091205 CC Reg AgP
.
f
I
J
.
.
.
.
.
CITY OF SHOREWOOD
CITY COUNCIL REGULAR MEETING
MONDAY, SEPTEMBER 12, 2005
5755 COUNTRY CLUB ROAD
COUNCIL CHAMBERS
7:00 P.M.
AGENDA
1. CONVENE CITY COUNCIL MEETING
A. Roll Call
Mayor Love _
Lizee
Turgeon _
Callies
Wellens
B. Review Agenda
2.
APPROVAL OF MINUTES
A. City Council Special Meeting Minutes, August 22, 2005 (Art. - Minutes)
B. City Council Regular Meeting Minutes, August 22, 2005 (Art.- Minutes)
C. City Council Work Session Minutes, August 22,2005 (Att. - Minutes)
3.
CONSENT AGENDA - Motion to approve items on Consent Agenda & Adopt Resolutions
Therein:
NOTE: Give the public an opportunity to request an item be removedfrom the
Consent Agenda. Comments can be taken or questions asked following removal from
Consent Agenda.
A.
Approval of the Verified Claims List (Art.- Claims List)
B. Staffing - no action required
C. City Clerk's License Approvals -Temporary Liquor License for Municipal Liquor Store
Wine Tasting Events (Art. - Deputy Clerk's memorandum, 3 Resolutions)
D. Accepting Bids and Awarding Contract for 2005 Pavement Marking and Radisson Road
Improvement Projects (Art. - Public Works Director's memorandum, Resolution)
E. Resolution Proclaiming November 12-19, 2005 to be Housing Awareness Week (Art.-
Resolution)
F. Accept Proposal from American Engineering and Testing, Inc. for Professional
Engineering Services (Art. - Public Works Director's memorandum)
4.
MATTERS FROM THE FLOOR (No Council action will be taken.)
.
,)
.
.
.
.
.
CITY COUNCIL AGENDA - SEPTEMBER 12, 2005
PAGE20F2
5.
REPORTS AND PRESENTATIONS
6. PUBLIC HEARING
7. PARKS - Report by Representative
A. Report on Park Commission Meeting Held August 23, 2005 (Art.- Draft Minutes)
8. PLANNING - Report by Representative
A. Approval of Final Plat - Lake Virginia Woods (Art. - Engineering Consultant's
Memorandum, Planning Director's Memorandum, Draft Resolution/Development
. Agreement)
9. GENERALlNEW BUSINESS
A.
Acceptance of the 2006-2010 Capital Improvement Program (Art.- Finance Director's
memorandum, Resolution)
B. Approval of the 2006 Proposed Budget and Serting the Truth-in-Taxation Public Hearing
Dates (Art.- Finance Director's memorandum, 2 Resolutions)
C.
South Lake Minnetonka Police Department 2006 Interim Funding and Resolution
Proposal (Art. - Administrator's memorandum)
D. Request for Permanent No Parking Restrictions - Birch Bluff Road (Art. - Notice to
Residents, Petition, Draft Resolution)
10. ENGINEERINGIPUBLIC WORKS
A.
Accept Feasibility Report for the Interconnection of the SE Area Well and Amesbury
Well Systems, and Authorize Preparation of Plans Specifications and Engineers Estimate
(Art. - Public Works Director's memoranduIp., Resolution) "
11. STAFF AND COUNCIL REPORTS
A. Administrator & Staff
1. County Road 19 Intersection
B. Mayor & City Council
12. ADJOURN
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128. www.ci.shorewood.mn.us. cityhall@ci.shorewood.mn.us
Executive Summary
Shorewood City Council Regular Meeting
Monday, 12 September 2005
A work session will follow tonight's regular Council meeting.
. Councilmember Wellens may be absent from tonight's meeting.
Agenda Item #3A: Enclosed is the Verified Claims List for Council approval.
Agenda Item #3B: Staffing - no action required.
.
Agenda Item #3C: Shorewood Liquor is applying for a Temporary On-Sale Liquor License
for three of its Wine Club events to be held at the Southshore Center, 5735 Country Club
Road, on Wednesday, September 14, 2005; Wednesday, January 18, 2006; and
Wednesday, May 10, 2006. A separate Temporary Liquor License application is required
for each date. Three separate resolutions approving a Temporary Liquor License have
been prepared for Council approval.
.
Agenda Item #3D: Staff is recommending approval of a resolution that accepts the bids and
awards the contract to AM Striping Service Company in the amount of$9,888.98 for
the 2005 Pavement Marking and Radisson Road Improvement Projects.
Agenda Item #3E: Intercongregation Communities Association (lCA) has requested the City
consider a resolution proclaiming November 12-19 as Housing Awareness Week 2005.
This is a statewide campaign for save and affordable housing for all people. A resolution
is attached for Council approval.
Agenda Item #3F: Staff is recommending approval ofa motion that accepts the proposal
provided by American Engineering and Testing, Inc. for geotechnical engineering
services for the City Hall site, not to exceed $3,900.
Agenda Item #7 A: A report will be provided on the Park Commission meeting of August 23,
2005.
.
Agenda Item #8A: Pemsteiner and Associates has submitted a final plat for its Lake Virginia
Woods residential development. Staffhas recommended approval, subject to conditions
set forth in the Planning Director's memorandum, the consulting engineer's
memorandum, and the draft development agreement included herein.
#1l-
t~ PRINTED ON RECYCLED PAPER
Executive Summary - City Council Meeting of September 12, 2005
Page 2 of2
Agenda Item #9A: The 2006-2010 Capital Improvement Program (CIP) has been prepared for
approval by the City Council. It includes the changes as indicated by the Council at this
summer's budget work-sessions. Staff recommends that Council adopt the resolution
approving the 2006-2010 CIP.
Agenda Item #9B: The City Council is required to approve a proposed budget and tax levy by
September 15, according to Truth-In-Taxation laws. The enclosed 2006 Proposed
General Fund budget and tax levy has been prepared in accordance with City Council
recommendations. The Pay2006 proposed and levy is $4,247,395, and includes the
special levy necessary to pay for the public safety facilities. It also provides for transfers
to the capital improvement funds. The Council may change the property tax levy and
budget prior to final adoption of both in December.Staffrecommends that Council adopt
the resolutions that: (1) sets the proposed tax levy payable in 2006 (which may not be
exceeded); (2) approves the proposed 2006 budget; and (3) sets December 5, 2005, as the
date for the Truth-in- Taxation hearing.
Agenda Item # 9C: The city councils of Shorewood, Greenwood, and Tonka Bay approved,
by the August 31 deadline, the "final proposal" for SLMPD funding for 2006 and
resolution of issues that was endorsed by the SLMPD Coordinating Committee. On
August 29, the city council of Excelsior modified the final proposal and requested the
other city councils to approve Excelsior's version. On September 6, the Greenwood city
council decided to take no action on the last Excelsior proposal. Tonka Bay will consider
it on September 13. The Council should decide whether to approve or reject the last
Excelsior proposal and, if it chooses the latter, may wish to state it has already indicated
the final proposal it will support.
Agenda Item # 9D: The City has received a petition from numerous residents along Birch
Bluff Road, requesting permanent no parking restrictions for the north side of the street
between Grant Lorenz Road and Eureka Road. Planning and Engineering staff agree
with the arguments set forth in petition and recommend approval of a resolution
establishing the parking restriction. Per City policy, we have notified all property owners
of record along Birch Bluff Road of the impending discussion.
Agenda Item #10A: Included in the City Council packet is a feasibility report, prepared by
WSB and Associates, Inc., for consideration of the interconnection of the Southeast Area
and Amesbury Area water systems.
Staff is recommending that the feasibility report be accepted, and that plans and
specifications be prepared for the extension of a trunk main from the intersection of St.
Albans Bay with Excelsior Boulevard, along St. Albans Bay to Manor Road, and Manor
Road to Knightsbridge Road. (Known as Alternative 1B).
Staff feels that this alternative is the most cost-effective route, and also corresponds to the
City's Comprehensive Water Distribution Plan that was prepared in 1996.
.
.
.
.
.
.
.
.
.
.
CITY OF SHOREWOOD
CITY COUNCIL SPECIAL MEETING
MONDAY, AUGUST 22, 2005
5755 COUNTRY CLUB ROAD
CONFERENCE ROOM
6:30 P.M.
MINUTES
R
FT
1.
CONVENE SPECIAL CITY COUNCIL MEETING
Mayor Love called the meeting to order at 6:30 P.M.
A.
Roll Call
Present:
Mayor Love, Councilmembers Callies, Lizee, Turgeon, and Wellens; and Administrator
Dawson
Absent:
None
B. Review Agenda
Without objection from the Council, Mayor Love proceeded with the Agenda for the evening.
2. INTERVIEW CANDIDATES FOR CONSIDERATION OF APPOINTMENT TO THE
SHOREWOOD PARK COMMISSION
A.
6:30 P.M.
Robert Hensley, 28110 Woodside Road
Park Commission
B.
6:45 P.M.
Steven Loheit, 27915 Woodside Road
Park Commission
Council conducted with two candidates, Robert Hensley and Steven Loheit, for consideration of
appointment to the Shorewood Park Commission for a term of appointment from present date through
February 28, 2007, filling the term vacated in May 2005 by Mary Lou Meyer.
3. OTHER
No other business was presented this evening.
4. ADJOURN
Lizee moved, Turgeon seconded, Adjourning the Work Session Meeting of August 22, 2005, at 6:59
P.M. Motion passed 5/0.
RESPECTFULLY SUBMITTED,
Sally Keefe,
Recording Secretary
Woody Love, Mayor
ATTEST:
Craig W. Dawson, City Administrator/Clerk
1Jf\
"
.
.
.
.
.
CITY OF SHOREWOOD
CITY COUNCIL REGULAR MEETING
MONDAY, AUGUST 22, 2005
5755 COUNTRY CLUB ROAD
COUNCIL CHAMBERS
7:00 P.M.
MINUTES
RAFT
1.
CONVENE CITY COUNCIL MEETING
Mayor Love called the meeting to order at 7:05 P.M.
A.
Roll Call
Present:
Mayor Love, Councilmembers Callies, Lizee, Turgeon, and Wellens; Administrator
Dawson; Attorney Keane; Engineer Brown, Finance Director Burton, and Planning
Director Nielsen
Absent:
None
B. Review Agenda
Lizee moved, Wellens seconded, Approving the Agenda as presented. Motion passed 5/0.
2. APPROVAL OF MINUTES
A.
City Council Special Work Session Minutes, August 4,2005
Wellens moved, Turgeon seconded, Approving the City Council Special Work Session Meeting
Minutes for August 4, 2005. Motion passed 5/0.
B. City Council Regular Meeting Minutes, August 8, 2005
Turgeon moved, Wellens seconded, Approving the City Council Regular Meeting Minutes of
August 8, 2005. Motion passed 5/0.
3. CONSENT AGENDA
Lizee moved, Wellens seconded, Approving the Motions Contained on the Consent Agenda
and Adopting the Resolutions Therein:
A. Approval of the Verified Claims List
B. Staffing: Authorization to Hire a Senior Accounting Clerk
C. Adopting RESOLUTION NO. 05-073, "A Resolution Approving a Temporary
Gambling License for the Friends of the Southshore Center."
D.
Approve Extension of Conditional Use Permit for Gretchen Sebald, 20625 Garden
Road
E.
Authorization for Expenditure of Funds for two 800 MHz. Radios
* ~B
REGULAR CITY COUNCIL MEETING MINUTES
August 22, 2005
Page 2 of6
.
F. Sign Permit Request for Kay Marie & Carol's School of Dance, Shorewood Village
Shopping Center
Motion passed 5/0.
4. MATTERS FROM THE FLOOR
Dick Mueller, Excelsior resident, stated he was present this evening to provide comments to the Council
on some issues. Councilmember Wellens had written a recent letter-to-the-editor in an area newspaper.
Mueller explained the bandshell in Excelsior Commons had been painted with a flag in 1993 for aesthetic
reasons. He also provided information about comments made by Councilmember Wellens regarding
planning decisions made by the Excelsior Council that affected the tax base for that City. He shared
opinions regarding the South Lake Minnetonka Police Department budget and stated his belief that
Excelsior was being asked to contribute double in certain policing requireqments within the budget.
He thanked Council for allowing him the time to speak on this issue.
5. REPORTS AND PRESENTATIONS
.
None.
6. PUBLIC HEARING
~. .
7. PARKS
A. Report on Park Commission Meeting Held August 9, 2005
Engineer Brown reported on matters considered and actions taken at the Park Commission Meeting of
August 9,2005 (as detailed in the minutes of that meeting). He noted there would be a "Buckthorn Bust"
event slated for November 12, 2005, at Freeman Park to educate residents on buckthorn as well as work .
to eradicate the buckthorn from the Park. More information would be presented later on this event. Any
residents interested in attending should call City Hall for additional information.
Engineer Brown also explained the process the Park Commission had undergone regarding the Shirley
Rice Memorial to be placed at Manor Park. He briefly reviewed the plans and specifications for the
memorial, noting it would be completed by October 2005.
B. Acceptance of the Shirley Rice Memorial
Turgeon moved, Lizee seconded, Accepting the Plans and Specifications for the Shirley Rice
Memorial Garden as presented.
Mayor Love stated he was excited to see the memorial project come to fruition as Shirley Rice was a
friend, and he noted the plans seemed a fitting memorial to the family for a wonderful person.
Motion passed 5/0.
.
REGULAR CITY COUNCIL MEETING MINUTES
August 22, 2005
Page 3 of 6
. Councilmember Turgeon stated she would like the Council to discuss the subject of City trails and the
trail planning process at a Work Session meeting in the near future.
.
.
.
.
8. PLANNING
Director Nielsen explained there had not been a Planning Commission meeting since the most recent
Regular City Council Meeting; thus, there was nothing to report on at this time.
A. Variance to Build on a Substandard Lot
Applicant: Craig Buechler
Location: 5655 Eureka Road
Director Nielsen explained in January 2003 the City granted a variance to Craig Buechler to build a new
house on a substandard lot, located at 5655 Eureka Road. Mr. Buechler had not used the variance within
the required one-year deadline and the approval lapsed. He had now submitted a similar variance request
with slightly different house plans. Director Nielsen then reviewed the case, noting the issues and
analysis from the 2002 Staff report were still valid. He stated the recommendation from the previous
request included a condition that plans be modified to comply with the maximum impervious surface
requirement (33%). The new site plan complied with both setback and hardcover requirements for the R-
1 C district. Proposed hardcover was 32.7 percent. The only issue remaining for resolution was the
height of the structure. He explained the applicant's plan illustrated a three-story structure, 36.5 feet in
height, and the Code limited residential structures to 2.5 stories and 35 feet. As such, the building should
be adjusted to comply with the maximum requirements of the Zoning Code. Staff recommended that the
variance request be approved, subject to the applicant revising the plans to comply with height
requirements provided in the Zoning Code.
Craig Buechler, 5655 Eureka Road, stated he would be happy to answer any questions Council might
have of him.
Wellens moved, Lizee seconded, Adopting RESOLUTION NO. 05-074, "A Resolution Granting a
Conditional Use Permit and Lot Area Variance to Build on a Substandard Lot to Craig Buechler."
Motion passed 5/0.
9. GENERAL/NEW BUSINESS
A. Proposal Regarding SLMPD Interim Funding
Administrator Dawson explained at a Work Session meeting on August 4,2005, the City Council had
considered several proposals for interim funding of the South Lake Minnetonka Police Department for
2006. These points arose from a proposal by Greenwood Mayor Newman at a July 29 meeting of the
SLMPD Coordinating Committee, and subsequent modifications made to it by the Excelsior and
Greenwood City Councils in subsequent days.
Administrator Dawson then briefly reviewed the "Newman" proposal, a new Excelsior proposal,
highlighted changes between the two proposals, and also noted the status of Cities' actions on SLMPD
funding for 2006, as well as logistics associated with an amendment to the Joint Powers Agreement
(JPA) that currently governed all the cities comprising funding of the SLMPD.
REGULAR CITY COUNCIL MEETING MINUTES
August 22, 2005
Page 4 of 6
He noted this most recent proposal was endorsed by the SLMPD Coordinating Committee at its most
recent meeting with a vote of 3/1, with Excelsior representatives dissenting.
Mayor Love stated he had received a phone call from Mayor Newman of Greenwood on this subject in
recent days. He also stated he had looked at the draft of this proposal and believed it to be a good
simplification of issues, and he noted the proposal remained silent on the baseline funding issue;
however, he encouraged endorsement by this Council of the proposal.
Councilmember Callies questioned whether subsequent reiterations and changes would be allowed to this
proposal in the future by Excelsior. Administrator Dawson noted there was a special meeting slated for
the Excelsior City Council with interim funding on its agenda; however, he also stated the JP A dictated a
September 1,2005, deadline for setting funding levels.
Mayor Love stated he hoped all four cities would endorse funding levels presented; however, should only
three cities do so, he anticipated several courses of action would follow rapidly, with the situation being
resolved through legal action or with all four cities moving forward.together.
Turgeon moved, Callies seconded, Accepting the Newman proposal as presented. Motion passed
4/1, with Wellens dissenting.
Councilmember Wellens stated he had voted against the proposal because he did not see anything that
had changed substantially since the last vote on this subject.
B.
Park Commission Appointment
Administrator Dawson explained the Council had earlier held interviews with two candidates for an
opening on the Park Commission.
Callies moved, Wellens seconded, Adopting RESOLUTION NO. 05-075, "A Resolution Making
Park Commission Appointments, appointing Steven Loheit, 27915 Woodside Road, to a term to go
through February 27, 2007". Motion passed 5/0.
On behalf of the City, Mayor Love thanked all both residents for their interest in applying for this
position.
10. ENGlNEERING/PUBLIC WORKS
A. Accept Proposal and Award Contract for Dry Hydrant Relocation
Engineer Brown stated Michel Catain, 4550 Enchanted Point Road, had submitted a petition for local
improvement, in accordance with the Minnesota State Statute 429, requesting that the City perform an
engineering analysis and public works improvement project to relocate a dry hydrant that was located on
the subject parcel via a utility easement. Mr. Catain requested the hydrant be relocated outside the
current easement on his property. Council had undertaken the appropriate actions to proceed, and this
evening was being asked to accept a proposal and award a contract for such relocation.
.
.
.
.
Engineer Brown also explained that since Mr. Catain's legal representative had not yet had an
opportunity to review this proposal, nor had the desire of the applicant been confirmed with this proposal .
REGULAR CITY COUNCIL MEETING MINUTES
August 22, 2005
Page 5 of 6
. that would be at his expense, he was requesting that Council approve this action subject to approval by
the applicant.
Councilmember Turgeon questioned the process and responsibility of funding for this project. Engineer
Brown explained that process.
Wellens moved, Turgeon seconded, Accepting the Proposal and Awarding Contract for Dry
Hydrant Relocation, subject to applicant's and legal representative's approval, to G.F. Jedlicki,
Inc., in the amount of $47,960.00. Motion passed 5/0.
B. Update on the Right-of-Way Acquisition for County Road 19
Engineer Brown reported this update would be given as part of the update in Item 10C.
C. Update on Costs for County Road 19
.
Engineer Brown shared information regarding the costs incurred as part of the County Road 19
Intersection project to date. He noted the construction costs totaled approximately four million dollars
currently, and noted it was a daily challenge to ensure additional requests for costs were handled and
contained. As an example, he cited the recent issue created by a lack of removal of power poles by Xcel
Energy in a timely manner that the general contractor was identifying as an increase in project costs.
.
Councilmember Turgeon thanked Engineer Brown for providing this data, however, she requested
additional data be provided demonstrating the breakdown of costs incurred by the City on this County
project. Engineer Brown stated he would provide an amended tally to the Council at the next Regular
Council meeting.
11. STAFF AND COUNCIL REPORTS
A. Administrator & Staff
.
1.
County Road 19 Intersection
Engineer Brown thanked the Council for supporting efforts to remove the power poles as part of the
recent construction project challenges. He reported the power poles to be gone and noted many positive
reports had been received regarding the new "look" without them. He stated efforts would continue to
focus on roadway loading issues, as there was a great amount of work to be accomplished in the next
eight weeks.
B. Mayor & City Council
Mayor Love reported he would be attending the Excelsior Fire District Governing Board meeting on
Wednesday, August 24, 2005, at 7:00 P.M. at the West Side Station.
12. ADJOURN
.
Turgeon moved, Lizee seconded, Adjourning the Regular City Council Meeting of August 22, 2005,
at 7:44 P.M. Motion passed 5/0.
REGULAR CITY COUNCIL MEETING MINUTES
August 22, 2005
Page 6 of6
RESPECTFULLY SUBMITTED,
Sally Keefe,
Recording Secretary
.
Woody Love, Mayor
ATTEST:
Craig W. Dawson, City Administrator/Clerk
.
.
.
.
.
.
CITY OF SHOREWOOD
CITY COUNCIL WORK SESSION
MONDAY, AUGUST 22, 2005
5755 COUNTRY CLUB ROAD
COUNCIL CHAMBERS
8:00 PM or Immediately Following
Regular Council Meeting
NUNUTES
1. CONVENE CITY COUNCIL WORK SESSION
D
T
Mayor Love called the meeting to order at 7:55 P.M.
A.
Roll Call
Present:
Mayor Love, Councilmembers Callies, Lizee, Turgeon, and Wellens; Administrator
Dawson; Engineer Brown, Finance Director Burton, Planning Director Nielsen, and
Deputy Clerk Panchyshyn
Absent:
None
B. Review Agenda
Mayor Love reviewed the Agenda for the meeting. He requested Item 4, An Update on a Phone Call
Received, be added to the Agenda for the evening.
. Wellens moved, Lizee seconded, Approving the Agenda as amended. Motion passed 5/0.
2. DRAFT CAPITAL IMPROVEMENT PROGRAM (CIP) 2006-2010 BUDGET
.
.
Administrator Dawson explained the Capital Improvement Program (CIP) for Years 2006-2010 would be
discussed this evening. He then outlined the purpose, process, and suggestions for the CIP that the Staff
had undertaken in recent months.
Engineer Brown explained the CIP with regard to various projects as part of the Equipment Replacement,
Land Open Space Acquisition, Local Street Reconstruction, Municipal State Aid Streets, Municipal
Water System, Parks, Public Facilities/Office Equipment, Sanitary Sewer, and Stormwater Management
budgets.
Engineer Brown recommended the City began to reVIew and standardize the process for street
reconstruction projects.
After a brief discussion, Council indicated preference for removal of amounts toward certain projects in
the CIP from Park Foundation contributions.
Engineer Brown reviewed specific items for consideration as part of the CIP for the City parks. He noted
a "spotlight" should be kept on the Freeman Park Wetland Restoration Project in the CIP for future years.
Finance Director Burton reviewed the revenue sources for the CIP for Council.
Mayor Love thanked Staff for its efforts in collaboration for the CIP and noted they had done a wonderful
job of preparation and planning this report.
#<Rc,
CITY COUNCIL AGENDA
August 22, 2005
Page 2 of2
3. DRAFT 2006 GENERAL FUND OPERATING BUDGET
.
Administrator Dawson provided an overview of the draft of the proposed 2006 General Fund Operating
Budget. He noted recent actions by the State Legislature regarding levy limits, Market Value Homestead
Credit, the City's tax base, general trends in the budget preparation, and various highlights, including
salaries and insurance, transfers to the Capital Improvement Funds, Public Safety, Public
Works/Engineering, Municipal Facilities, Improvements to Document Retrieval System, other technology
improvements, and Park Programming.
Discussion ensued regarding various aspects of the 2006 General Fund Operating Budget.
With regard to the Public W orks/Engineering discussion, Councilmember Turgeon requested monies be
designated for training purposes on various operations for Staff prior to any installation of any bay and lift
being constructed in the Public Works facility. She also requested the staffing vacancy in the finance
department be reviewed to determine if the position could be dispersed into other positions for cost
saVIngs.
On behalf of the Council, Mayor Love thanked Staff for its insight, preparation, and planning for all .
future events.
4. AN UPDATE ON A PHONE CALL RECEIVED
Mayor Love stated he had received a phone call from former Justice Tim Gilbert who had been retained
by the Shorewood Yacht Club for mediation purposes with the City. Mayor Love stated he explained he
would recuse himself from all future discussions on this matter, and directed Mr. Gilbert to contact .
Administrator Dawson and Planning Director Nielsen for information needed in the future.
5. ADJOURN
Lizee moved, Turgeon seconded, Adjourning the Work Session Meeting of August 22, 2005, at 9:25
P.M. Motion passed 5/0.
RESPECTFULLY SUBMITTED,
Sally Keefe,
Recording Secretary
.
Woody Love, Mayor
ATTEST:
Craig W. Dawson, City Administrator/Clerk
.
.
PAY ABLES APPROVALS
For 9/12/05 Council Meeting
.
Approved by:
Craig
Date: (J'1 ~8 !o~
, ~
.
wson, City A ministrator
.
.
-:/I: ~B A-
.
.
.
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128. www.ci.shorewood.mn.us. cityhall@cLshorewood.mn.us
MEMORANDUM
.
DATE:
TO:
FROM:
CC:
September 8, 2005
Mayor and City Council
Jean Panchyshyn, Deputy Clerk ~~
Craig W. Dawson, City Administrator/Clerk
RE: MUNICIPAL LIQUOR STORE TEMPORARY LICENSE FOR WINE
TASTING EVENTS
The Shorewood Wine Club has several wine tasting events scheduled through May of 2006.
Pursuant to Minnesota Statute 340A.401, the State's Alcohol and Gambling Enforcement
Division requires Shorewood Liquor to have a Temporary Liquor License for events held at off-
site facilities that do not carry a liquor license.
.
Three of the wine-tasting events will be held at the Southshore Center at 5735 Country Club
Road. As the Southshore Center does not hold a liquor license, a Temporary License is needed
by Shorewood Liquor for the following wine tasting event dates:
Wednesday, September 14, 2005, 7:00 P.M. - 9:00 P.M.
Wednesday, January 18, 2006, 7:00 P.M. - 9:00 P.M.
Wednesday, May 10, 6:00 P.M. - 8:00 P.M.
Shorewood Liquor has completed the temporary liquor license applications for the three events
to be held at the Southshore Center. A copy of the license application and corresponding
resolution are attached.
COUNCIL ACTION
1)
2)
3)
Adoption of a Resolution Approving a Temporary On-Sale Liquor License to Shorewood
Liquor for September 14, 2005;
. Adoption of a Resolution Approving a Temporary On-Sale Liquor License to Shorewood
Liquor for January 18, 2006;
Adoption of a Resolution Approving a Temporary On-Sale Liquor License to Shorewood
Liquor for May 10, 2006.
n
~~ PRINTED ON RECYCLED PAPER
+/-- .';< /)
--It" ,J C....
"
Minnesota Department of Public Safety
ALCOHOL AND GAMBLING ENFORCEMENT DIVISION
444 Cedar Street Suite 133, St. Paul MN 55101-5133
(651) 215-6209 Fax (651) 297-5259 TTY (651) 282-6555
WWW.DPS.STATE.MN.US
.
.
APPLICATION AND PERMIT
FOR A 1 TO 4 DAY TEMPORARY ON-SALE LIQUOR LICENSE
TYPE OR PRlNT INFORMATION
NAME OF ORGANIZATION
~ ~1't..WCe L ~ . l.A.cr
STREET ADDRESS
;'~blo \~~
NAkfE OF PERSON MWNG A. LICA TIONj2 , '. -:1...
\J cr'\ ~\"u&.'\~d~'i txi\()le C::V(1el,
DATES LIQUOR WILL BE SOLD q - /4-- {)5
ORGANIZATION OFFICE~.. 'SS_N NAA1ME
t,-tC . S\Dr~, vViN
ORGANIZATION OFFICER'S NAME
DATE ORGANIZED
IQ5Co
CITY
'S l, or- et.J liJJ
BUSINESS PHONE
(4~~ Lt - b <6{, 1
TAX EXEMPT NUMBER
N/A
~
ZIP CODE
DRESS
51~~ CCJ1,urrtrc
ADDRESS S Df'i .
ORGANIZATION OFFICER'S NAME
ADDRESS
Location license will be used. If an outdoor area, describe
s ou\lshp~ c.&rt\fV\\J.I\J1 ~el';.."" Ce,,\ tr .
)
5135 COl.t-I1t-rV Club t<.c1
!;hv(l!-.UL1)Oc!/ r>~tJ55 33)
Will the applicant contract for intoxicating liquor service? If so, give the name and address of the liquor licensee providing the service.
f\ln
Will thl( applic~nt carry liquor liability insurance? If so, pI.ease provide the carrier's nam:: and amount of coverage. ,
':)-\ r ,<y\ '\ re..IltC!\er.s j:l S"'~j 1'.:'0 :~n I ",,,,v, ."'J IH~:III :.....I~~y
APROVAL
APPLICATION MUST BE APPROVED BY CITY OR COUNTY BEFORE SUBMITTING TO ALCOHOL & GAMBLING
ENFORCEMENT
CITY/COUNTY
DATE APPROVED
CITY FEE AMOUNT
'N/A
.
LICENSE DATES
DATE FEE PAID
SIGNATURE CITY CLERK OR COUNTY OFFICIAL APPROVED DIRECTOR ALCOHOL AJ"ID GAMBLING ENFORCEMENT
NOTE: Submit this form to the city or county 30 days prior to event. Forward application signed by city and/or county to the address .
above. If the application is approved the Alcohol and Gambling Enforcement Division will return this application to be used as the License for the event
PS-09079 (02/05)
.
.
.
.
.
CITY OF SHOREWOOD
RESOLUTION NO. 05-_
A RESOLUTION APPROVING A TEMPORARY ON-SALE LIQUOR LICENSE
WHEREAS, pursuant to Minnesota Statutes 340A.40 1, the Minnesota Department of
Public Safety, Alcohol and Gambling Enforcement Division requires an application and permit
for a temporary liquor license for Municipal Liquor wine-tasting events;
WHEREAS, said Department provides that an applicant shall complete an application
for a temporary on-sale liquor license for approval by the City;
WHEREAS, the applicant has satisfactorily completed an application for the issuance of
a temporary on-sale liquor license;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Shorewood as follows:
That a temporary on-sale liquor license be issued to Shorewood Liquor, for its wine
tasting event on September 14, 2005 from 7:00 P.M. to 9:00 P.M., at the Southshore
Center, 5735 Country Club Road.
ADOPTED by the City Council of the City of Shorewood this 12th day of September,
2005.
ATTEST:
Woody Love, Mayor
Craig W. Dawson, City Administrator/Clerk
Minnesota Department of Public Safety
ALCOHOL AND GAMBLING ENFORCEMENT DMSION
444 Cedar Street Suite 133, St. Paul-MN 55101-5133
(651) 215-6209 Fax (651) 297-5259 TTY (651) 282-6555
WWW.DPS.STATE.MN.US
.
APPLICATION AND PERMIT
FOR A 1 TO 4 DAY TEMPORARY ON-SALE LIQUOR LICENSE
DATE ORGANIZED
\Cl5to
TAX EXEMPT NUMBER
Nit
STATE ZIP CODE
r'\ rJ -55 ~ ~ \
S~PHONE 'ili.f"'3;).3~
(q,'1.) ~
M U-111 U Ct..! L-; -(,LG r
ORGANIZATION OFFICER'S NAME
C-l-M. of Sh()(.fi/,J-Dod
ORGANIZATION OFFICER'S NAME
RESS
5155 {!f9'Unff'l Cluh /.d, ShoreuftY1J! In
ADDRESS .E:53 3 }
ORGANIZATION OFFICER'S NAME
ADDRESS
Location license will be used. If an outdoor area, describe
S ou\lslo~ C'P\fV\V.I\J ~el\~..r' tel' tl 5135 CfJUyiffl Cf"Lh ~cl
0/r){5'(t~dl M S> 3 3 J
Will the applicant contract for intoxicating liquor service? If so, give the name and address of the liquor licensee providing the service.
~o . .
Will the appli~t carry: liquor liability insurance? Ifso, please provide the carrier's name and amount of coverage.
~\. rG1.u.\ \t~lI~l(r.s ji 5to~,NO $l."..u, .,~ bc."\:lv :....,l~,.y
APROV AL
APPLICATION MUST BE APPROVED BY CITY OR COUNTY BEFORE SUBMITTING TO ALCOHOL & GAMBLING
ENFORCEMENT
CITY/COUNTY
DATE APPROVED
CITY FEE AMOUNT
N/A
LICENSE DATES
DATE FEE PAID
SIGNATURE CITY CLERK OR COUNTY OFFICIAL APPROVED DIRECTOR ALCOHOL AND GAMBLING ENFORCEMENT
NOTE: Submit this form to the city or county 30 days prior to event. Forward application signed by city and/or county to the address .
above. If the application is approved the Alcohol and Gambling Enforcement Division will return this application to be used as the License for the event
PS-09079 (02fOS)
.
.
.
.
.
CITY OF SHOREWOOD
RESOLUTION NO. 05-_
A RESOLUTION APPROVING A TEMPORARY ON-SALE LIQUOR LICENSE
WHEREAS, pursuant to Minnesota Statutes 340A.40 1, the Minnesota Department of
Public Safety, Alcohol and Gambling Enforcement Division requires an application and permit
for a temporary liquor license for Municipal Liquor wine-tasting events;
WHEREAS, said Department provides that an applicant shall complete an application
for a temporary on-sale liquor license for approval by the City;
WHEREAS, the applicant has satisfactorily completed an application for the issuance of
a temporary on-sale liquor license;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Shorewood as follows:
That a temporary on-sale liquor license be issued to Shorewood Liquor, for its wine
tasting event on January 18, 2006 from 7:00 P.M. to 9:00 P.M., at the Southshore Center,
5735 Country Club Road.
ADOPTED by the City Council of the City of Shorewood this 12th day of September,
2005.
ATTEST:
Woody Love, Mayor
Craig W. Dawson, City Administrator/Clerk
Minnesota Department of Public Safety
ALCOHOL AND GAMBLING ENFORCEMENT DMSION
444 Cedar Street Suite 133, St. Paul:MN 55101-5133
(651) 215-6209 Fax (651) 297-5259 TTY (651) 282-6555
WWW.DPS.STATE.:MN.US
.
APPLICATION AND PERMIT
FOR A 1 TO 4 DAY TEMPORARY ON-SALE LIQUOR LICENSE
TYPE OR PRINT INFORMATION
NAME OF ORGANIZATION
S f) e..WCI2 L~' l.A.cC
STREET ADDRESS
~ ~ b 1 0 ,~ t.-> 1-
NAME OF PERSON MAjfING APPLICATION
\J 01'\ ~VS"'I\.<l~\j
DATES LIQUOR WILL BE SOLD 5 - . 0 -0 to
ORGANIZATION OFFICER'S NAME
C It D f ShDr tu:co&
ORGANIZATION OFFICER'S NAME
DATE ORGANIZED
\q5 ()
CITY
'Shorei.,JoJJ
BUSINESS PHONE
("'l~ ~ - (, <6b 1
F ORGANIZATION
TAXEXEMPT~BER
N/\
RESS
6156 LD /..,Ltf.f-y CJ K. b f({)({ J I S n Of e t,(J
ADDRESS m 5'53 I
ZIP CODE
USi
ORGANIZATION OFFICER'S NAME
ADDRESS
Location license will be used. If an outdoor area, describe
s ou\lslo~ c..&P\I"\IJ.I\J1 ~el\:..r c..el\\ 1(" " 5 735 COuntrv ~/IA. h 1\4
Sho(el),J-tJ-Od, YVlt0 5>331
Will the applicant contract for intoxicating liquor service? If so, give the name and address of the liquor licensee providing the service.
~ . .
{) .
Will th~ applic~t carry liquor liability insurance? If so, please provide the carrier's name and amount of coverage.
<5-\ \a.u.\ \ttlo..llfl\er"s J1 Stoi),no ~n,,,~!). mJ bc.~~lv :""I"4./"Y
APROV AL
APPLICATION MUST BE APPROVED BY CITY OR COUNTY BEFORE SUBMITTING TO ALCOHOL & GAMBLING
ENFORCEMENT
CITY/COUNTY
DATE APPROVED
CITY FEE AMOUNT
N/A
f
LICENSE DATES
DATE FEE PAID
SIGNATURE CITY CLERK OR COUNTY OFFICIAL APPROVED DIRECTOR ALCOHOL Ai'lD GAMBLING ENFORCEMENT
NOTE: Submit this form to the city or county 30 days prior to event. Forward application signed by city and/or county to the address .
above. If the application is approved the Alcohol and Gambling Enforcement Division will return this application to be used as the License for the event
PS-09079 (02105)
.
.
.
.
.
CITY OF SHOREWOOD
RESOLUTION NO. 05-_
A RESOLUTION APPROVING A TEMPORARY ON-SALE LIQUOR LICENSE
WHEREAS, pursuant to Minnesota Statutes 340A.401, the Minnesota Department of
Public Safety, Alcohol and Gambling Enforcement Division requires an application and permit
for a temporary liquor license for Municipal Liquor wine-tasting events;
WHEREAS, said Department provides that an applicant shall complete an application
for a temporary on-sale liquor license for approval by the City;
WHEREAS, the applicant has satisfactorily completed an application for the issuance of
a temporary on-sale liquor license;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Shorewood as follows:
That a temporary on-sale liquor license be issued to Shorewood Liquor, for its wine
tasting event on May 10, 2006 from 6:00 P.M. to 8:00 P.M., at the Southshore Center,
5735 Country Club Road.
ADOPTED by the City Council of the City of Shorewood this 12th day of September,
2005.
ATTEST:
Woody Love, Mayor
Craig W. Dawson, City Administrator/Clerk
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128. www.cLshorewood.mn.us. cityhall@cLshorewood.mn.us
MEMORANDUM
TO:
. FROM:
DATE:
RE:
.
Mayor and City Council
Craig Dawson, City Administrator
Larry Brown, Director of Public Works
September 8, 2005
A Resolution Accepting Bids and Awarding Contract for 2005 Pavement
Marking and Radisson Road Improvement Projects.
Attachment 1 is the Bid Tabulation for the 2005 Pavement Marking and Radisson Road
Improvement Projects. Bids were opened and tabulated on August 29,2005.
The low bidder is AAA Striping Service Company in the amount of$9,888.98, compared
to the engineer's estimate of$13,500.
.
Therefore, staff is recommending approval of the attached resolution that accepts the bids
and awards the contract to AAA Striping Service Company in the amount of$9,888.98.
A break down of the project bid is as follows:
Project No. 05-06 (2005 Signing and Striping)
Project No. 05-07 (Radisson Road Street Improvements)
$ 8,633.48
$ 1,255.50
A resolution is attached for the City Council's consideration.
.
tt= 3D
n
t.J PRINTED ON RECYCLED PAPER
City of Shorewood
Bid Tabulation
2005 Signing and Striping and Radisson Road Improvements
City Projects 05-06 and 05-07
.
Bids Opened: 3:00 P.M.
August 29, 2005
Engineer: WSB and Associates, Inc
Ji:nl~.\{:;llilill.I~!lliil[il\'i~llil~II.I.i.II!111111\~llilllll'illllliliilllillllllillll\illli!il!!i
1 AAA Striping Service Co.
2 Traffic Marking Services, Inc.
3
4
5
6
7
8
9
10
.11
12
13
14
15 En ineers Estimate
$
$
9,888.98
10,698.30
$
13,500.00
I hereby certify that this tabulation is a correct and
true representation of the bids received on this date
for this Improvement Project
G
~,
.. Larry Brown
City Engineer
1. e . os
Date
.---?
#/~
Steve Gurney,
WSB & Associates, Inc.
9/1/0')"
Date
.
Attachment # 1
.
.
.
.
.
.
CITY OF SHOREWOOD
RESOLUTION NO. 05-
-
A RESOLUTION ACCEPTING BID AND AWARDING CONTRACT FOR
2005 PAVEMENT MARKING AND
RADISSON ROAD SAFETY IMPROVEMENTS
WHEREAS, pursuant to an advertisement for bids for local improvements designated as
2005 Pavement Marking and Radisson Road Project, City Project Nos. 05-06 and 05-07, bids
were received, opened on August 29,2005 and tabulated according to law, and such tabulation is
attached hereto and made a part hereof as Exhibit A; and
WHEREAS, the City Council has determined that AAA Striping Service Co. is the
lowest bidder in compliance with the specifications.
NOW, THEREFORE, BE IT RESOLVED, by the City Council ofthe City of
Shorewood as follows:
1. That the Mayor and City Administrator/Clerk are hereby authorized and directed
to enter into a contract with AAA Striping Service Co., in the name of the City of Shorewood,
Project Nos. 05-06 and 05-07, according to the plans and specifications therefore approved by the
City Council on file in the office of the City Administrator/Clerk.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 12th
day of September 2005.
Woody Love, Mayor
ATTEST:
Craig W. Dawson, City Administrator/Clerk
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128' www.cLshorewood.mn.us' cityhall@cLshorewood.mn.us
MEMORANDUM
DATE:
September 6, 2005
.
TO:
Mayor and Council Members
Craig W. Dawson, City Administrator/Clerk ~
RE: A Resolution Proclaiming November 12-19 as Housing Awareness Week 2005
FROM:
.
Intercongregation Communities Association (ICA) has requested the City consider a resolution
proclaiming November 12-19 as Housing Awareness Week 2005. This is a statewide campaign
for safe and affordable housing for all people.
A draft resolution proclaiming November 12-19 as Housing Awareness Week 2005 is enclosed
for Council approval
.
.
#3E
,,11-
'..1 PRINTED ON RECYCLED PAPER
CITY OF SHOREWOOD
.
RESOLUTION NO. 05-
A RESOLUTION PROCLAIMING NOVEMBER 12-19, 2005
TO BE HOUSING AWARENESS WEEK 2005
WHEREAS, the lack of safe, decent, and affordable housing destabilizes the lives of
families and individuals, negatively impacts the health and school performance of children and
the health of elderly, and contributes to homlessness; and
WHEREAS, the Intercongregation Communities Association (lCA) provided
approximately 122 (a 3 7% increase) emergency housing assists in 2004 to prevent homelessness;
and
WHEREAS, Housing Awareness Week 2005 is a community initiative to raise awareness .
about local housing issues, to raise money to address housing needs, and to promote community
involvement and volunteerism. Congregations, service organizations, youth groups, community
residents, businesses, schools and civic organizations are participating in Housing Awareness
Week 2005; and
WHEREAS, public, private, and non-profit partnerships play an essential role in the
development and preservation of affordable housing; and .
WHEREAS, Housing Awareness Week 2005 coincides with National Hunger and
Homelessness Awareness Week 2005.
NOW, THEREFORE, BE IT RESOLVED that the Shorewood City Council does
hereby proclaim November 12-19,2005 to be Housing Awareness Week 2005, and encourages
all residents to participate in activities associated with Housing Awareness Week 2005. .
ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD, this
12th day of September, 2005.
WOODY LOVE, MAYOR
ATTEST:
CRAIG DAWSON, CITY ADMINISTRATOR/CLERK
.
.
.
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128' www.cLshorewood.mn.us' cityhall@cLshorewood.mn.us
MEMORANDUM
TO:
Mayor and City Council
Craig Dawson, City Administrator
FROM:
Larry Brown, Director of Public Works
.
DATE:
September 8, 2005
RE: Acceptance of Proposal- Professional Geotechnical Services - City Hall Site.
As part of the ongoing analysis to determine the viability of the existing City Hall basement structure,
and to explore the remainder of the site from a geotechnical and groundwater viewpoint, Staffhas
solicited a proposal from American Engineering and Testing, Inc.
Services requested are to include four geotechnical borings, document groundwater conditions, and
provide calculations and recommendations as to acceptable foundation.
Attachment 1 is the proposal provided by AET. Staffwas very pleased with the proposed contract
amount of $3,900. lf approved, this will be funded by the Public Facilities and Office Equipment fund
of the Capital Improvement Program.
.
Recommendation
Staff is recommending approval of a motion that accepts the proposal provided by American
Engineering and Testing, Inc. for geotechnical engineering services for the City Hall site.
1f3F
n
t.J PRINTED ON RECYCLED PAPER
I) AMERICAN
. ENGINEERING
TESTING, INC.
CONSULTANTS
. GEOTECHNICAL i
. MATERIALS i
. ENVIRONMENTA~
September 8. 2005
City of Shorewood
5755 Country Club Road
Shorewood. MN 55331
Attn: Larry Brown
I
I
I
I
I
Per your September 7 request, we are submitting this Letter Proposal for the following scope: i
I
Scqpe I
I
Fieldwork I
. Drill four standard penetration test borings at the site to depths of 21' . I
. Place temporary PVC casing (or hollow stem auger casing, depending on conditions) u1
the first three boreholes drilled to allow longer term. water level measuring during the
day of the fieldwork. Remove casing and backfill the holes prior to leaving the site.
. Clear underground public utilities through the Gopher State One System.
. Measure and document the boring locations and surface elevations.
Laboratory
. Conduct soil index testing ($160 budget).
Report
. Logs of test borings, including descriptions of drilling, test and classification methods. I
· Review of soil/groundwater conditions encountered and of pertinent soil properties. i
. Recommendations for possible foundation types, depths and allowable bearing capaci1:)1
(to be within assumed or given tolerable settlement levels); grading procedures to
prepare structural areas; suitability of on-site soils for re-use as fill; floor slab support"
estimate of modulus of subgrade reaction and moisture/vapor protection needs; building
backfilling with drainage comments and estimates of lateral earth pressures; pavement
subgrade preparation and estimated R-value; and pavement section thickness designs.
RE:
Proposal for Geotechnical Services
City Hall Site, Country Club Road & Echo Road, Shorewood
Dear Mr. Brown:
This document shall not be reproduced, except in full. without written approval of American Engineering Testing, Inc.
550 Cleveland Avenue North. St. Paul, MN 55114 .651-659-9001 . Fax 651-659-1379
Duluth. Mankato . Marshall. Rochester. Wausau . Rapid City. Pierre. Sioux Falls
AN Af'rIRMATIVE ACTION AND EOUAL OPPORTUNITY EMPLOYER
.
.
.
.
.
Attachment # 1
~
.
.
.
.
.
Larry Brown
September 8,2005
Page 2 of2
The scope of work defined in this proposal is intended for geotechnical purposes only, and not:
to explore for the presence or extent of environmental contamination at the site. However, we \;
will note obvious contamination encountered.
I
Fee I
Our services will be performed on a time-and-materials basis per the attached fee schedule. '
For the scope described, we will establish $3900 as a not-to-exceed fee. In the event the scope
of our work needs to be revised, we will review such scope adjustments and the associated fees
with you, and receive your approval before proceeding.
Schedule
Based on our current backlog, we anticipate being able to conduct the fieldwork within two :
weeks of authorization. The report should then follow the field work by about two weeks. I
Terms/Conditions
Our services will be performed per the "Contract Agreement Between the City of Shorewood
and American Engineering Testing, Inc. For Professional Services," dated September 13,;
1999.
Accejltance I
Please indicate your acceptance of this proposal by endorsing the enclosed copy and returning .
it to us. The original proposal is intended for your records.
Remarks
If you have questions or need additional information, please do not hesitate to contact me.
Sincerely,
1n~!i~
Vice President, Geotechnical Division
Phone #651-659-1305
Fax #651-659-1347
jvoyen@amengtest.com
PROPOSAL ACCEPTANCE BY:
Signature:
Printed Name:
Date:
Attachments :
2005 Geotechnical Fee Schedule
i
2005 GEOTECHNICAL FEE SbmD'lJLE
.
1. En~eerintzlTeclmical Personnel Rates 2. Diamond Bit - Metamorphic & Igneous
A. Word Processing Specialist SO.OO/hr a) B, NQ 17.00/foot
B. Drill Technician/Lab Technician 72.00/hr b) HQ 20.00lfoot
C. Senior Engineering Technician 77.00lhr
D. Engineering Assistant 86.001hr IV. Laboratory Tests of Soil
E. Engineer I1Geologist I 92.00/hr .Tests subcontracted to SET
F. Engineer WGeologist n lOS.OOIhr A. Water Content 13.00/test
G. Senior Engineer/Geologist 117.00lbr B. Dry Density (Includes water content) 4S.00/test
H. Principal Engineer/Geologist 141.001hr C. Atterberg Limits (ASTM:D4318)
1. Plasticity Index 96.00/test
n. Vebicle Mileal!e 2. Uquid Limit or Plastic Limit 70.00/test
A. Personal Automobileffruck O.SO/mile Separately
B. Auxiliary Truck O.68Jmile D. Shrinkage Limit (ASTM:D427) .
C. I-ton Truck with Drill Rig O.881mile E. Sieve Analysis (includes -#200) BO.oo/test
D. 1111-ton to 2'h-ton Truck with Drill Rig I.03/mile F. Hydrometer Analy.sis (sieve included) 220.oo/test
E. CPT Truck Rig (20-ton push capacity) 1.l4/mile G. Specific Gravity (ASTM:D8S4) .
F. Tractor/Lowboy Trailer US/mile H. Hand PenetrometerlTorvane 10.00/test
1. Unconf'med Compression 67.oo/test
m. Site ExPloration EquiDment Rental J. Consolidation - Primary Consolidation .
A. Drill Rig Rental Curve up to 32 tsf (ASTM:D243S) .
1. Rotary Drill on 4WD I-ton Truck 54.oolhr K. Direct Shear Test .
2. Rotary Drill on 2WD 1111 to 2~-ton Truck 63.00/hr L. Triaxial Compression Test .
3. Rotary Drill on All- Terrain Vehicle 93.oo/hr M. Pcnneablllty Tests .
4. Portable, Non-rotary Rig 63.00/hr N. Tests of Expansive Soils .
B. Auxiliary Vehiele Rental 13.SOIhr O. Electric Resistivity 7S.00/test
C. Cone (CPT) Rig/Equipment Rental P. Organic Content of Soli 68.00/test
1. CPT Truck Rig (20-ton push capacity) 114.001hr Q Topsoil Borrow Test (MnlDOT 3877) 3OO.00/test
2. All-Terrain Rig (10-ton push capacity) 93.001hr R. R-value (Hveem Stabllometer) 320.00/test
3. Electronic Cone or Piezocone w/Computer 33.001hr S. California Bearing Ratio
4. Soil Sampler 3.00/hr 1. Granular SSO.OO/test .
S. Water Sampler 2O.00lhr 2. Cohesive 620.00/test
D. Geotechnical Equipment Rental T Miscellaneous
1. Field Vane Shear 26O.00/da)' 1. nun-wall Samples (extrusion only) 2S.00/tube
2. Inclinometer Reading Equipment 270.00/day
3. Pneumatic Transducer Reading 13S.00/day V. EXDeDSeS
Equipment (pore pressure, settlement A. Direct Project Expenses: includes out-of- Cost + IS%
or earth pressure) town per diem; plowing & towing; special
4. Bore Hole Permeability materials & supplies; special travel.
a. Open End Casing Method 9S.00/day transponation & freight; subcontracted
b. HQ Wirellne Packer 26O.00/day services. and miscellaneous costs .
