92-003 .' . . \ I . . . RESOLUTION NO. 3 -92 RESOLUTION APPROVING SUPPLEMENTARY AGREEMENTS NOS. 1 , 2 AND CHANGE ORDER NO.1, OLD MARKET ROAD, CITY PROJECT 91-4 WHEREAS, required by described in project and; certain changes in the construction plans were the Minnesota Department of Transportation, as Supplementary Agreement numbers 1 and 2 for said WHEREAS, miscellaneous field changes were required during the construction phase of the project due to site conditions as described in Change Order Number 1 and; WHEREAS, these changes were made for the benefit of the project by the Contractor under the supervision of the City Engineer; NOW, THEREFORE, BE IT RESOLVED that: 1. The ci ty of Shorewood hereby approves Supplementary Agreements 1 and 2, and Change Order Number 1 for city Project 91-4. ADOPTED BY THE CITY COUNCIL, OF THE City of shorewood this 13th day of January 1992. ATTEST: . . . Orr SChelen Mayeron & Associates, Inc. 2021 East Hennepin Avenue Minneapolis, MN 55413 612-331-8660 FAX 331-3806 Engineers Architects Planners Surveyors January 6, 1992 Mayor and City Council City of Shorewood 5755 Country Club Road Shorewood, MN 55331 Re: Old Market Road Project Update OSM Project No. 4705.01 Dear Mayor and Council Members: As you are aware, the majority of the construction work at the referenced site has been halted due to the early winter this year. The majority of the utility and road work has been completed, with the exception of asphalt paving on Brom's Blvd. and Old Market Road. We were, fortunately, able to finish the base course widening of Trunk Highway 7, eliminating construction on this busy highway through the winter months. At this time, we are tying up the loose ends for the winter months. Attached are Supplementary Agreements 1 and 2, and Change Order No. 1 for miscellaneous changes, deletions and additions made to the project during this past fall. The Supplementary Agreements are essentially 100% paid through either State Aid or the Special Agreement Funds, while the items in the Change Order were non-eligible items that the City is responsible for. We have attached a copy of the Agreements and Change Order along with a budget update to let you know where we are in terms of total expenditures versus total revenue expected. Currently, we are expecting a roughly $65,000 budget excess in this project, including a reduced contingency of 5%. This should be a fairly conservative budget, given the fact that the project is roughly 70% complete and it is unlikely that we would run into $50,000 in contingency expenditures at this point. Also, while it has not been agreed to as yet, we are anticipating additional State Project Funds for engineering reimbursement on the eligible portions of this project. Equal Opportunity Employer " . . Mayor and City Council January 6, 1992 Page 2 While there may be some minor work performed over the winter, it is likely that this project will not begin in ernest again until late April. At that time, the construction work will begin and be completed by June 1, 1992, weather permitting. If you have any questions, please give me a call at 378-6370. Sincerely, ORR-SCHELEN-MA YERON & ASSOCIATES, INC. ~L<- Joel Dresel, P.E., L.S. City Engineer . /cmw 0106cos.m&c Enclosure . OLD MARKET ROAD BUDGET UPDATE . JANUARY 2, 1992 EXPENDITURES Base Construction Contract Supplementary Agreement #1 Supplementary Agreement #2 Change Order #1 5% Contingency Legal Bonding Administration . Plans & Specs Construction Admin.jObs. Construction