091304 CC Reg AgP
~~
.
"
CITY OF SHOREWOOD
CITY COUNCIL REGULAR MEETING
MONDAY, SEPTEMBER 13, 2004
5755 COUNTRY CLUB ROAD
COUNCIL CHAMBERS
7:00 P.M.
AGENDA
1. CONVENE CITY COUNCIL MEETING
A. RollCall
Mayor Love _
Garfunkel
Lizee
Zerby _
Turgeon _
B. Review Agenda
.
2.
APPROVAL OF MINUTES
A.
City Council Regular Meeting Minutes, August 23,2004 (Att.- Minutes)
.
3. CONSENT AGENDA - Motion to approve items on Consent Agenda & Adopt Resolutions
Therein:
NOTE: Give the public an opportunity to request an item be removed from the
Consent Agenda. Comments can be taken or questions asked following removal from
Consent Agenda.
A. Approval of the Verified Claims List (Att.- Claims List)
B.
Staffing - Appointment of Light Equipment Operator-Utility Operator (Att. - Public
Works Director's memorandum, Resolution)
.
C.
City Clerk's License Approvals (Deputy Clerk's memorandum, 2 Resolutions)
1) Temporary Gambling License for Friends of the Southshore Center
2) Temporary Gambling License for Edina Care Residence
.
D. Accept Consultant Services Proposal for Woodhaven Well (Att. - Public Works
Director's memorandum)
E. Amendments to the Parks Foundation Bylaws (Att .- Parks Foundation Board of
Director's memorandum, Resolution)
F. Accept Bids and Award Contract for 2004 Bituminous Overlay Project (Att.- Public
Works Director's memorandum, Resolution)
G. City Hall Roof Replacement (Att. - Public Works Director's memorandum)
H. Authorize Expenditure of Funds for 2004 Pavement Marking (Att. - Public Works
Director's memorandum)
CITY COUNCIL AGENDA - SEPTEMBER 13, 2004
PAGE20F3
1. Sign Permit Request (Att. - Planning Director's memorandum)
Applicant: Fitness 19
Location: 23730 State Hwy. 7 (Shorewood Village Shopping Center)
J. Sign Permit Request (Att. - Planning Director's memorandum)
Applicant: South Tonka Little League
Location: 25800 Hwy. 7 (Freeman Park)
K. Approval of a Permit to Move a House (Att. - Planning Director's memorandum)
Applicant: Ron Moore
Location: 20585 Minnetonka Blvd.
4. MATTERS FROM THE FLOOR (No Council action will be taken.)
5. REPORTS AND PRESENTATIONS
A.
Request for Comments from LMCD Resolutions regarding Six-Mile Creek (Att. -
Administrator's memorandum)
.
B. Request for comments from LMCD Regarding Alcohol Licenses (Att. - Administrator's
memorandum)
6. PUBLIC HEARING
7. PARKS - Report by Representative
A. Report on the Special Park Commission meeting of August 31, 2004 (Att. - Minutes)
B. Donor Recognition Policy (Att. - Public Works Director's memorandum)
C. Freeman Park Plaza Project (Att. -Administrator's memorandum)
8.
PLANNING - Report by Representative
.
A. Flood Plain Ordinance Amendment (Att. - Planning Director's memorandum, Draft
Ordinance)
9. GENERAL/NEW BUSINESS
A. Approval of the 2005-2009 Capital Improvement Program (Att.- Finance Director's
memorandum, Resolution)
B. Approval of the 2005 Proposed Budget (Att.- Finance Director's memorandum, 2
Resolutions)
C. Amending Dates of Terms for Park and Planning Commission Members (Att. - City
Administrator's memorandum, Draft Ordinance)
D. Excelsior Proposal regarding South Lake Minnetonka Police Department Joint Powers
Agreement (Att.- City of Excelsior memorandum)
.
.
CITY COUNCIL AGENDA - SEPTEMBER 13, 2004
PAGE 3 OF3
10. ENGINEERINGIPUBLIC WORKS
A. Approve Revised Plans and Specifications and Authorize Advertisement for Bids -
County Road 19 Project (Att. - Public Works Director's memorandum, Resolution)
11. STAFF AND COUNCIL REPORTS
A. Administrator & Staff
1. CR 19 Construction Update
2. Cty Rd. 19 LRT Crossing
B. Mayor & City Council
12. ADJOURN
.
.
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOOD, MINNESOTA 55331-8927 · (952) 474-3236
FAX (952) 474-0128. www.cLshorewood.mn.us. cityhall@cLshorewood.mn.us
Executive Summary
Shorewood City Council Regular Meeting
Monday, 13 September 2004
.
Agenda Item #3A: Enclosed is the Verified Claims List for Council approval.
Agenda Item #3B: Staff has performed interviewsJorthe position of a Utility Operator/Light
Equipment Operator for the Department of Public Works. Finalists for the position
included three qualified individuals with varying levels of experience. The preferred
candidate is Mr. Chris Pounder.
.,'
Agenda Item #3C: Two organizations have requested a Temporary Gambling Permit to
conduct a raffle. The first, Friends of the Southshore Center, is requesting a gambling
permit for January 4,2005, for a raffle to be held at the Southshore Center. The second,
Edina Care Residence, a non-profit organization, has requested a gambling permit for
July 11, 2005. Both organizations have submitted the required permit fee and
documentation. Approval requires simple majority vote.
Agenda Item #3D: Staffhas discussed on numerous occasions the need to reconstruct or
abandon the Woodhaven Well Facility. As such, this project has been scheduled for 2004
as part of the 2004-2008 Capital hnprovement Program (CIP). WSB and Associates, for
the design and construction services for this project. The.total cost of the proposal is
$18,400 for design and construction. This is within the amount budgeted for this project.
Staff is recommending approval of the proposal by WSB and Associates.
Agenda Item #3E: The Shorewood Parks Foundation has considered a request from the
Council that would remove the requirement that the Council make appointment to the
Foundation's Board of Directors. The Board has approved amendments to its Bylaws
that would remove the Council-appointment process. The Council must adopt a
resolution approving the necessary amendments.
Agenda Item #3F: A bid opening was conducted on Wednesday, September 8th, 2004, for the
Bituminous Overlay Project for Minnetonka Drive and Elmridge Circle. Midwest Asphalt
ft
'-.1 PRINTED ON RECYCLED PAPER
Executive Summary - City Council Meeting of 13 September 2004
Page 2 of3
Corporation provided the low bid in the amount of$ 63,272.50. Staffis recommending
approval of the bid, with an authorization for expenditure of funds, not to exceed $70,000
(to provide for contingencies).
Agenda Item #3GJ: As part of the space needs and inventory completed for City Hall, one of
the major items identified needing immediate attention is the roof over the City Hall
building. Staffhas solicited quotes for the removal of the existing shingles, installation
of ice dam material, and replacement of the shingles. Staff is recommending approval of
the low quote provided by SELA Roofing and Remodeling, Inc., for an amount not to
exceed $12,270.
Agenda Item #3H: Quotes were solicited for the annual striping contract for 79,030 lineal feet
of pavement marking. Three proposals were obtained for the contract. AAA Striping
Service Co. provided the low quote for an amount of$ 3,636.38. Staff is recommending
acceptance of this proposal.
Agenda Item #31: A new exercise facility, Fitness 19, is proposing to locate in the .
Shorewood Village Center. It is similar to a "Curves for Women" in that it is intended
for quick fitness routines, with no shower or pool facilities. They have requested a sign
permit, which complies with the conditional use permit for the Center. The Center's
manager has advised the City that Fitness 19 is considered one of the "major tenants" and
is allowed up to 75 square feet of area. Approval is recommended.
Agenda Item #3J: South Tonka Baseball proposes to replace an existing scoreboard on Field
1 in Freeman Park with an electronic one that matches the one on Field 3. The Park
Commission has reviewed the request and recommended approval.
Agenda Item #3K: Ron Moore owns the home at 20585 Minnetonka Boulevard. As part of
the Aldenwood development now under construction, the existing house will be removed.
Otting House Movers has requested a house moving permit, which involves moving the .
house along Minnetonka Boulevard, down Vine Hill Road and away on Highway 7. The
house will not be relocated in Shorewood, and the portion of Minnetonka Boulevard in
Shorewood is only 400 feet long. The City Engineer has approved the route and the
Planning Commission has recommended approval of the permit.
Agenda Item #5A: At the end ofthe 2004 session, the Legislature approved an act that
superseded the LMCD's prohibition of motorboats on Six-Mile Creek. Shorewood
representative and LMCD Chair Tom Skramstad spoke to the Council about this issue
during his last update to the Council; the Council at that time indicated its disagreement
with the Legislature's action. The LMCD has asked for comments from the 14 member
cities on a model resolution for the cities as well as a proposed LMCD Board resolution.
Chair Skramstad will discuss this matter with the Council tonight, and take your
comments back to the LMCD.
Agenda Item #5B: While the LMCD has a statutory maximum of 14 full-service liquor
licenses, all but a few of the 29 charter boats on Lake Minnetonka serve some type of
alcoholic beverage. The LMCD has been asked to begin the process that would result in
more -- and for the proponents, all - boats having full-service liquor licenses. The
.
.
.
Executive Summary - City Council Meeting of 13 September 2004
Page 3 of3
LMCD has asked for comments from member cities about raising the number of charter
boat liquor licenses before it considers any action.
Agenda Item #7B: At a specially scheduled Park Commission conducted on Monday, August
30th, 2004, the Park Commission recommended approval of a new Donor Recognition
Policy for the City of Shorewood. This policy seeks to recognize donors who wish to
support the City's park system through distinguished effort or substantial gift. It also
determines procedures for recognizing donated amenities or projects.
Agenda Item #7C: Earlier this summer, the Council, Parks Foundation, and Park Commission
heard about donors interested in fully funding the Foundation's proposed Freeman Park
Plaza project. Since that time, the Foundation has developed a sufficiently full set of
plans for consideration by the Park Commission. On August 30, the Park Commission
recommended approval of the plan subject to fulfillment ofa few further conditions. The
donors' expectation of recognition for an individual is consistent with the proposed
. Donor Recognition Policy.
Agenda Item #8A: The City has been directed to update its Flood Plain Management
Regulations by the Federal Emergency Management Agency (FEMA). The Planning
Commission held a public hearing on 7 September to consider adoption of a model
ordinance. They recommended unanimously to approve the model with
recommendations by staff. Included in your packet is a reformatted copy ofthe proposed
ordinance. Due to the length of the ordinance, staff will recommend adoption of
summary for publication purposes.
Agenda Item #9A: The 2005-2009 Capital Improvement Program (CIP) has been prepared for
approval by the City Council. It includes the changes as indicated by the Council at this
summer's budget work-sessions. Staff recommends that Council adopt the resolution
approving the 2005-2009 CIP.
. Agenda Item #9B: The City Council is required to approve a proposed budget and tax levy by
September 15, according to Truth-In-Taxation laws. The enclosed 2005 Proposed
General Fund budget and tax levy has been prepared in accordance with City Council
recommendations. The Pay2005 proposed and levy is $3,830,656, and includes the
special levy necessary to pay for the public safety facilities. It also provides for transfers
to the capital improvement funds, to restore reductions that resulted from the 2004 severe
levy limits. The Council may change the property tax levy and budget prior to final
adoption of both in December. Staff recommends that Council adopt the resolutions that:
1) set the proposed tax levy payable in 2005 (which may not be exceeded); (2) approves
the proposed 2005 budget; and (3) sets December 6,2004, as the date for the Truth-in-
Taxation hearing.
Agenda Item #9C: In work session discussions earlier this year, the Council indicated that
there are some good reasons for advisory commissioners' three-year terms run from
March 1 to the appropriate last day of February. An ordinance has been drafted to effect
these terms immediately. Council also had some discussion about whether it should no
longer be required to appoint the commission chairs; staff seeks direction to prepare an
amending ordinance if Council wants this change to occur.
Executive Summary - City Council Meeting of 13 September 2004
Page 4 of3
.
.
.
Agenda Item #9D: On September 7, the Excelsior City Council revised its proposal for a
review of the SLMPD joint powers agreement. It put forward additional funding for
SLMPD in 2004 and 2005, subject to conditions related to formation of a Blue Ribbon
Panel and implementation of its recommendations. It also would require an analysis of
the JP A by a neutral third party--a consulting firm-whose cost would be shared equally
by the four member cities.
The revised proposal is in many ways less prescriptive than the original version. It notes
that the Panel should conduct its business in any manner that it deems appropriate and
productive. It appears that the Panel would be reduced in size to one representative from
each city; Excelsior and Tonka Bay have already identified their representatives.
Excelsior is asking that Shorewood and Greenwood name representatives and schedule
the first meeting of the Panel for the evening of September 22.
Agenda Item #10A: On August 23rd, 2004, the Shorewood City Council, as the lead agency for .
the County Road 19 Improvement Project, rejected the bids received. This action was
taken by the City Council, based upon recommendations from Hennepin County.
Hennepin County has directed WSB and Associates to revise the plans to include various
cost-cutting measures. Plans have been revised and are ready to be re-bid. Therefore,
Staff is recommending approval of a resolution that approves the revised plans and
specifications, and authorizes advertisement for re-bidding the proj ect. The bid opening
will be conducted at 10:00 a.m. on October 20, 2004, at the Shorewood City Hall.
.
.
.
.
.
.
CITY OF SHOREWOOD
CITY COUNCIL REGULAR MEETING
MONDAY, AUGUST 23, 2004
5755 COUNTRY CLUB ROAD
COUNCIL CHAMBERS
7:00 P.M.
MINUTES
DRAFT
1.
CONVENE CITY COUNCIL MEETING
In the absence of Mayor Love, Acting Mayor Garfunkel called the meeting to order at 7:01 P.M.
A.
Roll Call
Present:
Acting Mayor Garfunkel; Councilmembers Lizee, Turgeon, and Zerby; Administrator
Dawson, Attorney Keane (arrived 7:05 P.M.), Engineer Brown, Finance Director Burton,
and Planning Director Nielsen
Absent:
Mayor Love
B. Review Agenda
Zerby moved, Turgeon seconded, Approving the Agenda as presented. Motion passed 4/0.
2. APPROVAL OF MINUTES
A.
City Council Special Meeting Minutes, August 9, 2004
Turgeon moved, Lizee seconded, Approving the City Council Special Meeting Minutes of August 9,
2004, as presented. Motion passed 4/0.
B. City Council Regular Meeting Minutes, August 9, 2004
Lizee moved, Zerby seconded, Approving the City Council Regular Meeting Minutes of August 9,
2004, as presented. Motion passed 4/0.
C. City Council Work Session Minutes, August 9, 2004
Zerby moved, Turgeon seconded, Approving the City Council Work Session Meeting Minutes of
August 9, 2004, as presented. Motion passed 4/0.
3. CONSENT AGENDA
Lizee moved, Zerby seconded, Approving the Motions Contained on the Consent Agenda
and Adopting the Resolutions Therein:
A. Approval of the Verified Claims List
B. Staffing
C.
Authorizing Submittal of the 2004-2005 Winter Trail Activities Permit
dJ:~A
CITY COUNCIL REGULAR MEETING MINUTES
August 23, 2004
Page 2 of8
D.
Authorization of Performance Pay for Liquor Store Manager
.
Motion passed 4/0.