S. Borehole Pressuremeter 4S.00/hr B. Equipment Replacement (when abandonment Cost
6. Iowa Borehole Shear Tester 29S.00/day is more feasible than recovery)
7. Double Ring Infiltrometer 20S.00/day C. Equipment Recovery (when requirecl by Cost + 15%
8. OPS Mapping System Equipment 12.00/hr regulatory agencies or project specifications)
9. Pile Driving Analyzer (PDA) 620.00/day
10. Auxiliary PDA Equipment VI. Emert Witness Service Rates
a. Generator 37.00/day A. Litigation Preparation 183.oo/hr
b. Calibrated SPT Rod lSS.OO/day B. Deposition or Court Time 226.00lbr
E. Geotechnical Software Rental (4-hour minimum)
1. Finite Element (seepage or deformation) SS.OO/hr
2. CAPW AP 30.00lhr The rates Ilresented are ponal-to-ponal with vehicle mileage, expenses and
3. Wave Equation lS.00lhr equipment rentals being additional.
4. L-PI1e lS.00/hr
S. Slope Stability lS.00/hr Overtime for persolUlel charged at above cost plus 2S % for over 8 hours per
6. Stabilized Earth Slopes & Walls lS.OO/hr day or Saturday; and at above cost plus SO% for Sundays or Holidays.
F. Bit Wear Hazardous work charged at an additional2S%. Night time shift work will
1. Diamond Bit - Sedimentary Rock include a premium charge of $30.00 per person per shift.
a) B. NQ 10.oo/foot
b) HQ 12.00/foot
OlDPM021(01/OS)
i
AMERICAN ENGINEERING TE~G, INC.
.
I..
.
.
.
.
.
CITY OF SHOREWOOD
P ARK COMMISSION WORK SESSION
TUESDAY, AUGUST 23, 2005
5755 COUNTRY CLUB ROAD
CITY HALL
7:00 A.M.
MINUTES
1.
CONVENE PARK COMMISSION WORK SESSION
DRAfT
The Park Commission began its discussion at 7:06 a.m.
A. ROLL CALL
Present Chair Davis; Commissioners Famiok, Young, Westerlund, and late arrival Wagner; and City
Engineer Brown
Absent
Commissioner Moonen was absent
B.
REVIEW AGENDA
Item 2B Park Foundation report and 2C Shirley Rice Memorial Garden were added to the agenda.
2. MUSIC IN THE PARK
Farniok reported that there were approximately 100 people at the final Music in the Park series event.
While there were fewer numbers present, she indicated that the band was entertaining. Overall, she felt
there had been a nice variety of music over the summer.
Chair Davis commented that the arboretum had learned through experience that by appealing to younger
children and families, attendance increases. She questioned holding the June concert later in the month to
ensure more reliable weather next year. She also commented that she had a contact with someone in an
orchestra whose group performs show tunes and musical numbers.
The Commission agreed that expanding the children's programs would be a good idea.
While he agreed that appealing to youth and families by adding an additional kids program was a good
idea, Brown reminded the Commission of the huge draw Big Walter had earlier in the summer and
suggested the Commission focus on a high quality program list.
Proposed dates for 2006 included June 23, July 21, and August 18 for the adult concerts; June 14 and
July 19 for the kids series with the latter held at Freeman and Manor.
Young asked whether the arboretum had a traveling activities program that could be rotated to various
parks over the summer as an alternative to music. In addition, he encouraged Davis to pursue an
orchestral group for the adult series as an alternative for the more mature listener.
Brown noted that it might behoove the Commission to reserve Big Walter for a second year as an anchor
for the series, since it was so well attended and would provide continuity to the program next year. In
addition, the Commission could investigate other options such as blue grass, orchestral, etc. With regard
1f1A
PARK COMMISSION AGENDA
TUESDAY, AUGUST 23, 2005
PAGE 2 OF 2
to the children's concerts, Brown agreed that tailoring one concert to the preschool circuit and one to the
slightly older hands-on age group was an interesting concept.
Chair Davis asked Brown to determine whether the budget for 2006 would be the same as this year at
$2,000 or be increased to $3,000.
B. PARK FOUNDATION
With regard to a letter from the Park Foundation which addresses old debt, Chair Davis reported that
Foundation member Callies, on behalf of the Foundation, has asked the City to formally forgive the old
debt for Eddy Station in order to allow the Foundation to start its fundraising efforts with a clean slate.
Brown reported that the Foundation is made up of a different group of people than those who had made
the original commitment to donate $10,000 annually towards Eddy Station, and it is their desire that the
City allow them to move on. While the City Council forgave the debt in order to reconcile its accounts,
the Council hoped the Foundation might still try to satisfy the old debt and live up to its commitment.
Young commented that he could see where the enthusiasm of the current Foundation members might be
sapped trying to solicit funds for old debt. He stated that he would like to see the Foundation freed of this
debt and allowed to move forward in their fundraising efforts. He asked whether the Commission could
make a recommendation to the City Council that they take formal action to clear the slate.
Chair Davis stated that she got the feeling from the Foundation that they had learned their lesson from
that experience.
Brown stated that the Commission could make a motion at its next formal meeting. H explained that
there was a rather spirited discussion during the Council work session regarding drinking fountains and
the Foundation's commitment to participate. Callies urged the City to resist the temptation to plug in
numbers or specific dollar amounts with regard to the Foundations level of participation.
Chair Davis stated that the Foundation also requested that the Commission or City provide them with
information that they could use in their Apple Days booth in order to display what the City is working on
with regard to parks. She suggested a display be put together containing the Manor Park water quality
study, Freeman Park wetland enhancement project, and buckthorn recruitment for November. Young and
Wagner volunteered to serve an hour or more in the booth if necessary during the event. In addition, she
asked for volunteers to assist the Foundation with the Art Show in November, presumably early morning
set-up. Farniok and Davis volunteered to assist with the Art Show.
C. SHIRLEY RICE MEMORIAL GARDEN.
Brown reported that the City Council had voted to approve the memorial garden proposal. Farniok stated
that the garden club would move forward.
Chair Davis indicated that the Foundation had requested that either the Garden Club or City maintain the
plazas annual garden as well.
J
.
.
.
.
Farniok stated that the garden club is a small group of people who would probably not be able to
accommodate the request. She suggested the Foundation plant perennials in order to eliminate the need .
for ongoing maintenance.
.
~
.
.
.
.
.
PARK COMMISSION AGENDA
TUESDAY, AUGUST 23, 2005
PAGE30F2
Young suggested that the City or Foundation contact the nearby seniors and ask them if they'd be willing
to maintain the garden.
Chair Davis stated that she would contact the seniors, since she wished to discuss the buckthorn project
and other items with them.
3. ADJOURNMENT
The Commission adjourned their meeting at 7:55 a.m.
RESPECTFULLY SUBMITTED,
Kristi B. Anderson
Recording Secretary
~
.
CITY OF SHOREWOOD
PLANNING COMMISSION MEETING
TUESDAY, AUGUST 23, 2005
COUNCIL CHAMBERS
5755 COUNTRY CLUB ROAD
7:00 P.M.
MINUTES
CALL TO ORDER
Chair Bailey called the meeting to order at 7:02 P.M.
ROLL CALL
Present:
Chair Bailey; Commissioners Conley, Gagne, Gniffke, Meyer, and Woodruff; and Planning
Director Nielsen
Absent:
Commissioner White and Council Liaison Wellens
. APPROVAL OF MINUTES
· August 2, 2005
Gagne moved, Conley seconded, Approving the August 2, 2005, Planning Commission Meeting
Minutes as presented. Motion passed 6/0.
.
1.
DISCUSS SIGNAGE ISSUES
Director Nielsen explained that for several months he had sought to provide clarity regarding signage issues
within the City's ordinances as part ofthe Work Program for this year. He stated upon review he believed
the ordinances to be in need of slight revisions without significant overhaul. To that end, he explained, he
wanted to provide the Commission with a slide presentation regarding different aspects. of signage for
contemplation with additional discussions to follow at a later meeting. He stated the purpose of signage
was to provide identification of businesses and certain pieces of property. In addition, aesthetics played a
. role in signage and should work to prevent visual clutter.
Director Nielsen then reviewed 28 different photos and noted several components of signage within each
picture. Next, he reviewed the current City ordinances and proposed suggestions for change.
Discussion ensued regarding how best to enforce or regulate signage issues with businesses that would not
adhere to current sign ordinance regulations. Discussion also ensued regarding appropriate sizing of
signage for various buildings and structures.
The Commission indicated consensus for allowing administrative approval to prevail on temporary and
permanent sign permit requests rather than being routed through the City Council approval process.
Director Nielsen stated additional information would be presented and discussed on these topics at the
September 20, 2005, Study Session Meeting of the Planning Commission.
2. MATTERS FROM THE FLOOR
.
There were no matters from the floor presented this evening.
CITY OF SHOREWOOD PLANNING COMMISSION MEETING MINUTES
August 23, 2005
Page 2 of 2
4.
DRAFT NEXT MEETING AGENDA
Director Nielsen stated there were three public hearings regarding a Conditional Use Permit for Accessory
Space Over 1200 Square Feet, Rezoning from R-1A, Single-Family Residential to R-2A, Single or Two-
Family Residential, and Rezoning from C-3, General Commercial, to R-1C, Single-Family Residential, as
well as a request for Minor Subdivision and a Minor Subdivision/Combination slated for the September 6,
2005, Planning Commission Meeting Agenda.
5. REPORTS
. Liaison to Council
Director Nielsen reported on matters considered and actions taken at the August 22,2005, Regular City
Council Meeting (as detailed in the minutes of that meeting).
· SLUC
Director Nielsen announced the topic for the next meeting of the Sensible Land Use Coalition (SLUe)
would be "Ke/o v. New London, Conn.". Interested Commissioners were encouraged to submit registration
forms promptly.
· Other
There was no other business presented this evening.
7. ADJOURNMENT
Woodruff moved, Gagne seconded, Adjourning the Planning Commission Meeting of August 23,
2005, at 9:00 P.M. Motion passed 6/0.
RESPECTFULLY SUBMITTED.
Sally Keefe
Recording Secretary
~
.
.
.
.
.
.
.
:.nia Woods Final Plat
005
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOOD, MINNESOTA 55331-8927 · (952) 474-3236
FAX (952) 474-0128. www.ci.shorewood.mn.us . cityhall@ci.shorewood.mn.us
MEMORANDUM
TO: Mayor and City Council
FROM: Brad Nielsen
. DATE: 9 September 2005
RE: Lake Virginia Woods - Final Plat
FILE NO. 405(05.11)
.
.
Pernsteiner & Associates has submitted the final plat for Lake Virginia Woods, a
thirteen lot residential development at the west end of Smithtown Road. The plat is
consistent with the approved preliminary plat that was approved earlier this year.
Engineering comments are included under separate cover in a memorandum from
Steve Gurney, dated 6 September 2005. Recommendations from the Planning
Department are as follows:
1. The applicant's engineer must sign the plans and specification documents.
2. The applicant's landscape architect must provide and sign a final tree
reforestation plan.
3. The applicant must provide an up-to-date (within 30 days) title opinion or
title commitment for review by the City Attorney.
,4.
The applicant must provide a plan showing the location of wetland buffer
monuments and including legal description for a conservation easement.
n
to., PRINTED ON RECYCLED PAPER
:r/ r.? 4
Memorandum
Re: Lake Virginia Woods Final Plat
9 September 2005
.
5. The applicant must provide a deed for the wetland buffer conservation
easement.
6. The applicant must provide protective covenants for the property that include
the wetland restrictions set forth in the development agreement.
As of this writing, the proposed development agreement does not contain a provision
relative to water charges. This will be provided at the Council meeting Monday night.
Cc:
Craig Dawson
Tim Keane
Larry Brown
Terry Pernsteiner
.
.
.
.
.
.
.
.
.
CITY OF SHOREWOOD
RESOLUTION NO.
A RESOLUTION APPROVING THE FINAL PLAT OF
LAKE VIRGINIA WOODS
WHEREAS, the final plat of Lake Virginia Woods has been submitted in the manner
required for the platting of land under the Shorewood City Code and under Chapter 462 of
Minnesota Statutes, and all proceedings have been duly had thereunder; and
WHEREAS, said plat is consistent with the Shorewood Comprehensive Plan and the
regulations and requirements of the laws of the State of Minnesota and the City Code of the City
of Shorewood.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Shorewood as follows:
1.
The plat of Lake Virginia Woods is hereby approved.
2. The approval is specifically conditioned upon the Developer recording the
Development Agreement attached hereto and made a part hereof as Attachment 1.
3.
The Mayor and City Administrator/Clerk are authorized to execute the Certificate
of Approval for the plat on behalf of the City Council.
4.
The final plat, together with this resolution, and the Development Agreement
shown as Attachment I shall be recorded within sixty (60) days ofthe date of
certification of this Resolution.
BE IT FURTHER RESOLVED, that the execution of the Certificate upon said plat by
the Mayor and City Administrator/Clerk shall be conclusive, showing a proper compliance
therewith by the subdivider and City officials and shall entitle such plat to be placed on record
forthwith without further formality, all in compliance with Minnesota Statutes and the
Shorewood City Code.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 12th day of
September 2005.
WOODY LOVE, MAYOR
ATTEST:
CRAIG W. DAWSON, CITY ADMINISTRATOR/CLERK
-D-R-A-F-T-
CITY OF SHOREWOOD
DEVELOPMENT AGREEMENT
LAKE VIRGINIA WOODS
THIS AGREEMENT, made this day of , 2005, by and
between the CITY OF SHOREWOOD, a Minnesota municipal corporation, hereinafter
referred to as the "City", andPemsteiner & Associates, a Minnesota Corporation, hereinafter
referred to as the "Developer".
WHEREAS, the Developer has an interest in certain lands legally described in Exhibit
A, attached hereto and made a part hereof, which lands are hereinafter referred to as the
"Subject Property"; and
WHEREAS, Developer proposes to develop the Subject Property into thirteen (13)
single-family residential lots; and
WHEREAS, the Developer has made application for a preliminary plat for the
property with the Zoning Administrator, which preliminary plat was considered by the
Planning Commission at their meeting held on 7 June 2005, and at a meeting of the City
Council on 25 July 2005; and
WHEREAS upon recommendation of the Planning Commission, the City Council did
consider and grant preliminary plat approval; and
WHEREAS, the Developer has filed with the City the Final Plat for "Lake Virginia
Woods", a copy of which plat is attached hereto and made a part hereof as Exhibit B;
NOW, THEREFORE, in consideration of the mutual covenants and guarantees
contained herein, the parties hereto agree as follows:
1) Conditions of Approval - The Developer shall comply with the conditions of
approval as set forth in Shorewood Resolution No. 05-066, attached hereto as Exhibit C. In
addition, development of the property is subject to the requirements of the R-IA/S, Single-
Family ResidentiallShoreland zoning district.
(01) Minimum setbacks (for all structures) shall be as follows:
(a) Front:
(b) Rear:
(c) Side minimum/total:
(d) Side yard abutting a street:
(e) Wetland buffer/Setback:
50 feet
50 feet
10/30 feet
50 feet
35/15 feet
.
.
.
.
.
1
Attachment I
.
.
.
.
.
(02) Maximum building height, as defined by the Shorewood Zoning Code, shall be
two and one-half stories or 35 feet, whichever is less.
(03) The Developer shall comply with the requirements of Shore wood's wetland
code (Chapter 1102) and the Wetlands Conservation Act of 1991 [Minn. Stat. 103
G.221 et. seq. (hereinafter referred to as the WCA)]. It is the intent of this agreement
that areas adjacent to wetlands be maintained in their natural state.
(a) A minimum 35-foot buffer strip shall be maintained adjacent to all
wetlands.
(b) Natural vegetation shall be maintained in wetland buffer strips. Where
disturbed by site development, wetland buffer strips shall be restored with
natural vegetation.
(c) Wetland buffer strips shall be identified within each lot by permanent
monumentation approved by the City. The Developer shall provide to the City
a map showing the location of proposed wetland monuments and a
conservation easement over the wetland buffer area.
(d) A monument is required at each lot line where it crosses a wetland
buffer strip and as necessary to establish required setbacks from the wetland
buffer strip. Monuments shall be placed within 60 days of completion of site
grading or prior to issuance of a building permit, whichever occurs first.
(e) The Developer shall record with the Hennepin County Recorder or
Registrar of Titles, a notice of the wetland buffer requirement against the title
of each lot with a required wetland buffer strip.
(f) No structures, including, but not limited to, decks, docks, patios, and
play equipment may be located in the wetland buffer strip or the required
wetland setback area, except that fences shall be allowed within the wetland
setback area.
(g) No artificial obstructions, including, but not limited to, decks, docks,
patios, and play equipment may be located within the wetland area. No cutting
of wetland vegetation or dredging shall be allowed within the wetland area.
2.) Improvements Installed by Developer - Developer agrees at its expense to
construct, install and perform all work and furnish all materials and equipment in connection
with the installation ofthe following improvements:
(01) All site grading including building pad correction where needed;
(02) Street grading, stabilizing and bituminous surfacing;
(03) Surmountable concrete curb and gutter;
(04) Sanitary sewer;
(05) Water main laterals or extensions, including all necessary building services,
hydrants, valves and other appurtenances;
2
(06) Storm sewer and surface water drainage facilities;
(07) Street name signs and traffic control signs;
(08) Required tree preservation, reforestation and landscaping;
consistent with the plans and specification prepared by Otto Associates, dated 19 August
2005 , and received and approved by the City Engineer.
It is understood that underground utility lines, including gas, electric, telephone, and television
cable shall be installed by the respective private utility companies pursuant to separate
agreements with the Developer.
3.) Final Plat. Grading. Drainage and Utility Plan. Building Plan - The Developer
has filed with the City Clerk the final plat titled Lake Virginia Woods for the development of
the Subject Property. Said plat is attached hereto and made a part hereof as Exhibit B. Said
final plat, together with the grading, drainage, and utility plans, referenced in paragraph 2
above and this Development Agreement, is herewith adopted and approved by the City.
4.) Pre-construction Meeting - Prior to the commencement of construction,
Developer or its engineer shall arrange for a pre-construction meeting to be held at Shorewood
City Hall. Such meeting shall be coordinated with the City Engineer and shall include all
appropriate parties specified by the City Engineer.
5.) Standards of Construction - Developer agrees that all of the improvements set
forth in paragraph 2 above shall be constructed and installed in accordance with engineering
plans and specifications approved by the City Engineer and the requirements of applicable
City ordinances and standards, and that all of said work shall be subject to final inspection and
approval by the City Engineer.
6.) Materials and Labor - All of the materials to be employed in the making of said
improvements and all of the work performed in connection therewith shall be of uniformly
good and workmanlike quality, shall equal or exceed the quantities and qualities required by
the approved plans and specifications, and shall be subject to inspection and approval of the
City, which approval shall not be unreasonably withheld if the materials and work are
consistent with the plans and specifications and the standards set forth herein. In case any
materials or labor supplied shall be rejected by the City as defective or unsuitable, then such
rejected materials shall be removed and replaced with approved materials, and rejected labor
shall be done anew to the reasonable satisfaction and approval of the City at the cost and
expense of Developer.
7.) Schedule of Work - The Developer shall submit a written schedule in the form
of a bar chart indicating the proposed progress schedule and order of completion of work
covered by this Agreement. It is understood and agreed that the work set forth in paragraph 2,
except the final lift of asphalt, shall be performed to be completed by 1 November 2006. The
final lift of asphalt shall be completed by 1 July 2007. Upon receipt of written notice from the
Developer of the existence of causes over which the Developer has no control, that will delay
3
.
.
.
.
.
.
.
.
.
.
the completion ofthe work, the City, at its discretion, may extend the dates specified for
completion.
8.) As-Built Plan - Within sixty (60) days after the completion of construction of
the Improvements, Developer shall cause its engineer to prepare and file with the City a full
set of "as-built" plans, including a mylar original and four (4) black line prints, showing the
installation of the Improvements within the plat. Failure to file said "as-built" plans within
said sixty (60) day period shall suspend the issuance of building permits and certificates of
occupancy for any further construction within the plat until the documents called for herein
are filed.
9.) Easements - Developer, at its expense, shall acquire all easements from
abutting property owners necessary to the installation of the sanitary sewer, water main, storm
sewer, and surface water drainage facilities within the plat, if and to the extent required by the
Minnehaha Creek Watershed District, and thereafter promptly assign said easements to the
City.
10.) Pre-existing Drain Tile - All pre-existing drain tile disturbed by Developer
during construction shall be restored by Developer.
11.) Staking. Surveying and Inspection - It is agreed that the Developer, through its
engineer, shall provide for all staking and surveying for the above-described improvements
and delineation of the wetland buffer areas. In order to ensure that the completed
improvements conform to the approved plans and specifications, the City will provide for
resident inspection as determined necessary by the City Engineer.
12.) Grading. Drainage. and Erosion Control- Developer, at its expense, shall
provide grading, drainage and erosion control plans to be reviewed and approved by the City
Engineer. Said plans shall provide for temporary dams, earthwork or such other devices and
practices, including seeding of graded areas, as reasonably necessary, to prevent the washing,
flooding, sedimentation and erosion of lands and streets within and outside the plat during all
phases of construction. Developer shall keep all streets within, and adjacent to, the plat free
of all dirt and debris resulting from construction therein by the Developer, its agents or
aSSIgnees.
13.) Street Signs - Developer, at its expense, shall provide standard city street
identification signs and traffic control signs in accordance with the Minnesota Manual on
Uniform Traffic Control Devices, as directed by the City Engineer.
14.) Access to Residences - Developer shall provide reasonable access, including
temporary grading and graveling, to all residences affected by construction until the streets are
accepted by the City.
15.) Occupancy Permits - The City shall not issue a certificate of occupancy until
all Improvements set forth in paragraph 2, except the final lift of asphalt, are completed and
approved by the City Engineer.
4
16.) Final Inspection - At the written request of the Developer, and upon
completion ofthe Improvements set forth in paragraph 2 above, the City Engineer, the
contractor, and the Developer's engineer will make a final inspection ofthe work. When the
City Engineer is satisfied that all work is completed in accordance with the approved plans
and specifications, and the Developer's engineer has submitted a written statement attesting to
same, the City Engineer shall recommend that the improvements be accepted by the City.
.
17.) Conveyance of Improvements - Upon completion of the installation by
Developer and approval by the City Engineer of the improvements set forth in paragraph 2
above, the Developer shall convey said improvements to the City free of all liens and
encumbrances and with warranty oftitle, which shall include copies of all lien waivers.
Should the Developer fail to so convey said improvements, the same shall become the
property of the City without further notice or action on the part of either party hereto, other
than acceptance by the City.
18.) Replacement - All work and materials performed and furnished hereunder by
the Developer, its agents and subcontractors, found by the City to be defective within one year .
after acceptance by the City, shall be replaced by Developer at Developer's sole expense.
Within a period of thirty (30) days prior to the expiration of the said one-year period,
Developer shall perform a televised inspection of all sanitary sewer lines within the plat and
provide the City with a VHS videotape thereof.
19.) Restoration of Streets. Public Facilities and Private Properties - The Developer
shall restore all City streets and other public facilities and any private properties disturbed or .
damaged as a result of Developer's construction activities, including sod with necessary black
dirt, bituminous replacement, curb replacement, and all other items disturbed during
construction.
20.) Reimbursement of Costs - The Developer shall reimburse the City for all costs,
including reasonable engineering, legal, planning and administrative expenses incurred by the
City in connection with all matters relating to the administration and enforcement of the .
within Agreement and the performance thereof by the Developer. Such reimbursement of
costs shall be made within thirty (30) days of the date of mailing ofthe City's notice of costs
to the address set forth in paragraph 28 below.
21.) Claims for Work - The Developer or its contractor shall do no work or furnish
no materials not covered by the plans and specifications and special conditions of this
Agreement, for which reimbursement is expected from the City, unless such work is first
ordered in writing by the City Engineer as provided in the specifications. Any such work or
materials which may be done or furnished by the contractor without such written order first
being obtained shall be at its own risk, cost and expense.
22.) Surety for Improvements - Deposit or Letter of Credit - For the purpose of
assuring and guaranteeing to the City that the improvements to be constructed, installed and
furnished by the Developer as set forth in paragraph 2 above, shall be constructed, installed
and furnished according to the terms of this Agreement, and to ensure that the Developer
submit to the City as-built plans as required in paragraph 8 and that the Developer pay all
.
5
.
.
.
.
.
claims for work done and materials and supplies furnished for the performance of this
Agreement, the Developer agrees to furnish to the City either a cash deposit or an irrevocable
letter of credit approved by the City in an amount equal to 150% of the total cost of said
Improvements estimated by the Developer's engineer and approved by the City Engineer.
Said deposit or letter of credit shall remain in effect for a period of one year following the
completion of the required improvements. The deposit or letter of credit may be reduced in
amount at the discretion of the City upon approval by the City of the partially completed
Improvements, but in no event shall the deposit or letter of credit be reduced to an amount less
than 125% of the cost of the remaining Improvements. At such time as the Improvements
have been approved by the City, such deposit or letter of credit may be replaced by a
maintenance bond. Any letter of credit shall contain language stating that the Developer's
lender shall, 30 days prior to the expiration ofthe letter of credit, notify the City by certified
mail that the letter of credit will not be renewed.
23.) Insurance - The Developer shall take out and maintain public liability and
property damage insurance covering personal injury, including death, and claims for property
damage which may arise out of the Developer's work or the work of their subcontractors, or
by one directly or indirectly employed by any of them. This insurance policy shall be a single
limit public liability insurance policy in the amount of $2,000,000.00 and shall remain in
effect until the improvements set forth in paragraph 2 have been accepted by the City. The
City shall be named as additional insured on said policy and the Developer shall file a copy of
the insurance coverage with the City.
Prior to commencement of construction of the Improvements described in paragraph 2 above,
the Developer shall file with the City a certificate of such insurance as will protect the
Developer, his contractors and subcontractors from claims arising under the workers'
compensation laws of the State of Minnesota. The insurance coverage required hereby may
be supplied by the Developer's contractors and subcontractors, thereby satisfying the
requirements of this section.
24.) Laws. Ordinances. Regulations and Permits - Developer shall comply with all
laws, ordinances, and regulations of all regulatory bodies having jurisdiction of the Subj ect
Property and shall secure all permits that may be required by the City of Shorewood, the State
of Minnesota, the Minnehaha Creek Watershed District, and the Metropolitan Council
Environmental Services before commencing development of the plat.
25.) Local Sanitary Sewer Access Charges (LSSAC) - Developer shall, prior to
release ofthe final plat by the City, make a cash payment to the City in the sum of $15,600
($1200 for each lot) as local sanitary sewer access charges.
26.) Park Fund Payment - Developer shall, prior to release of the final plat by the
City, make a cash payment to the City in the sum of $26,000 ($2000 for each lot) for the Park
Fund.
27.) Tree Preservation Measures - The City has adopted a Tree Preservation Policy
("Policy") which has been incorporated into the City Code. In addition to the Policy, the
6
Developer has prepared and the City has reviewed a detailed tree preservation plan prepared
by , dated , 2005 ("Plan"). .
The Developer agrees that the tree preservation measures provided for in the Policy and in the
Plan are the responsibility ofthe Developer, and that the Developer shall also be responsible
for any acts of its subcontractors or agents which are in violation of either the Policy or the
Plan.
As partial security for its obligation under this paragraph 27, the Developer agrees that prior to
the issuance of each building permit, it will provide for two thousand dollars ($2000) in cash
or letter of credit per lot to be deposited with the City as security for such obligation.
28.) Notices - All notices, certificates and other communications hereunder shall be
sufficiently given and shall be deemed given when mailed by certified mail, return receipt
requested, postage prepaid, with proper address as indicated below. The City and the
Developer by written notice given by one to the other, may designate any address or addresses
to which notices, certificates or other communications to them shall be sent when required as .
contemplated by this Agreement. Unless otherwise provided by the respective parties, all
notices, certificates and communications to each ofthem shall be addressed as follows:
To the City:
Zoning Administrator
CITY OF SHOREWOOD
5755 Country Club Road
Shorewood, Minnesota 55331
.
With a Copy to:
Shorewood City Attorney
c/o Leonard Street & Deinard
150 South Fifth Street, Suite 2300
Minneapolis, MN 55345
To the Developer:
Terry Pernsteiner,
Pernsteiner & Associates
11022 Tanglewood Lane, LLC
Champlin, MN 55316
.
29.) Proof of Title - Developer shall furnish a title opinion or title insurance
commitment addressed to the City guaranteeing that Developer is the fee owner or has a legal
right to become fee owner of the Subject Property upon exercise of certain rights and to enter
upon the same for the purpose of developing the property. Developer agrees that in the event
Developer's ownership in the property should change in any fashion, except for the normal
process of marketing lots, prior to the completion of the project and the fulfillment of the
requirements of this Agreement, Developer shall forthwith notify the City of such change in
ownership. Developer further agrees that all dedicated streets and utility easements provided
to City shall be free and clear of all liens and encumbrances.
30.) Indemnification - The Developer shall hold the City harmless from and
indemnify the City against any and all liability, damage, loss, and expenses, including but not
.
7
.
.
.
.
.
limited to reasonable attorneys' fees, arising from or out of the Developer's performance and
observance of any obligations, agreements, or covenants under this Agreement. It is further
understood and agreed that the City, the City Council, and the agents and employees of the
City shall not be personally liable or responsible in any manner to the Developer, the
Developer's contractors or subcontractors, materialmen, laborers, or any other person, firm or
corporation whomsoever, for any debt, claim, demand, damages, actions or causes of action of
any kind or character arising out of or by reason of the execution of this Agreement or the
performance and completion of the work and Improvements hereunder.
31.) Declaration of Covenants. Conditions and Restrictions - Developer shall
provide a copy of the Declaration of Covenants, Conditions and Restrictions, which
Declaration shall include the City as a signatory thereto, for review and approval by the City
prior to recording.
32.) Remedies Upon Default -
(01) Assessments. In the event the Developer shall default in the performance of
any of the covenants and agreements herein contained and such default shall not have
been cured within thirty (30) days after receipt by the Developer of written notice
thereof, the City may cause any ofthe improvements described in paragraph 2 above to
be constructed and installed or may take action to cure such other default and may
cause the entire cost thereof, including all reasonable engineering, legal and
administrative expense incurred by the City to be recovered as a special assessment
under Minnesota Statutes Chapter 429, in which case the Developer agrees to pay the
entire amount of such assessment within thirty (30) days after its adoption. Developer
further agrees that in the event of its failure to pay in full any such special assessment
within the time prescribed herein, the City shall have a specific lien on all of
Developer's real property within the Subject Property for any amount so unpaid, and
the City shall have the right to foreclose said lien in the manner prescribed for the
foreclosure of mechanic's liens under the laws of the State of Minnesota. In the event
of an emergency, as determined by the City Engineer, the notice requirements to the
Developer prescribed by Minnesota Statutes Chapter 429 shall be and hereby are
waived in their entirety, and the Developer shall reimburse the City for any expense
reasonably incurred by the City in remedying the conditions creating the emergency.
(02) Performance Guarantv. In addition to the foregoing, after notice and failure to
cure, the City may also institute legal action against the Developer or utilize any cash
deposit made or letter of credit delivered hereunder, to collect, pay, or reimburse the
City for:
(a) The cost of completing the construction of the improvements described
in paragraph 2 above.
(b)
The cost of curing any other default by the Developer in the
performance of any ofthe covenants and agreements contained herein.
8
(c)
The cost of reasonable engineering, legal and administrative expenses
incurred by the City in enforcing and administering this Agreement.
.
(03) Additional Remedies. Notwithstanding any other remedy available to the City
under this Agreement, the City may elect to proceed under this paragraph to remedy a
violation of Developer' s obligations under paragraph 27 hereof.
(a) Upon discovery of an apparent violation of the Plan or Policy, the City
will notify the Developer in writing of the violation. The notice will
contain a description ofthe circumstances constituting the violation, the
provision of the Policy or Plan which is apparently violated, the steps
which must be taken to correct the violation and the date by which the
compliance must occur.
(b)
If compliance has not occurred within such time, or if the violation, by
virtue of its repeated nature, seriousness or other factors are such that a
penalty may be appropriate, the matter will be scheduled for a hearing
by the City Council at a meeting not sooner than ten (10) days
following the date on which written notice is mailed to the Developer.
.
(c)
Following the hearing, the Council shall render its decisiop. in writing.
If the Council determines that the Plan or Policy has been violated,
(whether or not the violation has been corrected) it may take some or all
ofthe following actions:
.
(i) impose a monetary penalty of not more than $1000 for each
violation.
(ii) order that the Developer stop work on all construction for which
building permits have been issued; and withhold the issuance of
additional building permits until it has received assurances satisfactory .
to the City that no future violations of the Plan or Policy are likely to
occur.
(iii) take any other actions or enforce any other remedies available to it
under this Agreement, the Policy or the City Code.
(03) Legal Proceedings. In addition to the foregoing, the City may institute any
proper action or proceeding at law or at equity to abate violations of this Agreement,
or to prevent use or occupancy of the proposed dwellings.
33.) Headings - Headings at the beginning of paragraphs hereof are for convenience
of reference, shall not be considered a part of the text of this Agreement, and shall not
influence its construction.
34.) Severability - In the event any provisions of this Agreement shall be held
invalid, illegal, or unenforceable by any court of competent jurisdiction, such holding shall not
.
9
.
.
.
.
.
invalidate or render unenforceable any other provision hereof, and the remaining provisions
shall not in any way be affected or impaired thereby.
35.) Execution of Counterparts - This Agreement may be simultaneously executed
in several counterparts, each of which shall be an original, and all of which shall constitute but
one and the same instrument.
36.) Construction - This Agreement shall be construed in accordance with the laws
of the State of Minnesota.
37.) Successors and Assigns - It is agreed by and between the parties hereto that the
Agreement herein contained shall be binding upon and inure to the benefit of their respective
legal representatives, successors, and assigns.
IN WITNESS WHEREOF, the parties hereto have caused these presents to be
executed on the day and year first above written.
DEVELOPER
CITY OF SHOREWOOD
By:
Its:
By:
Its: Mayor
ATTEST:
City Administrator/Clerk
10
STATE OF MINNESOTA
ss.
COUNTY OF HENNEPIN
On this day of , 2005, before me, a Notary Public within
and for said County, personally appeared Woody Love and Craig W. Dawson to me personally
known, who, being each by me duly sworn, did say that they are respectively the Mayor and
City Administrator/Clerk of the municipal corporation named in the foregoing instrument, and
that said instrument was signed and sealed on behalf of said corporation by authority of its
City Council, and said Mayor and City Administrator/Clerk acknowledged said instrument to
be the free act and deed of said corporation.
Notary Public
STATE OF MINNESOTA
ss.
COUNTY OF HENNEPIN
The foregoing instrument was acknowledged before me this day of
,2005, by Terry Pernsteiner, , Pernsteiner & Associates.
Notary Public
THIS INSTRUMENT WAS DRAFTED BY:
Shorewood Planning Department
REVIEWED BY:
Leonard Street and Dienard
150 South Fifth Street, Suite 2300
Minneapolis, MN 55402
(TJK)
11
.
.
.
.
.
.
.
.
.
.
(insert Existing Legal Description - Exhibit A)
12
CITY OF SHOREWOOD
RESOLUTION NO.
A RESOLUTION APPROVING THE FINAL PLAT OF
LAKE VIRGINIA WOODS
.
WHEREAS, the final plat of Lake Virginia Woods has been submitted in the manner
required for the platting of land under the Shorewood City Code and under Chapter 462 of
Minnesota Statutes, and all proceedings have been duly had thereunder; and
WHEREAS, said plat is consistent with the Shorewood Comprehensive Plan and the
regulations and requirements of the laws ofthe State of Minnesota and the City Code of the City
of Shorewood.
NOW, THEREFORE, BE IT RESOL VEDby the City Council of the City of
Shorewood as follows:
1.
The plat of Lake Virginia Woods is hereby approved.
.
2. The approval is specifically conditioned upon the Developer recording the
Development Agreement attached hereto and made a part hereof as Attachment 1.
3. The Mayor and City Administrator/Clerk are authorized to execute the Certificate
of Approval for the plat on behalf of the City Council.
4.
The final plat, together with this resolution, and the Development Agreement
shown as Attachment I shall be recorded within sixty (60) days of the date of
certification of this Resolution.
.
BE IT FURTHER RESOLVED, that the execution of the Certificate upon said plat by
the Mayor and City Administrator/Clerk shall be conclusive, showing a proper compliance
therewith by the subdivider and City officials and shall entitle such plat to be placed on record .
forthwith without further formality, all in compliance with Minnesota Statutes and the
Shorewood City Code.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 12th day of
September 2005.
WOODY LOVE, MAYOR
ATTEST:
.
CRAIG W. DAWSON, CITY ADMINISTRATOR/CLERK
}
.
.
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOOD, MINNESOTA 55331-8927 · (952) 474-3236
FAX (952) 474-0128. www.cLshorewood.mn.us. cityhall@cLshorewood.mn.us
MEMORANDUM
Date:
September 8, 2005
.
To:
Honorable Mayor and City Council Members
Bonnie Burton, Finance Directortrreasurer ~
Larry Brown, Public Works Director ~
From:
Re:
Capital Improvement Program (ClP) for Years 2006 - 2010
Craig Dawson, City Administrator Gb
CC:
.
INTRODUCTION
Enclosed for your review is the Capital Improvement Program (CIP) for the Years 2006 - 2010.
The CIP has been reviewed and revised by staff and Council during several work-sessions over
the past few months. The ClP is typically the first step in the budget process, with identification
of specific capital expenditures which will direct the efforts of the 2006 budget.
As Council will recall, the approach taken in developing the ClP is that it is intended to be a
flexible document, and an important physical as well as financial planning tool. The first year of
the CIP is most definite in terms of planning and implementation. The latter years of the CIP are
most subject to change. A recommended fiscal policy section is located at the beginning of the
document to assist in setting priorities for projects.
CIP HIGHLIGHTS
Council will recall the following highlights:
. Numerous water system enhancements are contemplated for 2006, some of which are
continuations of projects begun in 2005.
. A Public Works Addition (bay with lift) is contemplated for 2006, with completion
scheduled for 2007, and other information technology upgrades are programmed for the
Public Facilities/Office Equipment fund for 2006.
. Numerous projects are programmed for the Local Street Reconstruction fund, including
bituminous overlays, retaining wall and guardrail replacements, and pavement reclamation
projects.
n
t.~ PRINTED ON RECYCLED PAPER
# 9A
i
Memo - CIP 2006-2010
Page 2
.
. The Municipal State Aid Roadway fund will be exhausted by the Smithtown Road
rehabilitation project in 2006 and an advance for the City's portion of the County Road 19
intersection. The ClP reflects the advance and repayment of these MSA funds.
. The Sanitary Sewer fund annual allocations for Inflow & Infiltration Reduction projects was
increased from $25,000 to $50,000 beginning in 2006.
. The Stormwater Management fund allocates $30,000 annually starting in 2006 for drainage
. projects and it also reflects the Gideon Glen improvements.
. The Land and Open Space Acquisition fund continues to receive annual contributions of
$5,000 from the General Fund.
The CIP does not automatically commit the Council to implement any of the projects listed in it;
it is a planning document to focus resources and a document for financial planning. Individual
projects are to be approved in the annual budget process and later authorized for purchase or
award of contracts according to standard operating procedures. .
RECOMMENDED ACTION
Staff recommends that the City Council approve the attached resolution accepting the 2006-2010
Capital Improvement Program.
.
.
.
\ .
.
CITY OF SHOREWOOD
RESOLUTION NO. 05-
A RESOLUTION ADOPTING A CAPITAL IMPROVEMENT PROGRAM
FOR THE YEARS 2006-2010
WHEREAS, the Shorewood City Council wishes to carefully plan and
coordinate City public capital purchases and projects over a five-year period matching
physical needs with financial resources; and
.
WHEREAS, City Staff has prepared and presented a proposal for a five-
year Capital Improvement Program to facilitate the planning and coordination of projects
for the years 2006-2010.
NOW, THEREFORE BE IT RESOLVED that the City Council hereby
adopts the Capital Improvement Program for the period of 2006-2010.
.
ADOPTED BY THE CITY COUNCIL of the City of Shorewood this
12th day of September, 2005.
Woody Love, Mayor
.
ATTEST:
Craig W. Dawson, City Administrator/Clerk
.
I
I
I
I
I
I
I
I
I
I
I
I
I
Ii
I
I
I
I
I
. CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOOD, MINNESOTA 55331-8927 · (952) 474-3236
FAX (952) 474-0128. www.cLshorewood.mn.us. cityhall@cLshorewood.mn.us
C'APIT AL
IMPROVEMENT,
.P'ROGRAM
Calendar Years 2006 - 2010
September 2005
n
t..J PRINTED ON RECYCLED PAPER
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CAPITAL IMPROVEMENT PROGRAM
2006-2010
TABLE OF CONTENTS
I. INTRODUCTION AND POLICY..................................... 1-8
II. TABLES
A. Department Summary......... ................ ................. ............. ...... ............ ........11
B. Projects by Department ........................................................ ..............12 -14
C. Sources of Revenue. ............................................. ..... .......... .......................15
D. Projects by Department and Funding Source ................................16-19
E. Projects by Funding Source with Balances ....................................20-23
III. CAPITAL IMPROVEMENT PLAN PROJECTS
A. Equipment Replacement Fund ................................................................. 27
B. Land & Open Space Acquisition .............................................................. 37
C. Local Street Reconstruction .............. .............. .............................. ..........41
D. Muni ci pal State Aid Streets ............ ......... ...................... ........... ..............51
E. Munici pal Water System.... ...................... ........ ............... ......................... 55
F. Parks.... ................................................... ....................................................... 63
G. Public Facilities and Office Equipment .................................................. 71
H. Sanitary Sewer System ...................... ............ ............. ........ ...... .............. 77
I. Stormwater Management.. ............ ........ .......... ....... ................. ................. 83
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOOD, MINNESOTA 55331-8927 · (952) 474-3236
FAX (952) 474-0128 . www.cLshorewood.mn.us . cityhall@ci.shorewood.mn.us
September 12,2005
Honorable Mayor and City Councilmembers,
Introduction
It is our privilege to present to you the 2006 - 2010 Capital Improvement Program for the
City of Shorewood, MN. The Capital Improvement Program (CIP) is a coordinated
schedule of municipal capital projects, improvements, and purchases for the years 2006
through 2010. It consists of project proposals that include the project title, scheduled
year, and the funding sources for each project. It identifies sources of revenue to pay
for the planned capital project improvements and purchases.
The Basics
At its essence, a CIP is a planning tool for some specified period of time. The CIP lists
significar'lt (hence the term "capital") improvements in infrastructure and equipment that
the City should plan for. It becomes a financial planning tool that identifies funding
sources and funding availability, and helps decision-makers to determine affordability. .
With the approval or amendment by the Council/the CIP provides an implementation
program for staff to work on.
The League of Minnesota Cities' Handbook for Minnesota Cities contains the following
discussion of Capital Improvement Budgeting.
"Capital budgeting is a list of needed capital improvements, their order of priority,
and the means of financing them. Besides being one of the major tools of planning,
a capital budget can provide some or all of the following advantages:
,VY
~ \') PRINTED ON RECYCLED PAPER
..",
3
..
-
-
-
-
-0
,
o
,
-+
(\i'
IA
o
o
o
c
,
CTQ~
~ :3
, 0- ()
~ IA H
<0'"0
(\i . ::s- iii .
:E~:s
~c~
Q ~ Q
:s 0
O--hg-
o -h 0
::s- :;. c
Q Q 3
~ ~ ~
~ _. :3
o..~ ;:
Q -+ ~
IA -< -+
-g..~. :;.
-<OIA
1Ae..-+
S' -< g
--h~
o -.
o ~ H
:s -+
0--<
-. ~ iii'
::!: Q .....
o , ....
:3 IA IA
IA :s :s
-+ Q
-ho"g
:;. -+ ::s-
Q ::s- 0
~ ~ -+
o' -h 0
C -h
o -+ :s
o c ~
:3 ' ~
O-~O-
=+ IA
o'
a iii'
Q
:s
0-
o
::r
Q
:s
l.O
~
IA
H'
-+ IA
o
::r
~
0..
c
~
o
-h
:s
-+
~
:s
0-
~
0-
-+3
::r -0
Q ,
:s-. -+ 0
-+ <
::r~
~ 3
()~
H~
'"0 IA
-
o Q "
o :3 '"0
:s 0-'
IA o'
a: :} -+3.
~, ~
, 0 ~
-+ 0 IA
::rc
~ :3 :3
Q !:!, -+
0.. ::r
~IA~
-+ ::r 0
O' g .g
:s 0- =+
o , Q
-h~-
:3<CT
~ -. c
:E~g
-0 -+ ~
ci ::r-+
c-. ~ -0
~ 3 ci
-+QlQ
IA :3 ,
Q :s Q
:3 5 3
O-=-h
-+-< 0
::r' ,
~ ~ -+
O--+::r
~ -+ ~
- -h
~ 5" 0
o' -+ a
:s ::!: :E
o 3 5'
-h~l.O
~"-+-<
::r::r~
~ ~ ~
, 0 IA
IA 0
.. C '
:s ~
o 3
-, Q
;; 5'
::r-+
o ~
c :s
O-ti
-+
<'
,~
-
-
-< "
~ 11
Q 0
, a
:E
;:f :;.
~lQ
, -+
~ ::r
S iii'
3 -+
3 ::s-
~ ~
:s CT
o-c
~O-
_. l.O
o ~
:s -+
IA 0
-h
:;' -h
~ 0
-h~
-h'
~ ,
o ~
-+ 0
o
CT3
~ 3
o ~
3 :s
~ g-
-+-0
::S-,
~ 0
, c-.
~ ~
o 0
o -+
3 IA
3 cr
~ ,
:s -+
O-::s-
~ ~
0-0
-0 0
, 3
o _.
l.O :3
cil.O
3 g-
o-
l.O
~
-+
-
~1O' ~ -i
-+::s-o::r
::r -+ lQ ~
~ 0 ci 0
-o-h3=+
ci :}o-<
c-' ~ :s-o
~o-+c
~o::s-it
1A3~3
CT3Q-o
~31A'
o -. iii' 0<
:s -+
0- -<_ 0 ~
-+1A-h3
::r-h-+~
~ 5' if ~
Q ~ -0
3 :s IA ,
-0 0 -+ 0
, o' Q c-,
~ IA Q: ~
~~~it
~ Q ~ :;'
:3-+0--+
-+ O' -0 0
-o:S'Q
~ :.. o'
o -+ 3. g
0- g ~ ::!:
g -< ' ~
O-~:E~
o :3 ::r-<
-+O-~~
::r-+:3Q
~ ::r -+ '
'~::ro
-oo~Q
, -, 0 -0
o -+ =+
c-, -< 0 Q
~ c_
o ;}:3 _.
it 0 !:!. 3
=- :;- ~
i5.0-~0
~ 0- =S, ~
-h ~ ~ 3
5' -h:E ~
=+~IA:s
~IA=+-+
--:< 0 :;.
3
~
-
-
.
.
.
.
.
-olQ OJ~_HO I::r()3 0 11< m
,c-< :3-h~QQ -h,QIA
OQ :3-+o_-o-o-oo~~ti
~ ci a' :;. ~ ~ ~ 5" ~ ci .g -g ~ CT
Q :s c Q , 0-' N - < =+ ~ iii'
:3 -+ , -+ Q 1ft Q -. ~..... :s::r
, ~ -, 5' -+ -+ u; , 3 3 ~ :t. -.
~ ~ lQ (\)-+ Q (\) 9: -0 (\) (\) -< Q Q
Q :3'-<':SXQo:S
3-oo::r0-< 0-+--00
, 0 ~ (\) < IA ~ -
-0 -.:s :3 -+ (\) (\) 0 3 '
~~-h~Q::r :3 i5.:E3g-
-+ 0 0 Q :;. ~ (\) -, Q c ,
-, 0 ::!: :s -+ 0 :3 ~ 0 :!.-<
3 :s :s ~ e, 0 it , 0 j 0
(\) IA lQ :s.... :s 3 (\) 3 ......- Q
-h a: -, -+ -h 3 IA-o
o (\) Q 0- :s:3 Q -, c 0.. -.
,,:S-olQ c " :3:s ~-+
..... ..... 0-, Q:3 (\) Q CT Q
...... .... 0 -, -0 :s -+ -
(\) ::!: ~ ~. q ~ 0 -< -+ -.
ti 0 (\) n(\)o g :;' -+ ' 3
-. :3 :2. -+ 0.. , ~ lQ 0 ~ ~
~ -ho Q IA -+_. (\) -h 3 _ 0
0- , :g 0 , ~ 5' 0 0 l\l :;:
Q Q -. -h (\) -+ Q , < 3 \V
:S=:3QIA, Q(\)(\):3
0.. lQ=(\)Q a Ol.O:S~
o -0 , -+ lQ 0' -+ :s-+
S Q , !:!. < -. 0 :3 Q
, ~. 0 -+ (\) ~ Q_ IA 0.. -0 -0
(\) -+ c-' -< -h -. C ' ,
-he..(\)o o..og Q O-Q 0 0
c_ _. -+ 1ft ,...... :s ~ - l.O l.O
:3 \V 0.. ~ -< ~ ~
-0 IA-o(\)-o ............
--0 Q:3' 0 CT -+ :3 :3
gci :34~~ Cl. ~o
:3 < ,..... (\) (\) -0 Q -0
-. (\) (\) ....:s , 0 -0 '
tS:3 :3 ~::!: -< '-+ E ~
(\) -+o:s ...... ~
O:s IA -. lQ :3 O' p :s
-h -+ Q (\)..... Q :3 IA -+
-+IA :s1A....:s '
::r ' 0- Q:3 :s 0 --< :;
(\) -. -+ 0 -h 0 l.O
-+ Q < (\) c-+
Q::r lQ e.. (\) , =+ I ::r
o (\) (\) -, , IA l.O (\)
-+ - :3 -+ I Q' 0
C-o 0 (\) -+ -0-0
e.. IA (\i '3 ~::r , (\)
IA~(\) (\) 0 ~
1A:3 ' lQ IA
IA -+ ,
o'::S- 3Q g
:s g 0..
-
-
-
-
-
.
. .
0-0
-h'
-+ (\)
(\) IA
:3 ~
, ,
(\) (\)
O-lQ
c ,
o 0
(\) C
0-0
, IA
IA IA
-+ (\)
Q (\)
CT~
~:s
t:j. l.O
(\)-0
-+ '
::r ~,
~ ~
-+ 0
Q -+
X IA
, ,
Q Q
-+-+
~ ~
0-
-
~
~
~
-0
-+
::r
(\)
-0
C
CT
0'
:;.
-h
o
,
3
~
0-
o
-h
-h
C
-+
c
,
(\)
:3
~
~
0-
alA
:E Q
:s
g 0-
-+-0
::s-'
~ ~
-0 (\)
3. ~
~ 0
=+g
-< :3
iii' !:! .
-+3
(\)
:3
CT
~
,
IA
-h
,
o
:3
-
U\
(\)
-0
-+
~
:3
CT
~
,
N
o
o
U1
I
'"0
Q
lQ
~
N
n
H
'"0
-I
,
Q
:s
IA
:3
-+
-+
e..
r
(\)
-+
-+
(\)
,
-
-
(Y)
t.. a!
a! Ol
+- 0
+-0-
a! I
....1m
00
+-0
~N
E t..
V! a!
c.o
o E
t.. a!
I-+-
0- 0..
I-f a!
UVl
-
-
-
~ 0-
a :-2 tj
>
.~ 0 ~ a!
0- ~ .- ..c
-v+-
tj~a!c
V!..,Q...s::::.c
- +-+-
~ $! ~.~
'- 0 .0
U V! c +-
a! a! 0 V
..c c ._ a!
+- .~ 1;.'0'
':iE 0 t..
a ,-0 0.
-+-ot..
o.vV!..,Q
t.. 0 +- :J
a! ,+-.- V
+-co+-
V! I-f +- t..
o t.. 0
E c .2 a.
~...!2t..oc
t.. 0- a. V! ...!2
o a! 0- V! 0-
a. > I-f a!
ft' 'V!- U s:: a!
