will be as follows: Task 1 Preliminarv Plans (Ilourlv - not-eo-ex.cud) .............................. $2,000. . . . Task 2 Final Signal Plans / Specifications rllourly - not-eo-exceed) ................. 52,700. Task 3 ConstructIOn Services (Hour(); - /6 Hours at $83.50/hour) . . . . . . . . . . . . . . . . . .. $/336. Total Cost ...........,....10....'..................................... S6.,036. A 1998 Fee Schedule is attached. Schedule \VSB will deliver a final set ofpians and speci.fications to the City o[Shorewood within the frame . required by the City. This time schedule is assuming no unusual circumstances are encountered. )l'otice to proceed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . April 27, 1998 Meetings with City ........................................... Week of May 4, 1998 Preliminary design submittal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. May 18, 1998 Meeting with City to review preliminary desil;,Tfl . . . . . . . . . . . . . . . . . . . . Week of May 18, 1998 Final design and specification submittal .................................. June 1. 1998 Meeting with CIty to review tinal design .......................... Week of June 8. 1998 J\tlnlDOT Review and Approval. . . . . . . . . . . . . . . . . . . . . . June 15, 1998 through June 26, 1998 City Council Approves Plans. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. June 29, 1998 Ad for bid. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . July 5 through July 24, 1998 Open bids . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . July 28, 1998 A\vard ......................................................... August 10, 1998 Construction. .,. . . . . . . . .. . . . . . . . . . .... . . . . August 15, 1998 through September 15, 1998 . City oIS}znr~wooci Exhibit I3 - Compensation / Schedule. Plan 2 WSR ProPQ~'(11 028.98