4. MATTERS FROM THE FLOOR
There were no matters from the floor presented this evening.
5. REPORTS AND PRESENTATIONS
None.
6. PUBLIC HEARING
None.
7.
PARKS
.
A. Report on Park Commission Meeting Held August 10, 2004
Chair Davis reported on matters considered and actions taken at the Park Commission Meeting of August
10,2004 (as detailed in the minutes of that meeting). She also noted communications were still being
received, mostly in favor, of the proposed Dog Park area in the Lake Minnetonka Regional Park.
In response to Councilmember Garfunkel's question, Chair Davis explained the proposed park would
include approximately 17-25 acres of open space for dogs to run, and Carver County Parks had indicated
it would be requesting funding donations from municipalities approximately lO-15 miles from the
proposed park. She stated representatives from the Park District would be returning to speak further with
the Shorewood Park Commission at a later date. Approximately $30,000 of the $47,000 necessary for
funding of the proposed park had already been received from Chanhassen and Victoria. Councilmember
Turgeon stated she would not be opposed to contributing to the proposed park at a later date.
.
Engineer Brown also stated South Tonka Little League had submitted a request for replacement of an
existing scoreboard with an electronic scoreboard at Freeman Park, as well as other maintenance items
associated with appropriate field use at the Little League fields in the park. He noted the Park
Commission held a lengthy discussion regarding whether sponsorship stated on the scoreboard assigned
the scoreboard to the Donor Policy guidelines being developed by the Commission in recent months.
.
Councilmember Zerby questioned whether the sponsorship could be made a removable portion of the
signage.
Councilmember Turgeon stated she was concerned for establishing a precedent by allowing additional
signage in this case as the signage was being placed in a City park. She was also concerned for potential
impacts to the Donor Policy.
Acting Mayor Garfunkel stated he thought the size of the signage seemed an issue for consideration. If
the signage was large, the perception of the sponsorship seemed to be advertising; if the signage was
small, the perception seemed to be commemorative. He stated he was not opposed to some sort of .
recognition, if it was not obtrusive in nature.
.
.
.
.
.
CITY COUNCIL REGULAR MEETING MINUTES
August 23, 2004
Page 3 of 8
Councilmember Lizee questioned whether the Freeman Park Plaza plans, if submitted for review prior to
the Special Meeting of the Park Commission for this purpose on August 30,2004, could still move
forward with construction this fall as desired by the donors and Shorewood Parks Foundation. Engineer
Brown responded affirmatively, noting it was imperative the detailed plans be submitted in a timely
fashion for the Special Meeting to take place on August 30, 2004.
8. PLANNING - Report by Representative
Commissioner Conley reported on matters considered and actions taken at the August 17, 2004, Planning
Commission Meeting (as detailed in the minutes of that meeting).
A. Barrington PUD Final Plan and Final Plat (Att. - Draft Resolution and
Development Agreement)
Applicant: Brian Harju (Capestone Builders)
Location: 20755 and 20775 Manor Road
Director Nielsen explained a fmal plan and final plat had been submitted for this Planned Unit
Development project located on the old Carmichiel Auto Salvage site. The project proposed eleven twin
home buildings (a total of22 units) plus the existing home on the site. He stated the fmal plans depicted
tree placement near the entry to the site on the south end, near the small pond on the northerly portion of
the site, and throughout the interior portion of the development. Director Nielsen also explained a
development agreement had been prepared, and was in need of formatting revisions. He went on to state
the roadway for this project was private and would be maintained by the homeowner's association rather
than the City. He stated the final plan and plat was subject to the City Engineer's approval of these plans
and specifications associated with the project.
Engineer Brown stated Staffhad'been working with Roger Anderson, the developer's Engineer, to
resolve issues associated with ponding on the site. These issues had been resolved and reviewed by City
Engineering Staff. Plans were in order for the project, and the biggest hurdle remaining for the
successful completion of the project was review by the City Engineer of the watermain extension outside
the project area.
Councilmember Lizee questioned whether any provisions for lighting were part of the plans. Brian
Harju, of Capes tone Builders, stated lighting had been prepared to Department of Transportation
standards. He stated lighting would be placed at the entrance to the site, and on both street areas and in
the cul-de-sac area shown on the plan. Director Nielsen stated lighting would be part of a separate
planning item at a later date,
Councilmember Turgeon complimented the developer on the plans for the site, and noted the site in its
current condition, was being well maintained throughout construction phasing.
Councilmember Zerby questioned the types of block to be utilized in the retaining walls throughout the
project. Roger Anderson, Engineer for Capestone Builders, then reviewed the block types and locations
throughout the project.
Turgeon moved, Zerby seconded, Adopting RESOLUTION NO. 04-070. "A Resolution Approving
the Barrington Planned Unit Development Final Plan and Final Plat for Brian Harju (Capestone
Builders), 20755 and 20775 Manor Road."
CITY COUNCIL REGULAR MEETING MINUTES
August 23, 2004
Page 4 of8
Councilmember Zerby stated he thought this was a great project and he was excited to see progress being
made on the site. Councilmember Lizee agreed,
.
Motion passed 4/0.
9. GENERAL/NEW BUSINESS
A. Approval of 2005 Funding for SLMPD
Administrator Dawson explained the South Lake Minnetonka Police Department (SLMPD) Coordinating
Committee met August 4, 2004, and by consensus forwarded a proposed budget that would increase
member cities' contributions by 4.1 % compared to the budget recommended for Fiscal Year 2004. He
explained Shorewood's required contribution, if approved, would be $690,092. Administrator Dawson
then went on to review the necessary approval timeline for the budget review by Councils, noting action
must be taken on the 2005 contribution to the budget by September 1, 2004.
Councilmember Turgeon expressed disappointment in receiving the budgets from SLMPD so late in the
time line for budgetary consideration. She stated the lack of time to consider the budget forced Councils
to view the budget in a "reactionary" mode, and she requested a change be made in the budget planning
process for next year to allow more time for review. She further noted the lack of time impacted the
ability to mediate any situations requiring resolution prior to the approval deadline, She requested the
budgets be presented to Council no later than June 1 of each year for adequate time to consider the
budget.
.
.
In response to questions related to timing within the budget planning process, Administrator Dawson
explained SLMPD Chief Litsey may have waited for 6 months of operational data at the new facility for
accuracy in preparing the 2005 budget. In addition, Administrator Dawson would forward further
information regarding the services provided by the Cornerstone Agency.
Lizee moved, Zerby seconded, Approving a Contribution of $690,092 for the 2005 South Lake
Minnetonka Police Department Operating Budget.
.
Councilmember Zerby stated he agreed with Councilmember Turgeon's issues related to the timeliness of
the budget; however he also stated he was sympathetic to there being a new facility. He was quite certain
the Chief understood the frustration Council had indicated and he thought a requested increase of 4.1 %
was fair, and would provide the City with services at a value to the taxpayer. He thanked Chief Litsey,
City Staff, and Council for its efforts in bringing the budget forward.
Motion passed 4/0.
Councilmember Turgeon explained the City ofTonka Bay had responded to a letter from the City of
Excelsior regarding options for budget consideration in the near future. She stated, with regard to the
letter from Tonka Bay to Excelsior, that she had no problems with the idea of a panel helping the
Councils to work the problems associated with approval of the budget, however she believed certain
stipulations should apply. Specifically, she believed there needed to be a "sunset" date included when
discussing the idea of a panel, and there needed to be a timeline determined regarding how long each
Council would have to respond to the panel's recommendations. She stated she thought the end of the .
year would be too long for consideration of issues to be resolved, and she suggested the panel be
.
.
.
.
.
CITY COUNCIL REGULAR MEETING MINUTES
August 23, 2004
Page 5 of8
established by mid-September of this year, and October 31, 2004, as a deadline for completion of tasks
before the panel, with an early November consideration by Councils. Any mediation resulting from the
unresolved issues required binding arbitration, and to that end, she requested an estimate from a mediator
on the necessary time for arbitration.
Council indicated consensus for these suggestions, and Administrator Dawson stated he would send a
supplemental letter to the City of Excelsior further explaining the position of the Shorewood Council.
Councilmember Zerby requested a draft of this letter be submitted to all Councilmembers prior to being
sent formally to the City of Excelsior.
10. ENGINEERINGIPUBLIC WORKS
A. Southwest LRT Trail Crossing at County Road 19
Engineer Brown explained that at a Regular Council Meeting held on July 26, 2004, Council heard a
request through petition to make the Southwest LRT Trail crossing at County Road 19 as an official trail
crossing. Under State Statute, this action would result in all vehicles yielding right-of-way to pedestrian
traffic. After considerable discussion with representatives from the Minnesota Department of
Transportation, SLMPD, Hennepin County and the Three Rivers Park District, regarding the safety of
this action, Hennepin County performed an installation of a pedestrian crossing at County Road 19 at the
LRT Trail crossing. Engineer Brown noted County Road 19 carried traffic volumes in excess of 15,000
vehicles daily, with speeds often in excess of 40 miles per hour.
Engineer Brown went on to state from a technical standpoint, a marked pedestrian crossing at the LRT
trail on County Road 19 was unacceptable. He noted two hours after the signage and crossing had been
designated, there was a "near miss" involving four vehicles and pedestrians at the posted trail crossing.
He stated the excessive traffic artd increased speeds along this roadway made the situation very unsafe.
He stated the installation performed was not acceptable, and one viable solution, although clearly not
perfect in this case, would involve the installation of a "safety island" whereby pedestrians would be able
to stand approximately halfway across the roadway on an island before crossing to the other side.
Engineer Brown stated WSB and Associates had concurred with his assessment of the unsafe situation
and Chief Litsey of the SLMPD had submitted an emailletter expressing his disappointment for
installation of the crossing with no input from the police department regarding this issue. This email also
stated Chief Litsey's concern for a potential increase in accidents due to the changes in signage and
markings in the area for pedestrians.
In response to Councilmember Turgeon's question, Engineer Brown explained the legal designation for a
crosswalk had changed in the last year. The signage posted for the trail crossing was now considered
enforceable due to the size of the signage and color intensity of the signage. Engineer Brown noted,
however, nowhere in any of the posted pedestrian crossing signage was it indicated motorists would need
to yield or stop for pedestrians. Furthermore, he stated bicyclists were not considered pedestrians in
these crossings. He also stated the signage posted did meet enforcement standards; however, motorists
were uncertain how to respond.
Councilmember Lizee stated she did not think the pedestrian signage at the trail crossing was safe or
effective in this case, as she also did not think people knew they needed to stop at this crossing.
Councilmember Turgeon agreed, noting the current crossing seemed to provide a false sense of security
CITY COUNCIL REGULAR MEETING MINUTES
August 23, 2004
Page 6 of8
for pedestrians. She also stated to post "No passing on the shoulder" signage would help but still would
not be enough to deter motorists refusing to yield to pedestrians as required.
Elizabeth Van, 24710 Amlee Road, stated she was one of the residents in support of the crossing and had
brought the issue to Council via petition. She stated representatives of all agencies referenced by
Engineer Brown were aware of the trail crossing issues, and noted placement of the signage posed a
"double-edged sword" in this case. She also stated she was quite surprised the signage had been posted
so quickly. She further stated representatives of both Hennepin County and MnDOT had insisted the
trail crossing area required additional police patrol, and MnDOT representatives did not believe any
additional signage was warranted in this case as all Drivers' Education manuals clearly informed
motorists that they need to stop at posted crosswalks such as this one. Also, Ms. Vann stated, people
would be crossing on the trail with or without appropriate signage, and with the signage it became
enforceable for police to ticket those motorists that did not follow the signage. She stated she agreed
some advance warning of the posted signage would have been better received by all parties involved and
construction of a "safety island" seemed a better solution; however, at this point in time, the signage
provided enforcement of the issue.
Carolyn Nicklow, 5585 Harding Lane, stated she used the trail and crossing quite frequently, and while
she appreciated the efforts made by the County, she thought the signs made it worse for crossing as
motorists were not certain about how to handle the situation. She stated she thought safety should always
come first, and flashing lights were certainly required in this case. She also stated she thought the
County would have realized this was a family area with the park nearby and would have provided
additional safety measures.
Patricia Arnst, 5480 Teal Circle, stated she believed there was ambiguity on County Road 19 currently
since the signage had been posted. She stated pedestrians on the trail had been and would continue to be
certain that they needed to stop at the crossing, but the same could not be said for motorists. She stated
she supported Engineer Brown's comments and also thought the signage and crossing brought more
confusion to County Road 19. She also stated police enforcement efforts would need to be limited
simply due to budget constraints at this time. Ms. Arnst further stated she liked the idea of a "grass
roots" beginning to this issue, but wished the writer of the petition and fliers being shared in nearby
neighborhoods would include a name and phone number rather than calling themselves Shorewood
residents only as she was a resident that did not agree with the situation as stated in the flier.
Acting Mayor Garfunkel stated he was quite concerned about the situation as it seemed to provide an
opportunity for mistakes to be made by motorists at the expense of pedestrians.
Councilmember Lizee stated the crossing was not adequate in its current state. She questioned Engineer
Brown regarding the liability of the situation. Engineer Brown explained the liability rested with the
County since the roadway was a County owned roadway, and the County had performed the installation
of the signage.
Council indicated by consensus that a letter be sent to Hennepin County Commissioners regarding the
unsafe situation created by the installation of the pedestrian signage at the trail crossing, and requesting
help in this matter.
.
.
.
.
.
.
<l
.
.
.
.
.
CITY COUNCIL REGULAR MEETING MINUTES
August 23, 2004
Page 7 of 8
B.
Rejecting Bids for the County Road 19 Intersection Project
Engineer Brown explained bids had been received and were opened on August 4, 2004 for the County
Road 19 Improvement Project. Bids were checked for accuracy and tabulated. He then shared the bid
tabulations noting the lowest bid provided was 28.69% above the engineer's estimate for the project.
He went on to explain City Staff had discussed the matter with representatives of Hennepin County.
These representatives were requesting the City reject the bids in order to allow revisions to be made to
the County's portion of the roadway section that they believed would result in substantial changes to the
amounts of a second bid. Engineer Brown noted Staff had relayed its skepticism in whether the revisions
could result in substantial savings. Despite these concerns the County was requesting the project be re-
bid.
Discussion ensued regarding the potential areas the County believed could be impacted by revisions. In
response to Councilmember Turgeon's question, Engineer Brown explained the County would not be
supplying any additional funding to offset any additional costs incurred as part of the market situation
related to the project. He then shared a revised timeline for the project indicating the construction
phasing for the project would need to be split differently but would still begin this year.
Zerby moved, Turgeon seconded, Adopting RESOLUTION NO. 04-071, "A Resolution Rejecting
Bids for the County Road 19 Intersection Project." Motion passed 4/0.
11. STAFF AND COUNCIL REPORTS
A.
Administrator & Staff
1. CR 19 Construction Update
Engineer Brown stated there was nothing further to add at this time.
2. Timber Lane Watermain
Engineer Brown stated Staff would need to re-contact residents along Timber Lane regarding the
potential water main installation in that area, as only three residents had responded to the City's request
for input on the project.
B. Mayor & City Council
1. Liquor Committee Recommendations from Liquor Marketing Study
Administrator Dawson explained that the City had contracted with Dakota Worldwide Corporation
earlier in the year to provide a Liquor Marketing Study to determine potential impacts to the City should
another liquor store operation begin in the City. The study had considered a number of options and after
considerable review by the Liquor Committee; it was recommended the Council take no action toward
implementation of a new liquor store at this time.