..s: c a! :J .~
+- a!..c a! ~
V!..c+-ca!
1::~~-8~
a! a..~ E t..
~~~oo.
o-Ut..-O~
E .V! .;! ~ U
.- ~ a!
E ~ .~ .~ ..c
o U c +-
t.. ft' 0 .~ ..c
Ol ... '- ..c +-
0...s:::V!+-
s:: t.. +- .~ a! ~
.2 a. '+- E .~ +-
Q..+-OE+-c
a.~Evog~
E E 0 t.. V!
o t.. Ol a.'Vi
\J ~ ~.~ s:: s::
o t.. s:: .- 0
Q) t.. 0. s:: ..c v
-;f: 0. S::...!2 Ol.~
"0 .~ .2 0. g a!
C .::t:. +- .V! ..c .0
tJ t.. +-0 ~ +- 0
o +--+-
Q..a.~utJV!
lj ~ ~ 0 '0 6
Q) +- _ +- s:: a!
_V!0.0:J0.
..... E...s:::oo..
I- < .- +- v 0
-
-
VI
+-
.~ 0
I a!
..c >
.~ 0
..c
~ a!
Ea! E
o
8Vl
al
.0
+-
V!
o
E
o
a!
E
o
Vl
t..
o
a! VI
]~
s:: V
al a!
a!..c
.a+-
E. a! .~
o ~...s:::
t.. ..c +-
OlVl~
o +-
t.. s:: -0
0.. a! a!
a! E E
i: :!:: ...!2
,+-Ea.
o E a!
a.:VlO~
Ht..V...s:::
utJ...s:::
a! v ~
o ~.- ~
.~ t.. ..c E
a! ~ +-
+- +- s:: s::
V! g 0 a!
~a!V!E
al...s:::t s::
..r: +- a! ~
+- .~ '0' >
V! t.. g.
+- :? a. ....,
~ v ~'+-
.., a! _ 0
o .., c V!
t..oo+-
0.. a a! 's;:
(', '+- -0 -0 :J
Q.. 0 a!.2 t..
lj 1:: .5 g ~
a! '+- '- +-
Q)+-a!-oo
-;f:x-os::+-
a! ..!.. 0 0
,5; a!;::: ,..c
..c,+-a!+-
Q) +- 0 g-VI
"c+-v+-
:JO..2V1~
U t.. -0'"
C a! 0 al 0 vi
H '+- Ol +- t.. ft'
'+- s:: '- a..:!:
o ~ '_ E a! t..
+- .... .5 := -0 0
+- V! 0 ft' :J-o
tJ a! +- ... - s::
.s:: +: s:: 5 v :J
~ '- 0 E x 0
;>u v a!.o
-
-
-
+-
:J 0
.8 +-
oq-.~
V! a! +:
s:: >o..J ._
.2 +- s::
+- s:: :J
o a! +-
+- E 5
v s:: 0..
a! t.. a.
0.. a! 0
~ > +-
v ~ 0
+:'+-i:
.!!2 0 0
o V! V!
a! +-
t.. s:: s::
...s::: :J ~
+- t.. 0
.~ ~ ~
V! +- s::
-00 a!
a!,+-...s:::
a! 0 ~
S::VI""::
~~t
.~ .-,.-
o~'::-o
a! 0..!!2 .~
t..a!-O~
.~ i: -g 1::
.o+-...s:::a!
EVV!:-2
o a! t..
V '+- a! a!
a! +-.0
o t.. 0 c
+--o~o
-0 ' v
a!:i~V!
a. 0 c +-
..2...s::::J v
a! V! 0 a!
> ~ U ..,
a! a! s:: ~
-0 ...s::: '- a.
a! I- g-~
.0 s:: +-
-0 V! s:: U
- ~ al
g :J I ~
..c ~ '0
V! -0 I- s::
O-cO~
H alD t..
U a.s:: 0
<~:iES
-
-
o a! E
~N g ~'+-
.~ +- 0 +- 0
,+-:Jo1V!
o.o+- al
a! t.. V
i:~o.,ga!
-0 s:: :J V! '0-
s::~ E1:;o
o x O...s::: .~
~a! a!+-+-
.0 ~:E == 'i:
VI +- 0 v
+-'+-1:;..ct..
~o..cV!o
.., E +- ~ '+-
OOa!O-o
t.. t.. t.. E a!
0.. Ol :J .+-_ V!:J
'+-O~ V!
o t.. 0 t.. '-
V!a. Oa!
t;1::~ .0
-a!-o-oo
t.. E a! a! +-
oa!Et..-o
v a!
VI o+-a! a!
~ 0- al i: s::
-5a!.os::~
a! t.. s:: '- ....
..c +- 0 0 E
v s:: v Ol_
V! a! +- V!
t.. E s:: 7- a!
al 0.. a! s:: +-
..c ':; E ~ 0
+-o-a.ov
o a! ':; -0 '+-
VI c 0--0 +-
al 0 a! s:: ~
.~ ',+-:J V
-o~o'+-+-
~E~1::~
a. 0 '- a! E
e-x~Ea.
.... a! VI a! '-
~ 5 .~ g ~
s::' u.. g g- t..
'0 C a! t.. g
1::0...s:::+-~
N+- s:: I
S .- +- a! a!
s:: 5 0 E .~
o ...s::: :E .e- '+- ...:
Va! :J:-s::
O-E~g-~al
H+: 'a!vE
'" VI +- 0..
ft' t.. t....c ..... ,-
...00+-.......:J
.s:: a! a! c al 0-
I- ~ ~._ -0 al
-
-
111-0
+- al
U +-
Q) v
,~ 0
o s::
ct al
~
~...!2
;: a!
"O+-
tJ 0
o +-
a.Vl
-
c. 0
g al
L. Ea!'+-
t.EV!:J~~
'- -0 al a!
V!E5>i:
+- :J ... al
V t.. t.. ~
al -g a! 0
.., al 't +- E
o t.. t.. +- :J
t..a! v-o
0. '+- +- al s::
-0 a! :J .., a!
o t.. 0 .0 t..
...s::: :J a!
~O~V!'+-
a! >:. ~ VI a!
V 0:: '- t..
s:: 0.. V! -0 tJ
go-gat;
'+- +- 0 0- a!
~ .0 H :J
~ 0 ~u g-
VI ~ ~ :? t.. --'
.~ al -0 '- c c
+- > 0 s:: 0 0
'0 '- 0 V
'+- t.. V! V! +-
5 a "a! t 1:: g
'+-...s::: :J a! al .V!
~ +- VI '''-0
o VI 0 '- v
~ al .- t.. V!
>t..>-o.a!S::
~ 0 0 al t.. g
a!EE...s:::1;v
s:: Ol +- a!
o s:: V! -0 t.. ..c
.- al al a! +-
-0 .~ +: .- .0
a! :J '- '+- E <t-
+- 0- v .- 0
Oal ,+-:J
al t.. al ~ s:: -0
t..v Ol g' -0 +- 0
c 0 .- s:: t..
N '0 ...s::: ~ .~ ~
8 s:: v .s:: '- ~
N .~ ~ ~~ ~
s:: '+- .- V! I
+-alV 0
s::...s::: a! 0 (Y)
a! +-..c :-
E...s:::+-alo
V! +- +- ;.::, .5
V!SoE..c
a!>..c of-
V! +-:J'-
V! -0 ==
o-o-occ
-ala!a!o
.2 t..:"Q t.. +:
v :J > a! .-
a! o-o't;~
a. al t.. ... ...
V!t..o..t..o..
-
-
-
-
U')
-
-
. Projects in Shorewood's CIP are listed with particular care in terms of the
likelihood that they will be implemented in the first or second year of the
program.
. Projects listed in years three through five of the program identify projects
and opportunities that merit further evaluation.
. There are programs for on-going outlays for which individual projects are
not well-defined at this time. For instance, the City has a pavement
management program to assess the condition of local streets, and it is
updated every year. It is appropriate to budget $95,000 for bituminous
overlays each year without listing specific streets after the first year.
. Placing a project or outlay in the CIP does not commit the City Council to
accomplish it. The Council's normal processes of authorizing studies to be
prepared and gaining public comment need to be followed. A CIP listing does
not in any way imply a done deal or a foregone conclusion. A CIP helps to
keep needs in front of the Council and helps it set priorities.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CIP Transmittal Letter
September 2005 - Page 4
There may be an incentive to list many projects, or have a general plan for roadways with
an annual outlay for them, within the CIP. The law is not clear that a road project needs
to be constructed in the year of financing; rather, the project(s) or outlays simply need to
be listed in the CIP. If projects or outlays are not listed, the CIP could be amended as
necessary to qualify them roadway bonds.
Some additional roadway-related projects that were added to the CIP for 2006 include
retaining walls and guardrails for: Linden Drive, Excelsior Boulevard near Footprint Lake,
Spring Circle, and Maple Lane.
Approaches in Developing the CIP
Council has developed a philosophy about what is to be included when a CIP is presented.
The following points, subject to Council modification, are part of that understanding.
Respectfully submitted,
L~I)(~.'-~ I
Bonnie Burton VLawrence Brown I
Finance Director/Treasurer Director of Public Works
I
I
I
6
~
.....
...J
o
Q.
...J
<
\..)
V)
.....
u.
~
Z
w
~
w
>
o
at.
Q.
~
H
...J
<
I-
.....
Q.
<
\..)
-
-
~
:t
o
Q..
..J
~
Ci.
W
Z
w
(.!)
s::
o t...
-0 0
a> ~
-0 Vl
s:: a> +-
a> ::J..s:: s::
..s:: 0 +- a>
+- ~ t... E
~VlO+-
o ID
+- +- a> >
s:: H 0 s::
a> s:: t...
E ~ g a> Oft
Vl s:: a> > ::{
IDa>~ou
Vl E '0 +->-.::;
Vl a> E .- t...
c:J > t... a>
a ~ +-~.~ Vl
a.. s:: t... 3:
Vl E a> a.. a>
t .- E a> s::
a>~a>~~
i:i: ';:7 g ..s:: 0
a> 'OJ - -
t... E a..= 0
E a> c:J
t... t... ..s:: Vl
c:J 0 t... Vl .::;
t...~OVlo
O'l >-~ E t...
~ c:J -0 a> a..
a.. a.. a> +- a>
Vl ~ .~ ~:E
~>-::JVlt...
a> +- g- O'l 0
E;.: t... .!:: Vl
a>..o+-+-E
> c:J s:: .~ a>
o Vl a> x +-
a.+- E a> Vl
.- +- >-
E-oVl~Vl
H s:: a> 0 O'l
-a c:J ~ ~ s::
+- Vl .- s:: +-
.- -0 a> a> Vl
g- ~ t... 'u X
Us::t\i=.a>
VlVl..s::~~
=0- +-a>o
o ~ >--0 s::
o '- U a> 0
3: s:: ;.: Vl
a> ::J 0 c:J ~
t... E a.. a> c:J
oEa>t...a..
.s::: 0 .s::: U x
V) U +- s:: a>
-
-
-
- -
Vl
Vl
c:J
..0
>-
+-
t...
o
.t:
a..
O'l
s::
;:
o
o
'4-
a>
..s::
+-
s::
o
-0
a>
-0
s::
::J
'4-
a>
..0
~
-a
t...
a>
s::
a>
O'l
Ul
w
~
t-I
Ci.
o
t-I
Ci.
Q..
(.!)
Z
t-I
a
Z
::>
u..
3:
Vl
-a
Vl
o
a..
o
t...
a..
O'l
s::
-0
s::
a>
a..
Vl
c:J
+-
a..
c:J
U
a>
t...
c:J
'4-
a>
3:
-0
s::
c:J
.s:::
+-
c:J
a>
..I:
o
..0
::J
a..
a>
..s::
+-
o
+-
O'l
s::
+-
::J
:-e
t...
+-
s::
o
o
t...
o
'4-
>-
t...
c:J
Vl
Vl
a>
o
a>
s::
Vl
+-
o
a>
.....,
o
t...
a..
a>
Vl
o
..s::
I-
E
a>
+-
Vl
>-
Vl
O'l
s::
+-
Vl
x
a>
s::
c:J
s::
'0
+-
s::
c:J
E
o
+-
a..
(\)
..s::
..-4
-
';:
..I:
U
..I:
;:
Vl
+-
U
a>
.....,
o
t...
a..
a>
Vl
o
..s::
I-
+-
s::
a>
o
'4-
~
a>
a>
t...
o
E
E
a>
+-
V)
>-
V)
O'l
s::
+-
V)
x
a>
s::
c:J
a>
~
c:J
E
3:
+-
c:J
..s::
+-
V)
+-
U
a>
. ....,
o
t...
a..
a>
V)
o
..s::
I-
N
-
3:
a>
s::
t...
o
~
E
a>
+-
V)
>-
V)
O'l
s::
+=
V)
~ a>
U
s:: .::;
c:J t...
'4- a>
o V)
s:: t...
o 0
Vl >-
s:: +-
c:J_
a.. .-
X U
a>~
a> U
..I: .-
+-:0
O'l::J
s:: a..
1: ~
~ s::
a> >-
t...-
a.. a>
a> +-
t...~
Vl a..
+- E
U 0
a> 0
. ....,
o t...
t... 0
CLa>
a> U
~ .::;
..s:: t...
I- ~
(V)
"""
-
-
Ul
W
..J
Q..
t-I
\J
Z
t-I
Ci.
Q..
(.!)
Z
t-I
Q
Z
::>
u..
a>
..s::
+-
'4-
o
s::
o
b
+-
s::
a>
E
~
CL
E
a>
..s::
+-
s::
t...
~ E
o c:J
O'lt...
O'l
-a ~
..I: Q..
V) Vl
V) +-
a> s::
a.. a>
'u E
s:: a>
>
t... 0
a..t...
O'lE
S::H
;:
o c:J
+-
o 'c..
'4- c:J
a>U
..I:-o
+- a>
~-o
.:!:: s::
::J a>
ID E
t... E
c:J 0
V) U
'< ~
-
-0
a>
+-
a..
o
-0
c:J
a>
..I:
+-
..I:
+-
3:
a>
o
s::
c:J
-0
t...
o
U
U
c:J
s::
V)
+-
s::
a>
E
a>
>
o
t...
a..
E E
c:J
c:J t...
+- O'l
a.. 0
c:J t...
oa..
Vl
+-
c:J s::
a> a>
~ E
c:J a>
E >
o
t...
';: E
>-H
+- -
u.g
a> a..
..I: c:J
I-u
..-4
-
-
a>
+-
c:J
-0
a..
::J
-0
s::
c:J
V)
+-
s::
a>
E
a>
>
o
t...
a..
E
H
c:J
+-
a..
c:J
U
t...
o
~
s::
c:J
a..
t...
c:J
a>
>-
I
+-
::J
E
c:J
CL
o
a>
>
a>
-0
3: >..
>-=
+- c:J
.- ::J
U s::
a> s::
..s:: c:J
I-+-
N
-
E s::
c:J
t...V)-o
O'l +- a>
OVl-o
t... 0 ::J
a.. 0
o
~-as::
c c
a> 0-0
E +- s::
a> a.. c:J
> 0 -0
o a> a>
t... t... +-
a.. ::J U
E +- a>
H ::J '0'
_ LL t...
c:J a..
+- +- a>
g- ~..o
U-o=
::J '-
1..03:
+- O'l V)
'4- . !:: 1:
o +- a>
+- c:J E
s:: t... a>
a> a> >
E a.. 0
o t...
g- -a a..E
- ::J
a> s::
~ s:: c:J ~
-0 c:J +- Vl
a> a> c... c:J
+- ..s:: c:J 0
c:J+-U~
s:: '4- ;: 0
-0 0 a> '4-
~ 1: s:: +-
o a>..s:: ~
OE:!::-o
c... ;: ::J
';: ~ -0 ..0
a> a> s::
~.~ b 0
U -0 'u t
a> ..s:: 0 t...
..s:: +- V) a>
1-3:~g-
(V)
-
-
'"
-
-
"
. H
3
-c
-
~
. 3
(II) ~
::s
-+
Q
-+
-.
0
. ::s
/
H
::s
~
a
0
~
~
::s
Q
~
III
iii'
.."
00 0
-
0-0 -.
c.... Q n
AI -
. n III -< ....
:tQ
~ ::s .."
III c.. -
Q
::s
0"0
AI _
"0 < Q
o AI ::s
=O'::s
!:t "tJ :;.
Al3\C
III AI
::s A-
...
~
-
C'
III Q
AI a.
-f
"1
Q
::s
III
"tJ
0
4-
a
o'
::s "
:r
-< ::2
-"n ~.
Q 0 n Q
n 3 0 ::s
=3
:+c I ::s
-. ::s -.
AI -. m ::s
11I';< n l.Q ~
0 ~
~ :s -t
0
"'0 2. Q
0 n n
"tJ
c I -+
a (J) -.
... n
o' 0 en
::s n
- ~
"'0
<"1
Q 0
_ "tJ
C AI
AI "1
11I';<
"'0
~3:
AI Q
::s "1
...~
-. AI
e.....
III
..oil
.."
-
Q
::s
:s
-.
::s
l.Q
H
::s
<
~
::s
-+
o
.,
-<
.."
r("'l
)).0
z;:
Z.."
H7:J
Zm
Ci'J:
.."m
7:JZ
Otn
("'lH
m<
tnm
tn
-------------------
10
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
THIS PAGE INTENTIONALLY LEFT BLANK
I
I
I
I
I Department
Equipment Replacement
Land & Open Space Acquisition
I Local Street Reconstruction
Municipal State Aid Streets
I Municipal Water System
Parks
I Public Facilities/Office Equip
Sanitary Sewer
I Stormwater Management
I
I
I
I
I
I
I
I
I
I
Monday September 12, 2005
Capital Improvement Program
City of Shorewood, Minnesota
DEPARTMENTS~RY
2006
2010
thru
Total
2006 2007 2008 2009 2010 Total
285,778 105-,522 53,533 273,308 43,360 761,501
5,000 5,000 5,000 5,000 5,000 25,000
1,067,800 343,000 411,000 261,000 261,000 2,343,800
4,053,200 104,000 4,157,200
1,119,000 22,000 22,000 21,045 100,000 1,284,045
115,500 447,000 30,000 5,000 5,000 602,500
159,000 3,667,250 10,000 10,000 10,000 3,856,250
192,000 148,000 141,000 50,000 50,000 581,000
125,000 30,000 30,000 30,000 30,000 245,000
7,122,278 4,787,772 702,533 655,353 608,360 13,856,296
11
I Department Project# Priority 2006 2007 2008 2009 2010 Total
Guardrail-Spring Circle LR-06-05 0 24,000 24,000
I Relocate Retaining Wall-Maple Ln/Shady Island LR-06-06 0 22,000 22,000
Beverly Dr Pavement Reclamation LR-07-01 0 82,000 82,000
Street Reclamation Projects LR-07-02 0 100,000 100,000 100,000 100,000 400,000
I Bracketts Rd Pavement Reclamation LR-08-01 0 150,000 150,000
Local Street Reconstruction Total 1,067,800 343,000 411,000 261,000 261,000 2,343,800
I Municipal State Aid Streets
Vine Hill Road - Mill and Overlay MSA-OS-Q5 0 104,000 104,000
I CR 19 Intersection Realignment MSAOS-06 0 3,981,200 S,981 ,200
Yellowstone Trail- Bit Overlay MSA-04-Q1 0 72,000 72,000
I Municipal State Aid Streets Total 4,053,200 104,000 4,157,200
I Municipal Water System
Wood haven Well Interconnect with Chanhassen W-OS-05 0 174,500 174,500
Water Meter Radio Read Project W-OS-OS 0 210,000 210,000
Amesbury Polyphosphate System W-04-08 0 12,100 12,100
I Amesbury Well Controls Replacement W-05-02 0 75,000 7S,000
Boulder Bridge Submersible Well - Pull & Inspect W.OS-QS 0 21,000 21,000
I S.E. Area Lineshaft Well. Pull & Inspect W-06.01 0 22,000 22,000
Interconnection of Amesbury & SE Area Wells W.07-01 0 626,400 S2S ,400
Amesbury Lineshaft Well. Pull & Inspect W-07-02 0 22,000 22,000
I Boulder Bridge Well #2 . Pull & Inspect W.09-01 0 21,045 21 ,045
Water System Improvements W-10-01 0 100,000 100,000
I Municipal Water System Total 1,119,000 22,000 22,000 21,045 100,000 1,284,045
Parks
I Park Improvements P.04.0S 0 5,000 S,OOO 5,000 5,000 5,000 2S,OOO
Badger Park - Resurface tennis courts P-OS-Q1 0 20,000 20,000
Badger Park-Football and Hockey Lighting P-OS-02 0 45,000 45,000
I Silverwood Park-Erosion Control P-06.0S 0 8,000 8,000
Skate Park-Equipment Rehabilitation P.06.04 0 S,500 S,SOO
I Minnewashta Dog Park. Matching Funds P.06-05 0 5.000 5,000
Freeman Park.Drinking Fountain at Eddy Station P-QS-OS 0 12,000 12,000
Skate Park.Drinking Fountain P-QS~07 0 12,000 12,000
I Manor Park-Manor Park Pond WA Quality Improvements P.OS-08 0 5,000 S,OOO
Cathcart Parks-Resurface Tennis Court P-07 -01 0 14,000 14,000
Freeman Park-Wetland Enhancement/Interpretive Cen P.07-02 0 428,000 428,000
I Skate Park.Plaza Picnic Area P-08.01 0 25,000 25,000
Parks Total 115,500 447,000 30,000 5,000 5,000 602,500
I Public Facilities/Office Equip
Computer Upgrades PF-OS.06 0 10,000 10,000 10,000 10,000 10,000 50,000
I Civil Defense Sirens PF-05-05 0 25,000 25,000
Network (Computer) Upgrade PF-06-01 0 17 ,250 17,250
I MII/ulay Septembl'/' 12. 2005
13
I Capital Improvement Program
I City of Shorewood, Minnesota
SOURCESOFREVENUES~ARY
I 2006 thru 2010
I
I Source 2006 2007 2008 2009 2010 Total
Donations 42,800 8,333 51,133
Equipment Replacement Fund 285,778 105,522 53,533 273,308 43,360 761,501
I G.O. Bonds-2007 wI City Hall 60,000 3,640,000 3,700,000
General Fund 15,000 5,000 5,000 5,000 5,000 35,000
I Grant Money 342,400 8,334 350,734
Local Street Reconstruction 1,067,800 343,000 411,000 261,000 261 ,000 2,343,800
I Met Council Grant Money 70,000 70,000
MSA Advancel(Repay) -181,000 -181,000 -181,000 -543,000
I MSA Funding 72,000 104,000 176,000
Municipal Water Fund 125,100 22,000 22,000 21,045 100,000 290,145
Park Foundation Donations 5,000 5,000 5,000 5,000 5,000 25,000
I Park Fund 93,500 14,000 8,333 115,833
Public Facilities/Office Equipment 89,000 27,250 10,000 10,000 10,000 146,250
I Sanitary Sewer Fund 192,000 148,000 141,000 50,000 50,000 581,000
Stormwater Management Fund 55,000 72,800 30,000 30,000 30,000 217,800
I Water Revenue Bonds.2005 1,010,900 1,010,900
Total 2,960,078 4,586,772 521 ,533 655,353 608,360 9,332,096
I
I
I
I
I
I
I lvlol/day September 12.2005
15
I Department Project# Priority 2006 2007 2008 2009 2010 Total
I Land & Open Space Acquisition Total 5,000 5,000 5,000 5,000 5,000 25,000
Local Street Reconstruction
I Brand Circle Pavement Reclamation LR-Ol-04 0 57,000 57,000
Local Street ReconstrucUon 57,000 57,000
Amlee Road Pavement Reclamation LR-01-06 0 85,800 85,800
Local Street Reconstruction 85,800 85,800
I Bituminous Overlays LR-03-04 0 95,000 95,000 95,000 95,000 95,000 475,000
Local Street Reconstruction 95,000 95,000 95,000 95,000 95,000 475,000
Bituminous Sealcoating LR-03-05 0 66,000 66,000 66,000 66,000 66,000 330,000
I Local Street Reconstruction 66,000 66,000 66,000 66,000 66,000 330,000
Wedgewood Drive Overlay & Reconstruction LR-Q4-01 0 240,500 240,500
Local Street Reconstruction 240,500 240,500
I Pavement Reclamation Wood Duck Circle LR-05-01 0 96,500 96,500
Local Street ReconstrucUon 96,500 96,500
County Road 19 Entry (Gateway) LR-05-Q2 0 10,000 10,000
I Local Street Reconstruction 10,000 10,000
Star Circle Reconstruction LR-06-01 0 57,000 57,000
Local Street Reconstruction 57,000 57,000
I Star Lane Reconstruction LR-06-02 0 265,000 265,000
Local Street Reconstruction 265,000 265,000
Retaining Wall & Guardrail-Lk Linden DrNellowston LR-Q6-03 0 27,000 27,000
I Local Street ReconstrucUon 27,000 27,000
Guardrail-Excelsior Blvd/Footprint Lk LR-06-04 0 22,000 22,000
Local Street Reconstruction 22,000 22,000
Guardrail-Spring Circle LR-06-05 0 24,000 24,000
I Local Street ReconstrucUon 24,000 24,000
Relocate Retaining Wall-Maple Ln/Shady Island LR-Q6-Q6 0 22,000 22,000
Local Street Reconstruction 22,000 22,000
I Beverly Dr Pavement Reclamation LR-07 -01 0 82,000 B2,000
Local Street ReconslrucUon 82,000 82,000
Street Reclamation Projects LR-07-02 0 100,000 100,000 100,000 100,000 400,000
I Local Street Reconstruction 100,000 100,000 100,000 100,000 400,000
Bracketts Rd Pavement Reclamation LR-08-01 0 150,000 150,000
Local Street ReconstrucUon 150,000 150,000
I Local Street Reconstruction Total 1,067,800 343,000 411,000 261,000 261,000 2,343,800
Municipal State Aid Streets
I Vine Hill Road - Mill and OVerlay MSA-03-05 0 104,000 104,000
MSA Funding 104,000 104,000
CR 19 Intersection Realignment MSA03-Q6 0 3,981,200 3,981,200
I MSA Advancel(Repay) -181,000 -181,000 -181,000 -543,000
Yellowstone Trail- Bit Overlay MSA-04-01 0 72,000 72,000
MSA Funding 72,000 72,000
I Municipal State Aid Streets Total 4,053,200 104,000 4,157 ,200
I Municipal Water System
Woodhaven Well Interconnect with Chanhassen W-03-05 0 174,500 174,500
Water Revenue Bonds-2005 174,500 174,500
Water Meter Radio Read Project W-OS-06 0 210,000 210,000
I Water Revenue Bonds-2005 210,000 210,000
Monday September 12, 2005
I 17
Department Project# Priority 2006 2007 2008 2009 2010 Total I
Amesbury Polyphosphate System W.04-DS 0 12,100 12,100
Municipal Water Fund 12,100 12,100 I
Amesbury Well Controls Replacement W-05-02 0 75,000 75,000
Municipal Water Fund 75,000 75,000
Boulder Bridge Submersible Well- Pull & Inspect W-05-03 0 21,000 21,000 I
Municipal Water Fund 21,000 21,000
S.E. Area Lineshaft Well. Pull & Inspect W-OS-01 0 22,000 22,000
Municipal Water Fund 22,000 22,000 I
Interconnection of Amesbury & SE Area Wells W-07-01 0 62S,400 S26,4OO
Water Revenue Bonds-2005 626,400 626,400
Amesbury Uneshaft Well- Pull & Inspect W-07-Q2 0 22,000 22,000 I
Municipal Water Fund 22,000 22,000
Boulder Bridge Well #2 - Pull & Inspect W-09.01 0 21,045 21,045
Municipal Water Fund 21,045 21,045 I
Water System Improvements W-10-D1 0 100,000 100,000
Municipal Water Fund 100,000 100,000
Municipal Water System Total 1,119,000 22,000 22,000 21,045 100,000 1,284,045 I
Parks
Park Improvements P-04-D3 0 5,000 5,000 5,000 5,000 5,000 25,000 I
Park Foundation Donations 5,000 5,000 5,000 5,000 5,000 25,000
Badger Park - Resurface tennis courts P-OS-D1 0 20,000 20,000
Park Fund 20,000 20,000 I
Badger Park-Football and Hockey Lighting P-OS-D2 0 45,000 45,000
Park Fund 45,000 45,000
Silverwood Park-Erosion Control P-OS-03 0 8,000 8,000
Park Fund 8,000 8,000 I
Skate Park-Equipment Rehabilitation P-06-D4 0 3,500 3,500
Park Fund 3,500 3,500
Minnewashta Dog Park-Matching Funds P-OS-05 0 5,000 5,000 I
Park Fund 5,000 5,000
Freeman Park-Drinking Fountain at Eddy Station P-06-0S 0 12,000 12,000
Municipal Water Fund 6,000 6,000 I
Park Fund 6,000 6,000
Skate Park-Drinking Fountain P-06-07 0 12,000 12,000
Municipal Water Fund 6,000 6,000 I
Park Fund 6,000 6,000
Manor Park-Manor Park Pond WA Quality Improvements P-06-0S 0 5,000 5,000
Municipal Water Fund 5,000 5,000
Cathcart Parks-Resurface Tennis Court P-07-01 0 14,000 14,000 I
Park Fund 14,000 14,000
Freeman Park.Wetiand Enhancement/ Interpretive Cen P-07-02 0 428,000 428,000
DonaUons 42,800 42,800 I
Grant Money 342,400 342,400
Stormwater Management Fund 42,800 42,800
Skate Park-Plaza Picnic Area P-08-01 0 25,000 25,000 I
Donations 8,333 8,333
Grant Money 8,334 8,334
Park Fund 8,333 8,333
Parks Total 115,500 447,000 30,000 5,000 5,000 602,500 I
Public Facilities/Office Equip I
Computer Upgrades PF-03-06 0 10,000 10,000 10,000 10,000 10,000 50,000
Monda." September /2, 2005
18 I
I Department Project# Priority 2006 2007 2008 2009 2010 Total
Public Facilities/Office Equipment 10,000 10,000 10,000 10,000 10,000 50,000
I Civil Defense Sirens PF.05-05 0 25,000 25,000
Public Facilities/Office Equipment 25,000 25,000
Network (Computer) Upgrade PF-Q6-01 0 17,250 17 ,250
I Public Facilities/Office Equipment 17,250 17,250
City Hall Project PF-06-02 0 3,300,000 3,300,000
G.O. Bonds-2oo7 wi City Hall 3,300,000 3,300,000
I Public Works Addition (Bay w/lift) PF-Q6-03 0 60,000 340,000 400,000
G.O. Bonds-2oo7 wi City Hall 60,000 340,000 400,000
Document Retrieval System Upgrades PF-Q6-04 0 10,000 10,000
I General Fund 10,000 10,000
City Hall ~enerator PF.06-05 0 16,000 16,000
Public Facllltles/Offlce Equipment 16,000 16,000
I Public Works Building Generator PF-06-Q6 0 38,000 38,000
Public Facilities/Office Equipment 38,000 38,000
Public Facilities/Office Equip Total 159,000 3,667,250 10,000 10,000 10,000 3,856,250
I Sanitary Sewer
Infiltration and Inflow Reduction 5S-03-o5 0 50,000 50,000 50,000 50,000 50,000 250,000
I Sanitary Sewer Fund 50,000 50,000 50,000 50,000 50,000 250,000
Lift Station 17 Rehabilitation SS.Q4.01 0 81,000 81,000
Sanitary Sewer Fund 81,000 81,000
I Lilt Station 16 Rehabilitation SS-05-o2 0 25,000 79,000 104,000
Sanitary Sewer Fund 25,000 79,000 104,000
Lift Station Pump Rebuilds and Mountings SS-Q6-o1 0 30,000 30,000
Sanitary Sewer Fund 30,000 30,000
I Portable Lift Station Control Panel SS.06-o2 0 6,000 6,000
Sanitary Sewer Fund 6,000 6,000
Lilt Station 12 Rehabilitation S5-o7 -01 0 19,000 91,000 110,000
I Sanitary Sewer Fund 19,000 91,000 110,000
Sanitary Sewer Total 192,000 148,000 141,000 50,000 50,000 581,000
I Stormwater Mana~ement
Gideon Glen Improvements(City Costs) STM.04-01 0 70,000 70,000
Met Council Grant Money 70,000 70,000
I Glen Road Drainage STM-04-02 0 25,000 25,000
Stormwater Management Fund 25,000 25,000
Misc Stormwater Projects STM-04-05 0 30,000 30,000 30,000 30,000 30,000 150,000
I . Stormwater Management Fund 30,000 30,000 30,000 30,000 30,000 150,000
Stormwater Management Total 125,000 30,000 30,000 30,000 30,000 245,000
I GRAND TOT AL 7,122,278 4,767,772 702,533 655,353 608,360 13,856,296
I
I
I
Monda)' September 12, 2005
I 19
Capital Improvement Program I
City of Shorewood, Minnesota I
PROJECTS BY FUNDING SOURCE WITH BALANCES
2006 thru 2010 I
I
Source Project# Priority 2006 2007 2008 2009 2010 Total I
Donations
Beainnina Balance
Freeman Park-Wetland Enhancement/Interpretive Cen P-07-02 0 42,800 42,800 I
Skate Park-Plaza Picnic Area P-08-01 0 8,333 8,333
Donations Total 42,800 8,333 51,133 I
Equipment Replacement Fund
Beainnina Balance $136,136 ($149,642) ($255, 164) ($308,697) ($582,005) ($625,365) I
Groundsmaster Mower E-02-57 0 23,029 23,029
Air Compressor E-05-38 0 14,409 14,409 I
Dump Truck Lighting System E-OS-O 1 0 4,000 4,000
Dump Truck - Ford L8000 E.06-33 0 123,735 123,735
F350 & Flatbed E-06-49 0 36,558 36,558 I
Dump w/Plow and SND E-06-54 0 121,485 121,485
Trail King Trailer E-07.21 0 8,189 8,189
Ford 555 Backhoe E-07-22 0 64,459 64,459 I
Tennant 240 Floor Sweeper E-07-46 0 12,401 12,401
Mower - Toro Groundsmaster 325D E-07-70 0 20,473 20,473 I
Tractor - Ford 3910 E.08.35 0 31,633 31,633
Speed Awareness Display E.08-51 0 21,900 21,900
Dump Truck E-09-65 0 136,654 136,654 I
Dump truck - Ford E.09-68 0 136,654 136,654
Trailer E-10.41 0 3,027 3,027
42"-48" Walk-behind Mower E-1D-73 0 2,895 2,895 I
Equipment Replacement Fund Total 285,778 105,522 53,533 273,308 43,360 761,501
G.O. Bonds-2007 wi City Hall I
Beainnina Balance $4,000,000 $3,940,000 $300,000 $300,000 $300,000 $300,000
City Hall Project PF-06-02 0 3,300,000 3,300,000 I
Public Works Addition (Bay w/lift) PF.06.03 0 60,000 340,000 400,000
G.O. Bonds-2007 w/ City Hall Total 60,000 3,640,000 3,700,000 I
General Fund I
Beainnina Balance $2,941,223 $2,926,223 $2,921,223 $2,916.223 $2,911,223 $2,906,223
Land Conservation Easements LO-04-01 0 5,000 5,000 5,000 5,000 5,000 25,000
MOl/day September 12,2005 I
20
I Source Project# Priority 2006 2007 2008 2009 2010 Total
Document Retrieval System Upgrades PF-06-04 0 10,000 10,000
I General Fund Total 15,000 5,000 5,000 5,000 5,000 35,000
I Grant Money
Beainnina Balance
Freeman Park-Wetland Enhancement/Interpretive Cen P-07-02 0 342,400 342,400
I Skate Park-Plaza Picnic Area P-08-D1 0 8,334 8,334
Grant Money Total 342,400 8,334 350,734
I Local Street Reconstruction
I Beainnina Balance $1,068,222 $422 ($342,578) ($753,578) ($1,014,578) ($1,275,578)
Brand Circle Pavement Reclamation LR-01-Q4 0 57,000 57,000
Amlee Road Pavement Reclamation LR-01-06 0 85,800 85,800
I Bituminous Overlays LR-03-Q4 0 95,000 95,000 95,000 95,000 95,000 475,000
Bituminous Sealcoating LR-03-05 0 66,000 66,000 66,000 66,000 66,000 330,000
Wedgewood Drive Overlay & Reconstruction LR-Q4-01 0 240,500 240,500
I Pavement Reclamation Wood Duck Circle LR-OS-Q1 0 96,500 96,500
County Road 19 Entry (Gateway) LR-OS-02 0 10,000 10,000
Star Circle Reconstruction LR-06-01 0 57,000 57,000
I Star Lane Reconstruction LR-06-02 0 265,000 265,000
Retaining Wall & Guardrail-Lk Linden DrNellowston LR-06-03 0 27,000 27,000
I Guardrail-Excelsior Blvd/Footprint Lk LR-06-Q4 0 22,000 22,000
Guardrail-Spring Circle LR-06-05 0 24,000 24,000
Relocate Retaining Wall-Maple Ln/Shady Island LR-06-06 0 22,000 22,000
I Beverly Dr Pavement Reclamation LR-07 -01 0 82,000 82,000
Street Reclamation Projects LR-07-02 0 100,000 100,000 100,000 100,000 400,000
Bracketts Rd Pavement Reclamation LR-OS-01 0 150,000 150,000
I Local Street Reconstruction Total 1,067,800 343,000 411,000 261,000 261,000 2,343,800
I Met Council Grant Money
Beainnina Balance $70,000 $0 $0 $0 $0 $0
I Gideon Glen Improvements(City Costs) STM-04-01 0 : 70,000 70,000
Met Council Grant Money Total 70,000 70,000
I MSA Advance/(Repay)
Beainnina Balance $885,000 $1,066,000 $1,247,000 $1,428,000 $1,428,000 $1,428,000
I CR 19 Intersection Realignment MSAOS-06 0 -181,000 -181,000 -181,000 -543,000
MSA Advance/(Repay) Total -181,000 -181,000 -181,000 -543,000
I MSA FundinJ,?;
Beainnina Balance $126,000 $54,000 $54,000 $54,000 $54,000 ($50,000)
I Vine Hill Road - Mill and Overlay MSA-03-05 0 104,000 104,000
Yellowstone Trail- Bit Overtay MSA.04-01 0 72,000 72,000
I Monda}' Seprember /2, 2005
21
Source Project# Priority 2006 2007 2008 2009 2010 Total I
MSA Funding Total 72,000 104,000 176,000 I
Municipal Water Fund
Beainnina Balance $2,303,810 $2,178,710 $2,156,710 $2,134,710 $2,113,665 $2,013,665 I
Freeman Park-Drinking Fountain at Eddy Station P-06-06 0 6,000 6,000
Skate Park-Drinking Fountain P-Q6-07 0 6,000 6,000
Manor Park-Manor Park Pond WA Quality Improvements P-06-08 0 5,000 5,000 I
Amesbury Polyphosphate System W-Q4-08 0 12,100 12,100
Amesbury Well Controls Replacement W-05-02 0 75,000 75,000 .1
Boulder Bridge Submersible Well- Pull & Inspect W-05-03 0 21.,000 21,000
S.E. Area Lineshaft Well- Pull & Inspect W-Q6-01 0 22,000 22,000
Amesbury Lineshaft Well- Pull & Inspect W-07-02 0 22,000 22,000 I
Boulder Bridge Well #2 - PuU-& Inspect W-09-01 0 21,045 21,045
Water System Improvements W-10-01 0 100,000 100,000
I
Municipal Water Fund Total 125,100 22,000 22,000 21,045 100,000 290,145
Park Foundation Donations I
Beainnina Balance
Park Improvements P-04-03 0 5,000 5,000 5,000 5,000 5,000 25,000 I
Park Foundation Donations Total 5,000 5,000 5,000 5,000 5,000 25,000
Park Fund I
Beainnina Balance $241,905 $148,405 $134,405 $126,072 $126,072 $126,072
Badger Park - Resurface tennis courts P-Q6-01 0 20,000 20,000 I
Badger Park-Football and Hockey Lighting P-Q6-Q2 0 45,000 45,000
SilveIWood Park-Erosion Control P-06-03 0 8,000 a,ooo
Skate Park-Equipment Rehabilitation P-06-04 0 3,500 3,500 I
Minnewashta Dog Park-Matching Funds P-Q6-05 0 5,000 5,000
Freeman Park-Drinking Fountain at Eddy Station P.06-o6 0 6,000 6,000
Skate Park-Drinking Fountain P-Q6-07 0 6,000 6,000 I
Cathcart Parks-Resurface Tennis Court P-07 -01 0 14,000 14,000
Skate Park-Plaza Picnic Area p-Oa-Ol 0 8,333 8,333 I
Park Fund Total 93,500 14,000 8,333 115,833
Public Facilities/Office Equipment I
Beainnina Balance $105,111 $16,111 ($11,139) ($21,139) ($31,139) ($41,139)
Computer Upgrades PF-03-Q6 0 10,000 10,000 10,000 10,000 10,000 50,000 I
Civil Defense Sirens PF.05-05 0 25,000 25,000
Network (Computer) Upgrade PF-06-01 0 17,250 17,250
City Hall Generator PF-06-05 0 16,000 16,000 I
Public Works Building Generator PF-06-06 0 38,000 38,000
Public Facilities/Office Equipment 89,000 27,250 10,000 10,000 10,000 146,250 I
Total
Mot/da}' Seprember 12.2005 I
22
I Source Project# Priority 2006 2007 2008 2009 2010 Total
I Sanitary Sewer Fund
Beainnina Balance $3,282,450 $3,090,450 $2,942,450 $2,801,450 $2,751,450 $2,701,450
Infiltration and Inflow Reduction SS-03-0S 0 SO,OOO SO,OOO SO,ooO SO,OOO SO ,000 2S0,OOO
I Lift Station 17 Rehabilitation SS-04-01 0 e1,OOO e1,000
Lift Station 16 Rehabilitation SS-OS-o2 0 2S,000 79,000 104,000
Lift Station Pump Rebuilds and Mountings SS-06.01 0 30,000 30,000
I Portable Lift Station Control Panel SS-06-Q2 0 6,000 6,000
Lift Station 12 Rehabilitation SS-07-o1 0 19,000 91,000 110,000
I Sanitary Sewer Fund Total 192,000 148,000 141,000 SO,OOO 50,000 581,000
Stormwater Management Fund
I Beainnina Balance $274,084 $219,084 $148,284 $116,284 $86,284 $56,284
Freeman Park-Wetland Enhancement! Interpretive Cen P.07.02 0 42,800 42,BOO
I Glen Road Drainage STM.04.02 0 2S,OOO 2S,000
Mise Stomnwater Projects STM-04-05 0 30,000 30,000 30,000 30,000 30,000 1 SO ,000
Storm water Management Fund Total 55,000 72,800 30,000 30,000 30,000 217,800
I Water Revenue Bonds-200S
I Beainnina Balance $1,471,500 $460,600 $480,800 $460,600 $460,600 $480,600
Woodhaven Well Interconnect with Chanhassen W-03-0S 0 17 4,SOO 174,SOO
Water Meter Radio Read Project W-03-06 0 210,000 210,000
I Interconnection of Amesbury & SE Area Wells W-07-01 0 626,400 626,400
Water Revenue Bonds-200S Total 1,010,900 1,010,900
I GRAND TOTAL 2,960,078 4,Se6,772 521,533 655,353 608,360 9,332,096
--------..-----.---.-------.-.,.-....--.--
I
I
I
I
I
I
I
I Monday September 12. 2005
23
~
....
-I
I
H
(J\
-0
)>
<i'
m
H
Z
-I
m
Z
t=t
o
z
)>
r
!<
r
m
..."
-I
{P
r
)>
Z
^
-------------------
U)
f-
u
w
....,
0
a.
0-
Z
'<
..J
0-
f-
Z
w
~ In
W C'o.I
>
0
a.
0-
~
H
..J
'<
f-
H
0-
'<
U
.
H
H
H
-------------------
....,
0)
-t
I
H
(J)
"
~
ij)
m
H
Z
-t
m
Z
;:t
o
z
~
r
~
r
m
"
-t
0:7
r
~
Z
^
-------------------
j~i:" Percent InllaUon at Cast Basis assumea per year
Unl Maael Acq Ute Year 01 Cast I I I I I I I I I I I I I
I I I I
No Year CescripUan Cate (Yrsl Rplmt Basis 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
~1:; Ii -.' S - ;:,~:.i', Ii - ~. .. Ii '. ~.' S :",h S . 2~~: S . ~~';'. Ii . ';;~~;. S - .... S
. .-.... S . ~/: :::-:. $ - ",,,. $ $ - ..... S '',C''''" $ - . . S - ;..',':~, Ii
Trailer 24' - Trail Kine 1987 20 2007 S 7,000 ...,..", S . .~",':'" S .b. S 8,189 "'.': S ... S .,:..-,
I-
Z
w
~
a..
1-1
:)
(J
w
-
-
'+- 0- 0
Oa>~
..s::-g
00-
+- 0
V) 0
'e
o
c
o
o
~
c
o
c:
o
+-
c
o
E
~
o
~
0..
..s::
o ~
o :::J
~-o
+- ~
o..s::
..s:: 0
+- V)
L. ~
o..s::
~ +-
>-'+-
~ 0
..s:: ~
+- V)
V) 0
~ e-
'+- :::J
+- 0-
C
~ 0
-0 L.
~
~ >
:::J 0
-0
~
..s::
u
V')
+-
- 0
-o-o..s::
c ~ +-
:::J 0 V)
LL.-~
O-u
~ L.
L. :::J
~ 0
.0 ~
L.
~+-(\) V)~
..s:: 0 '+- ~
+-..s::~3:+-:::J
+-~>-811
b ~ U :!:: ~ ..s::
:E~:..c\;Jc:~
o ~ ~ 0
-0 0- > ..s:: V) ..s:: >
c _V) 0 +- V) U 0
0>- ,>-:::JL.
+-+-'+-+-c; V) 0-
V) ., H C C 0..
L."" ~OV)O
~ 1 -0 ~ C <0:( _V)
5+-~UO u
V) ::J -S! -0 t\i 5
o 11o..c:::Jo
+-t:i..s::~o-o\.)
1= ~L.~1>-
o +- 0 -- 0 +-
+- c c '+- 0..0 V) ()
o L. ~ ~
+-oE..s::-o~~~
>- O-E 0.. 3: ~ L. ..s:: ..s::
L. -- +- :::J >- +- +-
'-:::J -0 - ..s::
o o-~~t:c+-
~ V) (\) .::;..s:: 0 . 3:
~ +-'+- +- ~ 0 0-,,,
A' H 0 0 :::J ~
.., C V) '+- ....
C ~ -- 0 -0 0
~ ~ >-+- >-~-o
.0 V) -- L. .- L. > ~
-00..0 CO 0.0
~ ..s:: ~ (\) ti E 0
c u ~..s:: +-
o u 3:..s:: ~
_V) ~ ~ -0.0 ~
~5 ~]~ ~~
()'+- ~ >-L. E ~
- ..s:: ~ 0 V)
~03:.oU~O
..s:: - ~ ~..s::
+- 0.. -0 -0 L. U U
>- ~ ~ 0 -;: L.
V) +- U -0 .....:::J
+-V)OCV)~O-
~ .- a.. ~ 0 > +-
E~~~~..s::oc
:::J L. ~ ~ ~
b 11 ] .c -~ 1= [
..s::..s::: o.o~ ~:::J
+-O+-S!>Eo-
V) .... ~ ~
+-V)~OU-o
CO,+-..9 C
~1=~Ho..O
E ~ L. ~ V)
~ E ~ L. ~
..9 0-.0 ~ .c g'
o..:::JC L.O
~0-000..r.:
L.~U-o~U
~
..r.: _
..... 3:
+-
c:
~
E
~
u 0
o
0.. +- 0
~ >-'U
C:i.. - C
~ 0
+- ~ C
C-'+-
~ .!!! ~ "t
0- +- ..r.: ~
'- C +- -
~~ >-'+-
wE'+-V)
.- ~
~ _e- ~ L.
..r.: :::J ~ 0
L- 0- -0 ::>
r- ~ ._ >
~
-
-
-
- -
to- V) '+- (\) +-
OCO..r.:C
~ 0 +- ~
?""+= ~ E
OO-O~O-
NEL.(\):::J
ofJ1~Jr
5~+-V)~
'+-C-gL...s::
-0 -a 0 g ::
~+-V)>-O
-oL.~ +-
~ ~ U ~ '-
~ 0 C L. C
CV)..200
~~.8~~
o 0 ..r.: ~ +-
+-EV):EV)
o V) 0
..r.: 0 +- (\)
+-~c.,gE
V)c; O+-+-
~ C -0 A' V)
o ~ ..,
L. > U ..r.:
gV)~+-+-
V)..s::..s::g+-
~ ..... U 0
L. 0 -oV)
~ V) ~ A' L.
..s:: -0 ~ :> .., 0
+-C+- -g~
+-:::JOU~>-
V)LL.L.CE3:
O+-+-:::JE~
UCV)O '+-
~~~\.)O+-
L. E L. U X
o ~ ~
,+-~+-+-L.~
U C C C
o 0'- ..r.:
+--~~U~
0-_ E 0 ..s:::
+- ~ .0 0.. 0 +-
eC:i.. g:::J ag'
~ +- ~ ~ 0-.-
+- C V) .., 0 L.
+-~~O'l~:::J
OEL.c..s:::-o
V) 0.. 0 L--o
c: -- '+- V) r- C,\)
o ::J ~ 0
-- o-..r.:..s::: b
tJW+-~:;-o
~ ~ 0 :::J .- 0-
. -,..r.: +- 0.. '+- :::J
~+--O,+-~V)
0.. L. L. 0 +-
o 0 c
.Q '+- ~ g V)
g -g L. += _!!! 0
o -- ..s::: 0 -0 -0
L.+--CC
C ~ __ "!= :::J :::J
LL. 0.. 3: .... '+- LL.
-
-
-
-
-
-
-
-
-
-
l"-
N
-
-
I r:;:':'~-::::~s:r~owe~------ -- -
Il_.- --. ... _.. - ---.--.----..------ -.. .-.---- -.---.----....-.---. -....
Fund I/:
....-........-...-.-..................1
._H'" .... ._____._ .._...__1
1 Description
1 Fustiticution
Prior Expenditures
1 17,500 I EqulpN ehicles/Fumishings
Total Total
1 Prior Funding Sources
17,500 I Equipment Replacement Fund
1 Total Total
Total Cost $70,833
Type Equipment
Useful Life Unassigned
Category PW: Small Tools & Equip
Priority n/a
Contact Public Works Director
Department Equipment Replacement
.
