Loading...
98-029 . . . CITY OF SHOREWOOD RESOLUTION NO. 98~29 A RESOLUTION ACCEPTING THE PROPOSAL FOR PROFESSIONAL ENGINEERING SERIVCES AND ORDERING PREPARA TION OF PLANS, SPECIFICATIONS, AND ESTIMATES FOR THE INSTALLATION OF A TRAFFIC SIGNAL AT COUNTY ROAD 19 AND COUNTRY CLUB ROAD WHEREAS, the City of Shorewood has petitioned Hennepin County for the installation of a traffic signal at the intersection of County State Aid Highway 19 and Country Club Road; and WHEREAS, Hennepin County has conducted a preliminary study and has determined the need for said traffic signal; and WHEREAS, WSB and Associates, Inc has submitted a proposal to provide Professional Engineering Services for said project and found to be acceptable to the City Council of the City of Shorewood; NOW, THEREFORE BE IT RESOLVED by the City Council of Shorewood, Minnesota: That the proposed improvement be referred to WSB Associates, Inc. for preparation of Project Plans, Specifications, and Construction Estimates in accordance with the proposal submitted and attached hereto as "Exhibit A." ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 13th day of April, 1998. A TIEST: 'ProjectiVo. 3: CSAH 19atSmithtownRd/CountryClubDrivelntersectionlmprovements . Task 1 - Traffic Study A traffic study will be completed that will address the needs and requirements for safe and efficient intersection operation. This will include the analysis of turning traffic, accident data, traffic flow on adjacent roadways, and the intersection capacity and Level of Service. The results of this task will be a report outlining the intersection requirements and what safety improvements should be considered at this intersection. Task 2 - Traffic Signal Justification Report A Traffic Signal Justification Report will be prepared which outlines the requirements for a traffic signal installation. This report will be prepared in a format suitable for submission to Hennepin County and Mn/DOT State Aid. Task 3 - Preliminary Intersection Concept Design . A Preliminary Intersection Concept Design will be completed that will document the recommended safety improvements (Task 1) and their impact to adjacent businesses. It is assumed that up to one (1) day of survey time will be required to provide enough data to develop a Concept Plan. This plan will be in a form detailed enough to determine right-of-way needs and begin initial conversations with adjacent businesses and the City. A preliminary construction cost estimate will be prepared. This plan will be reviewed with Hennepin County for inclusion in their 1999 Capital Improvement Program. Task 4 - Roadway Design A. Preliminary Design: A preliminary intersection design will be completed for the proposed roadway improvements including anticipating striping and lane configurations. B. Final Design: This task will include developing final construction plans for the required roadway improvements. This will include any detail sheets required, layout sheets, including profiles and applicable cross sections, as well as pavement section design. (It is assumed that WSB will rely on existing soils information. If soils information is required, it will be performed as an extra service). C Special Provisions: A set of special prOVIsIons addressing all required improvements will be completed in a format consistent with the City of Shorewood requirements. The bid proposal will be prepared as a part of this phase, including incorporating the city-designed sheets and specifications. . City of Shorewood Exhibit A - Scope of Services - Plan 3 WSB Proposal 028.98 Exhibit . D. Cost Estimate: A detailed cost estimate will be developed, based on Hennepin County Funding Guidelines, addressing all items included in the intersection improvement. E. Ji/eetings: It is assumed that up to four meetings will be held as part of this task. These meetings will be held in conjunction with the meetings as outlined in the traffic signal design task (Task 3). Task 5 - Traffic Signal Designs . . A. Preliminary Signal Design: A preliminary traffic signal design will be developed by WSB & Associates, Inc to accommodate the proposed roadway intersection configuration. The preliminary plan will include the location of the source of power, all poles and control equipment. This plan will be reviewed with the City of Shorewood and Mn/DOT. B. Final Signal Design: Following comments from the City and Mn/DOT on the preliminary design, a final design will be completed. Design of traffic signals will be in conformance with all applicable state and local electrical codes, the Federal and State Manuals on Uniform Traffic Control Devices (NfUTCD) and Minnesota Department of Transportation (Mn/DOT) State Aid Standards. The fmal design will include; all applicable detail sheets, intersection layout and wiring diagram. The final plans will also include provisions for a future Emergency Vehicle Preemption (EVP) system and any required mast arm SIgnIng. C Special Provisions; A set of special provisions will be developed for the traffic signal system and mast arm signing. These special provisions will be based on Hennepin County standards specifications. These special provisions will be incorporated into the bid proposal prepared for the