Administrator Dawson explained the committee's recommendation also included revisiting the concept
of a opening a third liquor store within the City at this time next year in preparation for the 2006 budget
deliberations.
CITY COUNCIL REGULAR MEETING MINUTES
August 23, 2004
Page 8 of8
12.
ADJOURN
Turgeon moved, Lizee seconded, Adjourning the Regular City Council Meeting of August 23, 2004,
at 8:57 P.M. Motion passed 4/0.
RESPECTFULLY SUBMITTED
Sally Keefe,
Recording Secretary
John Garfunkel, Acting Mayor
Craig W. Dawson, City Administrator
.
.
"
.
.
.
.
.
Il
.
PAYABLESAPPROVALS
For 9/13/04 Council Meeting
.
Prepared by: (I tttIt.e,1)/t\-~ Ctb
Catherine EIke, Sr. Accountant
~~
Reviewed by:
Bonnie Burton, Finance Director
& lJtu~ . ;Jb
Approved by:
Craig D
son, City Administrator
.
Date: 9-9-{)tf
Date: ~
Date: ~
431+
PAYROLL APPROVALS
For 9/13/04 Council Meeting
· Prepared by: ~l/l.j;'( elkā¬.- Date: 9-~(1'i
Catherine ~lke#r. ACCO. untant
Reviewed by: L~ Date:_
Bonnie Burton, Finance Director
Approved by:. ~ ~/ M Date: tJJ i. ~..f ./
Craig Da~son, City Administrator ~
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128. www.cLshorewood.mn.us. cityhall@cLshorewood.mn.us
MEMORANDUM
DATE:
Mayor and City Council
Craig Dawson, City Administrator
Larry Brown, Director of Public W arks ~
September 7, 2004
TO:
FROM:
.
RE:
Resolution filling Vacant Position of Light Equipment Operator
Staff has performed interviews for the position of a Utility Operator/Light Equipment Operator for the
Department of Public Works. Finalists for the position included three qualified individuals with varying
levels of experience. The preferred candidate is Mr. Chris Pounder.
Mr. Pounder has previously been employed with the City of Shorewood. During his service with the
City, his job performance was excellent. During his employment with another municipality, Mr.
Pounder has gained valuable experience within the field of public utilities. His experience will be an
asset to the City of Shorewood.
.
Mr. Pounder currently possesses a Class C Water License, from the Minnesota Department of Health.
This license meets the requirements for operation of the City of Shorewood utility system. Mr. Pounder
is seeking a Class SC license from the Metropolitan Pollution Control Agency for the wastewater
system. It is anticipated that this license will be obtained within 18 months from the time of
employment. Until that time, Mr. Pounder will be operating under the guidance and license of the
Utility Lead Operator.
The Pay rate for this position is set by the union contract. Based upon the valuable experience that Mr.
Pounder haS gained while employed at another municipality, Staff is recommending that the City
recognize his past service in terms of the rate of pay. However, benefits such as sick and vacation, will
accrue at the start of this term of employment with the City of Shorewood.
Staff is recommending approval of the attached resolution that appoints Mr. Christopher Pounder to the
position of Utility Operator / Light Equipment Operator, within the Department of Public Works. If
approved, Mr. Pounder will start on September 29, 2004.
Recommendation
Staff is recommending approval of the resolution that appoints Christopher Pounder to the position of
Utility Operator/Light Equipment Operator. A resolution is attached for your consideration.
n
t./ PRINTED ON RECYCLED PAPER
=#36
CITY OF SHORE WOOD
RESOLUTION NO. 04-_
A RESOLUTION FILLING THE POSITION OF LIGHT EQUIPMENT
OPERATORlUTILITY OPERATOR
WHEREAS, the City of Shorewood advertised for the position of Light
Equipment OperatorlUtility Operator within the Department of Public Works; and
WHEREAS, the Director of Public Works has made recommendation to the City
Council that preferred candidate for said position is Mr. Christopher Pounder.
NOW, THEREFORE BE IT RESOLVED
1.
The City Council of Shorewood does hereby appoint Christopher Pounder to the
position of Light Equipment Operator within the Utility Department, for the City
of Shorewood, for a probationary period of six months.
.
2. After said six-month probationary period has expired, the Director of Public
Works shall make recommendation to the City Council regarding permanent
appointment of Mr. Pounder to the position of Light Equipment OperatorlUtility
Operator.
ADOPTED by the City Council of the City of Shorewood this 13th day of
September, 2004.
.
WOODY LOVE, MAYOR
ATTEST:
CRAIG DAWSON, CITY ADMINISTRATOR
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOOD, MINNESOTA 55331-8927 · (952) 474-3236
FAX (952) 474-0128. www.cLshorewood.mn.us. cityhall@cLshorewood.mn.us
MEMORANDUM
DATE:
September 7, 2004 '
.
CC:
Mayor and City Council Members
Jean Panchyshyn, Executive SecretarylDeputy Clerk -$
Craig W. Dawson, City Administrator ~
TEMPORARY GAMBLING LICENSES - Friends of the Southshore Center
and Edina Care Residence
TO:
FROM:
RE:
.
The Friends of the Southshore Center have submitted an application and appropriate fee for a
Minnesota Lawful Gambling Permit to conduct a raffle drawing on January 4,2005, at the
Southshore Center, 5735 Country Club Road in Shorewood. Proceeds from the raffle drawing
will be used to support the Southshore Center.
Edina Care Residence, a non-profit organization, has submitted an application and appropriate
fee for a Minnesota Lawful Gambling Permit to conduct a raffle next year on July 11, 2005, at its
annual banquet to be held at the Minnetonka Country Club, 24575 Smithtown Road in
Shorewood. Proceeds from the raffle will be used to support the Edina Care Residence
organization.
COUNCIL ACTION
Adoption of two Resolutions:
1), Approving the Temporary Gambling License for Friends of the Southshore Center for a
raffle drawing to take place on January 4, 2005jat the Southshore Center, 5755 Country
Club Road in Shorewood; and
2) Adoption of a Resolution Approving a Temporary Gambling License for Edina Care
Residence, for a raffle drawing to take place on Monday, July 11,2005, at the
Minnetonka Country Club, 24575 Smithtown Road in Shorewood.
n
~J PRINTED ON RECYCLED PAPER
#-3t
CITY OF SHOREWOOD
RESOLUTION NO. 04-
A RESOLUTION APPROVING
A TEMPORARY GAMBLING LICENSE
WHEREAS, the Shorewood City Code, Chapter 301, provides for the licensing of
certain gambling activities in the City; and
WHEREAS, the City prescribes certain restrictions concerning eligibility for such
licensing and application, whereby the licensee will hold the City harmless for all claims
arising out of the granting of such license; and
WHEREAS, the following applicant has met the eligibility requirements for such a
license and has agreed to all terms and conditions of the agreement contained in the
license.
NOW, THEREFORE BE IT RESOLVED by the City Council of the City of
Shorewood as follows:
.
That a single temporary license for the conduct of gambling as specified in the
terms and conditions ofthe license be issued Friends of the Southshore Center. Said
raffle to be held on January 4, 2005, at the Southshore Center, 5735 Country Club
Road.
ADOPTED by the City Council of the City of Shorewood this 13th day of
September, 2004.
.
WOODY LOVE, MAYOR
ATTEST:
CRAIG W. DAWSON, CITY ADMINISTRATOR
.
.
Minnesota Lawful Gambling
LG220 Application for Exempt Permit
Fee $50
Fee Paid
Organization information
Organization name /
rr/erzd (')
Slreet
\S'7..3rf!. /'
Name of chief exe utive officer (CEO)
First name
rPA; V;J?
Check No.
./?preViOus lawful gamb~ing exemption number
Len e...r .XSS77
StatelZip Code County
:AI Q..s-...5'...3 / ../ .I?
cS;uJAs )e>/' e..
City
e>r' C'u47,d
Last name
Daytime phone number of CEO
'..5-7- 0/71./- // I
Type of Nonprofit Organization
Check the box that best describes. your organization:
o Fraternal 0 Religious
o Veteran [8( Other nonprofit organization
Check the box that indicates the type of proof your organization attached to this application:
o IRS letter indicating income tax exempt status
o Cel1ificale of Good Standing from the Minnesot::1 Secretary of State's Office
D...fA charter showing you are an affiliate of a parent nonprofit organization
B" Proof previously submitted and on file with the Gambling Control Board
Gamblin Premises Information
Name of premis as where gambling activity will be rond ucted (for raffle.s, I ist the site where the drawi ng will take place)
~ou.,-f Gn./er
Address (do not use PO box) City
'i:~~~~~~i{r~~i~atethed~~e~raWing)
J; CJCJ~
Check the box orboxas th indicate e type of gambling activity your organization will be conducting:
o "Binga S Raffles (cash prizes may not exceed $12,000) D "'Paddiewheels 0 .Pull-Tabs 0 'Tipboards
'Gambling equipment for puU-t8bs, tipboards, paddlewheels, and bingo (bingo paper, hard cards, and bingo ball
selection device) must be obtained from ill distributor licensed by the GambUng Control Board. To find a licensed
distributor. go to www.gcb.state.mn.us and click on List of Licensed Distributors. Or cafi 651-639-4000.
This form will b& made available in alterna1ive Your name and and your organization's name the following: Board members, staff of the
forma.t (Le. large print, Braille) upon request. and add r&ss will be pu bile information when Board whose work assignment requires that
The information requested on this form {and It!CI3ivad by the Boom. All the otherinformalion they have access to the information; the
any a1tachments) win be used by the Gambling that you provide will be private data about you Minnesota Department of Public Safety; the
Control Board (Board) to determine your until the Board issues your permit. When the Minnesota Attorney General; the Minnesota
qualifications to be involved in lawful gambling Board issues your permit all of the information Commissioners of Administration. Finance,
activities in Minnesota. You have the right lo that you have prollided lo the Board in the and Revenue; the Minnesota Legislative
refuse to supply the information requested; process of applying forY9ur permitwill become Auditor, national and international gambling
however, if you refuse to supply this public. If the Board does not issue you a reQulatorya.gendes;anyone pursuant to court
information, the Board may not be able to permit, ail the information you halle provided mde-,r; oU"ler individ uals and agencies Ihat are
d etermi ne your qualifications and I as a in the pn:x:ess of applying for a permit remains specifically authorized by state or federal law
consequence, may refuse to issue you a private, with th a exception of your name and to have access to the information; individuals
permit. If you supply the information your organization's name and address which and agencies for which law or legal order
requested, t'1e Board will be able to proce...<:\S will remain public. B'Jthorizas a new u-.cte or sharing ofinformation
your applica.lion. Private data about you are available on Iy to after this Notice was given; and anyone with
your consent.
State/Zip Code
-
County
~n he' ;
LG220 Application J9r Exempt Permit
Organization Name /r; ("ncl.J~ _.!?.I!
If the gambling premises is within city limits, the
city must sign this application.
. On behalf of the city, I acknowledge thi~. application.
C heck the action that
the city is taking on this application.
O The city approves the application with no
waiting period.
O The city approves the application with a 30 day
waiting period, and allows the Board to issue a
pam-lit after 30 days (60 days for a first class
city).
o The city denies the application.
Print name of city _._____________
(Signature ofci1y personnel receiving application)
Title______________.____..___._
Date._____.__..l._._.._..!.___..__...__..
Page 2 of2
./? / 12/03
_-I- ,{~..____......~~.~.t~ ~d,zc.~___t;_~~_~~...___..__.._
If the gambling premises Is located in a township, both
tile county and township must sign this application.
On behalf of the county, I acknowledge this application.
Check the action that
the county is taking on this application.
O The county approves the application with no
waiting period.
o The county approves the application with a 30 day
waiting period. and allows the Board to issue a
permit after 30 days.
o The county denies the application.
Print name of county _.__________.__
.
. .
(Signature of county personnel receiving appiication)
Title
Date ..____./......__..1_.._..._.__
TOWNSHIP: On behalf of the township, I acknowledge that
the organization is applying for exempted gambling activity
within the township limits. [Atownship has. no statutory
authority to approve or deny an application
(Minnesota Statute 349.213, subd. 2).J
Print name of township
(Signalureoftownst,ip official acknowledging application)
Title__._______________.__
.
Date
-. 1lflUI.1Ml , 1IIlt"N'
Chief Executive. Officer's Signature
The information provided in this .. . complete and accLlrate to the best of my knowledge.
( . 17)
.J, Chief executive officers signature.-!. " ~
Y Name (please print) P.4 ; / d&l /h';?
__III IIIU T .-"'__.IMllIlIllllMl"llllll'nJIIIlIiI'
Date
I
~ lo?3l 0
......._~_".lll.a~
.-
Mail.Applicationand Attachments
At least 45 days prior to your schedLded activity date send:
. the completed application,
. a copy of your proof of nonprofit status, and
. a $50 application fee (make check payable to "S1ate of Minnesota").
Application fees are not prorated, refundable. or transferable.
Send to: Gambling Control Board
1711 West County Road B, Suite 300 South
Roseville, MN 55113
If your application has not
been acknoJ'ltledged by the
local unit of government or
has been denied, do not
send the application to the
Gambling Control Board.
.
.
CITY OF SHOREWOOD
RESOLUTION NO. 04-
A RESOLUTION APPROVING
A TEMPORARY GAMBLING LICENSE
WHEREAS, the Shorewood City Code, Chapter 301, provides for the licensing of
certain gambling activities in the City; and
WHEREAS, the City prescribes certain restrictions concerning eligibility for such
licensing and application, whereby the licensee will hold the City harmless for all claims
arising out of the granting of such license; and
WHEREAS, the following applicant has met the eligibility requirements for such a
license and has agreed to all terms and conditions of the agreement contained in the
license.
NOW, THEREFORE BE IT RESOLVED by the City Council of the City of
Shorewood as follows:
That a single temporary license for the conduct of gambling as specified in the
terms and conditions of the license be issued to Edina Care Residence. Said raffle
to be held on Monday, July 21, 2005, at the Minnetonka Country Club, 24575
Smithtown Road, Shorewood, MN 55331.
ADOPTED by the City Council of the City of Shorewood this 13th day of
September, 2004.
WOODY LOVE, MAYOR
ATTEST:
CRAIG W. DAWSON, CITY ADMINISTRATOR
Minnesota Lawful Gambling
LG220 Application for Exempt Permit
Organization Information
Organization name
~O, U.t}- ~
Street City
U~C;-\ ~oV{L ,J){,
Name of chief executive officer (CEO)
First na1(lQ
Name of treasurer
First name ~-,..
.< tnf:..-
Type of Nonprofit Organization
Fee
r-t~}~:(~:'i'~ ;l:,..... \
AUG 5 2004
. Page 1 of 2 (W~b) 12/03
ny
Check No.