2010 Total Future
23,029 23,029 30,3041
23,029 23,029 Total
2010 Total Future
23,029 23,029 30,3041
23,029 23,029 Total
2006
2007
2008
2009
2006
2007
2008
2009
1
E-OS-38
Project It
I
Project Name Air Compressor
Fund #
I
I
[ Description
C-
Efication
Expenditures
EquipNehicles/Furnishings
Total Cost $14,409
I
l
2006
2007
2008
2009
I
Total
Type Equipment
Useful Life Unassigned
Category PW: Small Tools & Equip
Priority n/a
Contact Public Works Director
Department Equipment Replacement
..__--=:J
2010
14,409
14,409
Total
14,409
14,409
I
Funding Sources
Equipment Replacement Fund
Total
2006
2007
2008
2009
1
2010
14,409
14,409
Total
14,409
14,409
1
I
1
1
I
iHonda)' Seprember 11.2005
29
I
Total Future I
123,735 190,4841
123,735 Total
Total Future I
123,735 190,4841
123,735 Total 1
1
1
1
1
1
I'"~ ..----.. .-.-. ....--- -- _ u . _ _u
I Project # E-06-01
. ~~~~ct N~~_~~y_!~ck !-ighting S~st~~
Fund It
Type Equipment
Useful Life Unassigned
Category Unassigned
Priority nla
Contact Public Works Director
Department Equipment Replacement
Total Cost $4,000
Description
Retrofit DOT safety lighting system on the dump truck,
t Justiflcation
Expenditures
EquipN ehicles/Furnishings
Total
2010
Total
4,000
4,000
2006
4,000
4,000
2007
2008
2009
Funding Sources
Equipment Replacement Fund
Total
2006
'4,000
4,000
2007
2008
2009
2010
Total
4,000
4,000
'\ .~~~~:~~- -'-"-E:06~33'--- -------.. - -- _uU' ...- .--- ----.---.------- -- --l
_p~~~~~~~~~~__p~P- T.~~~~_~~2~ L~~~O_..___ __.._____.... _ ____ ___._u.._..._._ ___._..._J
Fund #
Type Equipment
Useful Life Unassigned
Category Facilities/equipment
Priority n/a
Contact Public Works Director
Department Equipment Replacement
J
Total Cost $314,219
FriPtion
Vusti~ication
Expenditures
EquipNehicles/Furnishings
2006
123,735
123,735
2007
2008
2009
2010
Total
Funding Sources
Equipment Replacement Fund
Total
2006
123,735
123,735
2007
2008
2009
2010
MOllda." S.'prember 12. 2005
30
I
I
1
1
1
I
1
I
I
I
11'"...... ....,.-.......-.-----......, ..,... .,--....-...........--,-..............--..,..........
! Project # E-06-49
I Project Name F350 & Flatbed
I--'---''';:;~d #.------------..----.--
I Description
II Justification
Expenditures
EquipN ehicleslFumishings
... ......-...-...-"- -_.. "..-------.-\
. .. ,_____.___ ___._" ... ______.__..__.........__,.._.__..,_.._.'........ ..J
Total Cost $95,089
Type Equipment
Useful Life Unassigned
Category pW: Vehicles
Priority nla
Contact Public Works Director
DepartIllent Equipment Replacement
I
Total
2010
I
Funding Sources
Equipment Replacement Fund
Total
2006
36,558
36,558
2008
2009
2010
Total Future
36,558 58,531 I
36,558 Total
Total Future
36,558 58,531 I
36,558 Total
2007
2006
36,558
36,558
2008
2009
I
2007
I r---'--- --.--...-. .' _.-- -- ---------.-...----------.-... - ...-- ..-, - -" - ._._-, -..".-.---..- .-.-.-
! Project If E-06-S4
II P-'~j""_N:~Du~~!!'lo~~n~S~ .~------ ----~ -.
I ~escriPlion
I tstification
l
Total Cost $308,506
Type Equipment
Useful Life Unassigned
Category PW: Vehicles
Priority nla
Contact Public Works Director
Department Equipment Replacement
~
I
Expenditures
EqulpN ehicles/Furnishings
Total
I
Funding Sources
Equipment Replacement Fund
Total
I
I
I
I
I
I
MUI/day Seprember J 2. 2005
2006
121,485
121,485
2008
2009
2007
2010
Total Future
121.485 187,021 I
121,485 Total
Total Ji'l1tUl"l~
121,485 187,021 I
121,485 Total
2006
121,485
121,485
2007
2008
2009
2010
31
Type Equipment
Useful Life Unassigned
Category PW: Vehicles
Priority oJa
Contact Public Works Director
DepartInenr Equipment Replacement
r;~~j~~~;----- E-07 - 21
'1 Project Name Trail King Trailer
.__"..____~_"_,_~,...__.~__._'__w.,__,..._._._._..________._.~,._.._..__.._._.,_'__
Fund It
Total Cost $8,189
----J I
2008 2009 2010 Total I
64,459
64,459
2008 2009 2010 Total I
64,459
64,459 I
I
I
I
I
I
Description
\ Justification
Expenditures
EquipN ehicles/Fumishings
Total
2010
Total
8,189
8,189
2008
2009
2006
2007
8,189
8,189
Funding Sources
Equipment Replacement Fund
Total
2006
2007
8,189
8,189
2008
2010
Total
8,189
8,189
2009
-----------"-----.---------..-------.---------"" ......-----...----..-"----...----.---------.----------]
ProjecU E-07-22
Projcct Namc Ford 555 Backhoe
__. ._"_____....,......~.,.,_.,"_.___.._....,_..___._"______._,_,._..._.___~_.'_._....__ .,.._ ,_.._...._...~_.._""'__._._...._..._...._....__._'.h.h_...".__..__..___."".._-.'__ ._._............_...
.._,.
Fund It
Type Equipment
Useful Life Unassigned
Category PW: Vehicles
Priority nla
Contact Public Works Director
Department Equipment Replacement
ToM Cost $64,4$9
~scriPtion
r ustification
L__
Expenditures 2006 2007
EquipNehicles/Fumishings 64,459
Total 64,459
Funding Sources 2006 2007
Equipment Replacement Fund 64,459
Total 64,459
Monday September n. 2005
32
I
I
I
I
I
I
I
I
I
___-.-J
I
I .......-.------...--.......-- ......-.-.-......--.--.-----...--..-.
I Description
Total Cost $12,401
Type Equipment
Useful Life Unassigned
Category PW: Vehicles
Priority oJa
Contact Public Works Director
Department Equipment Replacement
Project #
E-07 -46
Project Name Tennant 240 Floor Sweeper
I L._. ....-..-.-.----.-.-.---.---- _.____._._______._.___.__.___......._.._...__.___n._..-..------.--......-..-.--....-.....-- -.. .
Fund It
I [JUstification
I
Expenditures 2006 2007
EquipN ehicles/Fumishings 12,401
Total 12,401
Funding Sources 2006 2007
Equipment Replacement Fund 12,401
Total 12,401
2008
2009
2010
Total
12,401
12,401
I
2008
2009
2010
Total
12,401
12,401
I
I
.-._.__.,',.."".._.,-----,,,._-._.__.,-_._._._..._~.._---,-_._-,--._--,--~.._,_._..."_._..._._..._.._..._--'-.--.......-.----.-..--..---."---."
I
J
Total Cost $82,865
Type Equipment
Useful Life Unassigned
Category Facilities/equipment
Priority nla
Contact Public Works Director
Depllrtmcnt Equipment Replacement
Project It
E-07-70
I
Project Name Mower - Toro Groundsmaster 325D
. -,,-,.. .,......-..-. .---.--.-,,,.-..---..--.-...-... ~- "......,,-,-,-_.._-'_..._--~_.._~._'._._"...'-. ."'...--... ._>.-.-...- .-.,.........-.....".''',',...''.........-....."..'.,..-.......-...
........-..--........".-....---..-....,.,.-...-...
Fund It
I Description
L
\ Justification
I
-..J
"l
I
Expenditures 2006 2007
EquipN ehicles/Fumishings 20,473
Total 20,473
Funding Sources 2006 2007
Equipment Replacement Fund 20,473
Total 20,473
2008
2009
2010
Total
20,473
20,473
Future
62,3921
Total
I
I
2008
2009
2010
Total
20,473
20,473
Future
62,392\
Total
I
I
I
I
I
Monda)' Seprember 12. 2005
33
r;~:~:~-~---_._-E-08~35 .... ...... .-- .--..---...---....-.-.-.-..-..... .---.------..----.-.-----..-..-----.-.--. ..
I Project Nume Tractor - Ford 3910
.....-.-.-.-.---...----.......--.....-..-....-.....----..--.--.--.......----...-.---.---...-.--....--.-......".,.-....,.,.'. ..-.~.._,".','.,._..,-..,_. .,.-.-.--...",....,."..-....--.-..-
Fund #
Total Cost $31,633
I
Description
Type Equipment
Useful Life Unassigned
Category PW: Vehicles
Priority cia
Contact Public Works Director
Department Equipment Replacement
I
I
l Justification
Expenditures
EquipN ehicleslFumishings
Total
2006
2008
31,633
31,633
2009
2007
I
2010
Total
31 ,633
31,633
I
2006
Funding Sources
Equipment Replacement Fund
Total
2007
2008
31.633
31,633
2009
--- --- --.-- ._-- --------... ----------- ------.-------.- ---..- - -------1
r ;~~ject # E-08-51
\_~~~j_e~~~~~~__~R!~~_ Awaren.!~.~~?!~_____.__ ._.._________..__...____ ___.____ .___ .._ _ .
Fund #
I Description
L
L J ustitication
I
Total Cost $21,900
I
L
Prior Expenditures
o I EquipNehicles/Furnishings
Total Total
2006
2008
21,900
21,900
2007
2009
2010
I
Total
31,633
31,633
I
Type Equipment
Useful Life Unassigned
Category PW: Vehicles
Priority nla
Contact Public Works Director
Depl\rbnent Equipment Replacement
I
I
~
I
2010
Total
21 ,900
21,900
I
Funding Sources
Equipment Replacement Fund
Total
2006
2008
21,900
21,900
2007
2009
Monday September 12.2005
34
2010
I
Total
21,900
21,900
I
I
I
I
I
I
I -. ----..--.-..--.--.--..--..--.--...----.-.----..----.--...---.-..
Project #
E-09-65
Project Name Dump Truck
I ----..--.---.------------.----------.-.--
Fund #
I Description
,-"-,.._.,-._,.".".,.,, ...,.,~,,-,..-..-_._......._-_\
Total Cost $347,027
Type Equipment
Useful Life Unassigned
Category PW: Vehicles
Priority n1a
Contact Public Works Director
Department Equipment Replacement
I ~ustification
Expenditures
EquipN ehicleslFumishings
I
Total
2010
I
Funding Sources
Equipment Replacement Fund
Total
I
2006
2007
2008
2009
. 136,654
136,654
2010
I
Total Future
136,654 210,3731
136,654 Total
Total Future
136,654 210,3731
136,654 Total
2006
2007
2008
2009
136,654
136,654
I
E-09-68
.,',.,,,.,'_"'__..__..~_,,_"___._.._._____.._.._._.._~.u.._..___"_..__.__.__.~___..._.'~,"",_..,,_~___._...._....._,__....._.........._.._._.__...M__.._M_~._... .-.-.-......-...,,'.-'......--.--.
Project #
I
Project Name Dump truck - Ford
L .._... _.. ..__..____._.___.__._._..__..._._ ..- ---.- _. .-......-----
Fund #
I l Description
L
Total Cost $136,654
Type Equipment
Useful Life Unassigned
Category Facilities/equipment
Priority n1a
Contact Public Works Director
Department Equipment Replacement
I
~lstification
I
2007
2008
2009
136,654
136,654
I
Expenditur-es 2006
EquipN ehicles/Furnishings
Total
I
I
I
I
I
I
I
Monday Seplember 12. 2005
~
2010
Total
136,654
136,654
2007
2008
2009
136,654
136,654
Funding Sources 2006
Equipment Replacement Fund
Total
2010
Total
136,654
136,654
35
Project #
E-I0-41
ProJect Name Trailer
Fund #
Description
Total Cost $3,027
Type Equipment
Useful Life Unassigned
Category PW: Vehicles
Priority nla
Contact Public Works Director
Department Equipment Replacement
I
I
I
I Justification
Expenditures
EquipN ehicles/Fumishings
Total
2006
2007
2009
I
2010 Total
3,027 3,027
3,027 3,027
2010 Total
3,027 3,027
3,027 3,027
I
E:~: :~~~~:~'-Walk.~bind MO:--~------ -----]
l.__..____.._______.________ .----.----------------... - -----.- - -- --....-.. ....-.-
Fund #
Funding Sources
Equipment Replacement Fund
Total
L
I Descdption
I
L
I J llstit~cation
Expenditures
EquipN ehicles/Fumishings
2008
2006
2007
2009
I
I
2008
Tof:nl Cost $2,895
Type Equipment
Useful Life Unassigned
Category PW: Small Tools & Equip
Priority nla
Contact Public Works Director
Department Equipment Replacement
I
I
___-.J
I
-..J I
2010 Total I
2,895 2,895
2,895 2,895
2010 Total I
2,895 2,895
2,895 2,895 I
I
I
I
I
I
2006
2009
Total
Funding Sources
Equipment Replacement Fund
Total
Mrmdcz." Seprember J:;, 2005
2007
2008
2006
2007
2008
2009
36
z
o
~
H
V)
H
j
C1
u
<
w
u
<
a-
U)
Z
W
a-
o
D
Z
<
D
Z
<
...J
.
co
S::-O
-0 s::
(\).2-0
-o4-(\)
s:: 0 -0
(\) s:: U
Eo(\)
E+--o
8 :~ Vl
(\) ::J ~
L. 0-
'""' u::= (\)
uCJUE
~t5+-
---I'+-OVl
........., u.
l\)..c(\)..s::
l\) -a ..t: +-
+- ::J +- +-
+- s:: CJ
.- s:: s:: l\)
ECJo+-
Eo+- .~
OOOL.
uo~O-
-a ~-o ~
+- 0 '- 0-
s:: ~ Vl 0-
l\)-tA-S::CJ
E+-O
l\) U {Jl
cO'lL.
o -0 l\) 1:
.~ :J +- l\)
>.o'+- E
tD;>-.< +-
-0 :!:: vi E
c U +- E
CJ l\) s:: 0
s:: ..t: l\) U
o +- E
+- +- l\) 0
o 0 Vl :J
>..t: 0 s::
L. +- l\) C
l\) +- s:: 0
VlL.OO
s:: 0 '-
o 0- +- 0
U l\) 5! o~
-0 L. L. In
s:: 0 . l\) -tA-
o s:: ~ 0
---I 0
l\) '+- U 1;
..t: {Jl L. ..s::
I-+-o+-
r-
('OJ
- - - - - - - - - - - - - .- - - - - -
38
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
PROJECTS BY DEPARTMENT
2006 thru 2010
Department Project# Priority 2006 2007 2008 2009 2010 Total
Land & Open Space Acquisition
Land ConselVation Easements LO.Q4.01 0 5,000 5,000 5,000 5,000 5,000 25,000
Land & Open Space Acquisition Total 5,000 5,000 5,000 5,000 5,000 25,000
GRAND TOT AL 5,000 5,000 5,000 5,000 5,000 25,000
,'.,fllI/day September ]2. 2005
I -...-.....-............----..---.--...........-.......... ........--..-.-.-....-.-....-...-----....-...-.....--............-..-....--]
Project # LO-04-01
Project Name Land Conservation Easements
I ....-...-....-.-........--.-.........-----.-.----.---.....-....--..-.---.-..-.." ............ ......--.-...-..----.....-
Fund #
I
Description Total Cost $35,000
Annual appropriation for land acquisition or conservation easements.
Type Improvement
Useful Life Unassigned
Category Land & Open Space Acquisitio
Priority nla
Contact Finance
Department Land & Open Space Acquisitio
II Justification
I
Prior
10,000 I
Total
2006
5,000
5,000
2007
5,000
5,000
Expenditures
Land Acquisition & Easements
Total
2008
5,000
5,000
2009
5,000
5,000
2010 Total
5,000 25,000
5,000 25,000
2010 Total
5,000 25,000
5,000 25,000
I
Funding Sources
General Fund
2006
5,000
5,000
2007
5,000
5,000
Prior
10,000 I
Total
Total
I
I
I
I
I
I
I
I
I
I
I
I
I
MOllday September n. 2005
39
2008
5,000
5,000
2009
5,000
5,000
~
o
-t
I
H
U\
-0
~
(i)
m
H
Z
-t
m
Z
;:t
o
z
~
r
~
r
m
-n
-t
OJ
r
~
Z
^
-------------------
Q
Z
::>
lL
Z
o
t:
u
::>
Cl.
l-
V)
Z
o
u
w
Cl.
I-
w
w
Cl.
l-
V)
..J
'C(
U
o
..J
-
-
+- +-
u a. VI
:::J Q) -0
t.. U 0
+- X 0
~ Q) (1.
o ~ >--
U "U +-
Q) 0 C
t.. 0 :::J
-o~8
t..-o
o c
...s::: 0
V)
::J
..0
o
+-4-
-0 0
Q)
...s:::
VI
.
u
VI
>--
o
;:
>--...s:::
+- 0"1
UI
..0
OQ)~
+- . C
VI .c ::J
Q) +- t..
VI c f-
...s::: Q)
-g;~
~ V)
c
o
+-
U
::J
t..
+-
VI
c
o
u
Q)
(1.4--0
o
+- '<(
Q)
Q) 0 Q)
t.. +-
+- C 0
V) '(1 +-
+-V)
o c
U '(1
.3 E
Q)-o
.c c
I- 0
VI ~
>--VI
o Q)
;: +-
-0 :::J
o 0
o t..
t.. ,.....
Q) '<(
...s:::V)
+-:E
'-'
-
o
a.
U
C
:::J
:E
VI>-->--
>--:!::.~ .
tj~--o
;:Q)~5
]-C+-lL
o I- t: >--
t.. Q) CJ
E ;:
VI-o
VI 0
Q) 0
~CL.
'4- -a ....
Ot......-
l\) >-- 0
VI tj U
l\) ~ ;:.3
E <.!> -0 l\)
~\ 0 .-
O..c~+=
10+-04-
>--E+-o
(i"j 0 c >-
+- t.. Q) :!::
tj'4-E>
E Q) _l\) ~
'x 5 0.. ~.
~ U E 0
~~"U l\)
....- c-C
....CJtj+-
VI . ~ l\) l\)
C 0.. t..
.- >-- +- :::J
o +- tj VI
+- Q)
C VI t.. C
'(1 l\) U 0
Et..o+-
~ +- VI
-0 .- "U +-
o -0 l\) C
o C l\) l\)
;: l\) s:: E
~ ~ l\) l\)
ol\)...s:::~
..s:::-c+-t..
V) U -0 0..
4- :J l\) E
o VI VI
t.. VI U
>--0::J_
+-'4-~..o
U V) '- :J
-0 "U a.
l\) C VI t..
-C ::::J 0 0
I-lL...s:::'4-
-a-o
U s::
o~
-
-
VI E
VI l\)
tj +-
..o~
CJV)
::::J +-
C C
C l\)
CJ E
C Q)
CJ 01
o
C C
o~~
VI <:; U
~ +- .~
;: ~ ~
-OEa.
o Q) C
o > 0
t.. CJ
Vlo..t
->- (1. :::J
:!:: w J:
\J V) VI
l\) '<( s::
...s:::IS
+-0..'4-
'4- l\) 0
o -C >--
+-+-
-a 0"1 t..
C 0
VI VI t..
l\) :J 0..
+-
tj -0 l\)
:J l\) -C
-a-o+-
> t.. 01
l\) 0 s::
t.. ~ +-
l\) 0
l\) t.. :J
C l\)-a
01 t.. >
s:: 0 l\)
w ~ C
>--o+-
+- +- VI
U CJ VI
::::J VI
l\) -a CJ
-C > 0
I-w+-
-
-
C >--
CJ 0
;:
~-o
+- CJ
~ 0
. ...., t..
0_
t.. 0
a.u
o
>--
o l\)
;:-c
-0 +-
CJ t..
o 0
t..'4-
o >--
U t..
o tj
E
...s::: E
U ::::J
o VI
l\) l\)
U
t.. t..
o ::::J
'4- 0
VI
VI 01
Cj s::
VI .-
0-0
a.c
o ::::J
t.. '4-
0..-0
+- s::
U CJ
l\) -
. ...., l\)
~:;
a.'1J
l\)
l\)-C
t.. U
o VI
O1t
C l\)
. ~ "e?
o t..
0..
o
'4-Cj
l\) t..
-c l\)
I- ~
-
E
Q)
+-
VI
>--
VI
-
-
-
-
-
-
-
-
-
....
~
-
-
11---....----.....------...--........-..-.-..-.--..-------. .... .......-....-.....-...-...--...-.-......-.-..-------------..- ....-. ..-... ..........--........-.....--.
I Project /I: LR-Ol-04
Project Name Brand Circle Pavement Reclamation
1 -.------.---.--..--..------.-.-..----.--........-.-.........................------.---.-..--....-...--.------. ....-.-....--...-...--
Fund /I:
Type hnprovement
Useful Life Unassigned
Category Roadways/streets
Priority n/a
1 Description Total Cost $57,000
This project includes reclamation of Brand Circle from Mill Street to the cul-de-sac.
Contact Engineer
Department LocalStreetReconstruction
1 \ Justitication
Expenditures 2006
1 Planning/Design/Survey 7,000
Construction/Inspection 43,475
Contingencies 6,525
1 Total 57,000
Funding Sources 2006
1 Local Street Reconstruction 57,000
Total 57,000
2007
2008
2009
2010
Total
7,000
43,475
6,525
57,000
2007
2008
2009
2010
Total
57,000
57,000
1
Type hnptovement
Useful Life Unassigned
Category Roadways/streets
Priority nla
Contact Engineer
Department Local Street Reconstruction
1
Project /I:
LR-Ol-06
Project Name Amlee Road Pavement Reclamation
Fund /I:
I'
Description Tutul Cost $91,800
This project includes Pavement Reclamation from Manitou Lane to the cul-de-sac,
l
1
I Justification
I
J
1
Prior
6,000 I
Total
Expenditures
Construction/Inspection
Contingencies
2006
75,600
10,200
85,800
2007
2008
2009
2010 Total
75,600
10,200
85,800
1
Total
1
Prior
.6,000 I
Total
Funding Sources
Local Street Reconstruction
2006
85,800
85,800
2007
2008
2009
2010
Total
85,800
85,800
Total
1
1
1
1
1
lvlollday S~pre/llber 12, 2005
43
1...........---.---.----..-..--..--.-----.........--......----...---...-...........---.-..---...-....----.......-..........-.............J-....
I Project /I: LR-03-04
Project Name Bituminous Overlays
M__________..._~,......_._._ . -.---.~.......-..-~--.-.---....--_.._-.--.-......-_..--~._.________
Fund #
Type Improvement
Useful Life Unassigned
Category Roadways/streets
Priority nla
1
I
Contact Engineer
Description Total Cost $750,000 Department Local Street Reconstruction 1
The City has traditionally allocated $80,000 per year towards bituminous overlay projects. It is recommended that this amount be increased to $90,000 per year.
I Justification
Prior Expenditures 2006 2007 2008 2009 2010 Total
275,000 I Construction/Inspection 83,750 83,750 83,750 83,750 95,000 430,000
Total Contingencies 11,250 11 ,250 11 ,250 11,250 45,000
Total 95,000 95,000 95,000 95,000 95,000 475,000
Prior Funding Sources 2006 2007 2008 2009 2010 Total
275,000 I Local Street Reconstruction 95,000 95,000 95,000 95,000 95,000 475,000
Total Total 95.000 95,000 95,000 95,000 95,000 475,000
1
1
1
1
\..........-.------...-.....-.---...-..--.-.---..................--....----....---....-----... .----...........--......-....---.:..--.........--1
Project # LR-03-0S
I Project Name Bituminous Sealcoating I
_......_ ."_"~ ...~._..._.._____..__-..___._...___....n_.'_____.".~.______....____._.._.__...._..___.._._._....__,._......_.__.._.._..___-'-_,".'-_...._....._.__....
1
Fund #
Type Improvement
Useful Life Unassigned
Category Roadways/streets
Priority nla
Contact Engineer
Department Local Street Reconstruction
1
Description Total Cost $511,000
The City has traditionally allocated $55,000 per year towards bituminous sealcoating.
1
1
I Justification
Prior Expenditures 2006 2007 2008 2009 2010 Total
181,000 I Construction/Inspection 60,500 60,500 60,500 60,500 66,000 308,000
Total Contingencies 5,500 5,500 5,500 5,500 22,000
Total 66.000 66,000 66,000 66,000 66,000 330,000
Prior . Funding Sources' 2006 2007 2008' 2009 2010 Total
181,000 I Local Street Reconstruction 66,000 66,000 66,000 . 66,000 66,000 330,000
Total Total 66,000 66,000 66,000 66,000 66,000 330,000
I
1
1
1
1
1
1
I
44
1
Monday Seprember 12, 2005
I
Project #
LR-04-01
Type Improvement
Useful Life Unassigned
Category Roadways/streets
Priority n1a
Contact Engineer
Department Local Street Reconstruction
Fund #
I Project Name Wedgewood Drive Overlay & Reconstruction
L...._..._._._____ ----..-.....---.------.-..-.....-------..-...-.----.-.-.-.-.---..-.-...-...-....
I Description Total Cost $252,500
Includes overlay from Smithtown to Mallard Lane and reconstruction from Mallard Lane to the cul-de-sac.
I I Justification
I
Prior
12,000 I
Total
2006
212,450
28,050
240,500
Expenditures
Construction/Inspection
Contingencies
I
Total
2010
I
Prior
12,000 I
Total
Total
Funding Sources
Local Street Reconstruction
2006
240,500
240,500
I
2007
2009
Total
212,450
28,050
240,500
2010
2008
2007
2008
2009
Total
240,500
240,500
I
Project #
LR-OS-Ol
Type Improvement
Useful Life Unassigned
Category Roadways/streets
Priority nJa
Pro.iect Name Pavement Reclamation Wood Duck Circle
Description Total Cost $96,500
I This project includes pavement reclamation from County Road 19 to the cul-de-sac.
pstitication I
I
Fund #
I
Contact Engineer
Department Local Street Reconstruction
I
Expenditures
Planning/Design/Survey
Constructionllnspection
Contingencies
2006
7,000
78,700
10,800
Total
96,500
2007
2008
2009
Total
96,500
96,500
I
Funding Sources
Local Street Reconstruction
2006
96,500
96,500
I
Total
I
I
I
I
IHonday Seprember 12. 2005
2007
2008
2009
2010 Total
7,000
78,700
10,800
96,500
2010
45
r.---.--..~._-'_._...__._.m___.__...._'_u_.__.._-_..~""".,,~..._.,.._...--,,_..~-_...._-_.-.--,.~-,...,...,..~.,..,,'....,..,. ... ._...--""~",."..-_..,---_.,,_.,.,""._,."._,_.._"--,,,_.,.___".."4_..
._...,.._,,.,.4~.._
I Project # LR-OS-02
l:ro~~~Na~~._~~~~ty Road 19 E~~~~~~~~~!L___..._____.____..___...m._...._..__.___
Fund #
Description
North end sign and landscape for County Road 19 improvement
Total Cost $10,000
Type Improvement
Useful Life Unassigned
Categor-y Roadways/streets
Priority nla
I
I
Contact Engineer
Department Local Street Reconstruction
I
I
I Justification
Expenditures
Construction/Inspection
Total
2006
10,000
10,000
2007
2008
2009
2010
I
Total
10,000
10,000
2010
I
Funding Sources
Local Street Reconstruction
Total
2006
10,000
10,000
2007
2009
Total
10,000
10,000
I
2008
Type Improvement
Useful Life Ullassigned
Category Roadways/streets
Priority nla
Contact Engineer
Department Local Street Reconstruction
I
.-....-..--.-..--...----------....--...--.-----.-....--..... --..---..--....--.-.---...-.......... .-...----...-.......-.....-..----.........\
Project # LR-06-01
Project Name Star Circle Reconstruction I
i._.......___...._._...______.._._.._____....__...__.______--...-...-----...-.-..--..........--.-.-..--...-------.........-..------......-..-.--..
Fund #
~~-
~uction
~ Justification
Expenditures
Construction/Inspection
Contingencies
Toml Cost $57,000
I
I
L
I
Total
Funding Sources
Local Street Reconstruction
Total
Iltfollda." Seprelf!ber 12. 2005
2006
50,700
6,300
57,000
2008
2009
2007
2010
I
Total
50,700
6,300
57,000
I
2006
57,000
57,000
2008
2009
2010
Total
.. . 57,000
57,000
I
2007
46
I
I
I
I
I
I
1-- ---.----- ..-----.- ------ ,..- -,------ u__ _n____ -- -- -----, - --- ---- - -- ----- - - - .- - - ----1
I Projcct # LR-06-02
'I' Project Name Star Lane Reconstruction I
_~_~.....__._.______.~__._________._ ..,..~_ 04_' .... . _. ~ ___._._._.~._____.__ _.._....__
Fund It
I
I
Description
Reconstruction
I VUSrifiCa'iOn
I
Expenditures
Construction/Inspection
Contingencies
I
Total
I
Funding Sources
Local Street Reconstruction
Total
I
2006
235,000
30,000
265,000
Total Cost $265,000
2007
2008
2009
Type Improvement
Uscful Life Unassigned
Category Roadways/streets
Priority nla
Contact Engineer
Department Local Street Reconstruction
2010
Total
235,000
30,000
265,000
2007
2008
2009
Total Cost $27,000
2010
Total
265,000
265,000
Total
2006
27,000
27,000
2006
265,000
265,000
I
[-;~Oje~~-;---LR:06-03------ -- ---- -- --------. - -- ---,-- - ---.--"---'- --- ,- ---- -- ------]
Projcct Name Retaining Wall & Guardrail-Lk Linden DrNellowston
4""'_ _. _....___._____._. ___.. .___.. .-.____._..._.._..... ______.__._n._.._ - -- ..-....--.- .
Fuud #
I
..J
I
l Description
I
\ Justification
Expenditures
Construction/Inspection
I
I
I
Funding Sources
Local Street Reconstruction
I
I
I
I
I
Monda." Sepr"mber 1::2.2005
Type Improvement
Useful Life
Category Unassigned
Priority nJa
Contact Public Works Director
Department Local Street Reconstruction
Total
2006
27,000
27,000
2007 2008
2009
2007
2008
2009
47
1
2010 Total
27,000
27,000
.2010
Total
27,000 .
27,000
.........-.----.-....... ..-..---...-....--.-.-..-..---.---.......-.---..-.......-......--......--....-..-.-..--.-.......-.............-...............-.....-..-.-..........--.]
Project It LR-06-04
Project Name Guardrail-Excelsior Blvd/Footprint Lk
.~....,__.._.._,.__.._,,___.__._._.__N__ ' _.._...-~_._~.._~._---_.._-_."--,--_.~,._'_._.._..---_..-
Fund It
Description
Total Cost $22,000
Type Improvement
Useful Life
Category Unassigned
Priority cia
Contact Public Works Director
Departlll.ent Local Street Reconstruction
I
I
I
p ustification
Expenditures
Construction/Inspection
Total
2006
22,000 .
22,000
2007
2008
2009
I
2010
Total
22,ooQ.
22,000
I
2010
I
Funding Sources
Local Street Reconstruction
Total
2006
22,000
22,000
2007
2008
2009
~~;~::t It--....--- LR-06:0S--.------.---.--.--.-.....--..---.--.-.-----.----"'--"-'
Project Name Guardrail-Spring Circle
----------------------------~
Fund It
~. Description
1 Justification
Expenditures
Construction/Inspection
Total Cost $24,000
Total
22,000
22,000
I
Type Improvement
Useful Life
Category Unassigned
Priority nla
Contact Public Works Director
Department Local Street Reconstruction
I
I
I
J
~I
Funding Sources
Local Street Reconstruction
MO/lday Sepcember 11, 2005
Total
2006
24,000
24,000
2007
2008
2009
2010
I
Total
24,000
24,000
Total
2006
24,000
24,000
2007
2008
2009
2010
Total
24,000
24,000
I
I
48
I
I
I
I
I
I . .......... . ...--...--....--....----......---.... ...... ......_--... .---....- -.-.--.....-...... '-" -........ .........-.....-.......----...-....--. ....... ....-....-.. -'-'--1
I Project ## LR-06-06 .
I Project Name Relocate Retaining Wall-Maple LnlShady Island
1 ... ..-.--------..--.....--.-......--.-....-.----.--...... ...............--...--..-....--.-........- .....---.-- -..---.
Fund If
1 Description
Total Cost $22,000
Type improvement
Useful Life
Category Unassigned
Priority nla
Contact Public Works Director
Department Locai Street Reconstruction
I. ~JUstification
Expenditures
Constructionllnspection
I
Total
2010
Total
22,000
22,000
1
Funding Sources
Local Street Reconstruction
1
Total
....--..-.......--..........---------------.-.............--..-.--.....----......--.................-.........-...-..-....-...... .-..........1
[project## LR-07-01 \
Project Name Beverly Dr Pavement Reclamation
-.-..-..---.. -.-'''-'- --........-.....--.--..-............ --- .....--...-.--.---.--....-.............--...-.--. -..--......-.--..-...- --.-......... -......-.-.-........-..-
Fund it
1
I
I
2006
22,000
22,000
2007
2008
2009
2006
22,000
22,000
2007
2008
2009
Description Tot:ll Cost $82,000
This project includes pavement reclamation from Cathcart Drive to the cul-de-sac.
1_
1
~tification
Expenditures
Planning/Design/Survey
Construction/Inspection
I
Total
I
Funding Sources
. Local Street Reconstruction
1
Total
1
1
1
1
I
MmtdCl)' Si:'pri:'mb~r 1:?, 2005
2010
Total
22,000
22,000
Type Improvement
Useful Life Unassigned
Category Roadways/streets
Priority nla
Contact Engineer
Department Local Street Reconstruction
2006
2007
8,000
74,000
82,000
2008
2009
l
2010
Total
8,000
74,000
82,000
2006
2007
82,000
82,000
2008
2009
2010
Total
. 82,000
82,000
49
Total Cost $400,000
Type Improvement
Useful Life Unassigned
Category Roadways/streets
Priority nJa
Contact Engineer
Department Local Street Reconstruction
I
....--...--.--.----.--....--.-----.---...........--.-...----......----.-...--.-...--......-.-.-.---...--..---...-.-......"..-----1
~~# ~m~ I
Project Name Street Reclamation Projects
..-.._-_.-._------_.._-_.,_...._._~- ._".'.'~"_.._---_.~-....-_..-'.'....._...__.'--_..'."."-...-.-,..-..-..---,-.........---.--.-.-----.-..
Fund #
I
Description
1
Vustification
Expenditures
Construction/Inspection
J
I
2006
2007 2008 2009 2010 Total
100,000 100,000 100,000 100,000 400,000
100,000 100,000 100,000 100,000 400,000
2007 2008 2009 2010 Total
100,000 100,000 100,000 100,000 400,000
100,000 100,000 100,000 100,000 400,000
I
2006
Total
Funding Sources
Local Street Reconstruction
I
Total
I
Description Total Cost $150,000
This project includes pavement reclamation from Mill Street to the cul-de-sac.
Type Improvement
Useful Life Unassigned
Category Roadways/streets
Priority nla
Contact Engineer
Department Local Street Reconstruction
I
.-...--.....-....--....-......--.-.-..-.-...-.---........-.---.---......-..---...--.--...-..-.....................-..---.---.-.-.---..--.-.......--\
Project # LR-OS-Ol
Project Name Bracketts Rd Pavement Reclamation ]
._,.,.._".._,_..._.."......_,.,,_._,.__..,.____.._~_. ._.__ ._..."__.'" _...... .............____..._...._.._.........__..._......_.._..u._..'.__._.~,...._,_____.._._._..._....""__....
Fund #
I
I
~tification
Expenditures
Planning/Design/Survey
Construction/! nspection
2006
2007
2008
11,000
139,000
150,000
2009
2010
Total
Funding Sources
Local Street" Reconstruction'
2006
2007
2008
150,000
150,000
2009
2010
Total
Munday Seprembl!/" 11, 2005
50
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
D. MUNICIPAL STATE AID ROADWAYS
Municipal State Aid (MSA) roadways are collector routes throughout the City that
have been designated by the City and reviewed and approved by the State as MSA
eligible routes. The Minnesota Department of Transportation's Office of State
Aid provides gas tax dollars, collected at the gas pump, to municipalities that have
a population in excess of 5,000. These funds are to be used to build, reconstruct,
and maintain MSA. routes.
The intent of the state aid system is to insure that a uniform network of roadways
exists as a motorist travels throughout the metropolitan area. The amount of
MSA routes that a municipality may designate is a maximum of 20 percent of City's
total roadway length. For the City of Shorewood, this equates to just over 9.1
miles of roadway. Table 2 below lists the current designated MSA routes.
MSA Route From To Mileage
Smithtown Rd. Victoria Border Country Club Rd. 1.91
Howards Pt. Rd. Smithtown Rd. Edqewood Rd. 0.78
Edgewood Rd. Howard's Pt. Rd. Grant Lorenz Rd. 0.72
Country Club Rd. Yellowstone Trail Trunk Hiqhway 7 0.44
Yellowstone Trail Country Club Rd. Lake Linden Dr. 1.26
Lake Linden Dr. Yel\owstone Tr. Trunk Hiqhway 7 0.29
Old Market Rd. Trunk Hwy 7 Covington Rd. 0.45
Covinqton Rd. Old Market Rd. Vinehill Road 0.43
Vinehill Road Broms Boulevard Townline Road 1.38
Total 7.66
Table 2
It should be noted that the MnDOT Office of State Aid allows municipalities to
use the dollars held in an account at the State on a reimbursement basis. In
addition, the state will allow cities to borrow a maximum of three times the annual
construction allotment received by the City to complete a project. All design,
construction, and documentation must adhere to MSA rules to be eligible for
reimbursement.
51
Department
Capital Improvement Program
City of Shorewood, Minnesota
PROJECTS BY DEP ARTtvIENT
2006 thru 2010
Project# Priority 2006 2007
2008
2009
2010
Total
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Municipal State Aid Streets
Vine Hili Road. MRI and Overlay
CR 19 Intersection Realignment
Yellowstone Tran . Bit Overlay
Municipal State Aid Streets Total
GRAND TOTAL
IIt/mulay September 12. 2005
MSA-oS-GS
MSAOS-GS
MSA.04-o1
o
o
o
3,981,200
72,000
104,000
104,000
3,981,200
72,000
4,053,200
104,000
4,157,200
4,053,200
104,000
4,157,200
52
Type Improvement
Useful Life Unassigned
Category State Aid Roadways
Priority n/a
Contact Engineer
Description Total Cost $104,000 Departnlent Municipal State Aid Streets
The City of Minnetonka has indicated that they would like to enter into a cooperative MSA project to mill and overlay Vine Hill Road. Both Cities share Vine Hill
Road as a common corporate boundary.
II;:j:;~-.-w.A-03-05----------------- --~._-----II
l Project Name Vine Hill Road - Mill and Overlay
I ..-....-..-...-----------..-.-..-......--.....-..............__........_............._..._.___...._.___J
Fund It
I
I
I Justification
Expenditures
Planning/Design/Survey
Construction/Inspection
Contingencies
2009
I
2006
2007
2008
I
Total
I
2006
Funding Sources
MSA Funding
2007
2008
2009
Total
2010 Total
3,000 3,000
88,000 88,000
13,000 13,000
104,000 104,000
2010 Total
104,000 104,000
104,000 104,000
I
I
~
I Project It MSA03-06
I Project Name CR 19 Intersection Realignment
Fund It
I
Type Improvement
Useful Life Unassigned
Category State Aid Roadways
Priority nla
I
Contact Engineer
Description Total Cost $5,241,200 Department Municipal State Aid Streets
This project includes right of way acquisition, realignment of the County Road 19 intersection, stormwater design. and streetscape construction.
I
\ Justification
I
Prior
I 1,260,000 I
Total
2006
2008
2009
Expenditures
Construction/Inspection
Contingencies
Streetscape Improvements
. Landscape Improvements
2007
I
Total
3,981,200
I
Prior
\ 5,241,200 I
Total
Funding Sources
MSA Advance/(Repay)
2006
-181,000
-181,000
2007
-181,000
-181,000
Total
2008
-181,000
-181,000
2009
2010
Total
3,088,000
650,000
143,200
100,000
3,981,200
2010
Total
-543,000
-543,000
I
I
I
I
MOl1day September /2. 2005
53
.-------..---.-..-------- -...-...-....-.....--...--..............-..--..--.-------.-..------.-.--....-...-....-.......-..--...........-.--.-.---.]
Project # MSA-04-01
Pro,jectName Yellowstone Trail- Bit Overlay
._,.__...M_.......,.~.__.-..__.,-~.-..-~-..,-._-----------.--,~---_._.,._--.-..-,-----------._._-
Fund #
Type Improvement
Useful Life Unassigned
Category State Aid Roadways
Priority n/a
I
I
Contact Engineer
Description Total Cost $72,000 Department Municipal State Aid Streets I
This project includes the overlay of Yellowstone Trail from Minnetonka Drive to Lake Linden, due to watermain construction.
f Justification I
Expenditures
Planning/Design/Survey
Construction/Inspection
Right-of-way
2006
1,000 .
1,000
70,000
72,000
2007
2008
2009
2010
Total
1,000.
1,000
70,000
72,000
I
Total
I
Funding Sources
MSA Funding
2006
72,000
72,000
2007
2008
2009
2010
Total
72,000
72,000
I
Total
I
I
I
I
I
I
I
I
I
I
I
54
I
MOTrday Seprember 12. 2005
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
E. MUNICIPAL WATER SERVICE
The City of Shorewood has 1,500 individual service connections to the municipal
water system. Other residents obtain water through individual residential wells.
The City of Shorewood operates and maintains five separate well houses, with a
total of seven wells to service the customers. For reference, the following table
provides some basic information of the City's systems.
Facility Well Aquifer Depth of Year Reserve
Name No. Well (Ft) Installed
,Badger 1 Shakopee- 372 1981 Minnewashta Water Tower
Jordan
Boulder 1 Franconia- 640 1981 Minnewashta Water Tower
Bridqe Iron -Gale
2 Franconia- 640 1981 Minnewashta Water Tower
Iron -Gale
S.E. Area 1 Jordan 415 1987 VVaterford VVater
Tower
Amesbury 1 St. Peter - 528 1973 5000 Gal Hydro-
Jordan pneumatic Tank
2 Shako pee 326 1982 5000 Gal Hydro-
pneumatic Tank
VVoodhaven 1 Shakopee- 480 1979 4000 Gal Hydro-
Jordan pneumatic Tank
The Amesbury and Woodhaven wells are hydro-pneumatic systems. These types of
systems are designed for a small neighborhood system. The MN Department of
Health recommends that the number of connections served by these types of
systems should not exceed twenty-five. The current number of connections
exceeds this amount.
The. Badger Field and Boulder Bridge well houses 'are interconnected via afrunk
watermain on Smithtown Road to the Minnewashta Water Tower. This tower is
located at 26352 Smithtown Road, on the Minnewashta Elementary School
property by way of an easement. This structure has a capacity of 500,000 gallons.
The water servicing this area' is not treated, with the exception of the addition of
chlorine and fluoride.
The Southeast area well is connected to the Waterford water tower located at
5500 Old Market Road. This structure is located on City property and has a
capacity of 400,000 gallons. Water from this well is treated for iron removal,
along with the addition of chlorine, and fluoride prior to delivery to the
distribution system.
55
I [;:::.~--:~:;~:~~ ::!~~~~t ~-"~~~-~-_--~~=~_-~-_-
I Fund# 601
Type Improvement
Useful Life Unassigned
Category Water: Wells
Priority nla
Contact Engineer
II Description Total Cost $174,500 Department Municipal Water System
This project proposes to interconnect the Woodhaven Well with the City of Excelsior's or the City of Chanhassen 's water system.
I Vustification
I
Expenditures
Planning/Design/Survey
Land Acquisition & Easements
Construction/Inspection
Contingencies
I
Total
I
Funding Sources
Water Revenue Bonds-2005
Total
2006
20,000 .
10,000
126,500
18,000
174,500
2007
2008
2009
2010
Total
20,000.
10,000
126,500
18,000
174,500
2006
174,500
174,500
2007
2008
2009
2010
Total
174,500
174,500
I
I
Project #
W -03-06
Project Name Water Meter Radio Read Project
I
Fund 1# 601
I
Description Total Cost $210,000
This project includes conversion of all water meters to a radio read system.
Type Improvement
Useful Life Unassigned
Category Water: Distribution
Priority nla
Contact Engineer
Department Municipal Water System
Prior Expenditures 2006
I o I Water System Improvement 210,000
Total Total 210,000
I Prior Funding Sources 2006
o I Water Revenue Bonds-2005 210,000
I Total Total 210,000
I
I
I
I Monday Sepremba J 2, 2005
I I Justification
2007
2008
2009
2010
Total
210,000
210,000
2007
2009..
2010
Total
210,000
210,000
2008
57
-----.----------...----......-..---.--....--..-----.--------.--..-.-.-.---...-....---.--..-......----............--'..-..-]'
Project # W -04-08
Project Name Amesbury Polyphosphate System
w__.....___._._.______..._.__.__._.......__.._._.____.'-..------.--...-....------..............--..".,.......---.-.-----..----.--
Fund 11= 601
Description Total Cost $12,100 Department Municipal Water System
The Minnesota Department of Health is mandating tbe addition of polyphosphates to the Amesbury system to sequester the lead in the home piping.
I Justification
Type Improvement
Useful Life Unassigned
Category Water: Wells
Priority nla
Contact Engineer
I
I
I
I
Expenditures
Construction/Inspection
Total
Funding Sources
Municipal Water Fund
Total
Description
Replace controls for Amesbury Well facility
II ustification
I
~ -.
2006
12,100
12,100
2008
2009
2010
Total
12,100
12,100
I
2007
2006
12,100
12,100
2009
2010
I
2007
2008
Total
12,100
12,100
I
r;~:ject~- - W -0-5:02 --- ---..--------- ----...-- - --- -_._.-~-- -----------]
I..~~~!~~~_~~~~__~.~~~~u~y ~~ll C~~~~~~s_~eJ~~_cem~~~_n__.__ .._____.._...... m_________
Fund 11=
ToM Cost"$7S,OOO
T}'Pe Improvement
Useful Life Unassigned
Category Water: Wells
Priority nla
Contact Engineer
Department Municipal Water System
I
I
1
I
I
Expenditures
Construction/I nspection
Funding Sources
Municipal Water Fund
Monday Sl!pEl!mb(~r /2. 2005
Total
2006
75,000
75,000
2008
2009
2007
2010
Total
75,000
75,000
I
Total
2006
75,000
75,000
2008
2009
2010
I
2007
Total
75,000
75,000
I
58
I
I
I
I
I
I
1-."""-""""..."-"....__._-'-_..._-'-"""-_._--"_..,, ."--"-."".""-,-,-"",-"""""."""-."".""-"""",,-,,.-,,,,-,,.-,,,-,,,-",--....--''"''"''".''-''""-,-.-.'',,,----''----''.-'',,--...
I projcct It W -05-03
ProjectName Boulder Bridae Submersible Well- Pull & Inspect
-- -- ,,---,--,_._----,,--~-,,----,---"""""--_._-------_._-,,---,-"-,,-,,-------,,-"",,,--,,----_._----
Fundlt 601
I
I
I
I
Expenditures
Constructionllnspection
Contingencies
2008
2009
I
Total
2006
18,000
3,000
21,000
2007
Type Improvement
Useful Life 5 yrs
Category Water: Wells
Priority nla
Contact Engineer
2010
Total
18,000
3,000
21,000
Funding Sources
Municipal Water Fund
2008
2009
Description Total Cost $21,000 Department Municipal Water System
This project includes pulling, inspection and repair of the Boulder Bridge Well Itllineshaft well. Pumps are to be pulled and inspected on a S-year rotation"
I Justitication
I
Total
2006
21,000
21,000
2007
I
I
1"--""",,"",,,-_...,,-,,-,,,,----,,",,----""---------''''_._''-------,,,"-.-----,,.--""".,,.- .---,..,,'''-''-'--...,,''''.----------'']
Project I/: W -06-01
I Project Name S.E. Area Lineshaft Well - Pull & Inspect
l..""_"_,,.__."",, ,..."",_,,,...,,,_.,,__.._,,,....,_,,,,__,,_."_,,,,,,,". ,,-,,-,,"- -,---,,-. .--"--.""----,-.-.",,,-,,,-,,,,,----,,...-.-,,-,"".,,,, ."-"----,,--,,-.--,,-"",,--,,""-,,-,...--"".",
,..".-.""",,,""...
FundI/: 601
I
I
I
I
Expenditures 2006 2007
Constructionll nspection 19,000
Contingencies 3,000
Total 22,000
Funding Sources 2006 2007
Municipal Water Fund 22,000
Total 22,000
2008
2009
2008
2009
I
2010
Total
21,000
21,000
Type Improvement
Useful Life 5 yrs
Category Water: Wells
Priority nla
2010
2010
Total
19,000
3,000
22,000
Total
22,000
22,000
Contact Engineer
~escriPtion I Total Cost $22,000 Department Municipal Water System
,This project includes pulling, inspection and repair of the SE Area lineshaft pump. Pumps are to be pulled and inspected on a S-year rotation. .- _--..J
\ Justification ~ l
I
I
I
I
I
t\llonday Seprember 12. 2005
59
1-';:~~~~-;-'---W-07~01 ._.___.____._u__...._ --.-.-.-..-- .. --.. .. .._-... ----.---...--.-.-...]
l~~~~~~~e Interco~~~~~~~~_~!~mesb.~:y & SE ~!ea Wel~__.____.____._._.__.
Fund #
I
Type Improvement
Useful Life Unassigned
Category Water: Wells
Priority nla
I
Contact Engineer I
Description Total Cost $626,400 Department Municipal Water System
Extend a 12-ineh main along St. Alban's Bay Road and Manor Road approx 3200 feel. Assume a cost of $14-5 per lineal foot: $464,000
I Justification I
Expenditures
Construction/Inspection
Contingencies
2006
556,800
69,600
626,400
2007
2008
2009
Total
2010
Total
556,800
69,600
626,400
I
I
Funding Sources
Water Revenue 8onds-2005
2006
626,400
626,400
2007
2008
2009
Total
2010
Total
626,400
626,400
I
...-........-------..--..-.--"...-......----...-.---..------.-----....--.....--------------------..-.-]
Project # W -07 -02
l....~"'~~~~~-'?' L~~~!I!.~l'lII~&~~_______________
Fund it
I
Type Improvement
Useful Life Unassigned
Category Water: Wells
Priority nla
Contact Engineer
I
I
Description . Total Cost $22,000 Department Municipal Water System
Project includes pulling, inspection and repair of the Amesbury Iineshaft pump. Pumps are to be pulled and inspected on a S-year rotation.
\ Justitication
Expenditures
Construction/Inspection
Contingencies
2006
2007
2008
19,000
3,000
22,000
2009
Total
I
2010
Total
19,000
3,000
22,000
I
Funding Sources
Municipal Water Fund
2006
2007
2008
22,000
22,000
2009
I
Total
" 20io
Total
22,000
22,000
I
I
ltilmzday Sepr~mber n. 2005
60
I
I
I
I
I r;~:j-~~~~--'..'--w~o~;~ol-.'-_.--- -- -...-------.-.-..-----...--......-.-------...--..........,,--.
t :~~ect_~~~e-.~-~~~~~r..~~~~e yv ~~ #2 -~~!_~.!~~P~~:... .__ ___.____.___.______.____.__.
I Fund # 601
Type Improvement
Useful Life 5yrs
Category Water. Wells
Priority nla
Contact Engineer
I I Description Total Cost $21,045 Department Municipal Water System
. project includes pulling, inspection and repair of Boulder Bridge well #2 lineshaft pump. Pumps are to be pulled and inspected on a 5-year rotation.
I f Justification
Expenditures
Construction/Inspection
Contingencies
2006
2007
2008
2009
18,300
2,745
21,045
I
Total
2010
Total
18,300
2,745
21,045
2010
Total
21,045
21,045
I
Funding Sources
Municipal Water Fund
2006
2007
2008
2009
21,045
21,045
I
Total
I
Project #
W-I0-0l
I
Project Name Water System Improvements
Fund # 601
Type Improvement
UsefulLife Unassigned
Category Water. Wells
Priority nla
I
Contact Engineer
Description Total Cost $100,000 Department Municipal Water System
project includes pulling, inspection and repair of the Badger linesllaft pump. Pumps are to be pulled and inspected on a S-year rotation.