project. D. Cost Estimate: An estimate of cost for the signal system components will be developed as a part of the total project estimate of cost. E. Meetings For The Traffic Signal System: It is anticipated that four (4) meetings will be held as part of the preliminary design. One meeting will be held with the local power company to determine the location and routing of the source of power for the intersection. Two meetings will be held with the City, one following !he preliminary design to review the intersection layout and addressing any concerns with the traffic signal system. The second meeting will be held following the final plans. One meeting will be held with Hennepin County to review the plans and assure all items that may be of concern to them have been addressed. City of Shore wood Exhibit A - Scope of Services - Plan 3 WSB Proposal 028.98 Page - . . . . Task 6 - Preconstruction Services A. Final Plans and Specifications: WSB will develop and distribute the plans and specifications to prospective bidders. WSB will charge for the bid proposals as payment for printing changes. The City and appropriate agencies will not be charged. B. Hennepin County and State Approvals: WSB will submit this project to Hennepin County and Mn/DOT for review and approval. Any comments made by Hennepin County and Mn/DOT will be addressed and their approvals will be obtained. C. Shop Drawing Review: All shop drawings from the manufacturers and contractor will be submitted through the City and reviewed by WSB to determine their adequacy prior to ordering of equipment. D. Contract A ward: WSB will review the bids received by the City and make a recommendation to the City as to their adequacy and make a recommendation of an award of the contract. Task 7 - Mn/DOT Coordination As discussed in the traffic signal design and roadway design tasks coordination with Hennepin County and Mn/DOT will occur throughout the design process. In addition to this, we will assist the City on obtaining and executing the cooperative agreements for the intersection improvements. Task 8 - Construction Services A. Construction Staking: WSB personnel will be available for construction staking services. Our survey crew would locate all components of the traffic signal system in addition to the roadway improvements necessary. This work would be completed on an hourly basis. B. Construction Inspection Services: WSB would assist the City in whatever level of construction services they would require. This would include either day-to- day inspection or an as-needed service during critical portions of the contract. City of Shore wood Exhibit A - Scope ofSer\"ices - Plan 3 WSB Proposal 028.98 , Project No.3: CSAH 19 at Smithtown RdlCollntry Club Drive Intersection Improvements . Estimated Cost Based on the scope of services, as outlined in Exhibit A the cost to provide such services will be as follows: Task 1 Traffic Study (Hourly - not-to-exceed) .................................. $5,000. Task 2 Signal Justification Report (Hourly - not-fo-exceed) ....................... $1,750. Task 3 Preliminary Concept Design (Hourly - not-fo-exceed) ............ . . . . . . . . . . $3,000. Task 4 Roadway Design (6% of Actual Construction Costs) ...................... $7,200. Task 5 Traffic Signal Design (6% of Actual Construction Costs) ................... $7,200. Task 5 MnlDOT Coordination (Hourly - not-fo-exceed) . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,500. Task 6 Preconstruction Services (Hourly - not-fo-exceed) ......................... $2,000. Task 7 Hennepin County Coordination (Hourly - not-to-exceed) ................... $1,500. Task 8 Construction Services (7% of Actual Construction Costs) .................. $15,400. Total Cost ................................................. $44,550. . A 1998 fee Schedule is attached. Schedule WSB will deliver a final set of plans and specifications to the City of Shorewood within the frame required by the City. This time schedule is assuming no unusual circumstances are encountered. Notice to proceed. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . April 13, 1998 Meetings with City ......................................... Week of April 20, 1998 Preliminary design submittal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . July 6, 1998 Meeting with City to review preliminary design. . . . . . . . . . . . . . . . . . .. Week of July 13, 1998 final design and specification submittal ............................... August 10, 1998 Meeting with City to review final design ....................... Week of August 17, 1998 Hennepin County/Mn/DOT Approval . . . . . . . . .. August 24, 1998 through September 28, 1998 City Council Approves Plans. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . October 12, 1998 Ad for bid . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . November 6 through December 4, 1998 Open bids . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . December 8, 1998 Award ....................................................... December 14, 1998 . Construction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . . . . . . .. Spring/Summer 1999 City of Shore wood Exhibit B - Compensation'/ Schedule - Plan 3 WSE PrODosa! 028.98