Previous lawful gambling exemption number
JZtsIOt~
State/Zip Code County J 1
fh AJ 17t~
t1}( tJA-
Last name
VOovgL
Daytime phone number of
treasurL//2.- c.7Ji-
Check the box that best describes your organization:
o Fraternal 0 Religious
o Veteran 1S't6ther nonprofit organization
Check th.e box that indicates the tYpe of proof your organization attached to this application:
lE' IRS letter indicating income tax exempt status
n Certificate of Good Standing from the Minnesota Secretary of State's Office
o A charter showing you are an affiliate of a parent nonprofit organization
o Proof previously submitted and on file with the Gambling Control Board
Gambling Premises Information
Name of premises where gambling activity will be conducted (for raffles, list the site where the drawing will take place)
rn ItJ~C2
Address (do not use PO box)
leA
City
UUiv'
StatelZip Code
County
.
Date(s) of activity (for raffles, indicate the date of the drawing)
""7 ,n---
.~ ~
Check the box or boxes that indicate the pe of gambling activity your organization will be conducting:
o *Bingo ']S( Raffles (cash prizes may not exceed $12,000) 0 *Paddlewheels 0 *Pull-Tabs D *Tipboards
*Gambling equ~nt for pull-tabs, tipboards, paddlewheels, and bingo (bingo paper, hard cards, and bingo ball
selection device) must be obtained from a distributor licensed by the Gambling Control Board. To find a licensed
distributor, go to www.gcb.state.mn.us and click on List of Licensed Distributors. Or call 651.639-4000.
This form will be made available in altematlve
format (I.e. large print, Braille) upon request.
The information requested on this form (and
any attachments) will be used by the Gambling
Control Board (Board) to determine your
qualifications to be involved in lawful gambling
activities in Minnesota. You have the right to
refuse to supply the information requested;
however, if you refuse to supply this
information, the Board may not be able to
determine your qualifications and, as a
consequence, may refuse to issue you a
permit. If you supply the information
requested, the Board will be able to process
your application.
Your name and and your organization's name
and address will be public information when
received by the Board. All the other information
that you provide will be private data about you
until the Board issues your permit. When the
Board issues your permit. all of the information
that you have provided to the Board in the
process of applying for your permit will become
public. If the Board does not issue you a
permit. all the information you have provided
in the process of applying for a permit remains
private, with the exception of your name and
your organization's name and address which
will remain public.
Private data about you are available only to
.
the following: Board members, staff of the
Board whose work assignment requires that
they have access to the information; the
Minnesota Department of Public Safety; the
Minnesota Attorney General; the Minnesota
Commissioners of Administration, Finance,
and Revenue; the Minnesota Legislative
Auditor, national and Intemational gambling
regulatory agencies; anyone pursuant to court
order; other individuals and agencies that are
specifically authorized by state or federal law
to have access to the information; individuals
and agencies for which law or legal order
authorizes a new use or sharing of information
after this Notice was given; and anyone with
your consent.
LG220 Application for Exempt Permit
Organization Name f1J( IJI}-
Local Unit of Government Acknowledgment
If the gambling premises is within city limits, the
city must sign this application.
On behalf of the city, I acknowledge this application.
Check the action that
the city is taking on this application.
O The city approves the application with no
waiting period.
O The city approves the application with a 30 day
waiting period, and allows the Board to issue a
permit after 30 days (60 days for a first class
city).
I
.
o The city denies the application.
Print name of city
(Signature of city personnel receiving application)
litle
Date~----1_
.
Cili l~ 'J-
i . O('./,.Ll~
Page 2 of 2
12/03
If the gambling premises is located in a township, both
the county and township must sign this application.
On behalf of the county, I acknowledge this application.
Check the action that
the county is taking on this application.
O The county approves the application with no
waiting period.
o The county approves the application with a 30 day
waiting period, and allows the Board to issue a
permit after 30 days.
o The county denies the application.
Print name of county
(Signature of county personnel receiving application)
Title
Date----1----1_
TOWNSHIP: On behalf of the township, I acknowledge that
the organization is applying for exempted gambling activity
within the township limits. [A township has no statutory
authority to approve or deny an application
(Minnesota Statute 349.213, subd. 2).]
Print name of township
(Signature of township official acknowledging application)
litle
Date
Chief Executive Officer's Signature
The information provided in this application is complete an
Chief executive officer's signature
Name (please print) tn.AflfJt t:J
Mail Application and Attachments
At least 45 days prior to your scheduled activity date send:
. the completed application,
. a cOpy of your proof of nonprofit status, and
. a $50 application fee (make check payable to "State of Minnesota").
Application fees are not prorated, refundable, or transferable.
Send to: Gambling Control Board
1711 West County Road B, Suite 300 South
Roseville, MN 55113
DateLi!Ll2.:L
If your application has not
been acknowledged by the
local unit of government or
has been denied, do not
send the application to the
Gambling Control Board.
..
'\
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128. www.cLshorewood.mn.us. cityhall@cLshorewood.mn.us
MEMORANDUM
FROM: .
Mayor and City Council
Craig Dawson, City Administrator 1 W
Larry Brown, Director of Public Works't-' 1
September 7, 2004
TO:
.
DATE:
RE: Motion Accepting Proposal for Professional Design Services - Woodhaven Well
Project, City project 00-01
Staff has discussed on numerous occasions the need to reconstruct or abandon the W oodhaven Well
Facility. As such, this project has been scheduled for 2004 as part of the 2004-2008 Capital
Improvement Program (CIP).Attachment 1 is an excerpt from the 2004-2008 CIP that indicates the
associated costs and site location map for the project.
.
Council may recall that a feasibility report was prepared by WSB and Associates, and was accepted by
the City Council. This report documented the cost analysis to reconstruct. the well, or abandoned the
facility and interconnect to a neighboring water system. The most cost-effective solution is to
abandoned the facility and interconnect to the City of Excelsior's water system. The Minnesota
Department of Health has performed an inspection of the well and has also indicated that the well
needs to be reconstructed or abandoned. Currently, the Woodhaven system serves 32 single-family
homes.
The proposed concept design involves the connection to Excelsior's water system north of St. John the
Baptist Catholic Church, and to extend watermain to the southeast along Mill Street to the intersection
of Apple Road. This utility would then continue south on Apple Road to a connection at the
intersection of Apple Road and Bracketts Road.
Attachment 2 is a proposal prepared by WSB and Associates, for the design and construction services
for this project. The total cost of the proposal is $18,400 for design and construction. This is within
the amount budgeted for this project.
Recommendation
Staff is recommending approval of a motion that accepts the proposal for professional design services
by WSB and Associates, Inc for the W oodhaven Well Improvement Project.
n
~.1 PRINTED ON RECYCLED PAPER
~3D
C~pital Plan
City of Shorewood, Minnesota
Pro,ject # W -03-05
Project Name W oodhaven Well Interconnect
Fund # 601
2004 thru 2008 "
Contact Engineer
Department Muni~ipal Water System f
Type Improvement
Useful Life
Category Water: Wells
Priority nla
Total Project Cost $140,000
Description
This project proposes to interconnect the Woodhaven Well with the City of Excelsior's water system. The City ofChanhassen's
system was considered, however Chanhassen denied the request.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
aT ( !.,"iF CH.'l
I
27
.
NORTH
if
l
"
,.. ,
,.
l i-
{.l
~ I
ATTACHMENT 1
.
WSB
& Associates. Inc.
August 10, 2004
\ ~ 110M
~\)\i
Mr, Larry Brown, P.E.
Public Works Director
City of Shorewood
5755 Country Club Road
Shorewood, MN 55331
.
Re:
Woodhaven Well Feasibility Report Design Proposal
Dear Mr. Brown:
WSB & Associates, Inc. is pleased to submit this proposal for the preparation of final plans
and specifications for the W oodhaven Well Watermain Proj ect. As you requested, we
have developed the attached scope of services, cost estimate, and schedule for this project.
I wi11lead our project team and serve as project manager and coordinate all activities with
the City and provide quality control and design input for the project.
.
Thank you for your consideration ofWSB for these professional engineering services. We
look forward to working with you on this project and other projects in the future. If you
have any questions or require any additional information, please do not hesitate to give me
a call at 763-287-7195.
Sincerely,
David E, Hutton, P .E.
Project Manager
4150 Olson
Memorial Highway Enclosure
Suite 300
Minneapolis
JS
Minnesota
55422
763.541-4800
763.541.1700 FAX
Minneapolis. St. Cloud. Equal
ATTACHMENT 2
..
Proposal to Provide
Professional Engineering Services for
Woodhaven Well Watermain Project
City of Shorewood, MN
WSB proposes to provide the following services to the City of Shorewood for the final design
and preparation of construction plans and specifications for the W oodhaven Well Watermain
Project. The specific work tasks are outlined below.
Work Tasks
A. Final Design/Plans
We will prepare the final construction plans in AutoCAD suitable for bidding this project.
The plans will generally consist of the following sheets:
· Title Sheet
· Quantity Tabulation
· Standard Details
· Alignment Plans and Tabulations
· Plan and Profile Sheets
· Roadway Replacement/Sections
.
B. Surveying / Mapping / Easements
In order to determine actual property lines and existing public right-of-way, a full
topography survey is proposed. Cross-sections wi11 be taken every 100 feet from right-
of-way to right-of-way and all property comers will be found if located. The field survey
data will be compared against the current right-of-way map for verification of the right-
of-way. The existing road will be located with respect to property lines / right-of-way. If .
necessary, easemfmt drawings and descriptions will be prepared.
C. Specifications
Specifications and bidding documents wi11 be developed as part of this final design phase.
We will prepare a bid tabulation and memorandum of recommendations upon opening
the bids.
D. Permits
We wi11 prepare and secure the necessary Minnesota Department of Health permits. The
City is responsible for all permit fees.
E. Bidding
We will prepare 10 sets of plans and specifications for bidding purpose and distribution.
P:\ShorewoodlProp for final design 10 Woodhaven Well Walermain.doc
:,
.
.
.
F. Timetable
We will have the plans done within 21 days of receiving the notice to proceed.
G. Fee
The total estimated fee for this work is $18,400 as shown on Attachment. We will bill
you using our current 2004 hourly rates based on actual hours worked. This consists of
approximately $9,400 for construction services and $9,000 for design services.
H. Meetings
We will attend the Council meeting to award the bid if the City desires. One
neighborhood meeting and one meeting with the City of Excelsior are included in the
proposal. If additional meetings are necessary, they can be added.
I.
Construction Services
This proposal includes contract management, construction observation and staking.
These services are approximately $9,400 of the total fee. If additional construction
services or hours are needed, they can be added at our 2004 or 2005 rates.
J. As-Builts
At the conclusion of the project, as-built drawings will be prepared and provided to the
City.
I hereby authoriz.~' WSB & Associates, Inc. to provide the services as outlined above.
Mr. Larry Brown, P .E.
Director of Public Works
Date
P:\ShorewoodlProp for final design 10 Woodhaven Well Watermain.doc
.
.
,~ .
&.bsocIatu, 1ni:.
Work Plan and Estimate of Cost
Woodhaven Well Replacement
Final design
..
WS8
City of Shorewood
Estimated Hours
Feasibility Report
Project Engineer Office Registered Constr. Total
Task Description Principal Engineer Tech Technician Land Surv. Observ Survey Crew Hours
1 PROJECT MANAGEMENT 5 5
2 PRELIMINARY SURVEY 6 12 18
3 FINAL DESIGN 2 12 16 30
4 PLAN REVIEWIREDLINE 4 4 8
5 SPECIFICATIONS 2 10 10 22
6 PERMITS 2 2
7 EASEMENTSILEGALS 5 5
8 ENGINEERS ESTIMATE 2 4 6
9 MEETINGS/COORDINATION 5 4 9
10 BIDDING SERVICES 4 4 8
11 CONSTRUCTION MGT . 10 10
12 CONSTRUCTION OBSERVATION 40 40
13 CONSTRUCTION STAKING 4 18 22
14 AS BUlL TSIFINAL PROJECT 4 4 8
Total Hours 30 40 24 10 15 40 34 193
02-Aug-04
Houri Com
Labor Costs
116.00 74.00 82.50
53,480.00 52,960.00 51,980.00
53.00 103.00 74.00 145.00
5530.00 $I 45.00 52,960.00 54,930.00
518,385.00
518,385.00
SHOREWOOD PARKS FOUNDATION
MEMORANDUM
TO:
FROM:
DATE:
SUBJECT:
City Council
Board of Directors
September 9, 2004
Proposed Amendments to By-Laws
At its August 19 meeting, the Board of Directors considered amendments to the By-laws suggested
by the Council regarding Directors. The amendments would:
1) remove the requirement that directors be appointed by Shorewood City Council; and
2) remove that section of the by-laws as one whose amendment requires approval by the City
Council.
. The amendments to accomplish these objectives would be as follows.
ARTICLE IV.
Directors & Meetin2s
Section 4.06. Appointment. All directors shall be appointed after nomination and approval by the
Board of Directors and approval of the Shorey:ood City Cmmeil.
Section 4.07 ...
ARTICLE XV.
Amendments
.
Section 15.01. Amendments. The Board of Directors may amend the Corporation's Articles of
Incorporation, as heretofore or hereafter from time to time amended or restated, to include or omit
any provision which could be lawfully included or omitted at the time such amendment is made. Any
number of amendments, or an entire revision or restatement of the Articles of Incorporation or
Bylaws, either may be submitted and voted upon at a single meeting of the Board of Directors and be
adopted at such meeting, a quorum being present, upon receiving the affirmative vote of not less than
two-thirds of the whole number of directors of the _corporation or may be adopted by a written
submittal signed by all of the directors of the Corporation; provided, however, that no amendment of
Section 2.01, 2.02, 2.03, 3.01, 4.04, ~ 4.10, 4.11, 5.02, 5.04 or 5.05 of these Bylaws, shall be
made without the approval, by resolution, of the Shorewood City Council.
Board Action: At its August 19 meeting, the Board recommended approval of these amendments.
City Council Action: Per Section 15.01 of the By-laws, City Council approval is necessary
regarding these amendments. No future Council approval would be required regarding Directors.
RECOMMENDATION: The Shorewood Parks Foundation Board of Director recommends
that the Council approve these amendments and adopt the resolution necessary to do so.
~3E
CITY OF SHOREWOOD
RESOLUTION NO. 04 -
A RESOULTION APPROVING AMENDMENTS TO SECTIONS 4.06 AND 15.01
OF THE BY-LAWS OF THE SHOREWOOD PARKS FOUNDATION
WHEREAS, the Shorewood Parks Foundation may amend its By-Laws from time to time;
and
WHEREAS, the Foundation's Board of Directors are proposing amendments in Sections
4.06 and 15.01 of its By-Laws; and
WHEREAS, Section 15.01 of the Foundation's By-Laws lists Sections 4.06 and 15.01 as
ones which may be amended only by approval through Resolution of the Shorewood City Council;
and
WHEREAS, the City Council has reviewed and given its consideration to the proposed
amendments, which would: .
1) remove the requirement that directors be appointed by Shorewood City Council, and
2) remove that section of the by-laws as one whose amendment requires approval by the
City Council; and
WHEREAS, the City Council believes that such an amendment is satisfactory and is
consistent with the purposes of the Foundation;
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Shore wood that it
approves the amendments to Sections 4.06 and 15.01 of the By-Laws of the Shorewood Parks
Foundation, as proposed by its Board of Directors.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 13th day of
September, 2004.
.
Woody Love, Mayor
ATTEST:
Craig W. Dawson, City Administrator/Clerk
~
,
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128 · www.cLshorewood.mn.us . cityhall@cLshorewood.mn.us
MEMORANDUM
TO:
Mayor and City Council
Craig Dawson, City Administrator
FROM:
Larry Brown, Director of Public Works
JP'
.