I
I Justification J
I
Expenditures 2006 2007 2008 2009 2010 Total
Maintenance 100,000 100,000
Total 100,000 100,000
Funding Sources 2006 2007 2008 2009 2010 Total
Municipal Water Fund 100,000 100,000
Total 100,000 100,000
I
I
I
I
I
I
I
I
/\I[ollda." seprember 12, 2005
61
en
N
-f
J:
H
(J)
-0
~
ij)
m
H
Z
-I
m
Z
;:t
o
z
~
r
~
r
m
-n
-f
ro
r-
~
Z
^
-------------------
-
V)
~
CL.
~
a..
C
;: l\)
o...s::l\)o
C of- > of-
~-o.,g-o
-0 l\) l\)
tns:C-tnC
...s:: 0 0 of- \4-
~ I- tn l\) ~ l\)
L. -0 > "....,-0
o . l\) l\) 0 s:
C- tn l\) -0 L. l\)
C +- C ,.. c.. l\)
o C ....
l\)l\)l\)~..o
-OEL....s::L.l\)
l\) l\) ::J +- 0 >
tn > +- C C- 0
::J 0:.0 o-o...s::
u L. C '- l\) tn
.e E ~.~ ~ .~
tn XEC-Ol
o l\) l\) E 0 l\)
...s:: L.+-
5 -a 0 c.. 0
C of- of- ~ l\) L.
o U .- .::t:. tn +-
tn ::J C- L. l\) tn
tnL.Oo..s:+-
E of- U a.. of- C
E~~l\)-o~
L. .- ..s: s: ft\
8't::L.l-oQ-.
.::t:. ~ EO
L. L. tn 0 c:
00-0 E L. 0 l\)
0.. c: l\) l\) Ol:E..o
l\)E~+-~J2
~ -0 "> l\) 0.. t '0
C ft\ U +- 0 >
tn ~ 0 L: c: s: C- 0
L. c: tn 0 El\) l\) tn
2 .~ 0 ~ L. l\)
>-+- 3:+- ~ tn ~
;::8-tC:~~5
l\) ::J 0 EO c.. i:: tn
\4- -0 c.. E'- l\)
+- l\)...... L.
tn ~..s: '" I-t -0
o of- U l\) _ l\) l\)
c.. c: 0 of- 0 -0 ..s:
l\) l\) &.:t: ::J of-
~ ~ L.~"o g- g ~
of- Ol l\) ".f= ~ . - ::J
L. 0 E c: .::t:. c: of-
l\) C E t1 L. l\) tn
> 0 ::J L. 0 l\) l\)
OEtnoa....o..o
.
u.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
M
co
-
-
Capital Improvement Program
City of Shorewood, Minnesota
PROJECTS BY DEPARTMENT
',2006
thru
2010
Department
Project# Priority 2006
2008
2007
Parks
Park Improvements P-04-03 0 5,000 5,000 ,5,000
Badger Park - Resurface tennis courts p.Qa.Q1 0 20,000
Badger Park-Football and Hockey Lighting P-Q6-02 0 45,000
SilvelWood Park-Erosion Control p-Oa-Q3 0 8,000
Skate Park-Equipment Rehabilitation P-Q6-Q4 0 3,500
Minnewashta Dog Park-Matching Funds P.06-05 0 5,000
Freeman Park-Drinking Fountain at Eddy Station P-Q6-06 0 12,000
Skate Park-Drinking Fountain P-Qa-07 0 12,000
Manor Park-Manor Park Pond WA Quality Improvements p-Qe-Q8 0 5,000
Cathcart Parks-Resurface Tennis Court P.07-Q1 0 14,000
Freeman Park-Weiland Enhancement/Interpretive Cen P.07.02 0 428,000
Skate Park-Plaza Picnic Area P.08.01 0 25,000
Parks Total 115,500 447,000 30,000
GRAND TOTAL 115,500 447,000 30,000
2009
5,000
I
I
I
I
2010 Total
5,000
25,000
20,000
45,000
8,000
3,500
5,000
12,000
12,000
5,000
14,000
428,000
25,000
I
I
I
I
I
602,500
I
I
I
5,000
5,000
5,000
5,000
602,500
Mnllday Seplember 12,2005
64
I
I
I
I
I
I
I
11-;r:~:;--"-'''P~04=O;--------''--''-,--, -, , -, ,_.,'.-.,'-..,....-..._,-~--~---" -~~l
t~ro.i~ct ~~~e...!~~~ IlI!~r~~~~e~~~__.,..__._.___ __..___......____.______ .___.
I Fund #
Total Cost $30,000
Typc Improvement
Useful Life Unassigned
Category Park improvements
Priority nla
Contact Engineer
Department Parks
I Description
I I Justification
l
Prior Expenditures 2006
I 5,000 I Construction/Inspection 5,000
Total Total 5,000
I Prior Funding Sources 2006
5,000 I Park Foundation Donations 5,000
I Total Total 5,000
2007 2008 2009 2010 Total
5,000 5,000 5,000 5,000 25,000
5,000 5,000 5,000 5,000 25,000
2007 2008 2009 2010 Total
5,000 5,000 5,000 5,000 25,000
5,000 5,000 5,000 5,000 25,000
I
[ "---.--..---------..-"..-....,----'--'-'------------....-.-..-----'.-.----'-.-...----.---1
Project # P-06-01
Project Namc Badger Park - Resurface tennis courts
.__.....____.._.......'_.....' ..___,..,.._____..,___.._____.__....,.,.._,__._._......".....__..'..'_..,_.._,..,....._......._._.__._..._ ..___..________....1
Fund # 402
I
Description
Resurface two tennis courts in Badger Park.
Total Cost $20,000
Type Unassigned
Useful Life 5 yrs
Category Park improvements
Priority nla
Contact
Department Parks
I
I I Justification
Expenditures
Resurfacing tennis court
I
2006
20,000
20,000
2007
2008
2009
2010
Total
20,000
20,000
Total
I
Funding Sources
Park Fund
2006
20,000
20,000
2007
2008
2009
2010
Total
20,000
20,000
I
Total
I
I
I
I
I
MVllday September 12.2005
65
---------...------.-----. -----.. --. --- .... --.-..-..---- - -----...-]
r-project# P-06-02
I Project Name Badger Park-Football and Hockey Lighting
'---..--.--------.---- -.----------.---.-.---.---...----
Fund # 402
Description Total Cost $45,000
Field lighting replacement at Badger Field. Replacement of 40 foot poles and 150 pounds light fixtures_
f Justification
Expenditures
EquipNehicles/Fumishings
Total
2006
45,000
45,000
2009
2007
2008
Type Equipment
Useful Life 15 yrs
Category Unassigned
Priority nla
Contact
Department Parks
2010
Total
45,000
45,000
Funding Sources
Park Fund
2008
2009
Total
2006
45,000
45,000
2007
1~~;:~--P-06:03.----._-...-.-----._...--------.-------.-----..--...-----.
I Project Name Silverwood Park-Erosion Control
._...._____._,_,_,,~..,,_..._~_...._._..'.._.____.__._._.,_._______.....___.__..__...,._._._,.____._._......._..._."_._',_.,N__'__~___" __.._.._._.._.__.__....__..._.
Fund # 402
2010
Total
45,000
45,000
Type Improvement
Useful Life 5 yrs
Category Unassigned
Priority nla
Contact
Description Total Cost $8,000 Department Parks
Erosion Control near Giant Slides in Silverwood Park. Staff recommends that special earth stabilization products, be used_
I
I
I
I
I
I
I
I
I
~ I
~ I
I
I
I
I
I
I
I
I
I Justification
Expenditures
Construction/lnspection
2008
Total
2006
8,000
8,000
2007
2009
2010
Total
8,000
8,000
Funding Sources
Park Fund
2008
2009
Total
2006
8,000
. 8~000
2007
{Honda." September 12. 2005
66
2010
Total
8,000
8,000
I
~...__.-.,,,-,...,~_._..._._..._._..-._......._-,.._,.__.._._..-.._.._.._._..__.._-'",,'_.------_...~...__.._--.-.,_.~-,,,---'---'-.'..'-'-'-_.--'---"~+'----""'-"----"'.
Type Improvement
Useful Life 5yrs
Category Unassigned
Priority nla
Contact
Department Parks
Project #
P-06-04
I .. --.--.-------.
Project Name Skate Park-Equipment Rehabilitation
Fund # 402
I
Description Total Cost $3,500
Various structural repairs need to be completed to the railing, facia. and side boards of the equipment at Skate Park.
I ~ Justification
Expenditures
Maintenance
2006
3,500
3,500
2007
2008
2009
2010
Total
3,500
3,500
I
Total
I
Funding Sources
Park Fund
2006
3,500
3,500
2007
2008
2009
2010
Total
3,500
3,500
I
Total
I 1....-....-.-..--.---..-.-...........--...--............-.-.--.--.---...----..-..---........--....-.....---..--.........."-.-'..-']
I Project # P-06-0S
I Project Name Minnewashta Dog Park-Matching Funds
I ..."..-....-.-- ....-....-,,---.-...----..-..-....-..---.--.-....--~-_..-_.-".---..-.---.......--.--................---.--..----........-...."
Fund # 402
I
Type Unassigned
Useful Life Unassigned
Category Unassigned
Priority nla
Contact
Description Total Cost $5,000 Department Parks
The Park commission recommended a 2006 donation of matching funds for the design of the Minnewashta Dog Park. The park will built by the Carver County
Parks District.
I
\ Justification
I
I
I
Expenditures 2006
Constructionllnspection 5,000
Total 5,000
Funding Sources 2006
Park Fund 5,000
Total 5,000
2007
2008
2009
2010
Total
5,000
5,000
I
I
2007
2008
2009
2010
Total
5,000
5,000
I
I
I
I
I
Monday September 11. 2005
67
r;~~~~~-;--'-'-P-06=06--'-"-----'---'-----"'--'--..-...----.-----..-.---...--....--.-----.-- .--....--.--
I Project Name Freeman Park-Drinking Fountain at Eddy Station
L___.._____..._____.._.__.._._._.__._......__...._..._......_-.--..-.-------..-....---..---....
Fund #
Type Improvement
Useful Life Unassigned
Category Park improvements
Priority nla
Contact Engineer
Description Total Cost $12,000 Department Parks
When Eddy Station was constructed, provisions were placed w/I the interior of the building to hang a drinking fountain outside, under the canopy portion of the
building. . .. .
\ Justification
I
I
I
I
Expenditures
Water System Improvement
Park Funds
2006
6,000
6,000
12,000
Total
2007
2008
2009
2010
Total
6,000
6,000
12,000
I
I
Funding Sources
Municipal Water Fund
Park Fund
2006
6,000
6,000
12,000
Total
2007
2008
2009
2010
Total
6,000
6,000
12,000
I
I
Type Improvement
Useful Life Unassigned
Category Park improvements
Priority nla
Contact Engineer
Description J Total Cost $12,000 Department Parks
Over the years, the Park Comminssion has heardseveral requests regarding the desire to have a drinking fountain installed at the skate park. The high energy sport
creates the need for constant hydration of participants. Staff is pleased to report that watermain has been extended pas the site, with a water service and fire hydrant
installed into the Southshore Community Park, as part of the Barrington Subdi vision constructed in 2005. Therefore, costs for installation of the fountain can be
limited to location of a concrete foundation pad, minor extension of the water service, and placement of the drinking fountain.
\ Project # P-06-07
I Project Name Skate Park-Drinking Fountain
I
Fund #
I Justification
Expenditures
Water System Improvement
Park Funds
I
I
I
I
2006
6,000
6,000
12,000
.. Total
2007
2008
2009
2010
Total
6,000
6,000
12,000 . .
I
I
Funding Sources
Municipal Water Fund
Park Fund
2006
6,000
6,000
12,000
Total
2007
2009
2010
Total
6,000
6,000
12,000
I
2008
I
Monda." September 12. 2005
68
I
I
I
I ... .-.-..---------.-....--..-.---....--...-----.-.-.---...--..--..--......-.--..-............---......-----.---......----..--..-..----..-....1
I Project # P-06-08
I Project Name Manor Park-Manor Park Pond W A Quality Improvements
I .. ....----.---.-------.------.-.---.-------------......----------...-----
Fund #
Type Improvement
Useful Life Unassigned
Category Park improvements
Priority nla
Contact Engineer
I Description Total Cost $5,000 Department Parks
Park Commission has undertaken a water quality component wlin the parks. While still in its infancy, water testing is currently being completed to assist the city in
making informed decisions to improve the water quality of Manor Park Pond. Staff is recommending that $5000 be ear marked for a future improvement.
I \ Justification
I
Expenditures 2006
Water System Improvement 5,000
Total 5,000
Funding Sources 2006
Municipal Water Fund 5,000
Total 5,000
2007
2008
2009
2010
Total
5,000
5,000
I
2007
2008
2009
2010
Total
5,000
5,000
I
I
\
~
\ Project # P-07 -01
I Project Name Cathcart Parks-Resurface Tennis Court
Fund #
I
I Description Total Cost .$14,000
I Cathcarth Park has a single tennis court that is showing signs of deterioration and needs crack repairs and resurfacing.
I r~UStifiCatiOn
1-
I
Expenditures
EquipN ehicles/Fumishings
Total
2006
2007
14,000
14,000 .
2008
2009
Type Improvement
Useful Life Unassigned
Category Park improvements
Priority nla
Contact Engineer
Department Parks
2010
Total
14,000
14,000
I
Funding Sources
Park Fund
2006
2007
14,000
14,000
2008
2009
2010
Total
14,000
14,000
I
Total
I
I
I
I
I
t'v[ollday Sepwmber f2. 2005
69
.-.-.-.--....--...--..-.-.---.-..---.--.---..-.--.---....-....-.........-----..---....-....-.-.....-..-.-........-.---'--'J-
[Project It P-07 -02
Project Name Freeman Park- Wetland Enhancement! Interpretive Cen
. -_.__._.__.-.~.._._-,-,--~_._'_._.._.,------'_.._-_.,-._---_.._--"-,------,_.~,_._._..._._..._.._.._-
Fund It
I
Type Equipment
Useful Life Unassigned
Category Park improvements
Priority n/a
I
Contact Engineer
Description Total Cost $428,000 Department Parks I
Freeman Park WEIC was presented at the previous Conunissioners thought it to be a viable project, if altemative-furtding sources can be obtained. Efforts at this
time are to seek out grants and funding mercbanisms. .
I Justification I
Expenditures 2006
Grant Money
Stormwater Management Fund
Wetland Enhancementllnterpr
Total
2007
342,400
42,800
42,800
428,000
2008
2009
2010
Total
342,400
42,800
42,800
428,000
I
I
Funding Sources 2006
Donations
Grant Money
Stormwater Management Fund
Total
2007
42,800
342,400
42,800
428,000
2008
2009
2010
Total
42,800
342,400
42,800
428,000
I
I
Type Improvement
Useful Life Unassigned
'Category Park improvements
Priority nfa
Contact Engineer
Description Total Cost $25,000 Department Parks
Parents and onlookers of participants using the skate park are often noticed waiting in their cars or forced to si t on top of the wooden picnic tables that are on site.
r-"
I Project It P-08-01
~rOject Name Skate Park-Plaza Picnic Area
Fund It
I
I
I
I
lJUstification
Expenditures
Infrastructure Skate Park
Grant Money
Park Funds
2006
Total
2007
2008
8,333
8,334
8,333
25,000
2009
2010
Total
8,333
8,334
8,333
25,000
I
I
Funding Sources
Donations
Grant Money
Park Fund
2006
Total
2007
2008
8,333
8,334
8,333
25,000
2009
2010
Total
8,333
8,334
8,333
25,000
I
I
Monday S~ptl!mbl!r 12. 2005
70
I
I
I
...
z
w
:E
0..
H
::>
a
w
w
tJ
H
LL
LL
o
D
Z
<
\/)
w
~
H
...J
H
\J
<
u..
tJ
!:I
en
::>
0..
-
.
~
U t.. ~
_ 0 U
..D 0 -, s::
::r (j (j
C-Ec
~~~
o +- c
c -8 oa
o 0- E
+- ::r
U 0 ~
~ +- 0-
+--0:2
~ c ::J
5 0 .0
U -0 ~
-0 c U
c ::r ~
O~4-
C ~ 0
0Q1 t >-
~ t.. +-
~ (j .-
-0 C-U
~ ~ -0
..s:: ~ c
+- 0 0
t.. t.. ~
o ~ t..
~-O:J
~ s:: +-
~ :J C
-o-Ot..
> ~ ::J
o +-4-
t.. g ~
C-Olu
-0 0- .-
_~4-
.... ~ 4-
::J -0 0
4- ~
VI >- +-
~ -0 C
._ 0 ~
;t:~E
ou"O.9-
(j +- :J
lLoO-
U c ~
_ VI t..
.0 ~ ~
..... +- 0
....+-:JVI
a.. 0- -0
~ U E ~
..s:: 0 0 ~
I-4-UC
-
-
-
VI Ol 0 t..
C t.. ~
+- 0- 0 +-
VI :g 4- 5-
L 05 E
~..o ~ 0
~ .- U
~g-oV)
+- :J ->-
~..DG
-0 +- V)
~V)~~
~ c 5 ..s::
1:E3:
~-o ~4-
-oOU::r~
~.DVI(j
c U ::r s:: +-
~4-a.. ~V)
.04- o~
~o~+-o
>>-+-~~
o +- 0 t.. s::
..s:: ~ +- 0 ~
+- ~ ~ :t: Ou
~..s::-o~4-
+- +- (j Ol~
5, C ~
~ ~ 0.. 0- ~
U 0 ;:J 0 +-
~ Ol 0
O(l 02 -g 5 ~
~1JOVlt..
::r s:: 0 - 0..
s:: t.. 0 +- 0
oa +- .- ~ +-
E ~ :t: ..S! +-
o-O~~
~ U -0 ..s:: E
GJ~OI-
.l: t.. c ~
+- t.. 0 0 0
V)oV)~~
~(\) .0]
-o-gV)~
-0 0 0 -u c
s:: E U .2 ~
~~~~5
VI GJ U 3:
~ ~ +-
'={:'=E~
-
-
-
-
-
-
-
-
-
-
-
-
-
.-
r-
-
-
2006
thru
2010
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
PROJECTS BY DEPARTMENT
Department Project# Priority 2006 2007 2008 2009 2010 Total
Public Facilities/Office Equip
Computer Upgrades PF.03-0S 0 10,000 10,000 10,000 10,000 10,000 50,000
Civil Defense Sirens PF.Q5.05 0 25,000 25,000
Network (Computer) Upgrade PF-Q6.01 0 17,250 17,250
City Hall Project PF.OS.02 0 3,300,000 3,300,000
Public Works Addition (Bay wllift) PF-06.03 0 60,000 340,000 400,000
Document Retrieval System Upgrades PF.06-04 0 10,000 10,000
City Hall Generator P F-Q6.05 0 16,000 16,000
Public Works Building Generator PF.OS-Q6 0 38,000 3B,000
Public Facilities/Office Equip Total 159,000 3,667,250 10,000 10,000 10,000 3,856,250
GRAND TOTAL 159,000 3,667,250 10,000 10,000 10,000 3,856,250
I
I
I
I
I
I
I
I
I
I
I
I
I
I
72
I
I
MrllLday September J 2. 2005
II.... -....--..-------.. ..-..---....-.---...--..-....--..............--..--...-..-....-.- .--.----......---...............-...-......-.......-.-...--....-..................-.]
Project # PF -03-06
.~~_~~~ ~~~~. C~~~~ter_.Epgrad~~__.___. _. _________....__..._._.__._._____.._._ ..____ .._.___.J
I Fund# 401
Type Equipment
Useful Life 5 yrs
Category Facilities/equipment
Priority nla
Contact Finance
I Description Total Cost $70,000 Department Public Facilities/Office Equip
This project proposes to replace obsolete computer hardware and software systems (approximately three workstations per year).
I Justification
Computer equipment replacement.
Prior Expenditures 2006 2007 2008 2009 2010 Total
I 20,000 I Computer workstations 10,000 10,000 10,000 10,000 10,000 50,000
Total Total 10,000 10,000 10,000 10,000 10,000 50,000
I Prior Funding Sources 2006 2007 2008 2009 2010 Total
20,000 I Public Facilities/Office Equipm 10,000 10,000 10,000 10,000 10,000 50,000
I Total Total 10,000 10,000 10,000 10,000 10,000 50,000
I
I
Type Improvement
Useful Life Unassigned
Category Facilities/equipment
Priority nla
Contac.t Engineer
Department Public Facilities/Office Equip
._----~
Project #
PF~05-05
Project Name Civil Defense Sirens
Fund #
I
\ Description ~
\ Justification
Prior Expenditures
o I EquipNehicles/Furnishings
Total Cost $25,000
I
Total
2006
25,000
25,000
2007 2008
2009
2010 Total
25,000
25,000
I
Total
I Prior Funding Sources 2006 2007 2008 2009 2010
01 Public Facilities/Office Equipm 25,000
I Total Total 25,000
Total
25,000
25.000
I
I
I
I
I
Monday September 17., 2005
73
[;:~;~~;:~ (Co~puter)-~~gr~d~=___.
Fund if 401
.....-.....--.................--..-.-.-.......,
Type Improvement
Useful Life Unassigned
Category Facilities/equipment
Priority nia
Contact Engineer
Department Public Facilities/Office Equip
I
I
Description Total Cost $17,250
This project proposes to replace the computer network on a 5 year basis.
I
I Justification
I
Prior Expenditures 2006 2007
0.1 Computer workstations 17,250
Total Total 17,250
Funding Sources 2006 2007
Public Facilities/Office Equipm 17 ,250
Total 17,250
2008
2009
2010
Total
17,250
17,250
I
2008
2009
2010
Total
17,250
17,250
I
I
1-..-...-...-.....---.....-......---.........-.--.....--......................-....-----.-.-........------.-.-......-.----....--..--...---]
Project if PF -06-02
Project Name City Hall Project
l....__.___......._.._____...____.______.____.._...._.....______....--......--...--...-....-...---..-- ..-............-.---
Fund #
Type Improvement
Useful Life Unassigned
Category Facilities/equipment
Priority nia
Contact Finance
I
I
J
II
----'
"'---, I
I
Description Total Cost $3,300,000 Department Public Facilities/Office Equip
The funding shown for this project shows the estimate for replacing City Hall. Further study may result in a decision to remodel City Hall, which presumably would
have a lesser cost.
\ Justification
Expenditures 2006 2007
Construction/Inspection 3,300,000
Total 3,300,000
Funding Sources 2006 2007
G.O. Bonds-2007 wi City Hall 3,300,000
Total 3,300,000
2008
2009
2010
2008
2009
2010
Total I
3,300,000
3,300,000
Total I
3,300,000
3,300,000 I
I
I
I
I
I
Monday Seprember 12, 2005
74
I
Project if
PF -06-03
. _"'r_""'~"~'__'_"'_ ........_____~..,~___.._..........._........._.........._._.~..... _...........__..........._.._.H....'._._..__.........._..._......--..--..,..-....-........- _.....,~.__.._.~..
. ...~_...._."--_._-._.._.._~...-----.
I
Project Name Public Works Addition (Bay wffift)
-....-.-..-..--..-.----.-.....
Fund if
I
Description
Total Cost $400,000
Type Improvement
Uscful Life Unassigned
Category Facilities/equipment
Priorit)' nla
Contact Engineer
Department Public Facilities/Office Equip
I \ Justification
Expenditures
Construction/lnspection
2006
60,000
60,000
I
Total
2008
2009
2010
Total
400,000
400,000
...-......--...-......-...--..-..-.---.....---.----------...---.-..-.----------..-.-..-.--.-..-.....-.---..---...--........-..--'......-.-\
Project # PF -06-04
Project Name Document Retrieval System Upgrades I
.....,........,_...^__..__._._..__.w.....__...~......._--.---.-.,.,..--..---.----....-...-.....-..-.-.-.--..----......_--"_..-....._.._..._.".~.."......-...-.-.-_._....-....-- .-".-..-.--.....
Fund if
I
I
Funding Sources
G.O. Bonds-2007 w/ City Hall
Total
2006
60,000
60,000
I
I
I
\D~scription J
I Document storage and retrieval system
I
I Justification
I
J
I
Expenditures
Document Storage & retrieval
Total
2006
10,000
10,000
2007
340,000
340,000
2008
2009
2010
Total
400,000
400,000
2007
340,000
340,000
Total Cost $10,000
Type Equipment
Useful Life Unassigned
Category Facilities/equipment
Priority nla
Contact Unassigned
Depl\rtnlent Public Facilities/Office Equip
~
2007
2008
2009
2010
Total
10,000
10,000
I
Funding Sources
General Fund
2006
10,000
10,000
I
Total
I
I
I
I
I
MO/lday Septem{7e!' 1'2. 2005
2007
2008
2009
2010
Total
10,000
10,000
75
[....-..'-----....----..---.----'----........-........'---..--'-,--...,...-..---..--.-..-.-,--"-.-,.......-,.,......---.,--.....-'-'.'..-...'--..-.--..'''1
I Project It PF -06-05
Project Name City Hall Generator
l___..._....,..__..__.._.______,.__...____.___.____._..._,_.--,---.-..,.."..---------.
Fund It 641
Description
Purchase a generator for City Hall for use during power outages
Total Cost $16,000
Type Improvement
Useful Life 5 yrs
Category Facilities/equipment
Priority nla
Contact Engineer
Department Public Facilities/Office Equip
I
I
I
\ J u~tification
Expenditures
EquipN ehicleslFurnishings
Total
2006
16,000
16,000
2008
2009
2010
I
Total
16,000
16,000
I
2007
Funding Sources
Public Facilities/Office Equipm
Total
2006
16,000
16,000
2007
2009
2010
Total
16,000
16,000
I
2008
I
~;;;~-;;::~~B;~~~:ro~_-~~==-~=:]
Fund It
Description
Purchase generator for the Public Works Building.
Total Cost $38,000
I
Type Equipment
Useful Life 5 yrs
Category Facilities/equipment
Priority nla
I
Contact Engineer
Departnlent Public Facilities/Office Equip I
I Justification
Expenditures
EquipN ehicles/Fumishings
Total
I
Funding Sources
Pub.lic Facilities/Office Equipm
Total
lv{onda)' September 1'2, 2005
2006
38,000
38,000
2008
2009
2007
2010
Total
38,000
38,000
I
2006
38,000
38,000
2007
2009
2008
2010
Total
38,000
38,OOa .
I
I
76
I
I
I
I
I
:E
w
l-
V)
~
a.
w
~
w
V)
>-
a.
~
I-
H
Z
<
V)
-
E
Q)
+-
V)
>-
V)
t..
Q)
~
Q)
V)
>-
L.
o
+-
.2
o
V)
o
0..
U
C
::J
E
Q)
.c
+-
>-
..0
-0
l\)
>
L.
l\)
V)
V)
-0
o
o
~
l\)
L.
o
.c
V)
~
o
>-
+-
G
Q)
.c
+-
~
o
.
:J:
-
<(
~ s::
~ 0
+-
.c -
+- 0
3: 0.. d
o +-
.,. L. 0
v, +- V)
Q) l\) Q)
-=:f~
~~:f
~ +-
Q) 0 Q)
V) +- l\)
0..
C ~ 9
(j .- -
+- 0 (j
._ L. .J:
s;;: -0 V)
~ >- s::
li) .-
~+->-
o (j :t:
tnE=
Q) U
.:!:: (j
.e ::J ~
N~~
..0 +- (j
tn-l
~ >- l\)
Q) tn ::J
+--000
(j 0 .
E 0
.- ~ V)
~ Q) l\)
L. L. U
0.. 0 .>
o...c t..
(j V) Q)
V1~V)
Q) 0 (j
-0 >- +-
::J +- s;;:
U 0- l\)
c \J E
Q) s::
E.c 0
Q) f- .~
+->
tn . s;;:
~~w
o~
>- ..- 0
:t: t
\J t; g
Q) +- ::J
.c'4-0
f-.:.=\J
-
-
-oL.O
s;;: 0 VJ
(j'4-ti
V)
c+-+-
o V) tn
+- 0 ::J
(j U E
+- tn
.- <( ::
..0 0
(j
.cE'4-
l\) Q) C
L.+-
c: ~ -g
o V) (j
+- L.
o l\) c:
t; ~ 0
Q) +-
+- V) (j
'4- >- L.
L..:t:
o 0-
+-~
s:: ._ s::
o C
V) ~ l\)
+- ft' .J:
5 1: +-
'4- +- ~
'4- 0 U
Q) +- ::J
c-o
Q)
t..
V)
+- ~
0'l...2 0
.~ 1: +-
tn
::J
U
o
.....
tn
-o+-
c: L.
(j 0
'4-
S::'4-
V) 0 Q)
+-
>- 0 l\)
:t: J= V)
\J - (j
l\)
L.
U
c:
~
Q) c:
.J:
+- '4-
o
>..s::~
+= .2 Q) ~
s:: +- E V)
Q)u+-(j
L. ::J (j Q)
L. -0 l\) t..
::J Q) t.. u
\J L. +- c:
-
- -
-
-
-
-
-
-
-
-
-
-
I'-
I'-
-
-
Capital Improvement Program
City of Shorewood, Minnesota
PROJECTS BY DEPARTMENT
2006 thru.. 2010
Department
Project# Priority 2006 2007
2008
2010 Total
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Sanitary Sewer
Infiltration and Inflow Reduction SS.03.Q5 0 50,000 50,000 50,000 50,000
Uft Station 17 Rehabilitation SS.Q4.Q1 0 81 ,000
Lift Slation 16 Rehabilitation SS.05.Q2 0 25,000 79,000
Uft Station Pump Rebuilds and Mountings SS.06.Q1 0 30,000
Portable Lift Station Control Panel SS.Q6.02 0 6,000
Lift Station 12 Rehabilitation SS.Q7.Q1 0 19,000 91,000
Sanitary Sewer Total 192,000 148,000 141,000 50,000
GRAND TOT AI.. 192,000 148,000 141,000 50,000
2009
50,000 250,000
81,000
104,000
30,000
6,000
110,000
50,000 581,000
50,000 581,000
MOl/day September 12. 2005
78
I [=:_-==O~_and~::_~~U~~:--=-==-------J
I Fund# 611
Type Improvement
UseCul Life 5yrs
Category Sanitary Sewer
Priority nla
Contact Engineer
Department Sanitary Sewer
I Description Total Cost $300,000
This item is an annual project to reduce the costs of infiltration and inflow.
I
I Justification
Ii
I
Prior
50,000 I
Total
Expenditures
Planning/Design/Survey
Construction/Inspection
Contingencies
2006
I
Total
o
50,000
o
50,000
I
Prior
50,000 I
Total
Funding Sources
Sanitary Sewer Fund
2006
50,000
50,000
Total
2007 2008 2009 2010 Total
0 0 0 0
50,000 50,000 50,000 50,000 250,000
0 0 0
50,000 50,000 50,000 50,000 250,000
2007 2008 2009 2010 Total
50,000 50,000 50,000 50,000 250,000
50,000 50,000 50,000 50,000 250,000
I
I
r......---.--.-......-------.--...-..-----.-..........--...--.....-..-.-...--.--.---.-......--.-.........-.
Project # 88.04.01
I ProjectNarnc LiftStation 17 Rehabilitation
....._.___..._._...._.___._.-__....._-...__..__.._-_...____..____._._.__.._.....................__......_...._..____.~_.__.J
Fund # .611
I
I
Description
This project involves reconstruction of the wet well. control panels.
Total Cost $103,000
Type Improvement
Useful LiCe Syrs
Category Sanitary Sewer
Priority nJa
Contact Engineer
Department Sanitary Sewer
\ Justification 'l
Prior Expenditures
22,000 I Construction/Inspection
Total Contingencies
I
2006
72,000
9,000
81,000
I
Total
2007
2008
2009
2010
Total
8t,OOO
81,000
I
Prior
22,000 I
Total
Funding Sources
. Sanitary Sewer Fund
2006
81,000
81,000
Total
2007 2008
2009
2010
Total
72,000
9,000
81 ,000
I
I
I
I
I
L'dollda..1' September 12.2005
79
[..-.....-........--..--.-----..--..-...-. -----...-.-.-...-....-.-.-.--.-...--....-.-.......-....----.-..-.....-..-......-.......-.. ----J....
Project # SS.05-02
Project Name Lift Station 16 Rehabilitation
_.,-----_.._------_._----------_._.~_..'_..._"_._----.---,..--.-'.---.-----.--.
Fund # 611
Description Total Cost $104,000
This project involves reconstruction of the wet well.and control panels.
Type Improvement
Useful Life 5 yes
Category Sanitary Sewer
Priority nla
Contact Engineer
Department Sanitary Sewer
I
I
I
I Justification
Expenditures
Planning/Design/Survey
Construction/Inspection
Contingencies
2006
25.000
2007
2008
2009
69,500
9,500
79,000
Total
25,000
I
2010
Total
25,000
69,500
9,500
104,000
I
I
Funding Sources
Sanitary Sewer Fund
2006
25,000
25,000
2009
2010
Total
104.000
104,000
I
Total
2007
79,000
79,000
2008
1.......--...--.----..--.-.-.-...--.----.-..--....---.--..............-.--...----.-..------....-----...-
I Project # SS.06.01
Project Name Lift Station Pump Rebuilds and Mountings
,...____._...____._____....._.._. .._________.'._____,~.'_......._______..__"___.._.7"._~._.__.__._____.__._______.._._.'0.__
Fund #
Total Cost $30,000
I
Description
I
Type Improvement
Useful Life 15 yrs
Category Unassigned
Priority n/a
Contact Public Works Director
Department Sanitary Sewer
I
I
I Justification
Expenditures
Maintenance
2008
2009
Total
2006
30,000
30,000
2007
2010
Total
30,000
30,000
I
I
Funding Sources
Sanitary Sewer Fund
2006
30,000
30,000
2007
2008
2009 .
Total
2010
. Total
30,000
30,000
I
MO/lday Sepcember /::.. 2005
80
I
I
I
I
I
I r-----.--..-...-.---..... .________________n__._________.___.________. -.--.-. _____no --.--.--- - -..--.
I Project # 8S-06-02
L~~_o!ect Na~ !orta~!~_~!!~ ~~~~~~_~on_~rol_ Panel .________.________._ _ __ .u.__
I Fund #
Total Cost $6,000
IteSCriPtion
I (JUStification
Expenditures
EquipN ehicles/Fumishings
2006
6,000
6,000
2007
2008
2009
I
Total
Type Equipment
Useful Life 5 yrs
Category Unassigned
Priority nla
Contact Public Works Director
Department Sanitary Sewer
2010
Total
6,000
6,000
I
2008
2009
2010
Total
6,000
6,000
Funding Sources
Sanitary Sewer Fund
2006
6,000
6,000
2007
Total
I
I
1--------.-.---...----....--.-------.--.-....----.----.-.-----.-..-------.----.----..-----
\ project# 8S-07-01
I Project Name Lift Station 12 Rehabilitation-
L._. ...._........._.._.._________. .-..--..- --.. ..----.--.----.---.-.--.---.-.-..--..-....-.... . ........--...-.... -.....-.--.-----..... - .. ......-....-..--.-.......-
Fund# 611
I
I
I Description l Total Cost $110,000
IThis project involves reconstru:tion of the wet well and control panels.
I Justification
r
Type lmprovement
Useful Life Unassigned
Category Sanitary Sewer
Priority nla
Contact Engineer
Depllrtment Sanitary Sewer
-.J
I
\
I
Expenditures 2006
PlanninglDesign/Survey
Construction/Inspection
Contingencies
2007
19,000
2008
2009
I
19,000
81,000
10,000
91,000
Total
2010
Total
19,000
81,000
10,000
110,000
I
. Funding Sources 2006
. Sanitary Sewer Fund
2007
19,000
19,000
2008
91,000
91,000
Total
2009
2010.
Total
110,000
110,000
I
I
I
I
I
MOllday September 12,2005
81
82
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
THIS PAGE INTENTIONALLY LEFT BLANK
D
Z
::>
u.
I-
Z
w
~
w
~
<
Z
<
~
a.
w
I-
<
~
~
a.
o
~
-
.
1-1
C
-1:
+-
"0 3:
(\) tI)
-1: (\)
tI)
t.. -
(\) >-
b+-
3 U
~ (\)
(\)-1:
(\) +-
t..'+-
U 0
cJ t..
(\)
..cc_
cJ t.. CJ
-583
2+-U
~g~
(\) ..c e;,
..c+-+-
+- ::::J u
C ~ t..
..c (\) +-
+--1: V)
3:+-CJ
tI) .;: "0
(\) ,(\)
_c..c
-0 .2 ~
o +- (\)
o t.. +-
3: 0 0
(\) c. 3
t.. 01
o C ~
..c '2 (\)
\I) .- (\)
cJ t..
6EU
>-~'+-
+- '+-
._ (\) ::::J
U-1:'iii
(\) I- >-
-1: t..
+--0
,+-CJ+-
o 3 ~
>- U t..
:t:~~
t..,--,
.2, +- ~
o u-
E .~ ct
(\) t; (\)
-1: .- -1:
I-CJ+-
-
-
CJ
3
"0 U
(\) ~
-1: (\) (\)
V) 01-1:
t.. cJ +-
~c-o
~ ~ ~
cJ 0 cJ
+- c
(\) _ .2"'
b::>tI)
c <..!) (\)
.2"' ~ ~
V)'--'o
(\)-..c
-0 V)
'--'-0
o :t: 0
+- c 0
+-::>3:
~ - (\)
_Ot..
(\) 1:: 0
>-(\)..c
o E \I)
Ec'+-
t.. 0
C(\)>-
'- > +-
-a 0 .-
0- <..!) U
'u (\) (\)
._ - ..c
~:QI-
tI)
E5>-
..c o...:t:
u V) U
g ~ (\)
, (\) -1:
~ -1: +-
.- ..... '+-
t.. 0
o~'+-
...c: _
+- V) 0
::::J+--1:
cJ u (\)
>-'~ ..D
t.. +- s::
~ .~ 0
::::J -0 t..
+- t.. (\)
cJ 0 +-
ti +- 0
u 3:
t.. .- E
(\) t.. t..
-0 +- 0
C .~ +-
::>-0 V)
-
-
V)
::>
<..!)
~
(\)
-1:
+-
V)
c:J
o
~
3
u
co
a..
~
(\)
..c
+-
-0
c
o
O,+-
-0 0
(\) >-
a:t:
fr~ g
t.....c:.>
O-+-U
~ >-~
-1:..D(\)
-o"O..c
o (\) +-
o > >-
3: ~ ..D
(\) 0...-0
50...(\)
..c c:J >
\I) ~ ~
63:8:
>-bO
+- ..c s::
.- +- (\)
U (\)
(\) a ..D
-1:-tI)
+- a.. 0
+- -1:
C c
~.s!
(\) 0...
01(\)
c:J-1:
al-
~o
o
o
N
t..
o
(\)
>-
(\)
-1:
+-
s::
(\)
+-
o
-0
s::
o
E
(\)
.:::
+-
.s! ~
V) +-
.- c:J
013:
~ E
c:J t..
-1: 0
+-t)
3: (\)
(\) >
u .-
c~-o
.9 (\) 0
--1:0
0... (\) ;:
E t.. (\)
o C. t..
U E 0
s:: o..c
HU\I)
- -
o
+-uo
-au..2u
u .~ x ..2
o 0 .- 0
(\)t..'+-+-
>a..0V)
oc+--o
tI) l\) t.. C
(\) ," 0 :J +-
t.. ~ (\) '+- U
o C >- (\) .~
+- 0 t.. V) 0
(\) (\) (\) t..
C -0 c....c c..
(\).- +-
.8<..!)8l\)~
tI) ~ 0, b c..
o +- 0 U 0
-1: (V).- 0
tI) 6*-g 0,
l\)ct..-oLO
~Ol\)o*
V)+:..D+--o
uE-o(\)
+- ::::J :J (\) (\)
s:: t.. U N U
(\) ti C .- x
E c l\) 5 (\)
(\)01 Ou 0 -1: +-
+- +- 0
gt..-o::::Jc
Oo(\)cJ-o
E '+- +- V) .-
O1u 0-0
t.. c ~ 3: +-
(\) .- l\) U
+- -0 t.. (\)
o C tI) (\) .....,
3: :J 0 (\) 0
E '+- -1: c t..
t.. (\) ._ 'm 0...
o t.. U C ..c
+-::::JcWU
V) o-::::J >-0
(\) U 0 +- (\)
..c 0 U '- +-
+- 0 >-u cJ
,+-+-+-(\)..c
o-uo...c:+-
>- C (\) I- g'
c 0 ..c '-
o '+- -0
E ~ ,~.::;
'+- :J t; :J 0
o~o~a
tI) c.. .- ,
::::J (\) tI) (\) V)
U 01 t.. 01 +-
000 0 U
'+- C (\) s:: (\)
(\) 'ij >-'ij '(l
..c t.. s:: t.. t..
I- -0 H -0 c..
-
-
-
-
-
-
-
-
-
-
M
co
-
-
84
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
PROJECTS BY DEPARTMENT
2006 thru 2010
Department Project# Priority 2006 2007 2008 2009 2010 Total
Stormwater Management
Gideon Glen improvements(City Costs) STM.Q4.01 0 70,000 70,000
Glen Road Drainage STM-04.02 0 25,000 25,000
Mise Stormwater Projects STM-04-05 0 30,000 30,000 30,000 30,000 30,000 150,000
Stormwater Management Total 125,000 30,000 30,000 30,000 30,000 245,000
GRAND TOTAL 125,000 30,000 30,000 30,000 30,000 245,000
MOllday September /2.2005
I -.."...----------...,,-.-----.------.-...-....--.--....-.-.....--.......-----..............-.-...-......----------.--........-..-.....--.-
Project #: STM-04-01
ProjectName Gideon Glen Improvements(City Costs)
Fund #: 631
Type Improvement
Useful Life Unassigned
Category Stormwater Management
Priority nla
Contact Engineer
I
.._..~____"__H.~-.-_---_.---------_..._-------------.-_.._..~_._. ..HH...,.___~_...._._.H...__._....._.__~
Description Total Cost $75,000 Department Stormwater Management
The Gideon Glen project involves enhancement of an existing wetland, potential construction of storm water management facilities and creating a public education
program to study water quality and runoff characteristics. The City of Shorewood has key individuals seeking additional financial support for the project. Funding
will be a combined effort from such organizations as Minnehaha Creek Watershed District, Hennepin County Department of Transportation, the Metropolitan
LCouncil and the City of Shorewood.
C ustification
Prior Expenditures
r 5,000 I Construction/Inspection
Total
I
I
I
2006
70,000
2007
2008
2009
2010
Total
70,000
I
Total
70,000
70,000
I
Prior
5,000 I
Total
Funding Sources
Met Council Grant Money
Total
2006
70,000
70,000
2007
2008
2009
2010
Total
70,000
70,000
I
I
[;;;~~~:;;~~~:__=_n~~==::_-_-=::__. _]
Fund #: 631
Type Improvement
Useful Life Unassigned
I
Category Stormwater Management
Priority nla
Contact Engineer
Description Total Cost $25,000 Department Stormwater Management
Involves installation of tile lines, catch basin structure and cross culvert across Glen Road. In addition. a swale will be constructed to the north.
I
I
\ Justification
I
I
Expenditures
Planning/Design/Survey
Construction/Inspection
2006
5,000
20,000
25,000
2007
2008
2009
2010
Total
5,000
20,000
25,000
Total
I
Funding Sources
Stormwater Management Fund
Total
'2006
25,000
25,000
2007
2008
'2009.
2010
Total
. 25,000
25,000
I
I
I
I
I
Monday September 12. 2005
85
Total Cost $150,000
Type Improvement
Useful Life Unassigned
Category Stormwater Management
Priority nla
Contact Engineer
Department Stormwater Management
I
..-.. ---------.--.-. --.----..------.---....---...--.-.......-----.-...---.--...-..--------.-...-..----.-......J-.-
Project It STM-04-0S
Project Name Mise Stormwater Projects
.-.....---. . ' ..,'_.__._,-_.._..._.._---~,._,._----,._-_._--~.._..,..,.----------
FundI#: 631
I
Description
Specific projects to be determined.
\ Justitication
Expenditures
Construction/Inspection
I
I
2006
30,000
30,000
2007 2008 2009 2010 Total
30,000 30,000 30,000 30,000 150,000
30,000 30,000 30,000 30,000 150,000
2007 2008 2009 2010 Total
30,000 30,000 30,000 30,000 150,000
30,000 30,000 30,000 30,000 150,000
I
2006
30,000
30,000
Total
Funding Sources
Stormwater Management Fund
I
Total
I
I
I
I
I
I
I
I
I
I
I
I
l\-[ollday September 12. 2005
86
I
~
z
'<(
-1
Q)
l-
lL
W
-1
~
-1
'<(
Z
o
~
z
w
I-
Z
H
W
c.!)
'<(
0-
V)
H
I
I-
.....
00
-------------------
.
CITY OF
SHOREWOOD
\
,
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128 . www.cLshorewood.mn.us . cityhall@cLshorewood.mn.us
MEMORANDUM
.
TO: . Honorable Mayor and City Councilmembers
lr"aig-Dawson. City Administratorcb /l .
Bonnie Burton, Finance Director/Treasurer~
FROM:
DATE: September 1, 2005
SUBJECT: 2006 Proposed General Fund Operating Budget
.
INTRODUCTION
We pleased to present the 2006 Proposed General Fund Operating Budget for your review and
approval. The proposed budget and levy for Pay2006 must be certified to Hennepin County by
September 15, 2005.
. This budget is the result of Council and staff work-sessions in July 18,2005 and August 22,
2005, with direction from Council to be as responsible and as "lean" as possible in developing
the 2006 budget. The general approach in preparing the proposed budget has been to continue
increasing the transfers to capital funds, to continue addressing matters that have been
deferred, and to make additions that will enhance productivity and effectiveness.
2006 BUDGET HIGHLIGHTS
.
. Levy Limits
. For the second year in a row, the Legislature did not limit the property tax revenue
that cities may levy for. This provides the Council with another opportunity to address
matters that have been deferred. If past actions of the Legislature are a guide, if levy
limits were to be reinstated, the base for the limited levy will be the current-year levy.
n
f..~ PRINTED ON RECYCLED PAPER
# 98
r
2006 Proposed General Fund Operating Budget
Page 2
.
. Market Value Homestead Credit
The MVHC, scheduled to return in 2005, was again retained by the State for its own
budget fixes in the State's fiscal 2006-07 biennium (falling in the cities' calendar years
2005 and 2006). The City's scheduled MVHC revenue scheduled was approximately
$73,000.
. Tax Base
TheCity received preliminary information from Hennepin County indicating that the
City's tax base will increase 13.25'0 for Pay2006 taxes.
.
Transfers to Capital Improvernent Funds
With the severe levy limits in place for 2004, the Council focused resources on .
delivering on-going services and thus reduced capital improvement funds transfers. The
proposed 2006 budget restores transfers to the Improvement Funds at levels similar
to 2003:
2006 2005 2004 2003 .
Equipment Replacement 175,000 116,000 50,000 70,800
Street Reconstruction 345,000 311,000 183,500 200,000
Park Capital Improvement 10,000 10,000 10,000 185,000
Trail Capital Improvement 0 0 0 28,700
Public Facilities 50,000 50,000 50,000 89,600
Land & Open Space 5,000 5,000 5,000 0
Stormwater Management 25.000 7.000 25 .000 35.000 .
$610,000 $499,000 $323,500 $609,100
.
Public Safety
Police and fire services are major components of the budget, and total approximately
$1.5 million in 2006. For police, the City Council has approved the level of funding for
2006 recommended by the SLMPD Coordinating Committee: $715,806 (or 46.0% of the
$1,556,100 needed in municipal payments). There are several proposals currently under
consideration for alternate funding or services for SLMPD in 2006. Accordingly, There
is $754,708 available in the 2006 budget. The City's obligation toward the SLMPD
building lease is an additional $254,593. The budget for the Excelsior Fire District has
been approved by the requisite majority of cities, and Shorewood's resulting
contribution will be $538,278, or $289,075 for operations, and $249,203 for facilities.
Estimates for services provided by the Mound Fire Department are $26,421, which is .
$17,891 for operations, and $8,530 for facilities.
,
.
.
.
.
.
2006 Proposed General Fund Operating Budget
Page 3
. Public Works/Engineering
Council approved a major change in the Public Works department, with the
authorization of a separate full-time City Engineer position. Earlier this year a
candidate accepted an employment offer but soon after withdrew it. We are currently
accepting applications for the position, and hope to have someone on board for the last
quarter of 2005. We expect that the Council's priority to move ahead on the City's
infrastructure planning will be better addressed, along with the work needed to fulfill
the.increasing number and scope of state and federal reporting mandates.
. Municipal Facilities
The addition of an equipment/mechanic's bay at the Public Works Building wouldstart
late in 2006 and be completed in 2007. Funding for the planning and design ($60,000)
is included in the 2006 proposed budget, with funding for the balance of the $400,000
project to be included with a bond sale in 2007. Planning continues for improvements to
City Hall during 2006, and a sale of bonds for construction would be planned for 2007.
. Salaries and Insurance
The proposed budget provides for 2.0% economic adjustments on January 1 and July 1.
Increases for public works maintenance employees are yet to be set in the labor
agreement with AFSCME that will start in 2006. Total insurance premiums have been
estimated to increase 10 percent. Additional education reimbursement has also been
programmed.
. Improvements to Document Retrieval System
Council approved the acquisition of a document retrieval system in 2005. The goal is
for all of the City's documents to be stored in an archival-approved manner in digital
form, and placed on a database system, and with public Web access (subject to certain
levels of security). The structure of the system and scanning of documents has begun.
Improvements proposed for 2006 include Document Imaging Weblink software for a
total of $8,800.
. Other Technology Improvements
The Finance accounting software, purchased in 1998-1999, is no longer being supported
by the manufacturer and needs to be upgraded. After reviewing several packages, it
appears that "Incode" by Tyler Technologies offers the best value. Accordingly,
$45,000 has been proposed for financial software replacement.
-1<.1'1
:r -+
(\l a.
~-h
6 ~.
N-+
O:r
O(\l
O'::S
-+ 0
o (\l
x 4
ro-h
~-<
o :}
::s -.
Q.Ul
0"'0"'
c c
0.0.
lOlO
(\l (\l
-+-+
o 0
0...::S
o 0...
~(\l
o'~
::s 0
:E Ul
-. ,
-(\l
0"' -0
(\l C
Ul ,
o (\l
:r 0...
(\l 0"'
Q.(\l
=--h
(\l 0
0.'
-h(\l
o -+
, :r
(\l
~<.1'1
o (\l
(\l-a
3 -+
O"'(\l
(\l 3
, 0"'
N(\l
0'
0-
~U1
0.
(\l
o
0.
5'
~
.
0"<.1'1
::s , -+
0. 0 0
=-g -h
<.1'IUl-h
(\l (\l ,
::t: 0. (\l
-. (i) 0
::s (\l 0
lO ::s 3
-I (\l 3
, , (\l
C 0 ::s
-+-0.
:rI1Ul
I C
H::s-+
TQ.g
ofQ;)-+
xc -+
oo...:r
-+ lO (\l
-, (\l roo.
0-+"
::s -.
"g..;t
cQ.~
0"'-+0
;::;:. :r C
" (\l ::s
I " !2.