Staking MnDOT Plant Inspection Materials Testing TOTAL ESTIMATED EXPENDITURES REVENUE SOURCES Bond Agreement MNDOT Sta1:e Aid State Aid Eligible Engineerin MNDOT Special Agreement Water Fund (From Hook-Up fees TOTAL ESTIMATED REVENUE NET BUDGET EXCESS (DEFICIT) . $1,044,616 $3,100 $1,631 $11,413 $53,038 $24,405 $33,544 $24,180 $69,000 $65,000 $50,000 $5,000 $10,000 $1,394,927 $920,000 $139,318 $22,291 $360,000 $18,000 $1,459,609 $64,682 en ;;.ron& .;ociates, Inc. 2021 East Hennepin Avenue Minneapolis, MN 55413 612-331-8660 FAX 331-3806 Engineers Surveyors Planners Change Order *bange Ord~; No. 1 Project: Old Market Road Project No. 91-4 Owners: City of Shorewood Date of Issuance: January 13, 1992 5755 Country Club Road Shorewood, MN 55331 Contractor: Hardrives, Inc. Engineer: Orr-Schelen-Mayeron 9724 10th Avenue North & Associates, Inc. Plymouth, MN 55441 Contract For: Street, Storm Sewer, OSM Comm. No. 4705.01 Watermain, Signals and Appurtenant Work You are directed to make the following changes in the Contract Documents: Description: Summary of Miscellaneous items to date. Purpose of Change Order: Additional work required due to site conditions. Attachments: (List documents supporting change) Exhibit "A" - Item Summary . CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price Original Contract Time $1,044,615.70 Partial by November 1, 1991 Entire by June 1, 1992 Previous Change Orders No. _ to No. Net Change from Previous Change Orders - $ 0.00 None Contract Price Prior to this Change Order Contract Time Prior to this Change Order $1,044,615.70 Same Net Increase (decrease) of this Change Order Net Increase (decrease) of Change Order $ 11,413.00 Deletion of partial reg. Contract Price wfall Approved Change Orders Contract Time with Approved Change Orders $1,056,028.70 Completion by June 1, 1992 ~;~o~ fldA~/e, Approved By: :Y Hardrives, Inc. . Joel Dresel, L.S., P.E. Approved APprovf n I (~1Iu;yyYl Date 'f!3r~ion y: By: ! ~AA1!kJ j . Joel Dresel, L.S., P .E. ~im Hunn, City Engineer ftity Administrator ITEM SUMMARY . EXHIBIT "A" September 17, 1991 Existing 30-inch RCP at Catch Basin Manhole 31-1 had bad joints. Removal and relay of two pipes with 4-inch joint gaps September 25, 1991 September 26, 1991 October 10, 1991 Grade change at Catch Basin 18-1 Grade change at Catch Basins 18-3 Cut and lower existing 12-inch DIP at Catch Basin 22-2 October 14, 1991 Fix leak on existing 12-inch stub from water tower when testing new main October 18, 1991 Turn top on sanitary structures allowing adjustment outside of curb line October 23, 1991 .ctober 25, 1991 October 30, 1991 Reconstruct and adjust various catch basins Install extra drain in retaining wall Install hydrant extensions November 20, 1991 Extra cost to supply bituminous pavement after plant shut-down - 1,116 ton @ $2 per ton . $ 821.00 396.00 396.00 2,376.00 1,188.00 440.00 1,303.00 600.00 1,661.00 2,232.00 Total $11,413.00 . )-03 (5/88) . /NNESOTA DEr';TMENT OF TRANSPORTATION / . SUPPLEMENTAL AGREEMENT No. 1 ./ ,CIOr: . rdrives, Inc. Supp. to Contract No. 1 9 Y 1 - 4 1 2 Sheet_ of_ Federal Project: State Funds Slale Project No.: ~,s A 2 16 - 111 - 0 1 S.P. 2706-184 Localion: 9724 10th Avenue North Plymouth, MN 55441 At Junction of Old Market Road and Trunk Highway 7 in Shorewood Account 1.0. TYPE OF MO ( TRANSACTION: A44 ( ) M5 ( ) M6 ( ) Dated Number Oepl.JOiv. Sequence No. C.CO.S Amount C.CO.1 C.CO.2 M1 ( Dated Number Entered by Entered by WHEREAS: This contract is amended as follows: WHEREAS: WHEREAS: WHEREAS: The plan provides for among other things, grading, bituminous surfacing, traffic signal systems, storm sewer, watermain and turf establishment; Review of the plan for construction of the traffic signal system by MnDOl's Director of Traffic Engineering recommended changes to the design of the system, and The Engineer, after review of those recommendations, incorporated them into the current signal plan, and The Contractor has agreed to provide the change in work as requested by the Engineer. . NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: 1. The Contractor change Pole Nos. 2 and 3 to Type P100 poles from the current Type P90 poles at an increase cost of $2,490 ($1,245 each) and provide Type P100 pole foundations at an increased cost of $122 ($61 each). 2. The Contractor will provide 4 steel LD covers for Handholes 6, 7, 10 and 11 instead of 4 concrete at an increased cost of $122 each for a total of $488. 3. The Contractor has agreed that the negotiated prices above include a 6.5% sales tax and a 15% markup as provided in the contract provisions of MnDOT Specification 1806. 4. The contract time will not be revised except as may be provided under the Contract Provisions of MnDOT Specification 1806. 5. The Contractor shall not make claim of any kind or character, whatsoever, for any other costs or expenses which he may have incurred, or which he may hereafter incur in performing the work and furnishing the materials covered by this Agreement. APPROVED: Commissioner of Administration Dated APPROVED: Commisisoner of Finance Original Contract Dated 3/L ILtJ, ~ &-r Dated 9/'1/9/ Z~1;~~ , ntract By Approved as to form and execution Dated District Engineer Dated Assistant Attorney General Dated Agency Head Original to State Auditor - Copy to Agency i"(/'- , " /~/' Sl} ;jP'L,EMENTAL AGREEMENT No. She,,; Federal Project: State Project No.: . ~:Clor: w" ;1 Hardrivesl Inc. State Funds MSA 216-111-01 S.P. 2706-184 Location: At Junction of Old Market Road and Trunk Highway 7 in Shorewood Ad. 9724 lOth Avenue North Plymouth, MN 55441 C.CO.1 C.CO.2 Amount Pro. No. Account 1.0. OeptJDiv. C.CO.S TRANSACTION: A44 ( ) A45 ( ) A46 ( ) Dated Number Entered by Entered by TYPE OF A40 ( A41 ( Dated Number This contract is amended as follows: ESTIMATE OF COST Neaotiated Prices . Net Increase - 2565.511 Full T. Act. Cont. System - Lump Sum Distribution: MSA 216-11-01 @ 33.33% S.P. 2706-184 @ 66.67% $ 2,490.00 122.00 488.00 $ 3.100.00 Change Poles 2 and 3 to Type P100 @ 2 each Change Type P90 foundations to Type P100 @ 2 each Provide 4 steel LD covers versus concrete @ 4 each By By Approved as to form and execution Dated ..:!./.L Dated ~ Dated APPROVED: Commissioner of Administration APPROVED: Commisisoner of Finance Original Contract District Engin~ Dated Assistant Anomey General Dated Agency Head i I I' Original to State Auditor - Copy to Agency -.. .- - -- - ._'. ...~. - ..- -....-.--. .--.--.......,.-- /;;II~NESO:A U~~~ lEMENTAL AGREEMENT No. L. Sheet~- ..._ 01 -=-- ~or: Hardrives, Inc. Federal ?IOjErC\: state Funds Slale ProjErC\ No.: !.1SA 216-111-01 S'.P. 2706-184 Location: At Junction of Old Market Road and Trunk Highway 7 in shorewood - :idre 9724 lOth Avenue North Plymouth, MN 55441 'roo No. Account 1.0. OeptJOiv. Sequence No. C.CD.1 C.CD.2 C.CO.4 C.CO.S TYPE OF MO ( M1 ( Dated Number Entered by - TRANSACTION: M4 ( ) M5 ( ) A46 ( ) Dated Number Entered by This contract is amended as follows: WHEREAS: Tbe plan provides (or ,",ong otb<< things, €lading, bi_mous