DATE:
September 7, 2004
RE:
Accept Bids and Award Project..,.. Bituminous Overlays for the Year 2004
A bid opening was conducted on Wednesday, September 8th, 2004 for the Bituminous Overlay Project
for Minnetonka Drive and Elmridge Circle. Bid results have been tabulated and are summarized below
in Table 1.
Firm
Midwest As halt Co
Wm. Mueller & Sons, Inc.
Barber Construction Co., Inc.
Hardrives, Inc.
Bituminous Roadways, Inc.
Bid
$ 63,272.50
$ 64,595.00
$ 70,240.00
$ 76,777.25
$ 84,732.50
.
Table 1
Midwest Asphalt Corporation is the lowest responsible bidder, with a bid of $ 63,272.50. The
engineers estimate for the project $63,172.96. Midwest Asphalt has performed work for the City of
Shorewood previously, and is found to be a responsible bidder.
The final amount paid under the contract is determined by the actual weight of asphalt placed.
Inspection personnel monitor and tally each roadway to track quantities and payment amounts, as the
project progresses. Since the final quantities are not known until constructed, a contingency amount
needs to be present to allow for differentials in the quantities.
Therefore, to provide for this contingency, Staff is recommending that the contract be awarded to
Midwest Asphalt Inc. for an amount not to exceed $ 70,000. This will keep the overall contract costs
within the $85,000 budgeted for the year 2004.
Recommendation
Staff is recommending approval of the attached resolution that accepts the bids and awards the contract
for 2004 Bituminous Overlay Project to Midwest Asphalt, Inc.
n
~.1 PRINTED ON RECYCLED PAPER
~ .3f
CITY OF SHOREWOOD
~
RESOLUTION NO. 04-
A RESOLUTION ACCEPTING BID AND AWARDING CONTRACT FOR
2004 BITUMINOUS OVERLAYS AND APPURTENANT WORK,
CITY PROJECT 04-06
WHEREAS, pursuant to an advertisement for bids for local improvements
designated as 2004 Bituminous Overlays and Appurtenant Work, City Project No. 04-06,
bids were received, opened on September 8, 2004 and tabulated according to law, and
such tabulation is attached hereto and made a part hereof as Exhibit A; and
WHEREAS, the City Council has determined that Midwest Asphalt Corporation,
is the lowest bidder in compliance with the specifications.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of
Shorewood as follows:
.
1. That the Mayor and City Administrator/Clerk are hereby authorized and
directed to enter into a contract with the firm of Midwest Asphalt Corporation, in
the name of the City of Shorewood, 2004 Bituminous Overlays, City Project No.
04-06, according to the plans and specifications on file in the office of the City
Administrator /Clerk.
2. That the City Administrator/Clerk is hereby authorized and directed to
return forthwith to all bidders the deposits made with their bids, except for the
deposits of the successful bidder and the next lowest bidder, which shall be
retained until a contract has been signed.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD
this 13th day of September, 2004.
.
Woody Love, Mayor
ATTEST:
Craig W. Dawson, City Administrator/Clerk
,
PROJECT:
2004 Bituminous Overlays and Appurtenant Work for
Minnetonka Drive and Elmridge Circle
City of Shorewood Project No. 04-06
LOCATION:
Shorewood, MN
WSB PROJECT NO(S).:
1611-00
Bids Opened: Wednesday, September 8, 2004 at 10:00 a.m.
Addendum No. Bid
Contractor 1 Rec'd. Security Total Bid
.
1 Midwest Asphalt Corporation X X $63,272.50
2 Wm. Mueller & Sons, Inc. X X $64,595.00
3 Barber Construction Co., Inc. * X X $70,240.00
4 Hardrives, Inc. X X $76,777.25
5 Bituminous Roadways, Inc. X X $84,732.50
Engineer's Opinion of Cost
$63,172.96
.
I hereby certify that this is a true and correct tabulation of the bids as received on September 8, 2004.
~/p ~
Larry Brown, P.E., City Engineer
~~~
JeVn Panchyshyn, Dep CI k
DENOTES CORRECTED FIGURE
* A bid was submitted to the City of Shorewood by Barber Construction Co., Inc. on Tuesday, September 7, 2004.
The City inadvertently overlooked Barber Construction's bid during the bid opening held at 10:00 a.m. on Wednesday,
September 8, 2004. Barber Construction's bid information is included on this Bid Tabulation indicating them as the
third low bidder.
EXHIBIT A
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128' www.cLshorewood.mn.us. cityhall@cLshorewood.mn.us
MEMORANDUM
TO:
FROM:
.
DATE:
RE: Authorize the Expenditure of Funds - City Hall Roof Replacement
As part of the space needs and inventory completed for City Hall, one of the major items identified
needing immediate attention is the roof over the City Hall building.
Staff has solicited quotes for the removal of the existing shingles, installation of ice dam material, and
replacement of the shingles. Replacement shingles will a 25 year shingle and will be brown in color
(similar to what is exists).
Two quotes were received for this work, and are summarized below.
.
Firm
SELA Roofing and Remodelin , Inc.
Incline Ente rises, Inc.
Base Bid Amount
$ 9,270.00
$ 10,920.00
SELA Roofing and Remodeling, Inc. provided the low quote for an amount of $9,270.00. It is
anticipated that additional work may be required to replace deteriorated decking. Since the extent of
replacement will not be known until such time as the existing shingles are removed, Staff is
recommending a contingency amount of $3,000, over and above the base bid, be approved.
If approved, this expenditure is to be funded by the Public Facilities and Office Equipment Fund.
Although this was not a scheduled expenditure in the Capital Improvement Program, this cost has been
identified as an imperative improvement for the City Hall building.
Recommendation
Staff is recommending approval of the motion that authorizes the expenditure of funds, not to exceed
$12,270 from the Public Facilities and Office Equipment Fund, for roof replacement at City Hall.
ft
'o.J PRINTED ON RECYCLED PAPER
4F3G-
.
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128. www.ci.shorewood.mn.us. cityhall@ci.shorewood.mn.us
MEMORANDUM
TO:
Mayor and City Council
Craig Dawson, City Administrator
FROM:
Larry Brown, Director of Public Works
f~
.
DATE:
September 7, 2004
RE: Authorize Expenditure of Funds, Local Roadway Fund for 2004 Pavement Marking
Contract
Quotes were solicited for the annual striping contract for 79,030 lineal feet of stripe. Three proposals
were obtained for the contract, and are summarized in Table 1 below.
Quoted Amount
$ 3,636.38
$ 5,410.08
$6,322.40
.
Table 1
Table 2, shown below, indicates which roadways are to be striped. Features such as crosswalks, turn
arrows etc, will be painted by Shorewood's Department of Public Works personnel.
. Brom' s Boulevard
. Vine Hill Road
. Old Market Road
. Covington Road
. Covington Road
. Radisson Rd (Christmas Lake Road to Merry Lane).
. Christmas Lake Rd (State TH 7 to 3rd Avenue.)
. Lake Linden Drive
. Yellowstone Trail (country Club Road to Lake Linden Drive)
. Smithtown Rd (center double yellow only)
. Excelsior Blvd
n
~J PRINTED ON RECYCLED PAPER
~
3H
Mayor and City Council
Award Pavement Marking Contract
September 8, 2004
Page 2 of2
Recommendation
Staff is recommending approval of a motion that awards the annual striping contract to AAA Striping
Service Co., in the amount of $ 3,636.38. This expenditure is to be funded from the Local Roadway
Fund.
.
.
/
CITY OF
SHOREWOOD
./
5755 COUNTRY CLUB ROAD · SHOREWOOD. MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128. www.ci.shorewood.mn.us. cityhafl@ci.shorewood.mn.us
MEMORANDUM
TO:
Mayor and City Council
FROM:
Brad Nielsen
DATE:
9 September 2004
RE:
Sign Permit - Fitness 19 (Shorewood Village Center)
FILE NO.
Property (23730 State Highway 7)
Eagle Sign Company has applied for a sign permit for a new fitness center that will
occupy space in the Shorewood Village Center. The sign (Exhibit A) is within the
allowable sign area for mall tenants as prescribed in the Center's current conditional
use permit. We have been advised by the manager of the Shopping Center that
Fitness 19 will be one of three "major tenants" in the center, and under the current
conditional use permit, major tenants are allowed additional signage (up to 75 square
feet).
The proposed sign contains slightly less than 60 square feet and is illustrated on
Exhibit A. Approval is recommended.
Cc:
Craig Dawson
Howard Humbyrd
n
~J PRINTED ON RECYCLED PAPER
# ],1.
.
~
7:
-
tr
... .
......
~
.
.
Page 1 of 1 ...
file://C: \ WINDOWS\ T em porary%20Intemet%20Fi I es\OLKC032\EMAIL %20SHOREVIEW.gif
9/8/04
,.
.
.
MEMORANDUM
TO:
FROM:
DATE:
RE:
FILE NO.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128. www.cLshorewood.mn.us. cityhall@cLshorewood.mn.us
Mayor and City Council
Brad Nielsen
9 September 2004
Sign Permit - South Tonka Baseball
Sign Permits (Freeman Park)
South Tonka Baseball proposes to replace the existing scoreboard at Freeman Park
Field No.1, with an electronic version, the same size and message as the one at Field
3. The existing scoreboard is shown on Exhibit A. Thenew one will be located in
the same location, using the existing poles. The only difference is that the new
scoreboard will not have "Donated by.. ..".
The Park Commission has recommended approval ofthe new scoreboard.
Cc: Craig Dawson
Larry Brown
ft
t..1 PRINTED ON RECYCLED PAPER
p:-
3;7.
. ~-... ,
. "
""0
t..
a .-(
~
....Q
oJ
~ .
Q .~
..J ~
'V'
<1' ~
t
-
'i- W
fI'
~...
~
M
~
C
~
~
~
U-~
.
.
.
.
#-J
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128 · www.cLshorewood.mn.us . cityhall@cLshorewood.mn.us
.
CITY OF
SHOREWOOD
MEMORANDUM
TO:
Planning Commission, Mayor and City Council
FROM:
Brad Nielsen
DATE:
3 September 2004
RE:
Miller, Ron - House Moving Permit
FILE NO.
Property (20585 Minnetonka Boulevard)
Ron Miller owns the house at 20585 Minnetonka Boulevard (see Site Location map-
Exhibit A, attached). This house is to be removed as part ofthe Aldenwood
development that was approved earlier this year. Mr. Miller proposes to have the
house moved outside of Shorewood.
Chapter 1003 regulates the moving of buildings within the city limits. The Planning
Commission is charged with reviewing the request and making recommendation to
the City Council. Although, several criteria exist for approving such requests, the two
most significant are: 1) Code compliance for structures being located within the city;
and 2) suitability of the route over which the building will be moved. In this case,
since the building is not being relocated in Shorewood, Code compliance is not an
issue. With respect to the route, the house will be moved via Minnetonka Boulevard,
east to Vine Hill Road and out to State Highway 7. The City Engineer has approved
the portion of the route within Shorewood (all 400 feet of it).
It is recommended that the moving permit be approved, subject to the Police
Department determining the best time for the move. Also, the moving contractor
must provide a copy of its State license and bond.
Cc: Craig Dawson
Tim Keane
Larry Brown
Ron Miller
Otting Housemovers
ft
';..1 PRINTED ON RECYCLED PAPER
#31<
-
rJ
z ....c: ~
~
to
m
z
<(
to
..J
<(
I-
m
~
SITE LOCATION
20585 Minnetonka Blvd.
t
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128 · www.cLshorewood.mn.us . cityhall@cLshorewood.mn.us
MEMORANDUM
TO:
FROM:
DATE:
SUBJECT:
City Council
Craig W. Dawson, City Administrator CD
September 9,2004
Request for Comments from LMCD Resolutions regarding Six-Mile Creek
.
At the close of the 2004 session, special legislation was introduced and enacted that superseded the
LMCD's prohibition of motorboats on Six-Mile Creek. The Lake Minnetonka Conservation District
is requesting comments from the 14 member cities regarding:
.. A model resolution for cities
. A resolution to be considered by the LMCD Board
This special legislation was a topic of discussion when the Council last heard a presentation from its
representative and LMCD Chair, Tom Skramstad. At that time, the Council concurred with the
LMCD that such legislative action was poor policy and procedure, and that the LMCD's motorboat
prohibition on Six-Mile Creek was appropriate.
.
City Council Action:
At this time the LMCD seeks comments only. Staffwill compile and forward any Council comments
to the LMCD.
45ft
n
\,.1 PRINTED ON RECYCLED PAPER
.
LAKE MINNETONKACONSERVATIOND1STRICT
18338 MINNETONKABL'{O. 0 DEEPHAVEN. MINNESOTA 55391 o TELEPHONE 9521745-0789 0 FAX .952/745.9085
GregoryS. Nybeck,EXECUTIVE DIRECTOR
August .12,2004
BOARD MEMBERS
Tom. Skramstad
Chair, $hoi'ewood
Katy Van Hercke .
Vice Chair, Minnetonka
Jose Valdesuso.. .
Secretary; Excelsior
Paul Knudsen.
Treasurer. Minnetrista .
. BOb Arnbrosl:l
. Wayzfita '
. Doug Babcock
Tanka Bay'
Orv Burma
Mound.
Miles Canning .
Grel:lnwciod
. Bert Foster
Deephaveh
Debbie/Halvorson
Orono
Pete. Nelson
. Victoria .
Tom Scanlon
. ~pringPark
Tom Sellntjens
MinnetonkaBeach
HerbSuerth
Woodland
Mr. Craig Dawson
. City Administrator
Cityof Shorewood
5755 Country Club Rd.
Shorewood,MN' 55331
Dear Mr. Dawso.n:
. . .
.In June 2002, the Lake Minneto.nka Conservation District (LMCD). Boardofqirectorsadopted LMGD
or..d. i..n. a.n.c. e.. 17. 8...... T. . h..i...S .Ordin. .a. nee. p...rOhi.bits th.. '.. e use .0. f m. ot.OriZe..d....W. .at.e.....r. c.. ra.ft... on. .....~. ix Mile c.ree.k;. p.
. ~.in.)e.
Creek.west of Count y.Road..110, and Long Lake Creek upstream from the railroad trestle. ...Electnc
trolling mot9rs areallowedinthese parts of Lake Minnetonka as long astheycompJy with the,.
,. speci~cationsoutlinedin the ordinance. .f;nclosect is a copy of this ordinance. .
Laws of Minnesota 2004, Chapter225,Section 43was recently passed. byth~ state legislature that
stripped. the LMCD of its jurisdiction in Six Mile Creek; The .Iegislation was sponsoredloc~lIy by
State $enatorGen Olson and RepresEmtativeSteve Smith and was done withoutconsulting the
LMCD, the City ofMinnetristaithe MN.. DNRj theMCWD, and a vanetyofother interest parties; The
LMCDis,currently thinkingabouthpwto react tpthislegislative deci~ion. .. ...
. ,
, '.'. .. :., ", . .
., .
. . " , .