(\l 6 0
~-a-a
:;. g ~
lO (\l 0
C7Q.<
o N (\l
-+0-+
(\lo:r
Ul" U1 (\l
,,~
, -+
o 0
-a 0
(\l :r
, (\l
..;to.
,
of~
x 2-
,c
(\l ::t
~ g
~ Ul
~
o "
(\l <.1'1
o (\l
::t::t:
0"' -.
_ ::s
(\llO
:;. :}
N(\l
ON
00
~O
- 0'
.,.,
m
n
o
~
~
m
Z
C1
m
C1
~
n
;:t
o
z
.
<.1'Ig~~ -I
:r 0. 0 -. :r
0<0 (\l
~ ~ 0.: ~. N
:E ::s (\l ::t 0
o 0 Ul (\l 0
ofiolAO'
0. -. 0"
9..~::s,
-aUlQ.o
0"0 0."0
Ul 0 -. 0
=+::s~~
o' & ~ 0...
? (i" o' (i)
:E "0 ::s ~
:r.P:r~
(\l ::s 0 0
-+::s-
o 0 ~ 11
g ..... -+ C
-+ '-I :r::s
-. e.. (\l 0.
::SOn
C ::s -. 0
-. 0 -+
t5(\l-<-g
-+-+~'
o:ro~
(\l C -,
-a ~ ::s ::s
6 -. !2. lO
<-+:-Q;)
-. -< C
0. Ul- <.1'1 0.
(\l Ul -+ lO
-0 (\l 0 (\l
C , -h -+
9.. ~, -h 0
-. 0 0"' ::s
..;t(\l~o...
0... -. -
Ul (\l (\l (\l
(\l_<<
, -. (\l -<
< < Ul
-, (\l :E
O'-+(\l
(\l -< :r ,
Ul ::s (\l (\l
-+(\l"o-
o (\l , '-I
-+ 0. 0 '
:rUl-a.g
(\l ~ 0 0
, 5' Ul ,
(\l -h (\l (\l
Ul,Q.Q.
-, 0 NO
0.(1)00
~-+oo
-+20'0
Ul 0 0"'6..
o c-+ C -.
-h Q.::S
~lOlO
::s (\l -+
(\l -+ 0
(\l -+
0. :r
Ul (\l
.
n
o
Z
n
E
(n
H
o
Z
O"'C7O"'<.1'I::s-f
C(\lC(\lo:r
0. 0 0..."0 (\l
lO (\l lO -+ C
(\l :3 (\l (\l 0.-+
-+O"'it3~2
o (\l 0"' roo. -+
5. ' :;. ~ ~~ =r
_ ~U1 :} _..;t :;'
~ 0 (\l ~U1 ~ ~
-<::S-h 00
O"'Q.oNcX
(\l -. - 0 ::s 0
-h-h::700::t
o::s :r~=0
,(\lo-ho::s
(\l (\l c:: _,"0 "0
-< 0... _. ::s "0 ,
(\l (\l ::s 0 6 0
oQ.lO-<O
'o.gj~e..~
~(\l(\l~OUl
0. 0 !2. 0 -h ~.
, ~e..60
0"' -g ::t ci' .ti'
(\l .....0-<
, '-I::S No
- o' 0 0 :E
N -h0
NifoO':}
oo=,,(\l
0'~"'1-+
U1 ::s =+ 0
"lO-<-g3
o Ul Ul (\l
::s 0 0"' (\l -+
Q.::s&o...g..
&. :} 'g of (\l
-8(\litxg
-+"0 ~ ,0...
o' 6 :;. ~ "0
::s"O 0-<,
o g C -+ g
5. (\l 9:- 0 (\l
0...::s0"'0...
2 0"' lO (\l fi
"'1 C (\l 0 (\l
-+o...~(\lUl
=h lO (\l "'1
0' ~ "'1 ::t ::s
o 0 ~ ~~
::t ::s -. (\l 0
o 0... ~ 0... 0
::s -+ ::s (\l
oogop
-hXQ. Ul
-+ - 0-+
:r (\l C (\t-<
(\l ~ ::t , (\l
-h ~~o
-, 0 ..;t :r '
6::S o'
- ::s -f
:r
iii'
.
-f
.,.,
C
-f
J:
I
H
Z
I
-f
~
X
~
;:t
o
z
"0 11 11 "
"'1 , C 0
<' (\l ::s ..,
o (\l o...:;IIt"'
-+3(1)"
(\l 00..,
-h::S'0
C ,,(\l \0
5.. ~ ::s a
:;. ^ !2.. 3
lO' C:3
o Q f} :;'
, -+ 0.\0
0. -< -+
o -h 0
6C"O
-+ ::s ,
-. 0. 0
o :;. <
~ lO 0.:
-h 0 (\l
o g 0
'--h
-+0.0
:rO"'c
(\l (\l ,
? , -0
(\l (\l
0.'
C -h
o 0
(\l ,
0...3
o
o ::s
, 0
3 (\l
o (I)
, (\l
(\l ~.
o (\l
o Ul
::s 0
o -h
(\l Ul
, C
it:3
o 3
-h(\l
-h,
(\l 0
, 0
(\l ::s
0.0
=h~
-+-+
:rUl
(\l 5'
,
(\l
iii'
.
"
o
lO
(\l
~
N
o
o
Cl'
"
,
o
"0
o
Ul
(\l
0.
(i)
(\l
::s
(\l
,
9..
11
C
::s
0.
o
"0
(\l
"'1
o
-+
:;.
lO
Q;)
C
0...
lO
(\l
-+
.
....
.
CITY OF SHOREWOOD
RESOLUTION NO. 05-
A RESOLUTION SETTING THE 2006 PROPOSED GENERAL
FUND BUDGET AND APPROVING THE PROPOSED 2005
PROPERTY TAX LEVY, COLLECTIBLE IN 2006
WHEREAS, the City staff has presented to the City Council the proposed 2006 General Fund
Budget and the 2005 property tax levy collectible in 1006; and,
WHEREAS, the City Council has met to review the proposed budget and property tax levy; and,
WHEREAS, the City Council must approve and certify its proposed 2006 budget and
preliminary property tax levy for the current year, collectible in 2006, to the County Auditor by
. September 15 of each year.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Shorewood that:
1. The 2006 Proposed General Fund budget is hereby set at $4,797,495.
.
2. The following sums be levied for the current year, collectible in 2006, upon taxable
property in the City of Shorewood, for the following purposes:
General Fund Levy
Special Levy
$3,735,592
511.803
Total 2004 Levy:
$4.247.395
.
3. That the City Clerk-Administrator is hereby instructed to transmit a certified copy of
this resolution to the County Auditor of Hennepin County, Minnesota.
ADOPTED by the City Council of the City of Shorewood this 12th day of September, 2005.
Woody Love, Mayor
ATTEST:
.
Craig W. Dawson, City Administrator/Clerk
CITY OF SHOREWOOD
RESOLUTION NO. 05-
A RESOLUTION SETTING TRUTH-IN-TAXATION PUBLIC HEARINGS ON
THE PROPOSED 2006 BUDGETS AND THE 2005 PROPERTY TAX LEVY
COLLECTIBLE IN 2006
WHEREAS, Minnesota State Law requires local governments to hold public
hearings on their proposed budgets and property tax levies, and to publish notice of said
public hearing to achieve truth in taxation, and,
WHEREAS, the Minnesota Department of Revenue has issued guidelines for
local governments to follow in implementing truth in taxation requirements, and,
WHEREAS, it is the intention of the City Council to comply with such
guidelines,
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Shorewood that a public hearing on the proposed 2006 Municipal Budgets and the
property tax levy for 2005, collectible in 2006, be held on Monday, December 5, 2005, at
7:00 p.m., or as soon thereafter as possible, and a continuation hearing, if necessary be
held on Monday, December 12, 2005, at 7:00 p.m., or as soon thereafter as possible, at
the City Hall, and that notice of such public hearing shall be published in accordance with
Minnesota State Law and guidelines set forth by the Minnesota Department of Revenue.
ADOPTED by the City Council of the City of Shorewood this 12th day of
September, 2005.
Woody Love, Mayor
ATTEST:
Craig W. Dawson, City Administrator/Clerk
.
.
.
.
.
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOOD, MINNESOTA 55331-8927 · (952) 474-3236
FAX (952) 474-0128. www.ci.shorewood.mn.us. cityhall@ci.shorewood.mn.us
,;
.
~
CITY OF SHOREWOOD,
MINNESOTA
2006 PROPOSED ANNUAL
GENERAL FUND OPERATING BUDGET
12 September 2005
ft
tJ PRINTED ON RECYCLED PAPER
# 96
CITY OF SHOREWOOD
2006 PROPOSED GENERAL FUND BUDGET
TABLE OF CONTENTS
PAGE
. Preparation Calendar for 2006 Budget 1
Summary of Proposed 2006 General Fund Budget 2-3
Ge.ne.ral Fund
Departmental Budgets
41110 - Mayor and Council 4-5
41300 - Administration 6-7
41400 - City Clerk 8-9
41450 - Elections 10-11
41500 - Finance 12-13
41600 - Professional Services 14-15
41910 - Planning and Zoning 16-17
41940 - Municipal Building - City Hall 18-19
42100 - Police 20-21
42200 - Fire Protection 22-23
42400 - Protective Inspection 24-25
42700 - Animal Control 26-27
43010 - City Engineer 28-29
43050 - Public Works Service 30-31
43100 - Streets and Roadways 32-33
43125 - Snow and Ice Removal 34-35
43160 - Traffic Control/Street Lighting 36-37
43200 - Sanitation/Waste Removal/Weeds 38-39
43250 - Tree Maintenance 40-41
45200 - Parks and Recreation 42-43
CITY OF SHOREWOOD
Year 2006 Budget Schedule
Date DescriDtion
07/15/05 Budget worksheets distributed to staff and department heads.
07/18/05 Budget discussion and work-session (Council and Staff)
07/23/05 Completed budget worksheets due from staff.
08/22/05 General Fund Operating Budget work session (Council and Staff)
09/12/05 Regular Council meeting. Council adopts 2006 proposed budget and levy.
09/15/05 Proposed budget and levy must be adopted and certified to County Auditor
by this date. State form Payable 2006 PT Form 280 also to be submitted.
10/24/05 Enterprise fund budget work-session (Council and staff)
11/20-11/24 Counties to mail Notice of Proposed Property Tax by this date.
11/24/05 Budget hearing advertisement published in the official newspaper.
12/05/05 City initial budget truth-in-taxation hearing.
12/12/05 If required, the continuation budget truth-in-taxation hearing to be held on
this date.
12/12/05 Regular Council meeting. Final 2006 budgets and levy to be adopted.
12/30/05 Final levy and budgets must be certified to the County Auditor by this date.
State forms Payable 2006 Property Tax Levy Report and PT Form TNT2006
also due.
1
CITY OF SHOREWOOD
GENERAL FUND REVENUE AND EXPENDITURE SUMMARY
2006 PROPOSED BUDGET
Actual Actual Budget YTD June Requested Proposed Adopted $$ 'Y.
2003 2004 2005 2005 2006 2006 2006 Change Change
Revenues and Other Sources
Property Taxes 3,071,853 3,344,442 3,830,656 1,326,100 4,201,389 4,247,395 416,739 10.88%
Licenses and Permits 334,424 310,055 196,100 139,850 197,100 197,100 1,000 0.51%
Intergovernmental 65,782 73,065 65,000 59,695 65,000 65,000 0 0.00%
Fines and Forfeitures 88,949 81,841 62,000 34,075 70,000 70,000 8,000 12.90%
Charges for Service 48,689 44,169 42,265 33,056 43,000 43,000 735 1.74%
Miscellaneous Revenue 89,343 103,676 125,000 121,615 125,000 125,000 0 0.1.10%
Total Revenues 3,699,040 3,957,248 4,321,021 1,714,391 4,701,489 4,747,495 0 426,474 9.87%
Expenditures
General Government
Mayor and Council 93,693 60,373 113,493 28,025 112,793 112,793 (700) -0.62%
Administration 104,539 110,659 144,444 66,296 148,209 148,209 3,765 2.61%
General Government 173,689 184,167 233,235 133,853 227,963 220,743 (12,492) .5.36%
Elections 6,006 13,817 600 831 37,618 45,323 44,723 7453.83%
Finance 127,064 148,776 194,684 92,857 241,172 241,172 46,488 23.88%
Professional Services 169,394 142,061 192,000 109,294 1BO,000 180,000 (12,000) -6.25%
Planning and Zoning 146,953 158,202 161 ,853 83,125 183,556 183,556 21,703 13.41%
Municipal Building 128,146 144,522 170,015 70,444 183,000 183,000 12,985 7.64%
Total General Government 949,484 962,577 1,210,324 584,725 1,314,311 1,314,796 0 104,472 8.63%
Public Safety
Police 609,992 937,001 992,550 494,685 992,456 1 ,038,538 45,988 4.63%
Fire Protection 293,029 481,642 493,710 252,074 564,699 564,699 70,989 14.38%
Protective Inspection 86,958 101,306 111,303 52,231 115,042 115,042 3,739 3.36%
Animal Control 19,900 20,971 24,000 13,005 26,000 26,000 2,000 8.33%
Total Public Safety 1,009,879 1,540,920 1,621,563 811,995 1,698,197 1,744,279 0 76,634 4.73%
Public Works
City Engineer 101,582 117,887 140,941 52,690 157,597 157,597 16,656 11.82%
Public Works Services 225,940 249,445 379,195 139,751 408,326 422,949 43,754 11.54%
Streets and Roadways 104,045 126,456 174,000 51,744 175,934 175,934 1,934 1.11%
Snow and Ice Removal 40,013 36,700 64,817 25,439 69,792 69,792 4,975 7.68%
Traffic Control/Street Lights 34,478 33,651 40,000 16,873 42,400 42,400 2,400 6.00%
Sanitation/Waste Removal 3,993 2,876 5,133 3,585 5,448 5,448 315 6.14%
Tree Maintenance 20,715 31,619 26,546 15,464 48,005 32,821 6,275 23.64%
Total Public Works 530,766 598,634 830,632 305,566 907,502 906,941 0 76,309 9.19%
Culture and Recreation
Parks and Recreation 451,793 166,864 209,502 84,668 221,479 221,479 11,977 5.72%
Total Culture and Recreation 451,793 166,864 209,502 84,668 221,479 221,479 0 11,977 5.72%
Total Expenditures 2,941.922 3,268,995 3,872,021 1,786,954 4,141,489 4,187,495 0 315,474 8.15%
Total Revenues Over (Under)
Expenditures 757,118 688,253 449,000 (72,563) 560,000 560,000 0 111,000
2
CITY OF SHOREWOOD
GENERAL FUND REVENUE. AND EXPENDITURE SUMMARY
2006 PROPOSED BUDGET
Actual Actual Budget YTD June Requested Proposed Adopted $$ 'Y.
2003 2004 2005 2005 2006 2006 2006 Change Change
Fund Transfers In
Liquor Fund 30,000 30,000 50.000 50,000 50,000 0 0.00%
Street Reconstr Fund 0 0 0 0 0 0 0.00%
Trail Fund 0 0 0 0 0 0 0.00%
Sewer Fund 25,000 0 0 0 0 0 0.00%
. Water Fund 0 0 0 0 0 0 0.00%
Total Transfers In 55,000 30,000 SO ,000 0 SO,OOO so ,000 0 0 0.00%
Fund Transfers Out
Equip Replacemt Fund (PW) 70,800 50.000 116,000 175,000 175,000 59,000 50.86%
Street Reconstr Fund 200,000 183,500 311,000 345,000 345,000 34,000 10.93%
Park Capital Imp Fund 185,000 10,000 10,000 10,000 10,000 0 0,00%
Trail Capital Imprvment Fnd 28,700 0 0 0 0 0 0.00%
Public Facilities Fund 89,600 50,000 50,000 50,000 50,000 0 0.00%
Land & Open Space Fund 0 5,000 5,000 5,000 5,000 0 0,00%
Stormwater Mgmt Fund 35,000 25,000 7,000 25,000 25,000 18,000 257.14%
Total Fund Transfers Out 609,100 323,500 499,000 0 610,000 610,000 0 111,000 22.24%
Excess (Deficiency) of Revenues and
Other Financing Sources Over
Expenditures and Other Uses 203,018 394,753 0 (72,563) 0 0 0 0 (0)
Amounts to be Provided from
General Fund Balance 0 0 72,563 0 0 0 0
General Fund Balance January 1 2,157,978 2,546,472 2,941,223 2,941,223 2,941,223 2,941,223 2,941,223
General Fund Balance December 31 2,546,472 2,941,223 2,941,223 2,868,660 2,941,223 2,941,223 2,941,223
3
FUND:
101 General
DEPARTMENT MISSION'
The Mayor and City Council set policy for the City
and provide general direction to the Administrator in
policy implementation. The department budget
supports council development, information efforts and
special City associations and proQrams.
DEPARTMENT: Mayor and Council
DEPT NO:
41110
DESCRIPTION OF ACTIVITY'
The City Council meets twice montly and in periodic special worksessions to consider
and adopt legislative and administrtive policies that pertain to the services
provided to residents. The City Council also sits as the Board of Review for property
valuations and as the Board of the Shorewood Economic Development Authority.
OBLJECTIVES:
. Establish annual work program of goals and priorities for the City
. Meet at least annually with advisory commissions.
- Strategic planning and direction
HIGHLIGHTS/COMMENTS'
Staffing:
City Council Salaries
Supplies/Materials:
Awards and misc. supplies
Support Services:
Conferences and Seminars
Appreciation Function for City Volunteers/Staff
Special Brochures
Lake Minnetonka Conservation District (LMCD)
Assn of Metro Municipalities
League of MN Cities
Excelsior Chamber of Commerce July 4th Celebration
Charges, Fees & Other:
Council Contingency
4
FUND: 101 DEPARTMENT: Mayor and Council DEPT 4111 0
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 2006
Staffing 13,564 13,564 13,733 16,793 8,397 16,793 16,793 0
Supplies/Materials 544 526 1,183 1,200 613 1,000 1,000 0
Support Services 77,282 46,779 45,457 65,500 19,016 55,000 55,000 0
Charges, Fees & Other 2,303 18 0 30,000 0 40,000 40,000 0
Capital Outlay 0 0 0 0 0 0 0 0
Transfers 0 0 0 0 0 0 0 0
TOTAL 93.693 60,887 60.373 113,493 28,025 112.793 112.793 0
SERVICE INDICATORS'
Seminars, Conferences &
Schools Attended 5 5 5 5 5 5 5
Newsletters Published 12 12 12 12 12 12 12
No. of Council Mtgs. 24 24 24 24 24 24 24
No. of Workshops/Special 24 24 24 24 24 24 24
Agenda Items 500 500 500 500 500 500 500
Ordinances &
Resolutions Adopted 113 122 130 130 130 130 130
COST INDICATORS'
Expenditures 93,693 60,887 60,373 113,493 28,025 112,793 112,793 0
- Program Revenues
= Levy Dollars 93,693 60,887 60,373 113,493 28,025 112,793 112,793 0
STAFFING'
Part time:
Mayor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Council members 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00
5
FUND:
101 General
DEPARTMENT MISSION'
To implement policy established by the City Council; offer
staff support to the City Council in its policy making role;
and manage day-to-day operations of the City in a manner
consistent with established City values to effectively and
efficiently meet set qoals & objectives.
DEPARTMENT: Administration
DEPT NO:
41300
DESCRIPTION OF ACTIVITY'
The City Administrator directs City departmental operations to ensure compliance with
policies established by the City Council and with state and federal laws. The
department supports the City Council by managing Council agendas, directing the
flow of information and requests for action to the Council.
OBJECTIVES'
- Take a leadership role in intergovernmental cooperative efforts in the Lake Minnetonka area
- Participate actively in joint powers organizations
- Participate actively in legislative and policy activities of municipal associations
- Actively monitor legislation and communicate with legislators
HIGHLIGHTS/COMMENTS:
Staffing:
Includes step increases
Supplies/Materials:
Miscellaneous books & supplies
Support Services:
Labor Relations Associates Contract
Conference, mileage, meetings & seminars
Memberships to ICMA, MCMA, MAMA
6
FUND: 101 DEPARTMENT: Administration DEPT 41300
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2002 2004 2005 2005 2006 2006 2006
Staffing 98,716 103,766 108,416 129,344 58,589 136.009 136,009 0
Supplies/Materials 0 0 0 400 0 400 400 0
Support Services 5,823 6,587 2,242 12,700 6,055 11,800 11,800 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 0 0 0 2,000 1,652 0 0 0
Transfers 0 0 0 0 0 0 0 0
TOTAL 104,539 110,353 110,659 144.444 66.296 148,209 148.209 0
SERVICE INDICATORS'
Council MtgslWork Sessions 48 48 48
Council Agenda Items 500 500 500
Public Safety Board Meetings 20 20 20
Public Safety Staff Meetings 14 14 14
Staff Meetings 52 52 52
COST INDICATORS'
Expenditures 104,539 110,353 110,659 66,296 148,209 148,209 0
- Program Revenues 0 0 0 0 0 0 0
= Levy Dollars 104,539 110,353 110,659 66,296 148,209 148,209 0
STAFFING:
Full Time:
Admistrator/Clk 1.00 1.00 1.00 1.00 1.00 1.00 1,00
Exec Sec/Dep Clk .33 .33 .33 .33 .33 .33 .33
7
FUND:
101 General
DEPARTMENT MISSION'
Provide staff support for the City Council including
preparation of agendas and meeting packets.
Responsible for City Clerk functions including
records retention, notices and licenses.
DEPARTMENT: General Government/City Clerk
DEPT NO:
41400
DESCRIPTION OF ACTIVITY:
This department provides for general reception and clerical duties in the City offices,
as well as the recording secretary for City Council meetings. The Deputy Clerk is the official
recordkeeper of minutes, contracts, and permanent records, and supervises all staff in this area.
This department is responsible for all licensing functions. It also oversees implementation of
the City communication tools.
OBJECTIVES:
. Continue to improve web site, to include information for residents and tools for better communication with City Hall
- Produce monthly City newsletter to include community articles & photos, council & commission articles, & project updates
- Provide information for general requests from residents and contractors
- Prepare orientation package for new council members, commission members and staff
- Assist in preparation of Employee Handbook
HIGHLIGHTS/COMMENTS:
Staffing:
Includes step increases for full time employees,
part-time communications tech
part-time, temporary, general office support
part-time Web developer
Supplies/Materials:
Newlsetter and General Office Supplies
Newsletter and General Postage
Software upgrades/Misc. Publications
Support Services:
Travel, Conferences and Education
Publication of legal notices for all General Fund Depts
Council Recording Secretary
Newsletter Mail Service
City Code Book UpdateslWeb Hosting
Documenet Destruction Service
Membership Dues
Capital Outlay:
Duplicator/Printer for Newsletter
Office Furniture and Fixtures
8
FUND: 101 DEPARTMENT: General Government/City Clerk DEPT 41400
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 2006
Staffing 128,277 126,512 143,456 141,875 69,288 145,948 137,978 0
Supplies/Materials 17 ,404 24,436 22,697 27,350 13,272 30,900 30,900 0
Support Services 25,044 20,741 13,548 23,710 7,675 28,315 29,065 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 2,964 3,456 4,467 40,300 43,619 22,800 22,800 0
Transfers 0 0 0 0 0 0 0 0
TOTAL 173.689 175,145 184.167 233.235 133.853 227.963 220.743 "~,:,,~
SERVICE INDICATORS'
No. of Elections held 0 0 0 2 0 0
No. of Ordinances 10 10 10 10 0 0
No. of Resolutions 120 120 120 120 0 0
Dog licenses issued 450 450 450 400 0 0
Other licenses issued 30 30 30 60 0 0
Council Agendas 48 48 48 48 0 0
COST INDICATORS:
Expenditures 173,689 175,145 184,167 233,235 133,853 227,963 220,743 0
. Program Revenues
= Levy Dollars 173,689 175,145 184,167 233,235 133,853 227,963 220,743 0
STAFFING'
Full time:
Exec Sec/Dep Clk .67 .67 .67 .67 .67 .60
Parks Secretary .70 .70 .70 .70 .70 .70
Secretary/Receptionist 0.25 0.25 0.25 0.25 0.25 0.25
Accounting Clerk I 0.25 0.25 0.25 0.25 0.25
Part time:
Communications Tech. 1.00 0.66 0.66 0.66 0.66 0.57
Web site Maint. (Plan.Asst) 0.20 0.20 0.20 0.20
Temporary Receptionist
9
FUND:
101 General
DEPARTMENT MISSION'
Responsible for Election functions.
DEPARTMENT: Elections
DEPT NO:
41410
DESCRIPTION OF ACTIVITY'
This department provides for the preparation for and supervision of State/Federal Primary
City General and Special elections by the Deputy City Clerk.
OBJECTIVES:
- Increase youth awareness of local govemment issues through active involvement with school officials
and instructors through programs such as student election judges and kids voting
- Implement HA V A requirements
HIGHLIGHTS/COMMENTS:
Staffing:
.10 Exec Sec/Deputy Clerk
Election Judges
Supplies/Materials:
Misc. Office Supplies
Postage
Equpment Maintenance
General Supplies
Support Services:
Legal Notices
Travel - Mileage Reimb.
Printing (ballots, envelopes)
Capital Outlay:
HAVA required Election Equipment
Voting Booths (6)
Directional Signs
10
FUND: 101 DEPARTMENT: Elections DEPT 41410
BUDGET Actual Actual Actual Budget YTD June ~equested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 2006
Staffing 0 0 9,122 0 0 12,918 20,623 0
Supplies/Materials 3.216 0 2,529 600 831 3,400 3,400 0
Support Services 2,790 0 1,898 0 0 2,200 2.200 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 0 0 268 0 0 19,100 19,100 0
Transfers 0 0 0 0 0 0 0 0
TOTAL 6,006 0 13,817 600 831 37.618 45,323 0
SERVICE INDICATORS:
No. of Elections held 2 0 0 2 2 0
COST INDICATORS'
Expenditures 6.006 0 13,817 600 831 37,618 45,323 0
- Program Revenues
= Levy Dollars 6,006 0 13,817 600 831 37,618 45,323 0
STAFFING:
Full time:
Exec Sec/Dep Clk 0,20 0.20 0.20 0.10 0.10
Part time:
Election Judges 35 35 40 40
11
FUND:
101 General
DEPARTMENT MISSION'
To administer financial policies of the City; perform
accounting functions for all fund types; invest
available funds in accordance with State Statutes;
oversee City insurance policies; and provide for
timely reporting of financial matters to City Council
staff and the public.
DEPARTMENT: Finance
DEPT NO:
41500
DESCRIPTION OF ACTIVITY'
Finance is responsible for processing all financial transactions of the City in accordance with
Federal, State and Local laws, and in compliance with Generally Accepted Accounting Principles.
Transactions include accounts payable, accounts receivable, payroll, investments, utility billing,
special assessments, risk management, personnel benefits and financial reporting. The
Finance Director is responsible for the preparation and administration of the City budget.
OB,JECTIVES'
- Prepare annual budget document
- Prepare CAFR for submittal to GFOA Certificate of Achievement Program
- Review debt issues and make recommendations on debt structure
- Review and update financial policies and procedures
- Coordinate the transition to GASB 34 financial reporting
HIGHLIGHTS/COMMENTS'
Staffing:
Includes step increases
Supplies/Materials:
Computer checks & budget supplies
Finance software support and maintenance
Miscellaneous supplies
Support Services:
Conferences, Mileage, Meetings, Education & Seminars
Publication of Financial Statements & Budgets
Memberships to GFOA & MGFOA
Subscription to GFOA periodicals
Submittal fee - GFOA Certificate of Excellence Program
Submittal fee - GFOA Distinguished Budget Award Program
Bank & Broker service charges
Capital Outlay:
12
FUND: 101 DEPARTMENT: Finance DEPT 41500
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 ._?QQa
Staffing 117,031 137,883 136,487 163,684 82,895 174,972 174,972 0
Supplies/Materials 1,090 5,176 4,722 18,000 5,415 6,700 6,700 0
Support Services 7,888 5,359 7,035 10,500 3,961 12,000 12,000 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 1,055 3,098 533 2,500 586 47,500 47,500 0
Transfers 0 0 0 0 0 0 0 0
TOTAL 127.064 151.517 148.776 194,684 92.857 241.172 241 .172 0
SERVICE INDICATORS'
No. Monthly Statements 12 12 12 12 12 12 12
No. Accounts Payable
Checks Issued 2,500 2,500 2,500 2,500 2,500 2,500 2,500
Utility Bills Sent 11,000 11,000 11,000 11 ,000 11,500 11,500 11 ,500
No. of Payroll Checks
Issued 1,100 1,100 1,100 1,100 1,250 1,250 1,250
No. of Sp. Assess.
Rolls Maintained 23 23 23 23 23 23 23
COST INDICATORS'
Expenditures 127,064 148,776 194,684 92,857 241,172 241,172 0
= Levy Dollars 127,064 148,776 194,684 92,857 241,172 241,172 0
STAFFING:
Full time:
Finance Dir 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Sr Acctg Clerk .75 .75 .75 .75 .75 .85 .85 .85
Acctg. Clerk .5 .5 .5 .5 .5 .5
13
FUND:
101 General
DEPARTMENT MISSION'
Provide contracted professional services to the City
including general legal, prosecution, financial
audit and property assessment.
DEPARTMENT: Professional Services
DEPT NO:
41600
DESCRIPTION OF ACTIVITY'
This department provides for contracted legal, assessing and auditing services for the
City. Legal services include general counsel to the City Council, litigation and
prosecution of criminal misdemeanors. Assessing services provide property valuation
information for tax purposes. Audit services provide for the annual financial audit required
by Minnesota State Statutes.
OB.IECTIVES:
- Contain costs on contracted professional services
- Attempt to utilize mediation services to avoid litigation
HIGHLIGHTS/COMMENTS:
Supplies/Materials:
Supplies for City Assessor
Support Services:
Includes general legal fees and prosecutions, mediation services, assessing contract, annual audit services.
Charges and Fees:
14
FUND: 101 DEPARTMENT: Professional Services DEPT 41600
BUDGET Actual Actual Actual Budget YTD JUNE Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 200?
Staffing 0 0 0 0 0 0 0 0
Supplies/Materials 0 0 0 0 0 0 0 0
Support Services 169,394 169,144 142,061 192,000 109,294 180,000 180,000 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 0 0 0 0 0 0 0 0
Transfers 0 0 0 0 0 0 0 0
TOTAL 169.394 169.144 142,061 192,000 109,294 180.000 180,000 0
SERVICE INDICATORS:
No. of parcels 3,050 3,050 3,050 3,050 3,050 3,050
No. of litigations 5 5 5 5 5 5
No. of City Funds 22 22 22 22 22 22
COST INDICATORS'
Expenditures 169,394 169,144 142,061 192,000 109,294 180,000 180,000 0
- Program Revenues
Fines 18,100 19,300 19,300 19,300 0 0
= Levy Dollars 151,294 149,844 122,761 172,700 109,294 180,000 180,000 0
Other Dollars
STAFFING'
15
FUND:
101 General
DEPARTMENT MISSION'
Guide and control the physical development of
the community. Coordinate and implement long
range city-wide and area planning activities.
DEPARTMENT: Planning & Zoning
DEPT NO:
41910
DESCRIPTION OF ACTIVITY'
This department is responsible for the review of development proposals, preparing and updating
the City's Comprehensive Plan, and other long range planning activities. It provides for
administration and enforcement of the City's zoning codes, and preparation and upkeep of
zoning, subdivision, floodplain and other planning and zoning related ordinances.
OBJECTIVES-
- Establish an action plan to implement Comprehensive Plan
- Complete GIS parcel data base
- Update/enhance city maps
- Update/enhance procedure handouts
HIGHLIGHTS/COMMENTS'
Staffing:
Includes step increases
Supplies/Materials:
Maintenance contracts for computer & office equipment
Miscellaneous supplies
Support Services:
Recording Secretary for Planning Commission Meetings
Air time for cellular phone
Conferences, mileage, meetings & seminars
Memberships to APA, MN APA, Sensible Land Use Coalition
Subscriptions to APA Journal & Zoning News
Charges & Fees:
Capital Outlay:
16
FUND: 101 DEPARTMENT: Planning & Zoning DEPT 41910
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 2006
Staffing 128,405 141,216 148,955 143,468 75,317 165,751 165,751 0
Supplies/Materials 842 994 916 1,475 552 1,925 1,925 0
Support Services 16,961 10,819 8,332 14,510 4,571 13,580 13,580 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 745 2,076 0 2,400 2,685 2,300 2,300 0
Transfers 0 0 0 0 0 0 0 0
TOTAL 146.953 155,105 158.202 161.853 83.125 183.556 183,556 0
SERVICE INDICATORS'
No. of zoning apps. 20 20 20 20 20
No. of zoning cornplnts 20 20 25 25 25
Planning Comm. Meetings 12 12 12 12 12
Planning Comm. Work
Sessions 12 12 12 12 12
COST INDICATORS'
Expenditures 146,953 155,105 158,202 161,853 83,125 183,556 183,556 0
- Program Revenues
Zoning Appl. Fees
Bldg. Permit Carryover
(from Proto Inspection)
= Levy Dollars 146,953 155,105 158,202 161 ,853 83,125 183,556 183,556 0
STAFFING'
Full time:
Planning Dir .95 .95 .95 .95 .95 .95 .95
Planning Asst. .70 .70 1.00 1.00 1.00 1.00 1.00
Part Time:
Clerical
17
FUND:
101 General
DEPARTMENT MISSION'
Provide for the physical operation of City Hall:
utilities; maintenance of office equipment and the
building structure; and provide for the City's general
liability, property, auto and workers' compensation
insurance.
DEPARTMENT: Municipal Bldg - City Hall
DEPT NO:
41940
DESCRIPTION OF ACTIVITY:
The Municipal Building department provides for maintenance of all equipment located in the City
Hall, and for janitorial services to furnish a clean environment in which to conduct City business.
General Uability, Property and Casualty insurance coverages are also provided under this department.
OBJECTIVES:
- Identify maintenance needs to avoid major investments in the future
- Identify options for maximum utilization of office space to avoid future additions
- Maintain existing facilities at current level or better utilizing staff to reduce maintenance costs
. Continue to dispose of outdated documentation in storage area
- Continue to promote community programs to enhance public facilities, such as "Adopt a Garden."
HIGHLIGHTS/COMMENTS'
Supplies/Materials:
Maintenance contracts for copiers, telephones and office equipment
Maintenance to city hall building
City Hall supplies
Support Services:
City Hall janitorial, rug services, & pest control
Utilities and phone service for City Hall
Insurance coverage for all city depts except enterprise funds
Rental of postage meter
Special Assessments on City owned property
Sales and Use Tax Payments
Charges & Fees:
Capital Outlay:
Senior Community Center Payment
Transfers:
Public Facilities Fund - Office Equipment
18
FUND: 101 DEPARTMENT: Municipal Building - City Hall DEPT 41940
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 2006
Staffing 0 0 0 0 0 0 0 0
Supplies/Materials 7,332 13,197 14,063 15,865 8,187 26,650 26,650 0
Support Services 82,228 98,160 93,444 115,600 24,713 117,800 117,800 0
Charges & Fees 0 37,544 0 0 0 0 0 0
Capital Outlay 38,586 1,938 37,544 38,550 37,544 38,550 38,550 0
Transfers 89,600 35.000 50.000 50,000 0 50,000 50,000 0
TOTAL 217.746 185.840 195.051 220,015 70.444 233,000 233.000 0
SERVICE INDICATORS:
COST INDICATORS:
Expenditures
217,746 185,840 195,051 220,015 70,444 233,000 233,000
o
- Program Revenues
o 0
= Levy Dollars
217,746 185,840 195,051 220,015 70,444 233,000 233,000
o
Other Dollars
STAFFING:
19
FUND:
101 General
DEPARTMENT MISSION'
To provide a modern, flexible, full-service criminal
justice agency which is responsive to community
needs.
DEPARTMENT: Police
DEPT NO:
42100
DESCRIPTION OF ACTIVITY'
The South Lake Minnetonka Police Department is a cooperative joint venture between the cities
of Excelsior, Greenwood, Shorewood and Tonka Bay. Through this venue, the department provides for
the protection of the safety and well-being of citizens in the community, the prevention and detection of
crime, and the enforcement of all local, state and federal laws in a cost-efficient manner.
Costs and staff are allocated to each of the participating cities on a set percentage basis.
The pro-rata share of costs and staff time for City of Shorewood is at 46.0%
A separate obligation is required to finance the new SLMPD station. The cost is apportioned on an
ad valorem basis among four cities. The City of Shorewood's pro-rata share of the 2006 payment is $254,600,
which is approximately 58% of the total payment due.
OBJECTIVES:
HIGHLIGHTS/COMMENTS'
Supplies/Materials:
Upgrade civil defense sirens (two sirens - 2006)
Support Services:
Police services contract for 2006
Prisoner expense, court officer expense, & booking fees
Annual Police Reserve Dinner
20
FUND: 101 DEPARTMENT: Police DEPT 42100
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 2906
Staffing 0 0 0 0 0 0 0 0
Supplies/Materials 0 0 165 0 0 0 0 0
Support Services 609,193 630,909 671 ,236 722,050 364,983 719,856 758,758 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 0 152,052 265,600 270,500 129,702 272,600 279,600 0
Transfers 800 0 0 0 0 0 0 0
TOTAL 609.993 782.961 937.001 992.550 494,685 992.456 1.038,358 0
SERVICE INDICATORS'
Initial complaint reports 6,611 6,174 6,174 6,174 Pending Pending
Clearance rate - ICR's 100% 100% 100% 100%
Part I crimes (serious) 204 189 189 189
Part II crimes (other) 634 717 717 717
Clearance rate (Parts I & 11) 67% 58% 58% 58%
Statewide clearance rate 45% 46% 46% 46%
Citations issued 6,924 5,591 5,591 5,591
Police vehicles 9 9 9 9
Shorewood demand
COST INDICATORS'
Expenditures 609,993 782,961 937,001 992,550 494,685 992,456 1,038,358 0
- Program Revenues
Fines 75,700 75,700 0 0
= Levy Dollars 551 ,753 782,961 861.301 916,850 494,685 992,456 1 ,038,358 0
STAFFING:
Chief 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Deputy Chief 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Sergeant 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Investigator * 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Patrol Officer 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
Office Administrator 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Office Specialist (part time) ** 2.00 2.00 2.00 2.00 1.00 2.00 2.00 2.00
Community Service Officer 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
* 1 Juvenile Specialist
21
FUND:
101 General
DEPARTMENT MISSION:
Provide the highest possible quality of fire
suppression, prevention and eduction services,
and First Responder emergency medical services.
DEPARTMENT: Fire Protection
DEPT NO:
42200
DESCRIPTION OF ACTIVITY'
Fire services are contracted by the City through the Excelsior Fire District and the City of Mound.
This department provides for the protection of life and property of the citizens of
the community through fire prevention and suppression, fire inspection, building inspection,
fire code enforcement and emergency medical services.
A separate obligation is made toward the financing of new facilities for the Excelsior Fire District. This
cost is apportioned on the same allocation for the operating budget. The City of Shorewood's pro-rata share
of the 2006 debt service payment is $249,203.
OBJECTIVES'
HIGHLIGHTS/COMMENTS:
Support Services:
Fire contracts with Mound and Excelsior Fire District
22
FUND: 101 DEPARTMENT: Fire Protection DEPT 42200
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 2006
Staffing 0 0 0 0 0 0 0 0
Supplies/Materials 0 0 0 0 0 0 0 0
Support Services 293,029 251,912 235,010 256,418 137,241 307,496 307,496 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 0 147,008 246,632 237,292 114,834 257,203 257,203 0
Transfers 0 0 0 0 0 0 0 0
TOTAL 293.029 398,920 481,642 493,710 252,074 564.699 564.699 0
SERVICE INDICATORS'
Fire calls 125 135 135 125 125
Rescue calls 179 125 125 180 180
Inspection hours 25 25 25 25
Investigation hours 35 35 35 35
Other hours * 400 400 400 400
Cost of emergency
response 463,771 475,839
Cost of inspection!
investigation 17,871 17,871 17,871 17,871
* includes plan review, paper work, complaint investigation, tank removals, burning permits, etc.
COST INDICATORS:
Expenditures 293,029 398,920 481,642 493,710 252,074 564,699 564,699 0
- Program Revenues 0 0 0 0 0 0 0 0
= Levy Dollars 293,029 398,920 481,642 493,710 252,074 564,699 564,699 0
EFD STAFFING:
Chief (FIT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Asst. Chief 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Dist. Chief 2.00 2.00 2.00 2.00 2.00 2.00
Captain 2.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00
Lieutenants 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00
Fire Marshal (FIT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Training Officer 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Firefighters 37.00 37.00 41.00 41.00 41.00 41.00 41.00 41.00
23
FUND:
101 General
DEPARTMENT MISSION'
Enforce construction safety and related building
codes through plan review and inspections.
Enforce animal control ordinances.
DEPARTMENT: Protective Inspection
DEPT NO:
42400
DESCRIPTION OF ACTIVITY'
This department provides for the issuance building and construction permits, review of
construction plans and specifications, enforcement of all building codes under the Uniform
Building Code, inspection of rental housing units, and inspection of zoning violations.
The department also provides for contractual animal control, which includes patrol, detention
and disposition of stray domestic animals.
OBJECTIVES:
- Increase and enhance public information through the development of at least
two handouts relative to building codes
- Explore joint inspection possibilities with adjoining communities
- Enhance environmental inspections
HIGHLIGHTS/COMMENTS'
Staffing:
Includes step increases
Supplies/Materials:
Maintenance contracts on computer and office equipment
Miscellaneous supplies
Support Services:
Contractual inspections during vacations, sick leave
Conferences, mileage, meetings & seminars
Printing of application forms
Membership tolCBO
Charges & Fees:
Remittances to state of permit surcharges collected
Capital Outlay:
24
FUND: 101 DEPARTMENT: Protective Inspection DEPT 42400
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 2006
Staffing 77,595 89,528 95,455 99,783 48,577 103,422 103,422 0
Supplies/Materials 361 89 777 300 137 400 400 0
Support Services 8,715 7,114 5,074 10,820 2,985 10,820 10,820 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 287 2,129 0 400 532 400 400 0
Transfers 0 0 0 0 0 0 0 0
TOTAL 86,958 98,860 101 .306 111 .303 52,231 115.042 115.042 0
SERVICE INDICATORS'
No. of permits issued
New Homes 10 25 20 20 20
Additions/Other 475 790 600 600 600
Avg inspections/permit
New Homes 8-10 8-10 8-10 8-10 8-10
Additions/Other 2-8 2-8 2-8 2-8 2-8
Commercial/Industrial: 1
COST INDICATORS:
Expenditures 86,958 98,860 101,306 111,303 52,231 115,042 115,042 0
- Program Revenues
Building Permits 175,000 175,000 82,898 180,000 180,000 0
State Surcharges 500 500
Rental Housing Licenses 3,500 3,500
= Levy Dollars 86,958 98,860 (77,694) (67,697) (30,667) (64,958) (64,958) 0
STAFFING:
Full time:
Building Official 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Planning Dir .05 .05 .05 .05 .05 .05 .05
Planning Asst .30 .30 .30 .30 .30 .20 .20
Secretary/Recept .10 .10 .10 .10 .10 .15 .15
25
FUND:
101 General
DEPARTMENT MISSION:
Enforce animal control ordinances.
DEPARTMENT: Animal Control
DEPT NO:
42700
DESCRIPTION OF ACTIVITY:
The department provides for contractual animal control, which includes patrol, detention
and disposition of stray domestic animals.
OBJECTIVES:
HIGHLIGHTS/COMMENTS:
Staffing:
Supplies/Materials:
Support Services:
Animal control contracts with City of Orono and Claws, Paws & Hooves
Charges & Fees:
Capital Outlay:
26
FUND: 101 DEPARTMENT: Animal Control DEPT 42700
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 20QQ,
Staffing 0 0 0 0 0 0 0 0
Supplies/Materials 0 0 0 0 0 0 0 0
Support Services 19,900 19,495 20,971 24,000 13,005 26,000 26,000 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 0 0 0 0 0 0 0 0
Transfers 0 0 0 0 0 0 0 ,.-JL
TOTAL 19,900 19,495 20.971 24.000 13.005 26.000 26.000 0
SERVICE INDICATORS:
No. of Animal Complaints 47 50 50 42 50 50 50
COST INDICATORS:
Expenditures 19,900 19,495 20,971 24,000 13,005 26,000 26,000 0
- Program Revenues
= Levy Dollars
STAFFING:
Full time:
19,900 19,495 20,971 24,000
13,005
26,000 26,000
o
27
FUND:
101 General
DEPARTMENT MISSION:
DEPARTMENT: City Engineer
Provide engineering and construction management
services for the City.
DEPT NO:
43010
DESRIPTION OF ACTIVITY:
This department is responsible for general engineering services in the City, as well as
preparation of feasibility studies, plans and specifications, and on-site inspection of
City projects. The City Engineer also reviews all development proposals and plans.
OBJECTIVES:
- Assist the City in determining right-of-way needs
- Keep construction project files up-to-date and accurate
- Communicate in written form to affected residents at least two
(2) times during a construction project
- Provide in-house engineering where feasible
- Provide good public relations with property owners adjacent to construction projects
- Resolve construction issues promptly.
HIGHLIGHTS/COMMENTS:
Staffing:
1.00 City Engineer
.50 FIT Engineer Technician
.25 FIT Clerical
Supplies/Materials:
Computer maintainance/Upgrade
Books, Materials and Software
Support Services:
Contractual engineering for 2006
Contractual engineering technical assistance
Cellular phone Airtime & Pager
Conferences and mileage
Subscriptions and Memberships
Charges & Fees:
Capital Outlay:
28
FUND: 101 DEPARTMENT: City Engineer DEPT 43010
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 .____2006
Staffing 94,212 108,273 101,302 122,891 58,976 132,147 132,147 0
Supplies/Materials 196 420 839 1,350 336 1 ,450 1 ,450 0
Support Services 1,380 5,339 15,136 13,550 (6,622) 20,850 20,850 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 5,795 219 610 3,150 0 3,150 3,150 0
Transfers 0 0 0 0 0 0 0 0
TOTAL 101,582 114,251 117,887 140,941 52.690 157,597 157,597 0
SERVICE INDICATORS:
City Engineer
Hrs spent on City Projects
Hrs charged to developers
COST INDICATORS:
Expenditures 101,582 114,251 117,887 140,941 52,690 157,597 157,597 0
- Program Revenues
Public Projects
Private Projects
Other
= Levy Dollars 101,582 114,251 117,887 140,941 52,690 157,597 157,597 0
STAFFING:
Full time:
City Engineer 1.00 1.00 0.65 0.65 0.65 1.00 1.00
Eng Technician 0.25 0.25 0.50 0.50 0.50
Clerical 0.25 0.25 0.25 0.25 0.25 0.25 0.25
Part time:
Clerical
29
FUND:
101 General
DEPARTMENT MISSION:
DEPT NO:
43050
Provide supervision and support for all public
works functions; provides for public works utilities,
shop and equipment maintenance and fuels
DEPARTMENT: Public Works Service
DESCRIPTION OF ACTIVITY:
The Public Works Service department is responsible for all general public works duties,
maintenance of all public works equipment, and maintenance of the public works facility.
OBJECTIVES:
- Perform preventative maintenance on all equipment within 100 miles or 10 hours
of scheduled service
- Perform 90% of City building repairs and preventative maintenance using City personnel
HIGHLIGHTS/COMMENTS:
Staffing:
Includes step increases
Supplies/Materials:
Includes motor fuel, maintenance of equipment and buildings, and inventory supply items
Support Services:
Uniforms for crew
Janitorial Services
Utilities and telephone service for public works building
Conierence, mileage, meetings & seminars
Miscellaneous - damage to private property (mailboxes, etc)
Hazardous Waste Licenses
Miscellaneous equipment rentals
Memberships
Charges & Fees:
Capital Outlay:
Replacement Radios
Transfers:
Transfer to Equipment Replacement Fund ($175,000 - 2006)
Transfer to Stormwater Management Fund ($25,000 - 2006)
30
FUND: 101 DEPARTMENT: Public Works Service DEPT 43050
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 2006
Staffing 166,852 165,723 178,292 281 ,335 104,132 239,701 254,324 0
Supplies/Materials 34,320 32,707 39,150 44,500 20,488 55,950 55,950 0
Support Services 24,112 29,048 28,850 29,950 14,782 37,200 37,200 0
Charges & Fees 0 O. 0 0 0 0 0 0
Capital Outlay 655 2,926 3,152 23,410 350 75,475 75,475 0
Transfers 105,000 100,000 75,000 141 ,000 0 200,000 200,000 0
TOTAL 330,940 330.403 324.445 520,195 139,751 608,326 622,949 0
SERVICE INDICATORS:
No of Gopher One calls 2,800 2,800 2,940 2,940 2,940 2,940 2,940 2,940
No of vehicle repairs 110 110 1.10 110 110 110 110 110
COST INDICATORS:
Expenditures 330,940 330,403 324,445 520,195 139,751 608,326 622,949 0
- Program Revenues
= Levy Dollars 330,940 330,403 324,445 520,195 139,751 608,326 622,949 0
STAFFING:
Full time:
Pub Wks Dir 0.10 0.10 0.10 0.75 0.75
Supervisor of Oper. & Maint. 1.00 1.00 1.00 1.00 .00 .00 .00
Lt Equip Oper 1.90 1.90 2.50 2.50 2.50 1.50 1.75
Clerical 0.25 0.25 0.05 0.05 0.05 0.05 0.05
Utility Maint. Operators .00 .00 .00 .67 .67
Utility Lead .25 .25
31
FUND:
101 General
DEPARTMENT MISSION:
DEPT NO:
43100
To maintain and upgrade City streets, parking areas
and storm water control systems in an efficient and
economical manner
DEPARTMENT: Streets & Roadways
DESCRIPTION OF ACTIVITY:
Includes ongoing maintenance consisting of street patching, street sweeping, roadside mowing,
painting of lane markings, and minor storm sewer repair.
OBJECTIVES:
- Maintain the pavement management system to aid in scheduling of street projects
- Paint lane markings on all designated streets
- Sweep each City street at least once annually
- Mow roadsides at least twice annually
- Visually inspect storm drainage grates annually and repair as needed
HIGHLIGHTS/COMMENTS:
Staffing:
2.0 LEO
0.33 Util. Maint. Ops.
Supplies/Materials:
Rock, gravel & bituminous for street & road repair
Support Services:
Safety training
Contracted road striping
Transfers:
Transfer to Local Street Reconstruction Fund $345,000
32
FUND: 101 DEPARTMENT: Streets & Roadways DEPT 43100
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 2.006
Staffing 62,839 55,335 74,773 122,000 42,004 108,534 108,534 0
Supplies/Materials 32,277 29,235 42,282 43,000 9,740 47,400 47,400 0
Support Services 8,930 7,546 9,402 9,000 0 20,000 20,000 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 0 0 0 0 0 0 0 0
Transfers 200.000 200,000 183.500 311 ,000 0 345,000 345.000 0
TOTAL 304.045 292.117 309.956 485.000 51.744 520.934 520.934 0
SERVICE INDICATORS:
Miles of street
State 3 3 3 3 3 3 3
County 2 2 2 2 2 2 2
City - MSA 9 9 9 9 9 9 9
City - Local 49 49 49 49 49 49 49
Miles Sealcoated 5 5 5 5 5 5 5
Tons of patch material 1,380 1,380 1,380 1,380 1,380 1,380 1,380
COST INDICATORS:
Expenditures 304,045 292,117 309,956 485,000 51,744 520,934 520,934 0
- Program Revenues
MSA Maintenance 13,750 13,750 13,750 13,750
Transfer from Street Fund
Budgeted Reserve
= Levy Dollars 290,295 278,367 296,206 471,250 51,744 520,934 520,934 0
STAFFING:
Full time:
Lt Equip Operators 2.20 2.20 2.20 2.20 2.00 2.00 2.00 2.00
Util. Maint. Operators 0.33 0.33 0.33
33
FUND:
101 General
DEPARTMENT MISSION:
DEPARTMENT: Snow & Ice Removal
DEPT NO:
43125
Provide snow and ice control for public streets and
City owned parking lots to ensure the safe and
efficient movement of traffic
DESCRIPTION OF ACTIVITY:
This department is reponsible for the plowing and removal of snow after a 2-inch or greater
snowfall has occured. Street sanding with a salt/sand mixture is used as a measure of ice control,
and is performed as needed.