su<facing, traffio signal systems, storm sewer, watermain and turf establisbIDent; WHEREAS: F",tber ,""ew witb NSP (or the so"',, o( pow", (S.O.P) bas <<,,"ted in NSP <<eommending that the traffio signal eontrOll<< be relocated to tbe soutbeast qua<hant o( the Old M" ket Road iPtersection, and WHEREAS: The Engine.r, after r",ew o( tbose reeo",,,,endations, ;"corpomted tbem ;"to tbe current signal plan, and . . WHEREAS: The Contractor bas ag<..d to pro,ide tbe cbange in wmk as requested \>y the Eogineer. NOW, THEREFORE. IT IS HE~BY MUTUALLY AGREED AND UNDERSTOOD THAT: . 1. The Con"actor shall relocate the seni.. eq,,;pment and traffio control cabinet from the northerly location to the southeast quadrant of Old Market Road and T.H. 7. 2. The Con"actor sball pr""de additional signal cable and eond,,;ts as sbown in tbe reVised plan. 3. The Contractor bas agreed upon the negotiated prices listed in this Supplemental Agreement 4. A W% ",,,kup bas been added to the net ;"crease (or the prime eontractor as provided in ,he Con "act Provisions of MnDOT Specification 1904. . 5. The eo""act tUne will not be re'ised except as may be pro,;ded onder the Con"act Provisions o( MoDOT Specification 1806. 6. The Con"actor shall not m..e claim of any kind or character, whatsoever, (or any otber oosts or expo.... ...Illch he may have mcunod. or wlllch be may hereafter ;"cur in performing tbe work and furnishing the materials coveTed by this Agreement. APPROVED: Commissioner of Administration APPROVED: Commisisoner of Finance Original Contract Dated I Z,3...Q/ /)-...1.1, g . ~ -.At Project EnginHl By Approved as to form and execution Dated Con\laclor By Dated Oistrid Engineer Dateri Dater! Assislant Anomey General Dated Aoer>CY Head Original to State Auditor - Copy to Agency . -- -.--.- -.'. _. - ------- - -- ----... -.....--- . --------.--- ..-- ..- --..-.--.-.. /34-03 (S/88) . ,,9iNNESOTA DEF}:,P lENT OF TRANSPORTATION .-) ,~ / 2 -. SUPPLEMENTAL AGREEM NT No. ~.. .~ nlraclor; qrdrives, Inc. dress: Federal Ploject; state Funds location; Supp. 10 Con' 2 2 Sheel_ 01_ S\a18 ProjEoCl No.; 11SA. 216,...111-01 S.P. 2706-184 9724 lOth Avenue North plymouth, MN 55441 At Junction of Old Market Road and Trunk Highway 7 in Shorewood Account l.D. ' TYPE OF MO { TRANSACTION: A44 ( ) A45 ( ) A46 ( ). Daled Number his contract is amended as follows: Decrease: 0565.603 0565.603 0565.603 . Increase: 0565.602 0565.603 0565.603 0565.603 0565.603 DepIJDi.... C.CD.1 C.CD.2 A41 { Dated Number Entered by '- ESTIMATE OF COST 4" Rigid Steel Conduit 3jC #12 Cable 3jC #14 Cable 100 L.F. @ $ 14.08 = 220 L.F. @$ 0.73 = 779 L.F. @ $ 0.50 = Total Decrease Steel LD Handhole Cover 3" Rigid Steel Conduit 12jC #12 Cable 3jC #20 Cable 1jC #8 Wire 1 Each @ $122.00 = 210 L.F. @ S 12.06 = 248 L.F. @ S 1.95 = 149 L.F. @ S 0.81 = 406 L.F. @ S 0.45 = Total Increase Net Increase 10% Markup Net Increase - 2565.511 Full T. Act. Cont. System - Lump Sum Distribution MSA 216-111-01 @ 33.33% S.P. 2706-184 @ 66.67% APPROVED: Commissioner of Administration . Dated APPROVED: Commisisoner of Finance Original Contract Dated f2.-3-Q/ Dated iJ. -lI- 9/ By Approved as to form and execution Dated Dater! Assistant .Mome, GenCt,al Dated Original to Stale Audilor - Copy 10 Agency c.co.s Entered by $1,408.00 160.60 389.50 $1.958.10 S 122.00 $2,532.60 483.60 120.69 182.70 S~441.59 $1,483.49 148.35 $1.631.84 District Engi,..Mt A~r>cy H..d - ._- - ---'-........---.----------------.- -- - -.---. ....------ - --------- ~ . ._---~- ..---.-- .-