Nits July.28; 2004. Meeting, the LMCD Board of Dir~ctors discussed a draft resolution relating to the
.. jurisdiction of the LMCD and supporting therepeal of Laws2004, Chapter255,$ection 43.. Although
, the LMCD Board of Directorstook no action on the. draft resol.utionatthis Regular Meeting,further
discussion is plannedSQmeti~inU1e next 6Oday& .. .... . . ... ...
In the meantime,theLMCD Board of Directors would like input and comments on the two enclosed
draft sample resolutions from the 14 ~MCD member cities. One sample resolution has been
prepared for review.and comments by the 14LMCDmember cities. As noted earlier, the second
sample resolution will be considered by the LMCD Board ofDireotors in the next60days. .
. . .
Please forward the sample resolutions for review and ~mmentsbyyour city council during .the
month of August If possible, theLMCDwould like to have.commentsback from the 14 LMCD
rnembercities by Tuesday, September 7,2004..
Please feel. free to contact LMCD Executive Director Greg Nybeck if you have questions or concerns
. . relating to this matter.
Sincerely,
#.
~.,
..1t'YV\ '
Tom Skramstad, Chair
LMCD Board of Directors
50% Recycled Content
20% Post Consumer Waste
Web Page Address: http://www.lmcd.org.
E-mail Address: Imcd@lmcd.org
#
LAKE MINNETONKA CONSERVATION DISTRICT
STATE OF MINNESOTA
ORDINANCE NO. 178
AN ORDINANCE PROHffiITING THE USE OF MOTORIZED
WATERCRAFT ON CERTAIN PARTS OF LAKE
MINNETONKA; ADDING NEW SECTION 3.022.
THE BOARD OF DIRECTORS OF THE LAKE MINNETONKA CONSERVATION DISTRICT
ORDAINS as follows:
Section 1.
LMCD Code is amended by adding new Section 3.022 as follows:
Section 3.022. Use of Motorboats Prohibited.
.
I
Subd. 1. Prohibition. No person. other than authorized law enforcement personnel
or governmental resource management personnel in performance of their duties.
shall operate a motorboat using propulsion by machinery in any of the following
areas:
~ Six Mile Creek from the mouth of the creek (located at a line between
Latitude 440 54.844' North. Longitude 930 42.166' West and Latitude 440
54.831' North. Longitude 930 42.138' West) upstream to the right of way of
State Highway 7.
Q} Painter's Creek west of County Road 110 (located at Latitude 440. 57.723'
North. Longitude 0930. 30.931' West) upstream to the contour line at
elevation 929.4 NGVD.
.
ill
Long Lake Creek from the railroad trestle (located at a line between Latitude
440.57.793' North. Longitude 0930.33.860' West and Latitude 440.57.806'
North. Longitude 0930. 33.842' West). upstream to the contour line at
elevation 929.4 NGVD.
Subd. 2. Aids to Navigation. If such areas in which use of motorboats using
propulsion by machinery is prohibited are delineated by signs. buoys. markers or
other aids to navigation by the District or by the County. the location indicated by
such aids to navigation shall control.
Subd. 3. Exception. The prohibition in Subdivision I shall not apply to any
watercraft that is 24 feet in length overall or less and that is being propelled by a
single electric motor that has only a single propeller and is not capable of generating
more than 60 pounds of thrust at its maximum operating voltage. Length overall
means the horizontal measurement from the foremost to the aftermost points of the
watercraft. including all equipment and attachments in their nonnal operating
positions.
Cl..Lr216483vl
LKIl04
1
,
Section 2.
This ordinance shall become effective the day following its publication.
Adopted by the Lake Minnetonka Conservation District Board of Directors ~is 26th day of
June, 2002. 1~.. . :::' k
(({;[ . -" \ItIJ fA
Albert O. Foster, Chair
ATTEST:
j:Q . y(~ ru flL
Lili McMillan, Secretary
Date of Publication: July 2. 2002
Effective Date: July 3. 2002
(Strikeout indicates matter to be deleted, underline indicates new matter.)
.
.
CLL-216483vl
LKII04
2
.
.
STATE OF MINNESOTA
COUNTY OF
CITY OF
RESOLUTION NO.
A RESOLUTION RELATING TO THE JURISDICTION
OF THE LAKE MINNETONKA CONSERVATION DISTRICT
AND SUPPORTING THE REPEAL OF LAWS 2004, CHAPTER 255, SECTION 43
WHEREAS, Lake Minnetonka ConServation District ("LMCD" or "the Districr) is a special purpose
political subdivision of the State, created pursuant to Laws 1967, Chapter 907 and Laws 1969, Chapter 272,
later codified as Minnesota Statutes, Sections 1038.601 through 1038.645; and
WHEREAS, Minnesota Statutes, Sections 1038.641 and 1038.611 grant to the LMCD the powers to
undertake research to determine the condition and development of Lake Minnetonka (lithe Lake"), to develop a
comprehensive program to eliminate pollution, to regulate the types of boats permitted to use the Lake and the
use of various parts of the Lake, and to regulate the construction and maintenance of docks on the Lake; and
WHEREAS, over the last thirty-seven years the LMCD has developed a comprehensive regulatory
program goveming the use and development of the Lake to protect and preserve the Lake as a vital
environmental and recreational resource of the State; and
WHEREAS, in 2002, the LMCD began a detailed review of the effect of the present and future use and
development of Six Mile Creek, Painters Creek and Long Lake Creek; and
WHEREAS, this review was a well publicized, open, public legislative process that took nearly two
years; and
WHEREAS, the LMCD solicited and carefully considered evidence and testimony from cities around
the Lake, the Minnehaha Creek Watershed District, the Department of Natural Resources, the Lake
Minnetonka Association, the Halsteds 8ay Preservation Group, Three Rivers Park District, water quality
experts and concemed citizens and landowners, many of whom were represented by legal counsel; and
WHEREAS, after consideration of the conflicting or differing interests of the Lake's ecology and
wildlife, riparian landowners, developers, and recreational users of the Lake, the LMCD adopted Ordinance No.
178 on June 26, 2002; and
WHEREAS, Ordinance No. 178 prohibits the use of gas motors on certain parts of Six Mile Creek,
Painters Creek and Long Lake Creek, thereby limiting the use of those areas to canoes, kayaks and similar
craft and boats using electric motors; and
WHEREAS, Ordinance No. 178 represents a compromise that preserves these sensitive wefland
areas for the quiet enjoyment of boaters, protects wildlife, and substantially reduces the increased flow of
nutrients into the Lake caused by gas motors stirring bottom sediment into the water column moving into the
CLL-251013vl
LKIIO-4
1
Lake, while still allowing reasonable use of these areas for watercraft owned by riparian owners using electric
motors; and
WHEREAS, the Minnesota Legislature adopted Laws of Minnesota 2004 Chapter 255 Section 43,
which removed Six Mile Creek from the jurisdiction of the LMCD; and
WHEREAS, Laws of Minnesota 2004, Chapter 225, Section 43 was passed by the Legislature without
consultation with the cities around the Lake, the Department of Natural Resources, the Minnehaha Creek
Watershed District, the Lake Minnetonka Association, the Halsteds Bay Preservation Group, or the Lake
Minnetonka Conservation District or any of its directors, and was passed without legislative hearings; and
WHEREAS, the LMCD is better able than other state or local agencies to devote the necessary time to
the unique issues presented by Lake Minnetonka, afford appropriate protection to the environment and the
public health, safety and welfare, adopt and enforce regulations on a uniform lake-wide basis, and mediate the
conflicting interests of the many stakeholders in Lake Minnetonka; and
WHEREAS, Laws of Minnesota 2004, Chapter 255, Section 43 deprives certain areas of the Lake of .
the benefits and protection of the LMCD and its regulation of development and use of the Lake;
NOW THEREFORE BE IT RESOLVED by the City Council of the City of
that:
1. It would be in the public interest to repeal Laws of Minnesota 2004, Chapter 255, Section 43.
2. The City's legislative delegation is urged to repeal Laws of Minnesota 2004, Chapter 255, Section 43
at its earliest opportunity.
3. The is authorized and directed to transmit a copy of this resolution to the members of
the City's legislative delegation and to take such other and further steps as deemed reasonable and
appropriate to communicate the support of the City Council for such repeal.
Adopted by the City Council of the City of
this _ day of
.2004.
.
CITY OF
Its Mayor
ATTEST:
City Clerk
CLL-25 10 13vI
LKIIO-4
2
.
.
STATE OF MINNESOTA
LAKE MINNETONKA CONSERVATION DISTRICT
RESOLUTION NO.
A RESOLUTION RELATING TO THE JURISDICTION
OF THE LAKE MINNETONKA CONSERVATION DISTRICT
AND SUPPORTING THE REPEAL OF LAWS 2004, CHAPTER 255, SECTION 43
WHEREAS, Lake Minnetonka Conservation District ("LMCD" or lithe District") is a special purpose
political subdivision of the State, created pursuant to Laws 1967, Chapter 907 and Laws 1969, Chapter 272,
later codified as Minnesota Statutes, Sections 103B.601 through 103B.645; and
WHEREAS, Minnesota Statutes, Sections 103B.641 and 103B.611 grant to the LMCD the powers to
undertake research to determine the condition and development of Lake Minnetonka ('1he Lake"), to develop a
comprehensive program to eliminate pollution, to regulate the types of boats permitted to use the Lake and the
use of various parts of the Lake, and to regulate the construction and maintenance of docks on the Lake; and
WHEREAS, over the last thirty-sev~n years the LMCD has developed a comprehensive regulatory
program goveming the use and development of the Lake to protect and preserve the Lake as a vital
environmental and recreational resource of the State; and
WHEREAS, in 2002, the LMCD began a detailed review of the effect of the present and future use and
development of Six Mile Creek, Painters Creek and Long Lake Creek; and
WHEREAS, this review was a well publicized, open, public legislative process that took nearly two
years; and
WHEREAS, the LMCD solicited and carefully considered evidence and testimony from cities around
the Lake, the Minnehaha Creek Watershed District, the Department of Natural Resources, the Lake
Minnetonka Association, the Halsteds Bay Preservation Group, Three Rivers Park District, water quality
experts and concemed citizens and landowners, many of whom were represented by legal counsel; and
WHEREAS, after consideration of the conflicting or differing interests of the Lake's ecology and
wildlife, riparian landowners, developers, and recreational users of the Lake, the LMCD adopted Ordinance No.
178 on June 26, 2002; and
WHEREAS, Ordinance No. 178 prohibits the use of gas motors on certain parts of Six Mile Creek,
Painters Creek and Long Lake Creek, thereby limiting the use of those areas to canoes, kayaks and similar
craft and boats using electric motors; and
WHEREAS, Ordinance No. 178 represents a compromise that preserves these sensitive wetland
areas for the quiet enjoyment of boaters, protects wildlife, and substantially reduces the increased flow of
nutrients into the Lake caused by gas motors stirring bottom sediment into the water column moving into the
Lake, while still allowing reasonable use of these areas for watercraft owned by riparian owners using electric
motors; and
CLL-251324vl
LKII04
1
WHEREAS, the Minnesota Legislature adopted Laws of Minnesota 2004 Chapter 255 Section 43,
which removed Six Mile Creek from the jurisdiction of the LMCD; and
WHEREAS, Laws of Minnesota 2004, Chapter 225, Section 43 was passed by the Legislature without
consultation with the cities around the Lake, the Department of Natural Resources, the Minnehaha Creek
Watershed District, the Lake Minnetonka Association, the Halsteds Bay Preservation Group, or the Lake
Minnetonka Conservation District or any of its directors, and was passed without legislative hearings; and
WHEREAS, the LMCD is better able than other state or local agencies to devote the necessary time to
the unique issues presented by Lake Minnetonka, afford appropriate protection to the environment and the
public health, safety and welfare, adopt and enforce regulations on a uniform lake-wide basis, and mediate the
conflicting interests of the many stakeholders in Lake Minnetonka; and
WHEREAS, Laws of Minnesota 2004, Chapter 255, Section 43 deprives certain areas of the Lake of
the benefits and protection of the LMCD and its regulation of development and use of the Lake;
NOW THEREFORE BE IT RESOLVED by the Board of Directors of the Lake Minnetonka
Conservation District that:
.
1. It would be in the public interest to repeal Laws of Minnesota 2004, Chapter 255, Section 43.
2. The District's legislative delegation is urged to repeal Laws of Minnesota 2004, Chapter 255, Section
43 at ns earliest opportunity.
3. The Chair is authorized and directed to transmit a copy of this resolution to the members of the
District's legislative delegation and to take such other and further steps as deemed reasonable and
appropriate to communicate the support of the District for such repeal.
Adopted by the Board of Directors of the Lake Minnetonka Conservation District this _ day of .
,2004.
Tom Skramstad, Chair
ATTEST:
Jose Valdesuso, Secretary
CLL-2S1324vl
LKl104
2
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128 . www.cLshorewood.mn.us . cityhall@cLshorewood.mn.us
MEMORANDUM
TO:
FROM:
DATE:
SUBJECT:
City Council
Craig W. Dawson, City Administrator A l\.
September 9,2004 G4-'
Request for Comments from LMCD regarding Alcohol Licenses
.
The Lake Minnetonka Conservation District issues licenses to serve alcohol on charter boats on Lake
Minnetonka. Currently there are 29 charter boats on Lake Minnetonka, 14 of which have on-sale
intoxicating licenses (the maximum by State law), and 13 of which have licenses for other forms of
alcohol. The Lake Minnetonka Charter Boat Association, which represents 26 of the 29 charter boats
on the Lake, is requesting that the LMCDbegin action to permit all charter boats on Lake
Minnetonka to have on-sale intoxicating liquor licenses.
Shorewood has no ports of call. Consequently, it is not directly affected by the land-side impacts that
may result from boat passengers who have used alcoholic beverages.
City Council Action:
- ..
At this time the LMCD seeks commentspnly before considering action on the Lake Minnetonka
Charter Boat Association. Staff will compile and forward any Council comments to the LMCD.
.
*68
{) PRINTED ON RECYCLED PAPER
BOARD MEMBERS
Tom Skramstad
Chair, Shorewood
Katy Van Hercke
Vice Chair, Minnetonka
Jose Valdesuso
Secretary, Excelsior
Paul Knudsen
Treasurer, Minnetrista
Bob Ambrose
Wayzata
Doug Babcock
Tonka Bay
Orv Burma
Mound
Miles Canning
Greenwood
Bert Foster
Deephaven
Debbie Halvorson
Orono
Pete Nelson
Victoria
Tom Scanlon
Spring Park
Tom Seuntjens
Minnetonka Beach
Herb Suerth
Woodland
#.
'-~
50% Recycled Content
20% Post Consumer waste
LAKE MINNETONKA CONSERVATION DISTRICT
18338 MINNETONKA BLVD. . DEEPHAVEN, MINNESOTA 55391 . TELEPHONE 952/745-0789 . FAX 952/745'9085
Gregory S. Nybeck, EXECUTIVE DIRECTOR
August 24,2004
AUG 3 0 2004
TO:
FROM:
LMCD Member Cities . .
LMCD Boarn ofDirectors ~ bt ~
Tom Skramstad, Chair - LMCD Board of Directors If
SUBJECT:
Alcohol Licenses on Charter Boats
One of the duties of the Lake Minnetonka Conservation District (LMCD) is to issue licenses to .
serve alcohol on charter boats on Lake Minnetonka. . Currently there are 29 charter boats
registered by the LMCD, of which 27 have some form of license to serve alcohol. Here are some
fads from 2004:
. The LMCD is limited by State law to grant only 14 on-sale Intoxicating Liquor licenses.