OBJECTIVES:
- Remove snow and ice and complete salt/sand operations within 14 hours after
the end of a snow event
- Complete widening and clean up functions within 48 hours of a snow event
HIGHLIGHTS/COMMENTS:
Staffing:
.5 LEO
Supplies/Materials:
Sand and salt for ice control
34
FUND: 101 DEPARTMENT: Snow & Ice Removal DEPT 43125
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 2006
Staffing 14,655 18,792 21,211 34,817 12,827 36,792 36,792 0
Supplies/Materials 25,358 21,629 15,490 30,000 12,613 33,000 33,000 0
Support Services 0 0 0 0 0 0 0 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 0 0 0 0 0 0 0 0
Transfers 0 0 0 0 0 0 0 0
TOTAL 40,013 40.421 36.700 64.817 25,439 69.792 69,792 0
SERVICE INDICATORS:
Miles of street plowed 51 51 51 51 51 51 51
Tons of salt used 250 250 250 250 250 250 250
Tons of sand used 1,200 1,200 1,200 1,200 1,200 1,200 1,200
Manhours spent 1,000 1,000 1,000 1,000 1,000 1,000 1,000
No. of cul-de-sacs 88 88 88 88 88 88 88
plowed
COST INDICATORS:
Expenditu res 40,013 40,421 36,700 64,817 25,439 69,792 69,792 0
- Program Revenues
MN Snow Removal Aid 0 0 0 0 0 0 0 0
= Levy Dollars 40,013 40,421 36,700 64,817 25,439 69,792 69,792 0
STAFFING:
Full time:
Lt Equip Oper (LEO) .50 .50 .50 .50 .50 .50 .50 .50
35
FUND:
101 General
DEPARTMENT MISSION:
Provide for street lighting and traffic signals at
intersections and other locations throughout the
City for the safety of pedestrians and vehicular
traffic
DEPARTMENT: Traffic Control/St Lights
DEPT NO:
43160
DESCRIPTION OF ACTIVITY:
Includes maintenence of semaphores and traffic control devices, and maintenance/replacement
of regulatory and informational road signs. Provides for electricity for street lights and traffic control
devices.
OBJECTIVES:
HIGHLIGHTS/COMMENTS:
Supplies/Materials:
Maintenance to semaphores and Hwy 7 & Vine Hill Road, Christmas Lake Road,
County Road 19, Hwy 41 and Old Market Road
Street signs & posts
Support Services:
36
FUND: 101 DEPARTMENT: Traffic Control/Street Lighting D EPT 43160
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 20Q6
Staffing 0 0 0 0 0 0 0 0
Supplies/Materials 1,249 2,750 1,979 6,000 2,619 6,000 6,000 0
Support Services 33,229 33,914 31,672 34,000 14,254 36,400 36,400 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 0 0 0 0 0 0 0 0
Transfers 0 0 0 0 0 0 0 0
TOTAL 34.478 36.665 33,651 40.000 16.873 42.400 42.400 0
SERVICE INDICATORS:
No of street lights 190 190 190 190 190 190 190 190
No of traffic signals 5 5 5 5 5 5 5 5
COST INDICATORS:
Expenditures 34,478 36,665 33,651 40,000 16,873 42,400 42.400 0
- Program Revenues
= Levy Dollars 34,478 36,665 33,651 40,000 16,873 42,400 42,400 0
STAFFING:
37
FUND:
101 General
DEPARTMENT: Sanitation/Waste Rmv/Weeds
DEPT NO:
43200
DESCRIPTION OF ACTIVITY:
DEPARTMENT MISSION:
Provide for the general sanitation and cleanliness
of the City and provide for the treatment of noxious
weeds on City properties.
Activities include spraying of boulevards and roadways for weed control, and clean-up
of properties in violation of City zoning and sanitation codes, as necessary.
OBJECTIVES:
- Aid in private property cleanup complaints
- Resolve 100% of weed complaints
HIGHLIGHTS/COMMENTS:
Staffing:
Miscellaneous staff time for property clean-ups
Support Services:
Miscellaneous property clean-ups
Contracted weed spraying services
38
FUND: 101 DEPARTMENT: Sanitation/Waste Removal/Weeds DEPT 43200
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 2006
Staffing 1,138 362 0 633 538 648 648 0
Supplies/Materials 0 0 0 400 0 500 500 0
Support Services 2,854 6,163 2,876 4,100 3,047 4,300 4,300 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 0 0 0 0 0 0 0 0
Transfers 0 0 0 0 0 0 0 0
TOTAL 3,993 6,525 2.876 5,133 3,585 5,448 5.448 0
SERVICE INDICATORS:
No of weed complaints 2 2 2 2 2 2
No of notices served 1 1 1 1 1 1
No of parcels sprayed 0 0 0 0 0 0
Miles/roadside sprayed 10 10 10 10 10 10
Spraying in Dollars 3,000 3,000 3,000 3,000 3,000 3,000
COST INDICATORS:
Expenditures 3,993 6,525 2,876 5,133 3,585 5,448 5,448 0
- Program Revenues
Fed Disaster Aid
= Levy Dollars 3,993 6,525 2,876 5,133 3,585 5,448 5,448 0
STAFFING:
39
FUND:
101 General
DEPARTMENT MISSION:
To provide diseased tree inspection services to
residents; to remove diseased trees located on City
property; and to maintain and trim trees located on
City rights-of-way and other property
DEPARTMENT: Tree Maintenance
DEPT NO:
43250
DESCRIPTION OF ACTIVITY:
This department is responsible for detection and removal of diseased and unsafe trees on City
rights-of-way and other properties, and pruning of trees on city property. Tree inspection
services are provided to citizens on an on-call basis.
OBJECTIVES:
- Remove 100% of diseased trees on public property
- Respond to all property owner requests to identify diseased trees.
- Maintain and trim trees on City property which present a hazard to public
HIGHLIGHTS/COMMENTS:
Staffing:
Supplies/Materials:
Small Tools
Paint for tree marking
Support Services:
Contracted tree and brush removal
Tree inspection certification
.
40
FUND: 101 DEPARTMENT: Tree Maintenance DEPT 43250
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 2996
Staffing 14,912 14,929 18,882 11 ,396 13,852 30,305 15,121 0
Supplies/Materials 369 206 1,048 1,800 0 2,700 2,700 0
Support Services 5,435 2,265 11,688 13,350 1,631 15,000 15,000 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 0 0 0 0 0 0 0 0
Transfers 0 0 0 0 0 0 0 0
TOTAL 20,715 17,400 31.619 26.546 15.484 48.005 32.821 0
SERVICE INDICATORS:
No of trees removed 20 20 20 20 20 20 20
Yards of brush hauled 700 700 700 700 700 700 700
COST INDICATORS:
Expenditures 20,715 17,400 31,619 26,546 15,484 48,005 32,821 0
- Program Revenues
= Levy Dollars 20,715 17,400 31,619 26,546 15,484 48,005 32,821 0
STAFFING:
..
Lt Equip Operator (LEO) .20 .20 .20 .20 .20 .50 .25
41
FUND:
101 General
DEPARTMENT MISSION:
Maintain City parks, trails & beaches to ensure s
and enjoyable recreational amenities, and coordi
recreational opportunities for City residents of all
ages and physical abilities
DEPARTMENT:
Parks & Recreation
DEPT NO:
45200
DESCRIPTION OF ACTIVITY
The department is responsible for the maintenance of all City parks, including
playgrounds, ballfields, trails, ice rinks, buildings and other play areas.
Winter ice skating, and summer recreation programs are coordinated within this department.
OBJECTIVES:
- Continue promoting the benefits of investing in Shorewood parks, and develop support for funding operation
and park improvements
_ Identify needs and assist the Shorewood Parks Foundation in coordination of fundraising efforts (to replace
diminishing park dedication fees).
HIGHLIGHTS/COMMENTS:
Staffing:
Includes step increases
Part time includes Park Commission Secretarial
Seasonal includes Summer employees and Winter Rink Attendants
Supplies/Materials:
Small tools
Maintenance to park equipment and buildings
Rock, black dirt, gravel, sand, fertilizers, seed for parks
Support Services:
Park Coordinating Services
Contracted weed control in parks
Park utility and telephone charges
Rental of portable toilets
Contribution to Senior Recreational Program Services
Charoes & Fees:
Capital Outlay:
..
Transfers:
Transfer to Park Capital Improvement Fund $10,000
Transfer to Land Conservation & Open Space Fund $5,000
42
FUND: 101 DEPARTMENT: Parks & Recreation DEPT 45200
BUDGET Actual Actual Actual Budget YTD June Requested Proposed Adopted
ITEM 2002 2003 2004 2005 2005 2006 2006 2006
Staffing 110,551 1 09,453 104,076 130,527 51,776 137,054 137,054 0
Supplies/Materials 10,367 9,273 11 ,341 14,600 3,460 13,250 13,250 0
Support Services 39,197 45,814 52,862 64,000 24,432 70,800 70,800 0
Charges & Fees 0 0 0 0 0 0 0 0
Capital Outlay 291,678 0 (1,415) 375 5,000 375 375 0
Transfers 213,700 30.000 15.000 15.000 0 15.000 15.000 0
TOTAL 665.493 194.539 181.864 224.502 84.668 236.479 236.479 0
SERVICE INDICATORS:
Acres of maint park 95.80 95.80 95.80 95.80 95.80 95.80 95.80
No. of ballfields
Softball 3 3 3 3 3 3 3
Baseball 5 5 5 5 5 5 5
No. of shelters 4 4 4 4 4 4 4
No. of hockey rinks 2 2 2 2 2 2 2
No. of skating rinks 3 3 3 3 3 3 3
Miles of Trails 2.75 2.75 2.75 2.75 2.75 2.75 2.75
Cost of maint per acre 1,327 1,316 1,217 1 ,493 671 1,561 1,561
No. of times rinks are
cleaned & resurfaced 80 80 80 80 80 80 80
No. of picnic tables 45 45 45 45 45 45 45
No. of Tennis Courts 4 4 4 4 4 4 4
COST INDICATORS:
Expenditures 665,493 194,539 181,864 224,502 84,668 236,479 236,479 0
- Program Revenues
Sports Organizations 12,000 12,000 See CIP See CIP
Tonka Bay - Beach 500 500 0 0
Transfer from Trail Fund 3,000 3,000 0 0
Capital Levy 10,000 10,000 15,000 15;000
= Levv Dollars - Maint. 665,493 194,539 156,364 199,002 84,668 221 ,479 221 ,479 0
.. STAFFING:
Full time:
Lt Equip Oper/Foreman 1.60 1.60 1.50 1.50 1.50 1.50 1.50 1.50
Clerical .25 .25 .25 .25 .25 .33 .33 .33
Part time:
Clerical --
Seasonal:
Summer 2.00 2.00 2.00 2.00 2.00 1.00 1.00 1.00
Winter (rinks) 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
43
~
.
.
.
.
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128. www.ci.shorewood.mn.us. cityhall@ci.shorewood.mn.us
MEMORANDUM
TO:
FROM:
DATE:
SUBJECT:
City Council ^ ~
Craig W. Dawson, City Administrator W
September 8, 2005 .
SLMPD 2006 Interim Funding and Resolution Proposal
On August 19,2005, the Coordinating Committee of the South Lake Minnetonka Police Department
(SLMPD) endorsed the "final version" of a proposal by its chair, Greenwood Mayor Bob Newman,
for funding the Department's 2006 recommended budget and for working through the issues of
differing positions among the member city councils. This proposal is attached.
During the week of August 22, the city councils of Shorewood, Tonka Bay, and Greenwood
approved the Coordinating Committee "final version" proposal. On August 29, the Excelsior City
Council did not approve the proposal, but offered modified it and sought approval by the other three
city councils (see attachment). Excelsior's proposal had four parts:
1. Payment of$14,000 for Tier II service for September 1 - December31, 2005.
2. Payment of an additional $12,000 [above its authorized $400,000, a 0.0% increase] for
services in 2006.
3. Payments to be conditioned on Excelsior receiving full and uniform level of police services as
other SLMPD member cities from September 1, 2005, through December 31, 2006.
4. If no determination is reached on the 2001 operating budget by September 1, 200Q, the 2007
operating budget would remain at municipal payments of$1,355,932 [the same sum as has
been in place since 2003].
The proposals compare as follows:
1. 2006 funding for operations:
Coordinating Cmte Excelsior
Excelsior
Greenwood
Shorewood
Tonka Bay
26.5%
8.5%
48.5%
16.0%
27.0%
8.5%
49.0%
16.0%
Excelsior @ 26.5% = - $412,000
@27.0%=-$420,000
1fcrt
n
~J PRINTED ON RECYCLED PAPER
Excelsior Proposal for SLMPD 2006 Interim Funding and Resolution
September 12, 2005, City Council Meeting
Page 2
~
.
2. Coordinating Committee: All four cities agree to continue with work begun by the Issues
Group.
Excelsior: Not mentioned; resumption of discussions could be inferred.
3. Coordinating Committee: JPA discussions to be completed by December 31,2005, unless
extended by all parties.
Excelsior: Not mentioned [i.e., no deadline].
4. Coordinating Committee: If December 31 or subsequent deadline passes without agreement,
procedures to reorganize membership or conditions of membership to begin immediately.
Excelsior: Not mentioned [i.e., specifically did not want appear to have pre-approval of the
possibility of dissolution].
5. Coordinating Committee: Excelsior to be provided Tier II service for remainder of2005 [i.e.,
one-third of year] at no additional cost.
Excelsior: Excelsior would pay $14,000 for Tier II service for remainder of2005 [i.e., one-
third of the - $42,000 that it was requested to pay for recommended 2005 budget].
.
6. Coordinating Committee: Proposal valid through August 31, 2005.
Excelsior: Not mentioned directly; a September 1, 2006, date could be inferred.
.
Status of Excelsior Proposal:
Coordinatint! Committee: Excelsior's proposal was addressed to the SLMPD Coordinating
Committee, which met in emergency session on August 31 in order to respond to Excelsior's request
to pay for Tier II service beginning September 1. The Coordinating Committee determined the
Excelsior proposal was beyond its scope of authority for action. While it could respond under the .
JP A to the request for Tier II services, the matter was placed with three other conditions that were not
within the JP A, and thus needing approval by all city councils. It gave provisional approval to
implement Tier II services for Excelsior, provided that Excelsior made this request decoupled from
the other three conditions in its proposal.
Excelsior: At its meeting on September 6, the Excelsior City Council did not act to decouple
its request for Tier II services.
Greenwood: At its meeting on September 6, the Greenwood City Council took no action on
the Excelsior proposal.
Shorewood: The City Council will consider the proposal at its September 12 meeting.
Tonka Bav: The City Council will consider the proposal at its September 13 meeting.
CITY COUNCIL ACTION. The City Council could:
a) Approve the Excelsior Proposal of August 29, 2005; or .
b) Acknowledge receipt and take no action on the Excelsior Proposal of August 29, 2005,
and restate that the Council has already approved the "final version" proposal endorsed
by the Coordinating Committee within the August 31 deadline.
.
.
.
.
.
Temporary "Make-Whole" Proposal-Final Version
1.
All four cities make a one-year commitment to fully fund the proposed 2006
SLMPD Operating Budget at the following contribution percentages:
Excelsior 27.0
Greenwood 8.5
Shorewood 48.5
Tonka Bay 16.0
100.0
2. All four cities agree to continue with the work begun by the Issues Group.
3.
JP A discussions must be completed by December 31, 2005, unless extended by all
four cities.
4. If the December 31, 2005, or the extended deadline passes without agreement,
procedures to reorganize the membership or conditions of membership shall
commence immediately thereafter.
5.
Upon all four cities' approval of this proposal, all cities will immediately receive
full service for the remainder of2005, and with no additional cost to the City of
Excelsior.
6. All four cities must agree to this proposal no later than August 31,2005.
CITY OF EXCELSIOR
.
September 6, 2004
339THIRD STREET
EXCELSIOR, MINNESOTA 55331
TEL: 952-474-5233
FAX: 952-474-6300
f
Mr. Craig Dawson, City Administrator
City of Shorewood
5755 Country Club Road
Shorewood,~ 55331-8926
bye-mail and U.S. Mail
.
Re: Interim Agreement Regarding Police Dispute
Dear Mr. Dawson:
Enclosed is a copy of my August 30, 2005 letter to the SLl\1PD Coordinating Committee .
transmitting Excelsior's proposal to facilitate continued negotiations to resolve the ongoing
dispute between the cities. The Coordinating Committee met in emergency session on August
31, 2005 to consider this offer. At that meeting, the Committee determined that, although it was
willing to approve the portion of the proposal that fell within the scope of its authority, the vast
majority of the proposal needed to be acted on by each member city.
I am, therefore asking you to seek a response to Excelsior's proposal from your city council at .
the earliest opportunity. I look forward to hearing from you.
Sincerely,
~~{Gr. W~
Laurence E. Whittaker
City Manager
cc: Mark Kelly
.
.
CITY OF EXCELSIOR
339THIRD STREET
EXCELSIOR, MINNESOTA 55331
TEL: 952-474-5233
FAX: 952-474-6300
August 30, 2005
Coordinating Committee
South Lake Minnetonka Police Department
24150 Smithtown Road
Shorewood, Minnesota 55331
.
Re:
Interim Agreement Regarding Police Dispute
Dear Committee Members:
.
Enclosed is City of Excelsior Resolution No. 2005-32 approving a contribution of
$400,000 by the City of Excelsior to the 2006 SLMPD annual operating budget. Based upon our
current JPA, this means that the 2006 operating budget may not exceed $1,355,932.
'When the Excelsior City Council passed this resolution at a special meeting held on
August 29, 2005, it also authorized me to extend an offer to facilitate continued negotiations to
resolve the ongoing dispute between the cities on the following terms:
.
1. Excelsior agrees to pay an additional $14,000 toward the 2005 SLMPD
operating budget above the $400,000 previously authorized.
2.
Excelsior agrees to pay an additional $12,000 toward the 2006 SLMPD
operating budget above the $400,000 authorized by Resolution No. 2005-32.
3. The above payments are conditioned on Excelsior receiving the full and
uniform level of police services as the other SLMPD member cities from
September 1,2005 through December 31,2006.
4. Under this proposal, ifno determination is reached regarding the 2007
operating budget by September 1, 2006, the 2007 operating budget would
remain at $1,355,932.
.
This proposal exceeds the financial contribution requested this month by the cities of
Greenwood, Shorewood, and Tonka Bay as part of the "Make-Whole Proposal" to facilitate
continued negotiations by approximately $6000.
There are no other conditions to this offer except those stated above.
Letter - SLMPD Coordinating Committee
RE: Interim Agreement Regarding Police Dispute
August 30, 2005
Page 2
.
Once all parties promptly agree to these financial terms, we anticipate that all parties
will, in good faith, immediately resume discussions to resolve outstanding issues.
We look forward to a favorable response. .
~[.w~
Laurence E. Whittaker .
City Manager
.
.
.
City of Excelsior
Resolution No. 2005 - 32
Resolution Approving Funds for the 2006 Operating Budget
for the South Lake Minnetonka Police Department
WHEREAS, the City of Excelsior is party to a Joint Powers Agreement ("JP A") creating
the South Lake Minnetonka Police Department ("SLMPD"); and
WHEREAS, the JP A as amended provides that each city that is a party to the JPA must
determine the amount it proposes to contribute to the SLMPD operating budget prior to
September 1 of the year immediately preceding the year in which the annual operating budget is
to be in effect.
.
NOW, THEREFORE, the City Council of the City of Excelsior resolves that it authorizes
a contribution of $400,000 toward the SLMPD operating budget for 2006.
Adopted this 29th day of August, :2005.
.
.
ATTEST:,1
J~ )2~
Janlif;S R. Olds, City Clerk/Treasurer
...,
~~~.w~
Laurence E. "Wbittaker, City Manager
.
.
.
.
.
.
CITY OF
SHOREWOOD
.
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128. www.cLshorewood.mn.us. cityhall@cLshorewood.mn.us
MEMORANDUM
TO:
Birch Bluff Road Residents
FROM:
Brad Nielsen, City Planner
DATE:
9 September 2005
RE:
Request for No Parking Signs
FILE NO.
Streets (Birch Bluff Road)
This is to advise residents/property owners of Birch Bluff Road that the
City Council will, at its regular meeting on Monday, 12 September 2005,
consider a petition by area residents to install permanent ''No Parking"
signs on the north side of the street, between Grant Lorenz Road and
Eureka Road.
Many of you may have signed the petition, however, it is the City's
policy to advise all adjoining property owners that may be affected by
the change. Shorewood's Planning and Engineering staff will be
recommending approval of the parking restrictions.
If you have questions or comments relative to this matter, you may
appear the meeting on Monday night, call the Shorewood "Shoreline" at
952-474-3236, Ext. 1, or e-mail the Council at
cityhall@ci.shorewood.mn.us
Cc: Mayor and City Council
Craig Dawson, City Administrator
Bryan Litsey, Police Chief
Mark DuCharme, Fire Chief
1Pq D
#It
~J PRINTED ON RECYCLED PAPER
0 26260
II::
N
z 26175
w
26310 II::
0
....J 619
I-
z 621
~ 26245
CJ
5425
26375
I:,f " I:::;:
y
26045
I-
en
o
0::
:r:
I-
26115
fl50
26075
25990
26020
25985
26025
25960
25920
25955
;t58'(P~
5420
25880
e\f~.cr\ e\.-Uff RO
v
25925
25845
~
I-
p.:,/g>
o
z
o
u
w
.
25810
25680 25660 25620
570
25760 574
25775
25695
25725
v
\I
5320
v
25655
5300
25630
.
2558
531
CT
533
o
0:::
~
w
0::
::>
w
537
I-
Mayor & City Council
Planning Commission
City of Shorewood
5755 Country Club Road
Shorewood, MN 55331
/cJt:~ ,K'&qJl/E'Jr ..9~.uS
g~ ;tJt//O,u ,Le? 7" ?//V'c-..s
WI..(bre'iA-1 ~fl ~ oS J/./ ~ .Lc:=-
.
August 2005
Subject: Permanent no parking on the North side of Birch Bluff Road
Dear Council & Planning Members;'
.
The undersigned residents of Birch Bluff Road request your consideration, approval
and erection of no parking signs on the north side of Birch Bluff Road between
. Eureka Road and Grant Lorenz Road. This is a public safety issue.
This request is justified based on the following facts:
. Birch Bluff is a hilly narrow road just wide enough for two cars to pass.
. There are no sidewalks and the road is often used by walkers, runners and
bikers.
. Many trucks, and boat trailers going to Howard's Point Marina, use the
road.
. It is a thoroughfare for vehicles traveling from highway 12 to highway 7 and
communities to the southwest.
. When vehicles are parked on both sides of the road across from each other
emergency vehicles could have great difficulty passing through or be blocked
completely.
. Vehicles parked on the north side of Birch Bluff can block mail delivery.
. School children walk to and wait for the bus on the road.
. School buses have been 20 minutes late because they cannot get through.
.
.
Respectfully submitted:
Signatures of both parties Address Telephone
number ~ j
1. ~ (f!: ~ .At/ UJ ;j~ ftI( tf. ers:: Ylo.,.: 77 0
77l~ ~ /1 II
2.'~ ~ '::>C5\1' R~ 8-5otCOGj &"rch 6\u* qs)'4iO'f~
3. ~~J/fl<<lesmJ 2.{gIQS ~~~10) 'V'?~l.\1t1.P?1f3
4. ~ 5i~'vU/. StJ'- 1-h2-/.( 13 i /LOt- lSurfPP q D-.- '-i 1 d fa (, l./u
1.;1. '~~..' ....... '2b \ ~ 1) Bl~ 6J LYfF b \~.'Y? r ) ~~'-I
~(>.\ \ 't cQ~, ~'1" " c<
~~ ~
~~~~
~~"r
~ ~
~
~
~._.; "'""
e". ~
"'""
9C
"'""
;'I
"'""
~
j \ ~ .~
\.1'\ CV\ r- ;.. !'(J
~ ~\~ ~. ~~& ~~ .~
ro {~ ~ j U)~. -", ~j.
0' tC'l. ..5 f{\ t ~ M (~ J'f)
, \~ _I \ '" , ..4 '"
c ~ 0 f"\ ~ 0\'+ /'0
t'-- "':r "'t\ ... ~ ~ ~ \./)
~~ ~ ~~ ~~. tJ ~~\
~: ~ ~ ~ ~t ~i ~ 1 f
~~ ~ \t a
~~ ~ U)}~. .. a:J: r
(tJ~ ~ ~ a ~ .~ ~ ,~
-r~ \J VJ A :0 ~ ~
i ~ ~ "~ v ~:1 ) -~ ~' ~
00 ~ ~ ti) ~ \5;, ~ ~, ~
(.) ~ ~ \J') ~ rY ~ '1 ~ x
\.q ,~--.. ..5 ~ " <.9 .~ ""l ~
~) <" '~":::> ~ V) 0
~ ~ ""~ "VI \
~~ ~ ~~~'t
~. ~,,~ :i~ \
. ~~, -- ~
-~ !:" ~ ~ ~ ';: -> 00 ~ ~ : '_ N CO") ~ tr) \0 l" 00 0'\ 0 - N CO") ~
N N N N N N N N CO") CO") CO") CO") CO") CO") CO") CO") CO") CO") ~ ~ ~ ~ ~
.
.
.
.
.
.
.
.
.
.
CITY OF SHOREWOOD
RESOLUTION NO.
~~~~\
A RESOLUTION PROHIBITING PARKING ALONG
PORTIONS OF BIRCH BLUFF ROAD
WHEREAS, Birch Bluff Road is not of sufficient width to permit parking on both the
north and south side of the roadway for safe passage of emergency vehicles, school buses and the
general public; and
WHEREAS, the City has received a petition from residents whose properties abut Birch
Bluff Road, requesting "No Parking" signs to be posted on the north side of Birch Bluff Road;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Shorewood that parking of vehicles is hereby prohibited on those portions of roadway described
as follows:
On the North side of Birch Bluff Road, starting at the westerly boundary of Grant Lorenz
Road and continuing to the westerly boundary of Eureka Road.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 12th
day of September, 2005.
WOODY LOVE, MAYOR
ATTEST:
CRAIG W. DAWSON, CITY ADMINISTRATOR/CLERK
.
.
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOOD, MINNESOTA 55331-8927 · (952) 474-3236
FAX (952) 474-0128. www.cLshorewood.mn.us. cityhall@cLshorewood.mn.us
MEMORANDUM
TO:
Mayor and City Council
Craig Dawson, City Administrator
FROM:
Larry Brown, Director of Public Works
.
DATE:
September 8, 2005
RE: Accept Feasibility Report and Authorize Preparation of Plans, Specifications, and
Engineer's Estimate for the Interconnection of the Southeast Area and Amesbury Area
Water Systems
.
Included in the City Council packet is a feasibility report, prepared by WSB and Associates, Inc., for
consideration of the interconnection of the Southeast Area and Amesbury Area water systems.
Background
The interconnection of the two systems is critical to the stability of both the Amesbury and SE Area
systems for the following reasons:
.
Amesbury is a hydro-pneumatic system that does not have a reservoir for backup supply. Any control
equipment failures, pump failures, or power outages brings the system to a halt. There are 167
accounts that are serviced by this system.
The SE Area system, which is the City's largest system, is connected to the water tower on Old Market
Road. This system serves 451 accounts.
Although the SE Area system is served by a water tower, there is only one well that can feed this
tower. Failure of the well or controls, "starts the clock ticking on the reservoir." During summer
months, this equates to approximately 36 hours of reserve (assuming no fires). During non- peak
months, the tower can supply approximately 72 hours of demand.
.
Recently, staff learned that ordering and replacement of the well motor for this system will take a
minimum of three-weeks. on an emergency basis. While an interconnection exists with the City of
Minnetonka, it is unreasonable to expect the City of Minnetonka to supply the SE area demand for a
three-week time period, during summer months.
Interconnection of the Amesbury System, the SE Area System, and the SE Area Water Tower
accomplishes the following:
n
to., PRINTED ON RECYCLED PAPER
it-- IDA
Mayor and City Council
Consideration of the Feasibility Report for the
Interconnection of the Amesbury and SE Area Water Systems
September 8, 2005
Page 2 of3
.'
I
.
1. Each system can serve as a backup pumping source for each other.
2. The Amesbury System would have access to water during power outages, and equipment failures
due to connection ofthe SE Area Water Tower.
3. Interconnection of the systems saves a substantial amount of funds, versus construction ofa backup
well to the SE Area system.
Report
The City's engineering consultant was required to model each to the two water systems to detemllne if
the elevations, pumping capacities, and water tower located on Old Market Road are compatible. The
conclusion of the analysis is indicates that the system can be interconnected. The quote taken from the
executive summary is:
.
"Connecting the NE (AmesburyJ and SE systems is feasible and would provide better service to the NE
system with little effect on the SE system. "
Having determined that the systems are compatible, the question becomes what is the preferred route
for the utility. The report considered two main routes, with an alternative sizing for each route. Routes
and associated costs are shown in Table 1 below: .
Alternative
lA-8" IB - 12" 2A-8" 2B - 12"
Cost Item Connecting Connecting Connecting Connecting
Main via St. Main via St. Main via Main via
Albans Bay Rd Albans Bay Rd Manor Rd Manor Rd
and Manor Rd and Manor Rd Only Only
Total Estimated $829,000 $942,000 $958,000 $1,094,000
Construction Cost
Engineering, Admin, $207,000 $236,000 $239,000 $273,000
and Leeal Fees (25%)
Total Estimated $1,036,00 $1,178,000 $1,197,000 $1,367,000
Probable Pro.iect Cost
.
Table 1
Staff will briefly present the alternatives considered and the associated pros and cons of each
alternative at Monday's City Council meeting.
It should be noted that Staffs recommendation differs slightly from WSB's recommendation. Staff is
recommending that plans and specifications be prepared for Alternative lB. Staff feels that this .
alternative is the most cost-effective route, and also corresponds to the City's Comprehensive Water
Distribution Plan that was prepared in 1996.
t
.
.
.
.
.
Consideration of the Feasibility Report for the
Interconnection of the Amesbury and SE Area Water Systems
September 8, 2005
Page 3 of3
Recommendation
Staff is recommending approval of a resolution that accepts the feasibility report for the for the
Interconnection of the Amesbury and SE Area Water Systems, and authorizes preparation of Plans,
Specifications, and Engineer's Estimate for said project.
A resolution for this item will be provide at Monday's meeting.
""
CITY OF SHOREWOOD
CITY COUNCIL MEETING
September 12,2005
PUBLIC SIGN-IN SHEET
For the record, please print your name and address below. Thank you.
Name
Address
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I September 12,2005
Connection of the Southeast Area
Water System to the Northeast Area
Water System
WSB Project No. 1608-04
Prepared for:
701 Xenia Avenue South, Suite 300
Minneapolis, MN 55416 (763) 541-4800
CITY OF
SHOREWOOD
Prepared by:
.
WSB
& Associates, Inc.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FEASIBILITY REPORT
CONNECTION OF THE SOUTHEAST AREA
WATER SYSTEM TO THE NORTHEAST AREA WATER SYSTEM
FOR THE
CITY OF SHOREWOOD, MINNESOTA
September 12, 2005
Prepared By:
WSB & Associates, Inc.
701 Xenia Ave South, Suite 300
Minneapolis, MN 55416
(763) 541-4800
(763) 541-1700 (Fax)
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
WSB
Infrastructure I Engineering I Planning I Construction
701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763-541-4800
Fax: 763-541-1700
& Associates, Inc.
September 12, 2005
Honorable Mayor and City Council
City of Shorewood
5755 Country Club Road
Shorewood, MN 55331
Re: Feasibility Report
Connection of the Southeast Area Water
System to the Northeast Area Water System
City of Shorewood, MN
WSB Project No. 1608-04
Dear Mayor and City Council Members:
Transmitted herewith is a feasibility report which addresses the connection of the Southeast Area
Water System to the Northeast Area Water System.
We would be happy to discuss this report with you at your convenience. Please do not hesitate
to contact me at 763-541-4800 if you have any questions regarding this report.
Sincerely,
WSB & Associates, Inc.
K~ ~ #~a.",
Kevin F. Newman, P.E.
Proj ect Manager
Enclosure
srb
Minneapolis I St. Cloud
Equal Opportunity Employer
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CERTIFICATION
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that I am a
duly Licensed Professional Engineer under the laws ofthe
State of Minnesota.
~ /" /l~~
Kevin F. Newman, P.E.
Date: September 12, 2005
Lic. No. 25198
Prepared By:
Date: September 12, 2005
Quality Control Review By:
r'-.\~ _
~ . .~
David E. Hutton, P.E.
Date: September 12, 2005
Lic. No. 19133
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE OF CONTENTS
TITLE SHEET
LETTER OF TRANS MITT AL
CERTIFICA TION SHEET
TABLE OF CONTENTS
1. EXE CUTIVE SU'MMAR Y ....... ......... ...... ....... .... ....... ... ...... ......... ....... ...... ....... ..... ......... .... 1
A. Existing Conditions .............. ...... ................... ....................... .................... ................ 1
B. Future Conditions........ .... .......................................... ............................. ............. ..... 2
2. INTRODUCTION AND PURPOSE ................................................................................5
3. EXISTING CO ND ITI ONS ............................................................................................... 6
A. Existing Service Area............ ..... .................. ........................ .................... ................ 6
B. Water Service Connections... ..... ...... ............ ............................................................ 6
C. Existing Water Supply and Storage ......................................................................... 6
D. Water Demands ................. ......... ..... ........ .... ........ .......... ..... ...... ... ...... ............ ...... ..... 7
E. Existing Distribution System ... ................. ............ ...... ........... ......... ........... .............. 9
4. FUTURE CO ND ITI 0 NS ................................................................................................ 11
A. Projected Service Area...................................................................................... ..... 11
B. Projected Population and Residential Water Service Connections ........................ 11
C. Water Demand Projections..... ..... ................ .......................................... ............ .... 11
D. Fire Protection........................................................................................................ 12
s. WATER SUPPLY EV ALUA TION ................................................................................ 13
6. DISTRIBUTION SYSTEM EV ALUA TION ................................................................. 14
A. Distribution System Modeling............................................................................... 14
B. Analysis of Alternatives.. ........... ............... ................. ............. ...................... ......... 14
C. Storage Evaluation................................................................................................. 17
7. SU'MMARY AND RECO~NDA TIONS ................................................................. 19
Appendix A
Figures (1-26)
Appendix B
Opinion of Probable Costs, Tables 6-12
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1. EXECUTIVE SU'MMARY
The City's southeast (SE) water system and.northeast (NE) water system currently operate as
two independent systems. The City is considering connecting these two systems in an effort to
provide more reliable water service to the existing customers in those two water service areas
and to proposed development in the northeast area.
The executive summary is a brief summary of findings, conclusions, and recommendations for
the Connection of the SE area water system to the NE area water system.
Connecting the NE and SE systems is feasible and would provide better service to the NE
system with little effect on the SE system.
A. Existing Conditions
The SE water system currently serves the area generally bounded by Vine Hill Road on the
west, Old Market Road and Sweetwater Curve on the east, State Highway 7 on the north,
and the Shorewood City limits on the south. Water users in the SE water system consist of
residential, commercial and public. The NE water system serves the area along Knights
Bridge Road, Regents Walk, and Bays Water Road directly north of Glendale Road. In
addition, St. James Gate, Old Kent Road, and Andover Place, all within the City of
Deephaven, are served by the NE water system.
Table 1 is a summary of the water demands for the SE and NE water system service areas.
Table 1
Summary of Total Average Day Water Usage
Northeast Water System Southeast Water System, Total
Year (Amesbury), Total Average Day Average Day Water Usage (gpd)(l)
Water Usa2e (2pd)(1,2)
2002 47,229 162,284
2003 58,795 202,325
2004 48,280 184,111
Average 51,435 183,000
(1) 10% was added to the total water sold for unaccounted for water usage.
(2) Includes Deephaven Water Connections
Figure 1 included in Appendix A illustrates the existing SE and NE water systems. The
existing SE water system generally consists of:
1. One water production well (Well No.7) with 950 gpm pumping capacity,
2. Horizontal pressure filter for removal of iron and manganese,
3. 400,000 gallon elevated storage tank,
4. Over 43,000 feet of watermain ranging in diameter from 6 to 12 inches, and
5. 661 connections
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
The existing NE water system generally consists of:
1. Two water production wells (Wells No.1 and No.6) with 560 gpm combined
pumping capacity,
2. 5,000 gallon hydropneumatic tank to maintain pressure on the system,
3. Over 13,000 feet of watermain ranging in diameter from 8 to 10 inches, and
4. 167 connections.
The existing SE and NE water systems were evaluated using an extended period simulation
(BPS) computer model (WaterCAD V6.5) to determine their capacity under various system
conditions. Details regarding existing system capacity, demands, and modeling are
discussed in section 3. System modeling indicated the following deficiencies.
Summary of Deficiencies
. High minimum hour pressures in both the NE and SE water systems.
. Large pressure fluctuation in the NE water system.
. Limited fire protection in the NE water system.
B. Future Conditions
Expansion of the SE and NE water systems is proposed north of Hwy 7 to serve existing
homes along St. Albans Bay Road, along Manor Road and along Suburban Drive. The
service area would also serve planned development at the comer of Suburban Drive and
Manor Road and in the northeast comer of Hwy 7 and Manor Road. The expanded service
area would include approximately 82 additional residential units for a total of 733
residential connections, 9 commercial connections and 1 church connection.
With the additional residential units the average day and maximum day demands for the
combined SE and NE water system service area are estimated to be 272,000 gpd and
1,362,000 gpd respectively. Minimum fire flow requirements are assumed to be 1,000 gpm.
Two general alternatives were evaluated for connection of the SE water system to the NE
water system and to serve the additional homes in the expanded service area. Alternative 1
includes connection to the existing 12-inch watermain near Hwy 7 and St. Albans Bay Road
and then extending the watermain north along St. Albans Bay Road and then northeast along
Manor Road to Knights Bridge Road where connection to the NE water system would be
made. Water service to the residential units along Suburban Drive would be provided by
extending a branch watermain from Manor Road north along Suburban Drive. Figure 6
included in Appendix A shows Alternative 1. Under Alternative lA the connecting
watermain and branch watermain would be 8-inch diameter and under Alternative IB the
connecting watermain and branch watermain would be 12-inch diameter.
Alternative 2 includes connecting to the existing 12-inch watermain on Manor Road in the
Barrington Subdivision and then extending the watermain north and then northeast along
Manor Road to Knights Bridge Road where connection to the NE water system would be
made. To serve the homes along St. Albans Bay Road and Suburban Drive, branch
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
watermains would be extended from Manor Road, north and south along these roads.
Figure 13 included in Appendix A shows Alternative 2. Under Alternative 2A the
watermain extension for connecting the two systems would be 8-inch diameter and under
Alternative 2B the watermains connecting the two systems would be 12-inch diameter.
Table 2 is a summary of the Engineer's opinion of total probable construction and project
cost for each of the alternatives.
Table 2
Summary of Engineer's Opinion of Total Probable Construction and Project Cost for Each
Alternative to Connect the SE and NE water systems and Serve the expanded water system
service area
Alternative
lA - 8" IB -12" 2A - 8" 2B - 12"
Connecting Connecting Connecting Connecting
Cost Item Main via St. Main via St. Main via Main via
Albans Bay Albans Bay Manor Rd Manor Rd
Rd and Rd and Only Only
Manor Rd Manor Rd
Total Estimated $829,000 $942,000 $958,000 $1,094,000
Construction Cost
Engineering, Admin. $207,000 $236,000 $239,000 $273,000
and Legal Fees (25%)
Total Estimated $1,036,00 $1,178,000 $1,197,000 $1,367,000
Probable Proiect Cost
To connect the NE and SE systems, Alternative 2A or 2B are recommended. An 8-inch
connecting watermain as described in Alternative 2A will provide adequate service and fire
protection to the future service area, however, if additional homes want to connect to the
City system beyond those identified in the project scope, a 12-inch diameter main, as
described in Alternative 2B would, provide the water system more capacity for future
expansion with a small cost increase.
A phase approach to the design and construction of the improvements described in
Alternative 2A and 2B is proposed. Phase I of the improvements would include installing
only the watermain that connects the SE water system to the NE water system. Figure 20
(phase 1 - Alternative 2A and 2B) included in Appendix A shows the initial connection of
the two systems and the first step in providing water to the future service area identified in
the project scope and shown in Figure 13 (Alternative 2A and 2B).
The total estimated project cost for an 8-inch connection main, Phase I - Alternative 2A, is
approximately $523,000 as shown in Table 10.
The total estimated project cost for a 12-inch connection main, Phase I - Alternative 2B, is
approximately $597,000 as shown in Table 11.
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Connecting the NE and SE systems is feasible and would provide fire protection and more
consistent operating pressures in the NE system while having little effect on the SE system.
There are a few pockets of homes in both the NE and SE system with minimum hour
pressures around 110 psi due to their low elevation. It is recommended to not raise system
pressures until this situation has been studied further.
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
2. INTRODUCTION AND PURPOSE
The City's SE water system and NE water system currently operate as two independent systems.
The City is considering connecting these two systems in an effort to provide more reliable water
service to the existing customers in those two water service areas and to proposed development
in the northeast area.
The purpose of this technical memorandum is to evaluate the feasibility of connecting the SE
water system to the NE water system. The scope of this technical memorandum will include a
review of the existing conditions for the NE and SE water systems, presentation of projected
future conditions, water supply evaluation, distribution system evaluation including storage
analysis, evaluation of the possibility for connecting the two systems together, and recommended
capital improvements costs.
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
3. EXISTING CONDITIONS
A. Existing Service Area
The existing NE service area can generally be described as the multi-family units along
Knights Bridge Road, Regents Walk, and Bays Water Road directly north of Greendale
Road. In addition, St. James Gate, Old Kent Road, and Andover Place, all within the City
of Deephaven, are served by the NE water system.
The SE system is generally bounded by Vine Hill Road (Shorewood City Limits) on the
west, Old Market Road and Sweetwater Curve on the east, State Highway 7 on the north,
and the Shorewood City Limits on the south. Multifamily units directly north of the
intersection of Highway 7 and Old Market Road along Spring Circle and St. Albans Bay
Circle are also served by the SE system. A 12-inch diameter main was recently extended
from the Spring Circle/St. Albans Bay Circle area west to the Barrington Subdivision.
B. Water Service Connections
The NE water system has served a customer base consisting of residential water users. The
NE water system currently serves 167 residential water connections. Thirty-eight of these
water service connections are in the City of Deephaven. The SE water system serves a
customer base consisting of residential, commercial and public. The SE water system
currently includes 484 residential water connections, nine commercial water connections
and one church connection.
C. Existing Water Supply and Storage
Northeast Water System
Water is supplied to the NE water system by two water production wells, which are
identified as City Well Nos. 1 and 6. The pumping capacity of Well No.1 is approximately
500 gpm and the pumping capacity of Well No.6 is approximately 60 gpm. No treatment
or storage facilities, elevated or ground, are provided. A 5000 gallon hydropneumatic tank
maintains pressure on the distribution system and helps in reducing the number of starts and
stops by the well pumps.
Southeast Water System
Water is supplied to the SE water system by one water production well, which is identified
as City Well No.7. The pumping capacity of Well No.7 is approximately 950 gpm.
Treatment for removal of iron and manganese is provided to the SE water system by one
horizontal pressure filter. A 400,000 gallon spheroid type elevated tank, constructed in
1988, provides storage for the SE water system. This elevated storage tank is 115 feet from
the base to the bottom of the storage tank and 150 feet from the base to the overflow, giving
a total potential operating range of 35 feet. The overflow elevation is at 1160 feet MSL.
Under normal operating conditions Well Pump No.7 will start when the tower water level is
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System'
WSB Project No. 1608-04
Page 6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
at 26 feet (1151 feet MSL) and stop when the tower water level is at 31 feet (1156 feet
MSL).
D. Water Demands
Residential water usage per connection for the entire City of Shorewood water service area
has averaged 335 gallons per connection per day. However, the residential water usage has
averaged 276 gallons per connection per day in the NE system, and 325 gallons per
connection per day in the SE system. This is the total volume of water sold each day
divided by the total connections. Commercial water usage per connection has averaged 967
gallons per connection and water usage per connection for churches in the SE system has
averaged 677 gallons per connection per day.
In almost all waters systems, there is a difference in the volume of water produced and the
volume of water sold to the customers. This portion of water is referred to as "unaccounted-
for" water use. Unaccounted-for water is usually attributed to hydrant flushing, water main
leaks, and un-metered water service connections. For this report, unaccounted-for water
data was not available. Industry standards recognize unaccounted-for water use up to 10%
as acceptable. For estimating purposes, 10% unaccounted-for water use was assumed to
determine the total existing demands and for projecting future demands.
Average daily water use, including residential, commercial, churches, assumed
unaccounted-for water and total average day water use for the years 2002 through 2004 are
summarized in Table 3.
Feasibility Report
City of Shorewood
Connection of the Southeast Area Wqter
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 7
-------------------
Table 3
City of Shorewood
Connection of the Northeast Water System and the Southeast Water System
Historical Water Usage
Northeast Water System (Amesbury), Southeast Water System, Water Usage
Year Water Usa e (1)
Residential, Unaccounted-for Total Residential Commercial Churches Unaccounted-for Total
( d) ( d) (2) ( d) ( d) ( d) ( d) ( d) (2) ( d)
2002 42,936 4,293 47,229 139,363 8,168 14,753 162,284
2003 53,450 5,345 58,795 174,214 8,307 1,411 18,393 202,325
2004 43,891 4,389 48,280 157,996 8,701 677 16,737 184,111
Avera e 46,759 4,676 51,435 157,191 8,392 1,044 16,628 183,000
(1)
(2)
Includes Deephaven Water Connections
Assumed to be 10%
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 8
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Water production is typically measured in average day and maximum day units. Maximum
day water production is influenced by high summertime water use, and tends to correlate
with summertime precipitation levels. Measurement of maximum day water demand
characterizes the highest typical water demand of the system, which will impact production,
storage, and treatment facility sizing and operation.
Maximum day water usage for 2002 through 2004 was not available when this report was
prepared. In most water systems, a maximum day to average day peaking factor of 3.0 to
.
4.0 is common, however some communities in the Lake Minnetonka area similar in size to
Shorewood have exhibited much greater peaking factors. For modeling the existing systems
and for projecting future maximum day demands, a maximum day to average day ratio of 5
was assumed.
Based on historical water usage comparisons of other metro communities, and A WW A
recommendations a ratio of peak hourly water usage demand to maximum day demand of
2.0 was assumed. A WW A recommends a peaking factor of 1.3-2.0. Figure 2 shows the
estimated hourly demand fluctuation on a maximum day. Peak hour demands impact sizing
of water distribution mains. I
E. Existing Distribution System
The existing NE water distribution system contains over 13,000 feet of water main ranging
from 8 inches to 10 inches in diameter. Mains are either cast or ductile iron. There is
approximately 43,000 feet of water main in the SE system. Mains are constructed of HDPE,
cast iron, or ductile iron. Mains in the SE system range in diameter from 6 inches to 12
inches, with the exception of the main connecting the distribution system to the water tower
which is 16 inches in diameter. Figure 1 illustrates the existing system.
An extended period simulation (EPS) computer model (WaterCAD V6.5) was used to
evaluate the existing water system's ability to provide adequate service under a variety of
conditions and provide fire protection. The EPS model replicates the daily fluctuation of
water demand versus time of day (hourly water usage, see figure 2). It offers a view of
time-varying features such as tank levels, water system demand, pump on and off operation,
and available fire flow.
Figures 3, 4, and 5 show existing peak hour pressures, minimum hour pressures, and
available fire flow, respectively. During peak hour conditions, the system exhibits pressures
ranging from 52-79 psi, and 79-106 psi at minimum hour in the NE system. In the SE,
pressures range from 59-108 psi at peak hour demand and from 62-113 psi at minimum
hour.
In the SE system, pressures fluctuate approximately 3-5 psi at any particular point, which is
very stable. Well No.7 has a capacity close to peak hour demand allowing the tower to fill
under most demand conditions. Over a 24 hour maximum day, Well 7 cannot supply
demands from 7-9 a.m. and 7-9 p.m. Therefore, the tower will fill when Well 7 is on except
during those times on a maximum day.
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 9
I
I
I
I
I
I
I
I
I
I
I
I -
I
I
I
I
I
I
I
Pressures fluctuate approximately 30 psi in the NE. The hydropneumatic tank is set to
fluctuate by approximately that amount. When limited storage or no storage is available,
well pumps should be sized for peak hour demand. Wells 6 and 7 will deliver much greater
than peak hour demand.
Water distribution mains are typically sized to deliver peak hour demands at pressures in the
range of 40-110 psi, in accordance with American Water Works Association (A WW A)
engineering standards. In addition, it is recommended for pressure fluctuation during the
day to remain less than 30 psi. For fire protection, distribution mains must deliver 1,000-
1,500 gallons per minute (gpm) at a pressure of 20 psi for protection of the single family
homes in the area.
The existing NE system mains are appropriately sized and looped for fire protection and
residential distribution. All mains will deliver greater than 1,000 gpm, however the
hydropneumatic tank's volume is very small so it provides only a few minutes of fire
protection. The 8-inch and 6-inch mains are capable of providing greater than 2,000 gpm
fire flows, but can only provide approximately 100 gpm once storage is depleted in the tank.
In addition, the hydropneumatic tank causes increased stress on the distribution mains
because of the consistent pressure fluctuation of 30 psi.
The existing SE system provides adequate service and fire protection. There are locations in
the areas of Vine Ridge and east Market Street that exhibit pressures greater than 110 psi.
Fire protection in the SE is satisfactory, with very few mains delivering less than 2,000 gpm.
Summary of Deficiencies
. High minimum hour pressures in both the NB and SE water systems.
. Large pressure fluctuation in the NE water system.
. Limited fire protection in the NE water system.
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 10
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
4. FUTURE CONDITIONS
As discussed, the City is considering connection of their SE water system to their NE water
system. Sizing of the connection and other future system improvements for the combined water
system will depend on the current water demands and any projected increases in water demands.
The increase in water demands will depend on overall residential growth and the connection of
residential units to the water system not currently served.
A. Projected Service Area
Based on discussions with City Staff, expansion of the water system is proposed to serve
additional existing homes located along St. Albans Bay Road from State Hwy 7 to Manor
Road, along Manor Road from St Albans Bay Road to Greendale Road, and along Suburban
Drive from Manor Road to Forest Drive. Immediate expansion of the water system is
proposed to serve planned new development at the northeast comer of Suburban Drive and
Manor Road (Manor Park) and in the northeast comer of State Hwy 7 and Manor Road
(Barrington Subdivision).
B. Projected Population and Residential Water Service Connections
The combined NE and SE water service area will consist of primarily residential water
users. The total estimated number of residential units, including existing service and
potential service to the areas described in section 4.A would be approximately 733.
Assuming 3 people per residential unit the total estimated population served would be
2,199.
C. Water Demand Projections
Average day and maximum day water use projections for the design period are based on
historical water usage, service area population projections, and development assumptions.
Residential water use projections are based on the projected number of residential water
service connections and the average water use per residential connection. Using the water
use data from 2002 through 2004 for the City's water systems, average residential water use
per connection is 325 gpd for the SE system. Per connection water use is expected to
remain stable. By applying this per connection residential water use to 733, which is the
projected number of residential connections, the total average day residential water usage
would be 238,000 gpd.
No additional commercial or church water service connections are anticipated. The number
of commercial water service connections is expected to remain at 9 and the number of
church water service connections is expected to remain at 1. Using the water use data from
2002 through 2004 for the City's SE water system's average commercial water use per
connection is 967 gpd and the average water use per connection for churches is 677 gpd.
The total average day commercial water usage, based on 9 connections would be 8,700 gpd
and the total average day water use for the single church connection would be
approximately 700 gpd.
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 11
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Average day unaccounted-for water is projected to be approximately 10% of the total
average day water use. Average day unaccounted-for water is projected to be 25,000 gpd.
For projecting maximum day demands, a peaking factor 5.0 will be applied to the average
day demands. Peaking factors will typically be in the range of 3.0 to 4.0, with a factor of
5.0 being the highest. Typically, as a community grows, the ratio of maximum day to
average day water use will decrease. The maximum day demand used for modeling and
design of future improvements for the combined water systems will be 1,362,500 gpd
Total water use projections for the combined NE and SE water service areas, including
residential use, commercial use, church use, unaccounted-for water use, total average day
use and maximum day use, are shown in Table 4.
Table 4
City of Shorewood
Connection of the Northeast Water System and Southeast Water System
Summary of Projected Water Usage
Total
Ave. Day A ve. Day Ave. Day Ave. Day, A ve. Day Max day to
Residential Commercial Church Unacc - for Water A ve. day Max Day
Water Use, Water Use, Water Use, Water Use, Use, Peaking Demand,
GPD GPD GPD GPD GPD Factor gpd
238,000 8,700 700 25,000 272,400 5.0 1,362,000
D. Fire Protection
The water demand required for fire protection is utilized in the evaluation of the water
distribution system components. Often, the fire demands will determine the size of water
storage, pumping, and distribution system elements. Fire protection for the City of
Shorewood is provided by the Mound Fire department. The Insurance Services Office, Inc
(ISO) determines fire insurance rates based on the adequacy of the fire protection system.
The ISO ranks cities on a scale from 1 to 10 based on the fire department's communication
system (10%), the water supply system (40%), and the fire department (50%), with Class 1
being the highest rating. Class 1 is comprised of the best fire departments, of which there
are only about 45 in the United States. The Mound Fire Department was contacted to
determine the fire protection rating for the City of Shorewood. The areas in Shorewood that
have a fire hydrant within 1000 feet are given an ISO rating of 6 and the areas in
Shorewood that do not have a fire hydrant within 1000 feet are given a rating of 9.
When the ISO looks at maximum fire flow requirements for a community they will calculate
the fire flow requirements for the 5th largest building in the community and use that fire flow
as the maximum fire flow required for that community. The majority of the buildings in the
NE and SE water system service areas are single family residential units. A minimum fire
flow requirement of 1000 gpm will be used for these residential areas.
Feasibility Report
City 01 Shorewood
Connection olthe Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
5. WATER SUPPLY EV ALUA TION
Water is currently supplied to the NE water system by two wells with a combined pumping
capacity of 560 gpm. Water is supplied to the SE water system by one well have a pumping
capacity of 950 gpm With the two systems operating as separate water systems, the NE water
system has a firm well pumping capacity of 60 gpm and the SE water system has no firm well
capacity. Firm well capacity is defined as the capacity with the single largest well out of service.
It is used as an indicator of a system's capacity for providing service with one well out of service
due to maintenance work or an emergency event. Firm well capacity should meet or exceed the
maximum day demands. With the two systems connected the firm capacity of the systems
combined is 560 gpm or 806,400 gpd assuming the well pumps are running 24-hours per day.
The well firm capacity of 806,400 gpd does not meet the projected maximum day demand of
1,362,000 gpd. However, it should be noted that in calculating the projected maximum day
demand a conservative peaking factor of 5.0 was used. As discussed previously, in most water
systems, a maximum day to average day peaking factor of 3.0 to 4.0 is common. Using a
peaking factor of 3.0 would result in a projected maximum day demand of 817,200, which is
very close to the firm pumping capacity of the combined water systems. Prior to planning for the
construction of additional wells to meet the firm capacity, an investigation of the actual
maximum day to average day peaking factors for the system should be made.
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 13
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
6. DISTRIBUTION SYSTEM EV ALUA TION
A. Distribution System Modeling
To correct existing system deficiencies, there are several options available. All the
alternatives evaluated include the connection of the two systems, and assume that the
hydropneumatic tank will be removed, and operating controls for Wells 1 and 6 adjusted
relative to the tower. For modeling, Wells 1 and 6 were used under high demand
conditions. Under normal demands, Well 7 would supply most water so it can be treated by
the existing pressure filter. Improvements could be accomplished through the following
alternatives:
1. Service to existing homes and NE/SE connection via St. Albans Bay Rd. and Manor Rd.
a. 8-inch water main for providing service to homes
b. 8-inch water main for providing service to homes wi 12-inch trunk for future
expansIOn
2. Service to existing homes and NElSE connection via Manor Rd. only
a. 8-inch water mains throughout system
b. 8-inch and 12-inch combination of water mains throughout system
B. Analysis of Alternatives
Alternative lA - 8-inch water main for service to existing homes and NE/SE connection via
St. Albans Bav Road and Manor Road
The existing homes to be served along with the system connection are shown in Figure 6.
These homes are along St. Albans Bay Road from Hwy 7 to Manor Road, along Manor
Road from St. Albans Bay Road to Greendale Road, and along Suburban Drive from Manor
Road to Forest Drive. Also, Figure 6 shows the future mains required to serve these homes.
The major difference between Alternative lA and 2A is Alternative lA ties into the SE
system at Highway 7 and St. Albans Bay Road leaving the existing 12-inch dead end main
at the Barrington subdivision.
Figures 7 through 10 illustrate peak hour pressure, maximum day pressure, minimum hour
pressure, and available fire flow for this alternative. The BPS model indicates a functional
system under all operating conditions, providing adequate available fire flow . Available fire
flow indicates the amount of water the mains can provide only if enough pressurized storage
is available. .
Connecting the two systems will correct two of the three deficiencies listed in section 3E.
Fire protection will be provided and pressure fluctuation will be reduced from
approximately 30 psi over the course of a day to a more consistent 10-20 psi daily
fluctuation. Discussion of high pressures is included in the summary.,
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 14
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
When possible it is recommended to loop water mains, which this alternative does not
accomplish. Looping improves pressures and water quality. Therefore, if cost differences
are not significant, it is recommended to loop the system as in Alternative 2A. However,
this system will provide adequate service for the future service area and connect the NE and
SE systems for the lowest cost.
The engineer's opinion of total probable project cost for Alternative 1A is approximately
$1,036,000 as shown in Table 6.
Alternative 1B - 12-inch water main for service to existing homes and NE/SE connection
via St. Albans Bay Rd. and Manor Rd.
I
The mains in this alternative are identical to those described in Alternative lA, except all are
12 inches in diameter, see Figure 6.
Although the system would be functional with 8-inch mains, 12-inch mains would increase
the level of service. Figures 11 and 12 show peak hour pressure and available fire flow for
this alternative, Minimum hour and maximum day pressure are not shown because there
were no significant changes to service.
When compared to Alternative lA, this alternative would significantly improve fire flows in
the NE system and higher peak hour pressures. As discussed in Alternative lA, connecting
with an 8-inch would meet minimum requirements for the current system, however if the
system is to be expanded beyond serving the existing homes identified in the project scope,
it would be prudent to upsize this main to serve future demands.
The engineer's opinion of total probable project cost for Alternative 1B is approximately
$1,178,000 as shown in Table 7.
Alternative 2A - 8-inch water main for service to existing homes and NElSE connection via
Manor Rd. only
The future service area and main route is identical to Alternative lA, however an additional
main would be installed to loop the system. This future system is shown in Figure 13. To
connect the two systems, an 8-inch main would be installed from the west end of the
existing 12-inch dead end main serving the Barrington subdivision at Manor Road to the
existing 8-inch main at the intersection of Knight's Bridge Road and Manor Road.
Compared wI Alternative 1A peak hour pressures are higher with the looped system. When
possible it is recommended to loop water mains. The comparison of Alternatives 1A and
2A show the improved pressures created by looping. The Barrington Subdivision would
have improved water quality, which cannot be shown in modeling the system.
Minimum hour pressures are similar to the non-looped in system in Alternative 1A. Since
peak hour pressure is higher and minimum hour pressure remained the same, there is less
pressure fluctuation, about 10 psi, with a looped system. This provides more consistent
service and causes less stress on water mains. Available fire flow is better with the looped
FeasibiljJy Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 15
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
system, especially near the intersection of Knights Bridge Road and Manor Road
intersection. However, the remainder of the system is similar to Alternative 1A and
provides over 1,000 gpm for fire flow. Figures 14 through 17 show peak hour pressure,
maximum day pressure, minimum hour pressure, and available fire flow.
The engineer's opinion of total probably project cost for Alternative 2A is approximately
$1,197,000 as shown in Table 8.
Alternative 2B - 12-inch water main for service to existing homes and NElSE connection
via Manor Rd. only
With this alternative, the main route is identical to Alternative 2B. The difference, as shown
in Figure 13, is that all mains are upsized to 12 inches except the main serving the existing
homes along St. Albans Bay Road, between Suburban Dr. and Hwy 7.
Compared to Alternative 2A, there is only a slight increase in peak hour pressure, but a large
increase in available fire flow. The majority of the NE system would have more than 2,000
gpm available. In Alternative 2A, the majority of the NE system would have only greater
than 1,000 gpm available. Figures 18 and 19 show improved peak hour pressure and
available fire flow.
The difference between Alternatives 2A and 2B is the level of service. If the future system
plans include service to other areas within the vicinity of the NE water system (beyond
scope of this report), it would be prudent to upsize the trunk main to a 12-inch diameter.
Increasing the main size from 8 inches to 12 inches will increase system operating pressures
and available fire flow presently and increase capacity for future residential service.
The engineer's opinion of total probable project cost for Alternative 2B is approximately
$1,367,000 as shown in Table 9.
Evaluation of Alternatives
Table 5 is a summary of the Engineer's opinion of total probable construction and project
cost for each of the alternatives described in the previous paragraphs
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 16
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Table 5
Summary of Engineer's Opinion of Total Probable Construction and Project Costs
Alternative
1A - 8" 1B-12" 2A - 8" 2B - 12"
Connecting Connecting Connecting Connecting
Cost Item Main via St. Main via St. Main via Main via
Albans Bay Albans Bay Manor Rd Manor Rd
Rd and Rd and Only Only
Manor Rd Manor Rd
Total Estimated $829,000 $942,000 $958,000 $1,094,000
Construction Cost
Engineering, Admin. $207,000 $236,000 $239,000 $273,000
and Legal Fees (25%)
Total Estimated $1,036,00 $1,178,000 $1,197,000 $1,367,000
Probable Project Cost
Alternative 2A is the recommended alternative if the proposed service area will be the
ultimate service area. If there is a chance service will be extended to other existing homes
outside of the future service area then Alternative 2B is recommended. The cost difference
between installing a 12-inch and 8-inch water main is minimal, which is the reason to give
consideration to future plans beyond the scope of this report. Whichever condition the City
would like to pursue, the initial construction in Phase 1 - Alternative 2A or 2B should be
pursued. Initial construction is discussed in section 7.0.
A few localized areas in the SE and NE top 110 psi, which can be corrected by individual
pressure reducing valves (PRV) at the home or a larger system PRV. Further study for
reducing these pressures requires more information regarding customer complaints, existing
PRVs, and actual home elevations. It is recommended to not raise system pressures until
this situation has been studied further.
An 8-inch main was modeled along the City Corporate limits and Vine St. to connect the
NE/SE systems. It did not serve the existing homes described in the project scope; therefore
it was not cost effective. However, if service to those parcels is ever desired, it would
provide an additional loop connecting the NE/SE systems. The engineer's opinion of total
probable project cost for providing an 8-inch water main along the east Municipal Boundary
Line and along Vine St. is approximately $284,000 as shown in Table 10.
C. Storage Evaluation
Currently, the NE water system has no storage and the SE water system has 400,000 gallons
of elevated storage. In a water system, storage is needed to equalize demand on supply,
treatment, and distribution facilities, and to provide a reserve capacity for emergency
situations. Two methods are commonly used to evaluate the storage requirements for a
water system.
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 17
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
The Minnesota Department of Health (MDOH) will typically refer tolO-State Standards,
which recommends that a distribution system have an adequate elevated storage capacity
and/or ground storage capacity with standby power for high service pumps to provide the
average day water usage. The existing 400,000 gallon elevated storage tank meets this
requirement.
Storage capacity is also evaluated on a system's capability to provide equalization during
peak demands without depleting the storage volume needed for fire fighting. Based on
typical water use patterns for a community, storage should be capable of meeting the peak
hour flow rate minus the maximum day flow rate over a period of at least 4 hours. An
Equalization volume of 227,000 gallons is required based on projected maximum day and
peak hour demands for the combined NE and SE water systems. Following a peak hour
demand period, approximately 183,000 gallons would be available for fire fighting. This
would provide the fire department with the capability of fighting a fire for over 3 hours at a
fire demand of 1,000 gallons per minute.
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 18
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
7. SUMMARY AND RECOMMENDATIONS
Several alternatives, discussed in section 6, were developed to connect the NE and SE water
systems in conjunction with providing City water to existing homes in the future service area.
The two systems were modeled to determine their compatibility. For the systems to be
compatible the existing NE wells need to have the ability to pump to the distribution system and
fill the tower, operating pressures need to remain consistent and appropriate for distribution, and
improve fire protection. The systems were modeled and acceptable operating pressures and fire
flows resulted with the removal of the NE hydropneumatic tank. The hydropneumatic tank must
be disconnected if the NE and SE are connected. Connecting the two systems had virtually no
effect on the SE system. However, the NE system would gain fire protection and more
consistent operating pressures.
To provide water to the future service area identified in the project scope, the most cost effective
solution is to route the connection main through the future service area. This solution will serve
the existing homes and connect the NE and SE system at the same time. Other routes were
modeled and found to be functional (Vine Street and East Corporate Limits). However, other
routes did not provide water to the desired service area, so additional water mains would have to
be constructed.
Based on the future service area there are two possible connection routes. Both routes travel
Southwest along Manor Road from the NE system end at the intersection of Knights Bridge
Road and Manor Road to the intersection of Manor Road and St Albans Bay Road. At that point,
the route is either southeast along St. Albans Bay road to connect to the existing 12-inch HDPE
main at the intersection of Highway 7 and St. Albans Bay Road, or southwest along Manor Road
to the end of the 12-inch HDPE main serving the Barrington subdivision just north of the
intersection of Manor Road and Highway 7. Modeling indicated an improvement in pressures
and available fire flow with the SE connection occurring at the west end of the existing 12-inch
HDPE main serving the Barrington Subdivision. This alternative would not create any dead end
mains, thus requiring less maintenance and improving water quality.
Dependent upon the City's ultimate service area, either an 8-inch or 12-inch main would be
installed from the west end of the existing 12-inch main serving the Barrington subdivision at
Manor Road to the existing 8,-inch main at the intersection of Knight's Bridge Road and Manor
Road, see Figure 20. This figure shows the initial connection of the two systems. It is the first
step in providing water to the future service area identified in the project scope and shown in
Figure 13. Below is an analysis and discussion of WaterCAD modeling for the initial connection
of the NE and SE systems.
Phase I - Alternative 2A - Initial connection for NElSE Systems with 8-inch Main along Manor
Rd.
Figure 20 shows the route for the future connecting main, whether 8-inch or 12-inch and system
features. It is an initial connection of the systems with the future goal of achieving the service
area included in Alternative 2A and 2B.
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 19
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Demands on the initial connection will be lower than those of the entire future service area, so
the WaterCAD model was developed to account for this change. Peak hour pressure, maximum
day pressure, minimum hour pressure, and available fire flow is shown in figures 21, 22, 23, and
24 respectively.
This alternative would provide adequate operating pressures and fire flows to the existing system
with the goal of serving the entire future service area identified in alternative 2A and Figure 13.
The engineer's opinion of total probable project cost for Phase I of Alternative 2A is
approximately $523,000 as shown in Table 11.
Phase I - Alternative 2B - Initial connection for NElSE Svstems with 12-inch Main along Manor
Rd.
The purpose of this alternative is to be the initial construction for Alternative 2B. A 12-inch
main connecting the NE and SE system would be installed on the same route as the 8-inch main
discussed in Phase 1 - Alternative 2A and shown in Figure 20. The proposed improvements
would be identical to those discussed in Phase 1 - Alternative 2A, except the main would be 12
inches.
As discussed in Alternative 2B, the system would be functional with an 8-inch connection; a 12-
inch main would increase the level of service presently and increase capacity in the event other
existing homes connect to City water. Figures 25 and 26 show peak hour pressure and available
fire flow for initial construction of Alternative 2B.
When compared to Phase 1 - Alternative 2A, this alternative would provide greater fire flows in
the NE system and slightly higher peak hour pressure. As discussed in Alternative 2B,
connecting with an 8-inch would meet minimum requirements for the current system, however if
the system is to be expanded beyond serving the existing homes identified in the project scope, it
would be prudent to up size this main to serve future demands. The engineer's opinion of total
probable cost for Phase I of Alternative 2B is approximately $597,000 as shown in Table 12.
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
Page 20
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
NE/SE CONNECTION FEASIBILITY
SHOREWOOD, MINNESOTA
EXISTING SYSTEM
WSB PROJECT NO. 1608-04
DATE: AUGUST 2005
W~B
701 Xenia Aveune South
Suite 300
Minneapolis. MN 55416
I
763-541-4800
lie """""latn. In<. FAX 763-541-1700
.1"liI:H.'I:(lr""J~~-=----~~[t11 ~ 1:11 :Il:...~ -j.j .~~~ I ~I::II ~~...
I
I
OFT
750
1500
------ 4'
-6'
-8'
-12'
-16'
- EXISTING
mm_n FUTURE
FIGURE 1
I
I
I
i
\""".,'
I
I
I
.......-...
\""
I
I
I
I
I
ro'",
1
I
Ij
I;
I~
,..
1
"
,
,
,
I
I
I
I
1
------1------
1
,
,
,
,
,
,
,
,
,
------------- --------------~------
,
,
,
,
,
,
I
I
1
,
, , ,
--,--------------,--------------r--
, I ,
I I ,
I I I
, I I
, , I
, , 1
, , ,
, I ,
, , ,
I I I
2.0
,
,
I
I
1
I
I
I
I
I
I
-------------1-------
,
,
,
,
,
,
,
Figure 2
Estimated Hour Peaking Factor
1.5
...
.~
~.o
:l
~
,
,
,
,
,
,
,
,
,
,
, ,
---------------------~-------
,
,
,
,
,
,
,
,
,
,
_______ --------__-_--1---
,
,
,
I
I
,
I
I
1
1
I
I
1
,
- __I
,
,
,
,
,
,
0.0
0.0
4.0
----------~----------
,
,
,
,
I
1
1
I
,
,
, ,
--,--------------T--------------
, I
, 1
I I
I I
, ,
, ,
, ,
, ,
I I
I ,
8.0
12.0
Time
(hr)
16.0
20.0
24.0
I
e>:isti:-' :stem w-unaccounted w-alternatives.wcd
08/25/05 '2:59:25?M @ Haestad Methods, Inc.
WSB &A.ssociates, Inc.
37 Brookside Re;d WaL:bury,-- 06708 USA
WaterCAD v6.5 [6.5120f]
.~1-203-755-1666 Page 1 C 'l
1
1
1
I
1
1
1
1
OFT
750
1500
- IJATER MAIN
1
1
1
PSI
1
1
1
1
1
1
1
1
W~B
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
~
NE/SE CONNECTION FEASIBILITY
SHOREWOOD. MINNESOTA
EXISTING SYSTEM
PEAK HOUR PRESSURE
WSB PROJECT NO. 1608-04
DA TE: AUGUST 2005
763-541-4800
&: Associates. Inc. FAX 763-541-1700
.1~liI;l'\..'I:tll'U'J :~=-- -::II~[til~I:::ll:::ll:...~ -:l.~~~I~1 ::lI:......
FIGURE 3
1
-
-
'<t
0
I
~ CO
0
z to Lt')
~
:E 0
Q< d 0
~ ~ '" '" ~
I- Z
C W
> I--
I-- (f) a::
() ::> ::>
w C) '"
t: J ::> i:i:
0
0 c::: <(
a.. W
CD I--
(f) <(
3: Cl
>-
t-
:J
Q:!~ w
a::
CIlO ::>
<(CIl ::!: CIl
Ww CIl
lLZ ~ W
Z~ a::
CIl C-
O::!: >-
F CIl a::
u - '" ::>
WCl
zO z 0
zO F :J:
03= CIl ::!:
U~ X ::>
wO w ~
CIl:J: Z
,CIl ::!:
w
z
M
~OIO g~
O~~ .,.~
cn.!1l) B
~.3Z
~CI)~ ~~
.;: .ti ~
IV 8- u.
"" IV
~ CD
c:
C; c:
..... ~
~ ~'
~~:
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
NE/SE CONNECTION FEASIBILITY
SHOREWOOD, MINNESOTA
EXISTING SYSTEM
AVAILABLE FIRE FLOW
I
OFT
750
1500
- VATER MAIN
vtss
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
WSB PROJECT NO. 1608-04
DATE: AUGUST 2005
I
763-541-4800
& Assoc:late.. Inc. FAX 763-541-1700
.I~I:I :'~\.'I:t'r"(lJ:~=----:II~[r1I~I~:II :...------:J..~'~]~I ::1l:......
FIGURE 5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
NE/SE CONNECTION FEASIBILITY
SHOREWOOD. MINNESOTA
ALTERNATIVE 1A AND 1B
WSB PROJECT NO. 1608-04
DATE: AUGUST 2005
w~s
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
I
763-541-4800
&: Associates. Inc. FAX 763-541-1700
.1~liI:'~'-'I:t'l"IIJ :~=-- -:II~[ti I ~I::II:II::..~ -~.~~~I~I:II:"''''
I
I
OFT
750
1500
EXISTING 4'
- EXISTING 6'
- EXISTING 8'
- EXISTING 12'
- EXISTING 16'
m_m__ FUTURE
NEIJ PARCELS
SERVED
FIGURE 6
-
-
-
.q-
~ 0
I
z CO
::i! 0
::E (0
ei 10
~ ~ 0
l- e 0
4: I'
:- C'J
z w
I- a::
l- (/) ::>
~ u :::l C>
0 W '-' G:
J :::l
0
0:::: <(
a... W
CD l-
(/) <(
3: Cl
>-
I-
:J
~~ W
(/)0 <( a::
<((/) ::>
Ww (/)
u..Z W (/)
Z~ > w
a::
O~ F a..
F <(
o - Z a::
wO a:: ::>
zO w 0
Z~ l- I
...J
Ow <( ~
o a::
wO <(
w
(/)I a..
.........(/)
W
Z
M
=0<0 g~
6g~ "t";"
[/)$ 5i5i
~'5z
~cn~ "''''
aHa
........
.;: .ti ~
'" 15 "-
'2 Co
'"
CD CD
X c:
0 c:
.... ~
-
-
-
-
-
-
-
-
-
-
-
-
-
~Ii:
-
-
-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
W~B
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
NE/SE CONNECTION FEASIBILITY
SHOREWOOD, MINNESOTA
ALTERNATIVE 1A
WSB PROJECT NO. 1608-04
DATE: AUGUST 2005
I
763-541-4800
& Ae8ociotee. Inc. FAX 763-541-1700
.I~ I ill ~1.\..'I;ilI"IIJ .~=-- - :l~[t1I"I:ll;l....~ -~.~~"I"I ::Il.~""
MAXIMUM DAY PRESSURE
I
I
OFT
750
1500
- VATER MAIN
FIGURE 8
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
vfss
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
NE/SE CONNECTION FEASIBILITY
SHOREWOOD, MINNESOTA
ALTERNATIVE 1A
WSB PROJECT NO. 1608-04
DA TE: AUGUST 2005
I
783-5414800
&: Associates. Inc. FAX 763-541-1700
.1"liI.'~\"'I.{lI" "J.~ =-- -;I.. ltll..I..;l.......... -:il.~'..I..I;Jl.~....
MINIMUM HOUR PRESSURE
I
I
OFT
750
1500
- VATER MAIN
FIGURE 9
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
w~s
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
NE/SE CONNECTION FEASIBILITY
SHOREWOOD, MINNESOTA
ALTERNATIVE 1A
WSB PROJECT NO. 1608-04
DA TE: AUGUST 2005
I
763-541-4800
ole _ales. Inc. FAX 763-541-1700
.1 ~ I iI:h\""I:i'rll(lJ:~=-- -::II ~ (tll ~ 1::II::ll:......... -:il.~'~I~I::lI:.......
AVAILABLE FIRE FLOW
I
I
OFT
750
1500
- IJATER MAIN
FIGURE 10
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
vfss
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
NE/SE CONNECTION FEASIBILITY
SHOREWOOD, MINNESOTA
ALTERNATIVE 1 B
WSB PROJECT NO. 1608-04
DA TE: AUGUST 2005
I
763-541-4600
ole _I... Inc. FAX 763-541-1700
.1~liI:h\""I:U[""I:~=-'-::Il~(tll~I::Il::ll:"'~-:lllr:'~"I"I::II......
PEAK HOUR PRESSURE
I
I
o FT 750
1500
- VATER MAIN
FIGURE 11
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
NE/SE CONNECTION FEASIBILITY
SHOREWOOD, MINNESOTA
ALTERNATIVE 1B
AVAILABLE FIRE FLOW
x
OFT
750
1500
- VATER MAIN
w~s
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
WSB PROJECT NO. 1608-04
DATE: AUGUST 2005
I
763-541-4800
& Associates. Inc. FAX 763-541-1700
.1~liI.hl..'l.illIlIlJ.~=-'-:Il"[fil"I::II::Il...~-:il.""I"I::l......
I
FIGURE 12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
NE/SE CONNECTION FEASIBILITY
SHOREWOOD. MINNESOTA
AL TERNA TIVE 2A AND 2B
vfsB
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
I
763-541-4800
&: AssocIates, Inc. FAX 763-541-1700
.1 ~I:I :l,\.o.tI:tlr.lIll :~=---:II ~Ifil~I::II::I:...------ :.I.~'~I ~ 1=1:......
I
I
OFT
750
1500
----- EXISTING 4'
- EXISTING 6'
- EXISTING 8'
- EXISTING 12'
- EXISTING 16'
nm_m FUTURE
NEIJ PARCELS
SERVED
WSB PROJECT NO. 1608-04
DATE: AUGUST 2005
FIGURE 13
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
vfss
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
NE/SE CONNECTION FEASIBILITY
SHOREWOOD. MINNESOTA
ALTERNATIVE 2A
WSB PROJECT NO. 1608-04
DA TE: AUGUST 2005
I
763-541-4800
&: Anoelotee. Inc. FAX 763-541-1700
.1~I:I:l.\."t l:ilIlIlIl :~=-- -=m~I~I::II::Il :...~ --:.I".;.'~I~I::II :......
PEAK HOUR PRESSURE
I
I
OFT
750
1500
- IJATER MAIN
FIGURE 14
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
NE/SE CONNECTION FEASIBILITY
SHOREWOOD, MINNESOTA
ALTERNATIVE 2A
MAXIMUM DAY PRESSURE
I
OFT
750
1500
- VATER MAIN
vfss
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
WSB PROJECT NO. 1608-04
DATE: AUGUST 2005
I
763-541-4800
&: Associates, Inc. FAX 763-541-1700
.I~I:I :B~"'tI:Urll"I:~=---::II ~r~I~I::II ::Il:...--- --:.I..;.'~I~ I ::ll:......
I
FIGURE 15
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
NE/SE CONNECTION FEASIBILITY
SHOREWOOD. MINNESOTA
ALTERNATIVE 2A
MINIMUM HOUR PRESSURE
I
OFT
750
1500
- VATER MAIN
vlss
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
WSB PROJECT NO. 1608-04
DATE: AUGUST 2005
I
763-541-4800
'" _, Inc. FAX 763-541-1700
., ~l:1:1.,-..tI:Ur"lIl :~=----:::l~ (tll ~ 1::II::Il:........ -:.I.]~I~I::Il:.....
FIGURE 16
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
NE/SE CONNECTION FEASIBILITY
SHOREWOOD. MINNESOTA
AL TERN A TIVE 2A
AVAILABLE FIRE FLOW
vfss
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
I
763-541-4800
Ie Associates. Inc. FAX 763-541-1700
.1~1::I:l''"'''''tI:~I[.UIJ:~ =-- -:Il~[fH~I::II :::I:........-:.l..'~ ~1~1::ll :...~
I
I
o FT 750
1500
- VATER MAIN
WSB PROJECT NO. 1608-04
DATE: AUGUST 2005
FIGURE 17
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
NE/SE CONNECTION FEASIBILITY
SHOREWOOD. MINNESOTA
AL TERNA TlVE 2B
vlss
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
~
PEAK HOUR PRESSURE
I
763-541-4800
Ie Associates, Inc. FAX 763.541-1700
.1\'I:I:l,\,,"'tI:n[IIIII:~=-- -:Il~[tll~I:Il:ll:...-'-'--:.l'>~ ~1~I:Il :......
I
I
OFT
1500
750
- ....ATER MAIN
WSB PROJECT NO. 1608-04
DATE: AUGUST 2005
FIGURE 18
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
NE/SE CONNECTION FEASIBILITY
SHOREWOOD. MINNESOTA
AL TERNA TIVE 2B
vtss
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
~
AVAILABLE FIRE FLOW
I
o FT 750
1500
- \lATER MAIN
WSB PROJECT NO. 1608-04
DATE: AUGUST 2005
I
763-541-4800
& Associates. Inc. FAX 763-541-1700
.1 ~I:I:B.."'tI:urll"J :~=----:ll~[tila:'I:Il:ll:..~ -:l.~' ~I~ I ::Il:......
I
FIGURE 19
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
NE/SE CONNECTION FEASIBILITY
SHOREWOOD. MINNESOTA
PHASE 1 - ALTERNATIVE
2A AND 2B
w~s
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
I
763-541-4800
a: Associates. Inc. FAX 763-541-1700
.1~1::I:H...'I:urlt"J:4=----:l~(t:lI~I:Il:ll:"'---:l."~I~I:ll:......
I
;(
OFT
71lO
1500
- EXISTING 4'
- EXISTING 6'
- EXISTING 8'
- EXISTING 12'
- EXISTING 16'
mmm FUTURE
NEV PARCELS
SERVED
WSB PROJECT NO. 1608-04
DATE: AUGUST 2005
FIGURE 20
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
763-541-4800
" Assoclatoa, Inc. FAX 763-541-1700
.1~liI :1.;.".'I:Ur....I:~=-- --:Il~[t:lI~I01:1l:..---:.IIJ..'~I~I:I:......
~
NE/SE CONNECTION FEASIBILITY
SHOREWOOD, MINNESOTA
PHASE 1 - ALTERNATIVE 2A
PEAK HOUR PRESSURE
I
OFT
750
1500
- IJATER MAIN
vf$B
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
WSB PROJECT NO. 1608-04
DA TE: AUGUST 2005
I
FIGURE 21
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
NE/SE CONNECTION FEASIBILITY
SHOREWOOD, MINNESOTA
PHASE 1 - ALTERNATIVE 2A
MAXIMUM DAY PRESSURE
I
o FT 750
1500
- VATER MAIN
vf$s
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
WSB PROJECT NO. 1608-04
DATE: AUGUST 2005
I
763-541-4800
a: Associates. Inc. FAX. 763-541 ~ 1700
.1~I.I.l''-'I.ur''''I.~=---::Il ~Itll~I::I:Il....------:.I".;.'~I"I:ll:......
I
FIGURE 22
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
763-541-4800
&: Associates. Inc. FAX 763-541-1700
.1"liI:l~\.'I:ilr"lIm=---::Il..[t1I"[:::I::Il:...---:lIr:'H'I"I:ll:......
~
NE/SE CONNECTION FEASIBILITY
SHOREWOOD, MINNESOTA
PHASE 1 - AL TERNA TlVE 2A
MINIMUM HOUR PRESSURE
I
OFT
750
1500
- VATER MAIN
w~s
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
WSB PROJECT NO. 1608-04
DA TE: AUGUST 2005
I
FIGURE 23
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
AVAILABLE FIRE FLOW
W~B
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
NE/SE CONNECTION FEASIBILITY
SHOREWOOD, MINNESOTA
PHASE 1 - ALTERNATIVE 2A
WSB PROJECT NO. 1608-04
DATE: AUGUST 2005
I
763-541-4800
II: Associates. Inc. FAX 763-541-1700
.1"liI:"\..'I:~.r"lIm=-'-:Il..[tll"I:Il:ll:...---:.Ir~~"I"I::Il:......
I
I
OFT
750
1500
- VATER MAIN
FIGURE 24
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PEAK HOUR PRESSURE
vfss
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
NE/SE CONNECTION FEASIBILITY
SHOREWOOD, MINNESOTA
PHASE 1 - ALTERNATIVE 2B
WSB PROJECT NO. 1608-04
DATE: AUGUST 2005
I
763-541-4800
" Associates. Inc. FAX 763-541-1700
.1~liI.l,;,\o.'I:tll""I:~--:II..[ttl"I:II:ll:"'----:IIlr:""I"I:lI:......
I
I
OFT
1500
750
- IJATER MAIN
FIGURE 25
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
AVAILABLE FIRE FLOW
w~s
701 Xenia Aveune South
Suite 300
Minneapolis, MN 55416
NE/SE CONNECTION FEASIBILITY
SHOREWOOD, MINNESOTA
PHASE 1 - ALTERNATIVE 2B
I
763-541-4800
a: Associates. Inc. FAX 763-541-1700
.1"1::I:l'~'I:~'1'IlIJ:~--:l"ltll"1:ll:ll:,,~"':.Ir,;,'''I''I:I:......
I
I
OFT
1500
750
- IJATER MAIN
WSB PROJECT NO. 1608-04
DATE: AUGUST 2005
FIGURE 26
I
I
I
I
I
I
I
I
I
APPENDIX B
I
OPINION OF PROBABLE COSTS
I
I
I
I
I
I
I
I
I
Feasibility Report
City of Shorewood
Connection of the Southeast Area Water
System to the Northeast Area Water System
WSB Project No. 1608-04
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Table 6
Alternative 1A - 8" Watermain for Service to Existing Homes and NE/SE connection via St. Albans Bay
Rd. and Manor Rd
Engineer's Opinion of Total Probable Project Cost
Schedule A - Surface Improvements
1 Mobilization LUMP SUM 1 $40,000.00 $40,000.00
2 Remove Curb and Gutter UN FT 155 $4.00 $620.00
3 Remove Bituminous Pavement SQYD 9,000 $8.50 $76,500.00
4 Sawing Bituminous Pavement (Full Depth) UN FT 4,800 $6.00 $28,800.00
5 Select Granular Borrow (CV) CUYD 700 $15.00 $10,500.00
6 Aggregate Base Class 5 (100% Crushed) TON 3500 $20.00 $70,000.00
7 Type 41 Wearing Course Mixture TON 900 $60.00 $54,000.00
8 Type 31 Base Course Mixture TON 900 $60.00 $54,000.00
9 Bituminous Material For Tack Coat GALLON 400 $5.00 $2,000.00
10 Concrete Curb & Gutter Design B618 UN FT 150 $9.00 $1,350.00
11 Traffic Control LUMP SUM 1 $4,500.00 $4,500.00
Total Schedule A - Surface Improvements $342,270.00
Schedule B - Watermain Improvements
12 1" Corporation Stop EACH 51 $75.00 $3,825.00
13 8" Gate Valve and Box EACH 5 $1,200.00 $6,000.00
14 Curb Stop & Box EACH 51 $250.00 $12,750.00
15 Connect to Existing Watermain (12") EACH 1 $2,000.00 $2,000.00
16 Hydrant Assembly EACH 10 $3,000.00 $30,000.00
17 1" Type K Copper Pipe UN FT 800 $20.00 $16,000.00
18 8" Water Main, DIP., CL 52 W/Polywrap UN FT 4765 $35.00 $166,775.00
19 Ductile Iron Fittings POUND 2400 $4.00 $9,600.00
20 Dewatering UN FT 4765 $15.00 $71,475.00
21 Sodding, Type Lawn (Inc!. Topsoil & Fert) SQYD 600 $3.50 $2,100.00
Total Schedule B - Watermain Improvements $320,525.00
Subtotal (Schedule A - B) $662,795.00
Contingencies (25%) $165,698.75
Total Estimated Construction Cost $828,493.75
Engineering, Administration, and Legal Fees (25%) $207,123.44
Total Estimated Project Cost $1,035,617.19
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Table 7
Alternative 1B -12" Watermain for Service to Existing Homes and NE/SE connection via St. Albans
Bay Rd. and Manor Rd
Engineer's Opinion of Total Probable Project Cost
Schedule A - Surface Improvements
1 Mobilization LUMP SUM 1 $46,000.00 $46,000.00
2 Remove Curb and Gutter UN FT 155 $4.00 $620.00
3 Remove Bituminous Pavement SQYD 9,000 $8.50 $76,500.00
4 Sawing Bituminous Pavement (Full Depth) UN FT 4,800 $6.00 $28,800.00
5 Select Granular Borrow (CV) CUYD 700 $15.00 $10,500.00
6 Aggregate Base Class 5 (100% Crushed) TON 3500 $20.00 $70,000.00
7 Type 41 Wearing Course Mixture TON 900 $60.00 $54,000.00
8 Type 31 Base Course Mixture TON 900 $60.00 $54,000.00
9 Bituminous Material For Tack Coat GALLON 400 $5.00 $2,000.00
10 Concrete Curb & Gutter Design B618 UN FT 150 $9.00 $1,350.00
11 Traffic Control . LUMP SUM 1 $4,500.00 $4,500.00
Total Schedule A - Surface Improvements $348,270.00
Schedule B - Watermain Improvements
12 1" Corporation Stop EACH 51 $75.00 $3,825.00
13 12" Gate Valve and Box EACH 5 $2,000.00 $10,000.00
14 Curb Stop & Box EACH 51 $250.00 $12,750.00
15 Connect to Existing Watermain (12") EACH 1 $2,000.00 $2,000.00
16 Hydrant Assembly EACH 10 $3,000.00 $30,000.00
17 1" Type K Copper Pipe UN FT 800 $20.00 $16,000.00
18 12" Water Main, DIP., CL 52 W/Polywrap UN FT 4765 $50.00 $238,250.00
19 Ductile Iron Fittings POUND 4765 $4.00 $19,060.00
20 Dewatering UN FT 4765 $15.00 $71,475.00
21 Sodding, Type Lawn (Inc!. Topsoil & Fert) SQYD 600 $3.50 $2,100.00
Total Schedule B - Watermain Improvements $405,460.00
Subtotal (Schedule A - B) $753,730.00
Contingencies (25%) $188,432.50
Total Estimated Construction Cost $942,162.50
Engineering, Administration, and Legal Fees (25%) $235,540.63
Total Estimated Project Cost $1,177,703.13
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Table 8
Alternative 2A - 8" Watermain for Service to Existing Homes and NE/SE connection via Manor Rd
only, with Additional 8" Watermain Along St. Albans Bay Road
Engineer's Opinion of Total Probable Project Cost
Schedule A - Surface Improvements
1 Mobilization LUMP SUM 1 $40,000.00 $40,000.00
2 Remove Curb and Gutter UN FT 155 $4.00 $620.00
3 Remove Bituminous Pavement SQYD 9,800 $8.50 $83,300.00
4 Sawing Bituminous Pavement (Full Depth) UN FT 5,900 $6.00 $35,400.00
5 Select Granular Borrow (CV) CUYD 810 $15.00 $12,150.00
6 Aggregate Base Class 5 (100% Crushed) TON 4025 $20.00 $80,500.00
7 Type 41 Wearing Course Mixture TON 1,020 $60.00 $61,200.00
8 Type 31 Base Course Mixture TON 1,020 $60.00 $61,200.00
9 Bituminous Material For Tack Coat GALLON 485 $5.00 $2,425.00
10 Concrete Curb & Gutter Design B618 UN FT 150 $9.00 $1,350.00
11 Traffic Control LUMP SUM 1 $5,000.00 $5,000.00
Total Schedule A - Surface Improvements $383,145.00
Schedule B - Watermain Improvements
12 1" Corporation Stop EACH 51 $75.00 $3,825.00
13 8" Gate Valve and Box EACH 6 $1,200.00 $7,200.00
14 Curb Stop & Box EACH 51 $250.00 $12,750.00
15 Connect to Existing Watermain (12") EACH 1 $2,000.00 $2,000.00
16 Hydrant Assembly EACH 12 $3,000.00 $36,000.00
17 1" Type K Copper Pipe UN FT 800 $20.00 $16,000.00
18 8" Water Main, DIP., CL 52 W/Polywrap UN FT 5825 $35.00 $203,875.00
19 Ductile Iron Fittings POUND 2915 $4.00 $11,660.00
20 Dewatering UN FT 5825 $15.00 $87,375.00
21 Sodding, Type Lawn (Incl. Topsoil & Fert) SQYD 600 $3.50 $2,100.00
Total Schedule B - Watermain Improvements $382,785.00
Subtotal (Schedule A - B) $765,930.00
Contingencies (25%) $191,482.50
Total Estimated Construction Cost $957,412.50
Engineering, Administration, and Legal Fees (25%) $239,353.13
Total Estimated Project Cost $1,196,765.63
I
I Table 9
I Alternative 2B -12" Watermain for Service to Existing Homes and NE/SE connection via Manor Rd
only, with Additional 8" Watermaln along St. Albans Bay Road
Engineer's Opinion of Total Probable Project Cost
I
I Schedule A - Surface Improvements
1 Mobilization LUMP SUM 1 $46,000.00 $46,000.00
2 Remove Curb and Gutter L1N FT 155 $4.00 $620.00
I 3 Remove Bituminous Pavement SQYD 9,800 $8.50 $83,300.00
4 Sawing Bituminous Pavement (Full Depth) LI N FT 5,900 $6.00 $35,400.00
I 5 Select Granular Borrow (CV) CUYD 810 $15.00 $12,150.00
6 Aggregate Base Class 5 (100% Crushed) TON 4025 $20.00 $80,500.00
7 Type 41 Wearing Course Mixture TON 1,020 $60.00 $61,200.00
I 8 Type 31 Base Course Mixture TON 1,020 $60.00 $61,200.00
9 Bituminous Material For Tack Coat GALLON 485 $5.00 $2,425.00
10 Concrete Curb & Gutter Design B618 LI N FT 150 $9.00 $1,350.00
I 11 Traffic Control LUMP SUM 1 $5,000.00 $5,000.00
Total Schedule A - Surface Improvements $389,145.00
I Schedule B - Watermaln Improvements
I 12 1" Corporation Stop EACH 51 $75.00 $3,825.00
13 12" Gate Valve and Box EACH 5 $2,000.00 $10,000.00
I 14 8" Gate Valve and Box EACH 1 $1,200.00 $1,200.00
15 Curb Stop & Box EACH 51 $250.00 $12,750.00
16 Connect to Existing Watermain (12") EACH 1 $2,000.00 $2,000.00
I 17 Hydrant Assembly EACH 12 $3,000.00 $36,000.00
18 1" Type K Copper Pipe L1N FT 800 $20.00 $16,000.00
19 12" Water Main, DIP., CL 52 W/Polywrap L1N FT 5825 $50.00 $291,250.00
I 20 Ductile Iron Fittings POUND 5825 $4.00 $23,300.00
21 Dewatering L1N FT 5825 $15.00 $87,375.00
22 Sodding, Type Lawn (Incl. Topsoil & Fert) SQYD 600 $3.50 $2,100.00
I Total Schedule B - Watermaln Improvements $485,800.00
I Subtotal (Schedule A - B) $874,945.00
Contingencies (25%) $218,736.25
I Total Estimated Construction Cost $1,093,681.25
Engineering, Administration, and Legal Fees (25%) $273,420.31
Total Estimated Project Cost $1,367,101.56
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Table 10
8" Watermaln along Eastern Municipal Boundary Line from Excelsior Blvd to Vine Street
Engineer's Opinion of Total Probable Project Cost
Schedule A - Surface Improvements
1 Mobilization LUMP SUM 1 $12,000.00 $12,000.00
2 Remove Bituminous Pavement SQYD 1,600 $8.50 $13,600.00
3 Sawing Bituminous Pavement (Full Depth) UN FT 1,450 $6.00 $8,700.00
4 Select Granular Borrow (CV) CUYD 135 $15.00 $2,025.00
5 Aggregate Base Class 5 (100% Crushed) TON 650 $20.00 $13,000.00
6 Type 41 Wearing Course Mixture TON 175 $60.00 $10,500.00
7 Type 31 Base Course Mixture TON 175 $60.00 $10,500.00
8 Bituminous Material For Tack Coat GALLON 80 $5.00 $400.00
Seeding (Incl Topsoil, Fert, Mulch, Disc
9 Anchor ACRE 0.50 $3,000.00 $1,500.00
10 Erosion Control Blankets Category 2 SQYD 100 $4.50 $450.00
11 Seed Mixture 250 POUND 21 $6.00 $126.00
12 Traffic Control LUMP SUM 1 $1,500.00 $1,500.00
Total Schedule A - Surface Improvements $74,301.00
Schedule B - Watermain Improvements
13 8" Gate Valve and Box EACH 3 $1,200.00 $3,600.00
14 Connect to Existing Watermain (8") EACH 1 $1,500.00 $1,500.00
15 Hydrant Assembly EACH 4 $3,000.00 $12,000.00
16 8" Water Main, DIP., CL 52 W/Polywrap UN FT 2045 $35.00 $71,575.00
17 Ductile Iron Fittings POUND 1025 $4.00 $4, 100.00
18 Dewatering UN FT 2045 $15.00 $30,675.00
Total Schedule B - Watermain Improvements $123,450.00
Subtotal (Schedule A - B) $197,751.00
Contingencies (25%) $29,662.65
Total Estimated Construction Cost $227,413.65
Engineering, Administration, and Legal Fees (25%) $56,853.41
Total Estimated Project Cost $284,267.06
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Table 11
Phase I - Alternative 2A - 8" Watermain for Service to Existing Homes and NE/SE connection via
Manor Rd only
Engineer's Opinion of Total Probable Project Cost
Schedule A - Surface Improvements
1 Mobilization LUMP SUM 1 $21,000.00 $21,000.00
2 Remove Curb and Gutter UN FT 110 $4.00 $440.00
3 Remove Bituminous Pavement SQYD 4,200 $8.50 $35,700.00
4 Sawing Bituminous Pavement (Full Depth) UN FT 2,550 $6.00 $15,300.00
5 Select Granular Borrow (CV) CUYD 350 $15.00 $5,250.00
6 Aggregate Base Class 5 (100% Crushed) TON 1725 $20.00 $34,500.00
7 Type 41 Wearing Course Mixture TON 450 $60.00 $27,000.00
8 Type 31 Base Course Mixture TON 450 $60.00 $27,000.00
9 Bituminous Material For Tack Coat GALLON 210 $5.00 $1,050.00
10 Concrete Curb & Gutter Design B618 UN FT 110 $9.00 $990.00
11 Traffic Control LUMP SUM 1 $4,000.00 $4,000.00
Total Schedule A - Surface Improvements $172,230.00
Schedule B - Watermain Improvements
12 1" Corporation Stop EACH 18 $75.00 $1,350.00
13 8" Gate Valve and Box EACH 3 $1,200.00 $3,600.00
14 Curb Stop & Box EACH 18 $250.00 $4,500.00
15 Connect to Existing Watermain (12") EACH 1 $2,000.00 $2,000.00
16 Hydrant Assembly EACH 5 $3,000.00 $15,000.00
17 1" Type K Copper Pipe UN FT 300 $20.00 $6,000.00
18 8" Water Main, DIP., CL 52 W/Polywrap UN FT 2484 $35.00 $86,940.00
19 Ductile Iron Fittings POUND 1300 $4.00 $5,200.00
20 Dewatering UN FT 2484 $15.00 $37,260.00
21 Sodding, Type Lawn (Incl. Topsoil & Fert) SQYD 200 $3.50 $700.00
Total Schedule B - Watermain Improvements $162,550.00
Subtotal (Schedule A - B) $334,780.00
Contingencies (25%) $83,695.00
Total Estimated Construction Cost $418,475.00
Engineering, Administration, and Legal Fees (25%) $104,618.75
Total Estimated Project Cost $523,093.75
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Table 12
Phase 1- Alternative 2B -12" Watermain for Service to Existing Homes and NE/SE connection via
Manor Rd only
Engineer's Opinion of Total Probable Project Cost
Schedule A - Surface Improvements
1 Mobilization LUMP SUM 1 $24,000.00 $24,000.00
2 Remove Curb and Gutter UN FT 110 $4.00 $440.00
3 Remove Bituminous Pavement SQYD 4,200 $8.50 $35,700.00
4 Sawing Bituminous Pavement (Full Depth) UN FT 2,550 $6.00 $15,300.00
5 Select Granular Borrow (CV) CUYD 350 $15.00 $5,250.00
6 Aggregate Base Class 5 (100% Crushed) TON 1725 $20.00 $34,500.00
7 Type 41 Wearing Course Mixture TON 450 $60.00 $27,000.00
8 Type 31 Base Course Mixture TON 450 $60.00 $27,000.00
9 Bituminous Material For Tack Coat GALLON 210 $5.00 $1,050.00
"10 Concrete Curb & Gutter Design B618 UN FT 110 $9.00 $990.00
11 Traffic Control LUMP SUM 1 $4,000.00 $4,000.00
Total Schedule A - Surface Improvements $175,230.00
Schedule B - Watermain Improvements
12 1" Corporation Stop EACH 18 $75.00 $1,350.00
13 12" Gate Valve and Box EACH 3 $2,000.00 $6,000.00
14 Curb Stop & Box EACH 18 $250.00 $4,500.00
15 Connect to Existing Watermain (12") EACH 1 $2,000.00 $2,000.00
16 Hydrant Assembly EACH 5 $3,000.00 $15,000.00
17 1" Type K Copper Pipe UN FT 300 $20.00 $6,000.00
18 12" Water Main, DIP., CL 52 W/Polywrap UN FT 2484 $50.00 $124,200.00
19 Ductile Iron Fittings POUND 2484 $4.00 $9,936.00
20 Dewatering UN FT 2484 $15.00 $37,260.00
21 Sodding, Type Lawn (Incl. Topsoil & Fert) SQYD 200 $3.50 $700.00
Total Schedule B - Watermain Improvements $206,946.00
Subtotal (Schedule A - B) $382,176.00
Contingencies (25%) $95,544.00
Total Estimated Construction Cost $477,720.00
Engineering, Administration, and Legal Fees (25%) $119,430.00
Total Estimated Project Cost $597,150.00