. 14 boats have on-sale Intoxicating Liquor licenses (allows the sale of liquor, wine and 3.2
beer). All 14 available on-sale Intoxicating Liquor licenses have been issued.
. 12 boats have Wine and Non-Intoxicating Malt Liquor licenses (allows the sale of wine and
3.2 beer).
. One boat has a Non-Intoxicating Malt Liquor license (allows the sale of 3.2 beer only).
. The LMCD is not limited as to how many Wine and Non-Intoxicating Malt Liquor or Non-
Intoxicating Malt Liquor licenses it can issue by State law. However, the LMCD has
restricted Wine and Non-Intoxicating Malt Liquor licenses to charter boats. on Lake
Minnetonka to 28 each. .
. Of the 13 charter boats that do not have an on~sale Intoxicating Liquor license, 12 have
permits that allow their patrons to bring liquor on the boat and the charter boat company to
serve them set-ups.
. In essence then, 27 bfthe 29 charter bOats serve liquor in one way or the other.
At the 8-11-2004 LMCD Board meeting. the Lake Minnetonka Charter Boat Association, which
represents 26 of 29 charter boats on the Lake, requested that theLMCD begin the process to
increase the number of on-sale Intoxicating Liquor licenses available so that it meets the current
number of charter boats. The LMCD Board of Directors took no action on this request because it
first wants to get input ~om the 14 LMCD member cities on this important subject.
I would appreciate your city's comments on this matter, and would ask that they be sent to the
LMCD office by Monday, October 4, 2004 (voice- (952) 745-0789, fax-(952) 745-9085, em ail-
gnvbeck@lmcd.oTl!.) The LMCDBoard will schedule a subsequent discussion to discuss what
possible further action to take;
Thank you for your help.
. Web Page Address: http://www.lmcd.org
E-mail Address: Imcd@lmcd.org
f
CITY OF SHOREWOOD
PARK COMMISSION SPECIAL MEETING
MONDAY, AUGUST 30,2004
5755 COUNTRY CLUB ROAD
CITY HALL
5:15 P.M.
.
MINUTES
DRAFT
1.
CONVENE PARK COMMISSION SPECIAL MEETING
A.
Roll Call
Present:
Chair Davis; Commissioners Meyer, Young, Farniok, and Westerlund; City Engineer
Brown; Administrator Dawson; Technician Bailey
Absent:
Commissioners Gilbertson and Wagner
B.
Review Agenda
Meyer moved, Westerlund seconded, approving the agenda as submitted. Motion passed
5/0.
.
2.
REVIEW PARK FOUNDATION PROPOSAL FOR FREEMAN PARK PLAZA
DRAWING
Brown reviewed the revised Plaza plans with planting designations. From a technical standpoint,
Brown felt the proposal could move forward, if the Park Commission was comfortable with the
submittals.
.
Farniok interjected that a tree that currently exists on site was placed incorrectly on the plans. In
addition, she suggested the Foundation consider a 'Y' shaped sidewalk accessing the plaza as
opposed to the two straight sidewalk paths designated on the plans. Finally, she questioned how
the traffic would flow around the picnic table area.
Since she believed patrons to the park might cut across the grass to the comer of the plaza instead
of using the sidewalks, Westerlund suggested some additional landscaping be planted to deter cut
through traffic.
.
Although Davis felt the Commission could approve the slab and the general proposal, she had
contacted a landscape architect who would be willing to work with the Foundation on other
details including the garden design.
Foundation Chair Dallman stated that the donor group planned to attend the next Commission
meeting to present their plaque proposal.
Westerlund encouraged staff to abide by ADA standards.
Brown stated that he believed the design was ADA compliant; however, indicated that he would
follow-up.
Farniok moved to accept the plaza plan per the architectural drawings subject to review by
a landscape architect regarding the table placement, trail access, garden recommendations,
tree selections, and the donor plaque.
.
Foundation member Callies asked whether the Commission could approve the proposal subject
to staff approval of the details so as not to necessitate another meeting on this issue.
The Commissioners agreed.
~14
PARK COMMISSION MINUTES
MONDAY, AUGUST 30, 2004
PAGE 2 OF3
.
Farniok amended her motion as follows, to accept the plaza plan per the architectural
drawings subject to staff recommendations and review by a landscape architect regarding
the table placement, trail access, garden recommendations, tree selections, and the donor
plaque. Westerlund seconded. Motion passed 5/0.
.
Davis promised to supply the Foundation with the contact name and number of the landscape
architect.
3. REVIEW AND APPROVE REVISIONS TO POLICIES AND PROCEDURES FOR
RECOGNIZING DONATIONS TO THE PARKS
Brown presented a revised Donor Policy for the Commission to review based on comments from the
previous Commission meeting.
The Commission reviewed the document and made minor modifications to the Policy.
Westerlund questioned whether the scoreboard discussions of the previous meeting fell under
Section 2, f, 'donations of a routine nature' .
.
Brown stated that, while replacement of an existing sign might be considered routine maintenance,
the installation of a new scoreboard might be a different subject; therefore, should be left out of the
routine nature subheading.
Westerlund agreed that the Commission should make the decision with regard to a new scoreboard
when it is approached with a request.
.
Brown acknowledged that there would be many subjective conditions that the Commission could not
possibly defme in this document, since the standards are yet to be determined until the Commission
is faced with items considered routine. Brown suggested that the scoreboard subject be left to fall
under the sign permit process as opposed to the donor policy.
.
Meyer questioned how the City would handle a donation of a lump sum of money without a
particular donor proj ect in mind.
Administrator Dawson indicated that the donor would be thanked and a plaque considered for items
funded with the donation.
Meyer moved, Westerlund seconded, to approve the revised Donor Policy as amended. Motion
passed 5/0.
Brown congratulated the Commission on finalizing this policy, which he guaranteed would be tested
over time as a living document.
4.
NEW BUSINESS
.
Council liaisons:
September 13
October 11
October 25
Westerlund
Farniok
Westerlund
~
#
PARK COMMISSION MINUTES
MONDAY, AUGUST 30, 2004
PAGE 3 OF3
.
Brown encouraged the Commission to give thought to its 2004-2005 goals and priorities. Other
than sign issues as they pertain to parks, and skate park equipment, he asked what goals the
Commission would like to set for itself.
Although she wished to pursue the dog park proposal for Minnewashta Park, Meyer stated that
she would like to see an accounting of the entire park budget.
Brown stated that the City Council had also discussed the dog park project, though no formal
motion was made, he believed many of the Council members were in support of this proposal. He
pointed out that the City has received many favorable emails for its construction. Brown
suggested that the Commission consider making a recommendation to the City Council that it
would like the City to support this project and put forth the funds that are available to move it
forward. In addition, Brown indicated that he would bring back the Minnewashta Park
representative for a status report.
.
Young maintained that it would be appropriate for the Commission to review its goals that it had
set up for this year, before it decides to distribute too much of its funds on new projects. He
believed many of the Commissioners would benefit from a review.
Westerlund concurred.
.
Farniok stated that, since joining the Commission, she has felt that they have been behaving
'reactively' , as opposed to 'proactively'. She indicated that she would prefer to be proactive, by
working from a plan laid out which covers the topics for discussion.
Young suggested that a discussion regarding the increased incidence of damage in the parks be a
matter of concern and discussion.
Brown asked what additional items the Commission would like to consider on future agendas.
.
Those identified included, water quality at Manor Park pond, and beyond, signage in the parks,
concession operation numbers for 2004, the role of horticulture and a tree inventory for the
parks, buckthorn control, identification of preservation areas within the park system, etc.
Davis suggested the Commissioners email Twila Grout, Park Secretary, additional discussion
topics.
5. ADJOURNMENT
Westerlund moved, Meyer seconded, to adjourn the Park Commission Special Meeting of
August 30, 2004, at 6:26 p.m. Motion passed 5/0.
RESPECTFULLY SUBMITTED,
.
Kristi B. Anderson
Recording Secretary
.
CITY OF
SHOREWOOD
f
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927 · (952) 474-3236
FAX (952) 474-0128. www.cLshorewood.mn.us . cityhall@cLshorewood.mn.us
MEMORANDUM
FROM:
Mayor and City Council
Craig Dawson, City Administrator
Larry Brown, Director of Public Works /fJ7
September 8, 2004
TO:
.
DATE:
RE: Donor Policy
At a specially scheduled Park Commission meeting conducted on Monday, August 30th, 2004, the Park
Commission recommended approval of a new Donor Policy for the City of Shorewood.
The introductory paragraph of the policy documents the intent of the policy:
"The City of Shorewood seeks to recognize donors who wish to support the City's park
system through distinguished effort or substantial gift. This policy determines procedures"
for recognizing donated amenities or projects, also noted in this policy as a "Substantial
Gift ", found within Shorewood parks.
.
This policy covers fixed and/or indefinite periods of time .
For the purposes of th is policy, "Substantial Gift" is defined as at least 50% of the
estimated cost of
(a) new construction, remodeling, or renovation;
(b) developing a new real property, i.e. park buildings, structures, real estate, etc.; or
(c) replacement of an existing, unnamed facility or landmark that requires substantial
renovation at the time of the gift.
Items found in this policy include park structures (pavilions, warming houses, shelters,
plazas, etc); real estate to be used for parks, trails, or open space, interpretive areas, or
active recreation; or other large-scale projects as discussed with the Park Commission
and City Council.
,.
to., PRINTED ON RECYCLED PAPER
#-;8
Mayor and City Council
Donor Policy
September 8, 2004
Page 2 of2
t
From that point, the policy sets process and procedures to bring a predictable order to the
process. While it is nearly impossible to define all of the items that may be donated over time,
establishing a logical process to evaluate and process donations is certainly attainable.
The Park Commission has spent a substantial amount of time preparing this policy. Having
stated this, it is acknowledged by all, that this policy will undoubtedly be tested and will need
occasional updates as items are presented for the City's consideration. Sections 2 through 5
document the intended process for donations.
Section 6 of the document is a little more challenging. The Park Commission discussed at length
the issues surrounding naming rights of any donation. As proposed, the policy states the
following:
"The City prefers not to name facilities within its park system that are made
possible with donations. "
.
Having stated this, the door is not entirely closed, with regard to the naming of facilities
or land. The policy also states in an earlier paragraph:
"The City of Shorewood will consider naming opportunities for outstanding contributions, such
as a parcel of land or new donation outside the geographic confines of the existing park
system. "
Throughout the discussion of this policy section, it became very difficult to state that
naming will never be considered; or conversely, that the City would entertain naming for
all donations. Thus, the stage has been set for a case by case analysis for such donations
that meet the other stated criteria of the policy.
Recommendation
.
The Park Commission has recommended to the City Council, that the Draft Donor Policy
be approved.
8-30-04
DONOR POLICY
1. DONOR RECOGNITION
The City of Shorewood seeks to recognize donors who wish to support the City's park
system through distinguished effort or substantial gift.
This policy determines procedures for recognizing donated amenities or projects, also
noted in this policy as a "Substantial Gift", found within Shorewood parks.
This policy covers fixed and/or indefinite periods oftime.
For the purposes of this policy, "Substantial Gift" is defmed as at least 50% of the
estimated cost of:
.
(a)
new construction, remodeling, or renovation;
(b) developing a new real property, i.e. park buildings, structures, real
estate, etc.; or
(c) replacement of an existing, unnamed facility or landmark that
requires substantial renovation at the time of the gift.
Items found in this policy include park structures (pavilions, warming houses, shelters,
plazas, etc); real estate to be used for parks, trails, or open space, interpretive areas, or
active recreation; or other large-scale projects as discussed with the Park Commission
and City Council.
.
2. DONORS AND DONATION
"Donors" or "Donation" as defined in this policy means a substantial financial
contribution toward the cost of an amenity or project. This contribution is defined as at
least 50% of the total estimated cost of stated amenity or proj ect.
Recognition may be in honor of individuals, groups of individuals, or corporations.
a) Donors or donor representatives must sign a donor agreement that
delineates terms of the contributions, unless donor wishes to remain
anonymous. The Donor Agreement will include the following:
(1) In the event of demolition of a structure, its recognition or any
part of it shall be subject to new recommendations.
1
8-30-04
(2) The style of recognizing structures and facilities should be
consistent with the City's visual standards, and adhere to City
ordinances.
(3) The Director of Public Works or designated staffperson is
responsible for overseeing compliance with policy
requirements, including completion of consultations and
approvals, securing signatures on donation agreements by
donor, donor representative, and City of Shorewood.
(4) Groundbreaking, dedication, or other ceremonies relating to
gifts, shall be reviewed by the Park Commission and approved
by the City Council.
(5) The City Council may rescind a donor's recognition for just
cause.
.
**Method of donor recognition must be agreed upon and formally approved by
City Council prior to signing the donor agreement.
(b) The nature of the donation will assist in determining the type of
recognition.
(c) A plaque, or other negotiated signage, may be placed on a building, room,
or facility to recognize a Donor. The design, wording, size, and location
of the plaque require the approval of the City Council.
(d)
A donor recognition or memorial plate may be affixed to routine furniture
items. The City shall specify the size and location of the donor plate and
the donor will pay for the plate and engraving. The City shall approve the
wording of the donor plate and affix the plate to the furniture.
.
( e) Plaques or markers will not be placed for routine tree donations.
(f) Donations of a routine nature (e.g., trees, park benches and other furniture)
shall be reviewed and approved, if appropriate, by the Public Works
Director and/or the Park Commission.
(g) The donor shall pay for the delivery and installation of the amenity and/or
donor recognition plaque or plate.
(h) The option of funding the amenity for life of said amenity is negotiable
and would require assurance of sufficient funding. There is no exclusive
right to sole recognition in cases of expansion or other structural
modifications.
2
8-30-04
Recognition carries no power of direction to the City on matters of schedule, design,
furnishing, or priority of use.
3. PROCESS AND PROCEDURES FOR SUBMISSION OF PROPOSAL
Any proposal for recognition shall be made through a formal submission process to the
Park Commission. The Park Commission will make a recommendation on the proposal
to the City Council.
Proposals must have the written approval of the person or corporate representative for
whom the recognition is to be given. If the person is deceased, the approval of the family
or designated representative should be obtained. If the person is deceased and there is not
family or a designated representative, recognition can proceed through the submission
process.
.
Procedures governing approval of recognition proposals, of a non-routine nature, are set
forth below and may also be supplemented by such operational guidelines as the City of
Shorewood may adopt from time to time. Exceptions from policy requirements must be
authorized by the City Council in advance of the donation.
Step One
A Schematic design and details will be submitted to the City of
Shorewood and shall include the following elements:
(a) A scaled architectural drawing or plan drawn to scale to be
completed by a landscape architect or civil engineer, registered in
the State of Minnesota, and would include:
1. site plan
2. architectural details
3. landscape plan
4. tree preservation plan
5. sign or memorial detail
.
Please note: The Schematic design phase of the submission process will be overseen by
the appropriate departments of the City of Shorewood according to established
procedure.
Proposed recognition should be designated at the time of submission of schematic design,
as found in Step One, as. Recognition may not be allowed after the amenity is
operational except by Council review and approval.
Step Two: After submission of the schematic design, the individual, group, or
corporation will formally present their request to the Park Commission. The Park
Commission will then make a recommendation to City Council.
Step Three: Upon approval by City Council, the Donor Agreement will be signed and
kept on record with the City of Shorewood.
3
8-30-04
5. METHOD OF PAYMENT AND RESPONSIBILITIES OF DONATION
Donation associated with recognition proposals can be made by the donor with financial
assurity or cash escrow for the full amount of the donation and shall be submitted to the
City prior to the commencement of construction of amenity or project.
Individual donors may gift a portion oftheir contribution through an irrevocable trust or a
contractual bequest mechanism.
Should the donor renege on any payment once the project has commenced and the donor
agreement has been signed, the City shall be allowed to keep any portion of the donation
already paid, and recognition shall not apply.
Should the City fail to use the funds for the stated purpose in the Donor Agreement, the
funds shall be returned to the donor.
.
6. NAMING
The City of Shorewood will commemorate long-term service to the community or to a
distinguished person, and such recognition is contingent upon Council review and
approval.
The City of Shorewood will consider naming opportunities for outstanding contributions,
such as a parcel ofland or new donation outside the geographic confines of the existing
park system.
The City prefers not to name facilities within its park system that are made possible with
donations.
Naming a building in honor of a person who has given extraordinary distinguished
service to the city will not normally be considered until after hislher substantive formal
relationship with the city has ended.
.
The name used should normally be the family name, or in the case of a corporate entity,
the shortest possible name. Unless the City Council determines otherwise, a name may
be used only once.
7. STEWARDSHIP
Stewardship requires that the City of Shorewood honor the expectations of donors and
abide by gift agreements, including recognition provisions. Recognition is generally
expected to last the lifetime of the building, facility, unit, program, or other endeavor.
There may nonetheless be extraordinary circumstances that justify cessation of the use of
a recognition, or "renewed recognition," such as change in use, substantial renovation, or
demolition of an existing building, facility, or part thereof, major programmatic changes,
4
"
~
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOOD, MINNESOTA 55331-8927 · (952) 474-3236
FAX (952) 474-0128' www.ci.shorewood.mn.us' cityhall@ci.shorewood.mn.us
MEMORANDUM
TO:
FROM:
DATE:
SUBJECT:
City Council
Craig W. Dawson, City Administrator A"
September 9,2004 1Ij)
Freeman Park Plaza Project
.
The Shorewood Parks Foundation is proposing the installation and conveyance of a sitting/picnic
plaza, to be located west of Eddy Station and south of the play structure at Freeman Park.
The project would have:
.
. Two concrete patio areas, each l8' x 36', connected by a 12' x 12' walk having two-foot-
wide planting areaS on either side of it.
. The patios would be smooth gray concrete, with brown two-foot saw-cut squares as
borders. The connecting walk would also be the same brown two-foot-squares. The
design for the patios and their bases are consistent with staffs specifications.
. Three round tables and benches, one of which would be handicap-accessible, would be placed
on each patio section.
. Planting areas with flowers and/or low shrubs. The Foundation hopes that volunteer
gardeners would offer to design the planting scheme and tend the plants.
. Three maple trees placed on the west and southwest of the plaza.
The Park Commission recommended approval of the proiect at its special meeting on August 30. It
conditioned its approval on the Foundation working further with a landscape architect regarding the
area between the walking path and connecting walkways, and on the specific species of maple trees,
and approval by staff.
Proiect History: This project began as an improvement that would feature with engraved bricks given
by donors to the project. Earlier this year, the Park Commission approved the concept plan, and
found it appropriate for Freeman Park. As the sales of donor bricks were not meeting expectations,
the Foundation believed that the plaza remained a worthwhile project. It decided to proceed with the
plaza without donor bricks, and featured the project at its first fundraiser breakfast held May 25,
2004.-
Progress: Following the May 25 fundraiser, a resident made an offer to the Foundation to raise the
funds necessary to complete the project. He and some neighbors believed that it would be an
appropriate tribute toa recently-deceased neighbor. In early June the Council and Foundation held a
special meeting, with an invitation to the Park Commission, to discuss the project and gain some
sense of City support before the individuals began fundraising. There was concurrence that the
project was worthwhile and the donations would be welcomed, and the project should be expedited.
n
~J PRINTED ON RECYCLED PAPER
=#:
1C/
t"
..
Freeman Park Plaza Project
September 13,2004, City Council Meeting
Page Two
Donor Recognition: At the same time, the Council and Commission realized that a policy needed to
be developed about the recognition of such visible donations to the City. The fundraisers wanted to
have the plaza project be a memorial to their neighbor, but all questioned what would be an
appropriate level of recognition for that individual. Throughout the rest of the summer, the Park
Commission developed and has proposed a Donor Recognition Policy.
The appropriate donor recognition under the policy would be a small plaque; there would be no
"name" given to the plaza. The Foundation understands that a small and appropriate plaque is what
the donors would prefer to have anyway.
Construction: The Foundation would be responsible for the construction of the plaza. As the City
would be taking ownership of the plaza, it would be prudent for the City to inspect the project for the .
Foundation as it is built. Construction would not be allowed until the Foundation has shown
sufficient funds to fulfill its contract with a private construction firm.
City Council Action:
It is recommended that the Council approve the Freeman Park Plaza Project proposed by the
Shorewood Parks Foundation, per the recommendations of the Park Commission and staff.
.
.....
~ '<:t
0
0
..... !:::!
G)
bO t:::
~ 0\
,~
.
.
.
~
''''':'>
~
~
N
i!-
>
~
o
N
;:R
'b
'.;3
<<l
~
0\
~
S
~
VI
~
....
a
~
y
CIl
..2
~
o
N
;:R
~
G)
5
d
8
N
i!-
~
0..
e
G)
f.-4
~
bO
d
'i
tI)
o
N
i!-
ta
o
o
~
~
~
bO
d
'S
G)
tI)
o
N
i!-
"'Cl
d
<<l
o
N
i!-
CIl
...
5
e
B
o
~
u
:::::::
Qj
tE
..J
~
D-
o
It-
I~
,..,
~ '
.
.,.
lI'\tCll
~
Z
:J
o
ex:
LJ
>-
<I:
---1
(L
r
I-
Z
W
2:
(L
t--1
:J
G
W
I
=-
o ~
~ en
~ 4(
g II..
~ ~
~ ~
~ ~
~ 0
C> ~
ti
~
~
.
ct;
___ J
<I:
W
ex:
<I:
I-
Z
W
~
~-l
<<
o..u
~~
w
~
u
z
8
; f ~
'j "6. S! z
i .fig i;j 8
:2 ~~ ~ III
.. 0 C I-
, gig g
I Jf~ b:2 ~
~ . II "0 il
... !i .. i ..
s a.t;. ~ :I ~
1 ! I ! [j!'"
Itci'D~~[j
"l_E a.u"
~ _ :HI' .. ug~
III o~:S I- 0 "
o ~ ~~ g -":'6.
Z :5 .:2 '11" "
'jfljOcuoe
...:...~~6:5
~ j:5 .! ($:5 !
_... Ii ..,!a
! ~t is lli!
II ~ 'll "ii tio ~
o :tl i .c.....
... ......~ .. = ~ ~
~ ;;t ~ ~~"9
a ill b IOU"
!Ii" e'-!G
6 ! ~ i ~ ~Ul Ii
z . U
_ <'l I':i....n .,;
o
<D
z
i
i
///0"
--0'1 · ·
, 0
~
-,
'----....
.~~-~
"
\.
-_=-X-
---.........
....,~_._---_.~"..._,~-"'-_._~.-.
-----
--------------
------
------------
............"
NOll '\t~IClClI '~
0<96'
...
i
j
..
..
"
CI
I I
!
;
! LJ
i
I Z LJ
I t--1 Z
! I- t--1 <I:
I V) ~ w
i t--1 rY rY
i X <I: <I:
! w (L
1
15
f
1
'0
I
~.
i= a.
< ..
~ ~
~ ..,
~ ,;
~ !
I- CI
~~ Z
0:.. <I:
e (/)
CI
8 LJ
Z
t--1
l-
V)
t--1
X
W
{
U
~
/-1
, . /'-', 11-1
(0" ' ---
'. \ ,If ' ..,.
, \ fO 0 I
\ ~ t
I I
I ", I
--- ----'-" ' -'" "
~-~-.--.-..-
---".-
>-
j:::l
j:::l
W
C)Nl.LSr~]
'''',1<9-
6'
h
II
x
-
_.- ------- -~-----
_-------M-+--
_..._~_--------"-.-M-....--.~--.-----~---..-.-.-.--~.-.
3NIl
"-.
..".....
"-
-...----.......----
_._---------._----_._--_.__._--~
--x
Gl3IJ
-.........
~ ~
::::i
Cl
I.LI
-- ~z
zO
01=
1=<
~g
:.!...I
~Cl
!!:4(
ti~
~S!l
~F=
01-
~<
~~~-~----
-----
-'-
Z
I--l
<I:
/5
~
- <I:
:3
1
I LJ
l~
t--1
I ~
I
"Y
~
/
2'<96' ~
/
.......-
6L6
x
<[ <[
NW
<[ a::
o! <[
>-
.J
.....w
::E: I-
<[ .....
!.... (I)
~
~
<[
0..
<[
I-
o
(/)
w
z
Z
l-I
L
z
<[
L
W
W
~
lL.
r::::l
o
o
::3
w
~
o
I
(/)
::E::
W
I-
(I)
>-
Vl
~
~
<I
0..
!I!
~~l!
Big
iil
~.S.
di~
~;~I
Z&W"
i~~~
...It;!
~:ii
e,"'''
U:~
!ih
x
~
S ~
i ~I
~ x
~
II
I~
NOIldI~JSJa 1JJH<'
-> N\lld
811"".
\ "~
z
c
;:
0..
iiO
u
II)
W
Q
...
W
~
II)
Z
<t
.J
0..
--
.."
~
NATURAL GRAY COHCRE
All. 2')(2' SAW-CUTCONCRETE PATTERN
TO BE SCHOFlElD CHROMIX C27
WESTWOOD BROWN OR EQUAL
.....
LJ
Z
I---i
~
co_
-.,
t-. 30' AS frGItD xxx
I'LAlI . IY:
BClI .lOt
CHt PfIOJt MOt
..s XIOC
1lEC0000COJI'/'It1 w.1l
xxx 07/13/04
xxxxxxxnxxxxxxxxxxx
GAtt: XX!XX!XX. lIED. ItO: XXX)f
I ICIIU'I' ep1n~ ,., 11l1S Pl.Nt. .u.lntA1JDlc. at It"'"
__ llIltP....u .~ DI' ,,*IlU '" OUlI;c:r $lIIPChUUIt M8
'M" I ...."....., lIIt'UTt1lE8 1'IIJ'tSS.1D<<. ENliUCt. tlNDC,
lie LAWS a '... l'.U .. MlwcsarA
CITY OF
SHOREIJOOD
ro
'"
I
I
i--
I
i
I
I
I
,
!
i
I
6~,584
<0
",'
'"
50.0184
'"
(-J
,-, 4' BITUMINOUS PATH
""'
FUTURE DONOR
BRASS PLAQUE
. ".\~.:..:. :}?r'~~' ~?~:<~:~.~:::::.:.
'. '~.: -,' ..: ((( >>r".. ". ~ ......':
.......-: '.. ... ~~.;..:.~... ..........
" ,';";"~;TA~i.Es P~R SPEc...6.;":
.: "'lOY .,.-.:'C.....:~ ~CJ\l"
'$ :::~.:.~~ :\:~ ~...~..~~.~~;:;~:::~ j-,~~~
(j) ,/
-I /
~ /
c::J 11/
-Z /
o /1
~,
:)/
r-
r-'
{:Q
(J
'" --7
~ ?--
~ r-'
r-
(/)
r-I
)<
LJ
NEW 3 INCH MAPLE
FIElD ADJJSTED
PARK
SYSTEM
/
/
/
/
DISCONNECT IRRIGATION FEEDLlNE
AT THIS HEAD LOCATION;
//
I
FREEMAN
PARK
.. CON~;;!!!ffi)J '.~L
( , ... BARS 12" O.C.E.W. )
24" SELECT GRANULAR BORROW
GEOTEXllLE FABRIC
CONCRETE PAVEMENT
TYPICAL
NO SCAlE
NOTES:
t. Edlle CInlClS to be restored with 4" of topllOll and re-wgetated with sod
2. lhl. detaR / If)tlClflcotlon. CInl mlnlmumn requirements, additional dOllllln
may be required depending on exlstlng eub-grade soil condltlans.
3. All materlale ehall conform to MOOT epeclflcattone dated YR 2000
4. No. 4 BARS lIhall be 60,000 pel In accordance wlth WooT SPEC No, 3301
5. Saw Cuts nat greater than 8 feet on cent..
6. Concrete colored Greae cre through color and not eurface.
PICNIC TABLE SPECIFICATION
T exturecl Concrete Picnic T abl.. 6000' psi welded rebor per cut lIheet attoched
N
~
o 30
I
60
FAMIL Y PLAZA
SITE AREA
SHOREY/ODD, MINNESOTA
.
.~
...
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128. www.cLshorewood.mn.us. cityhall@cLshorewood.mn,us
MEMORANDUM
TO:
Planning Commission
.
FROM:
Brad Nielsen
DATE:
3 September 2004
RE:
Floodplain Management Ordinace
FILE NO.
405(Nat Res - Floodplain)
.
The Federal Emergency Management Agency (FEMA) has advised cities that they
must update their existing floodplain regulations for residents to remain eligible for
flood insurance, The attached model ordinance is intended to replace Chapter 1101 of
the City Code. While we are somewhat skeptical of model ordinances in some cases,
. the floodplain regulations are considered highly technical, The only real policy aspect
is whether or not the City wants residents to be eligible for flood insurance. It does.
The most significant change to what is presented here is that the model will have to be
put into the City's Code format. This will be done prior to it going to the City
Council.
. The other advantage to adopting the model, is that most other cities are adopting the
same regulations, so there is consistency for builders and developers from one place
to another. We liken this to adopting the Building Code.
Unfortunately, the deadline for adopting the updated regulations snuck up on me and
the update is overdue. Consequently, if you have any questions as you review the
material, please call me on Tuesday to discuss. Ideally, this will go to the City
, Council on 13 August.
Cc: Craig Dawson
Tim Keane
Larry Brown
n
'..1 PRINTEO ON RECYCLED PAPER
if:fjA~
SECTION:
.
1101.01:
1101.02:
1101.03:
1101.04:
1101.05:
1101.06:
1101.07:
1101.08:
1101.09:
1101.10:
1101.11:
1101.12:
1101.13:
1101.01:
CHAPTER 1101
FLOOD PLAIN MANAGEMENT REGULATIONS
Statutory Authorization, Findings of Fact and Purpose
General Provisions
Establishment of Flood Plain Districts
FW, Floodway District
FF, Flood Fringe District
Reserved for Future Use
Subdivisions
Utilities, Railroads, Roads and Bridges
Manufactured Homes, Trailers and Travel Vehicles
Administration
Nonconforming Uses
Penalties for Violation
Amendments
STATUTORY AUTHORIZATION, FINDINGS OF FACT AND PURPOSE
Subd. 1. Statutory Authorization: The legislature of the State of Minnesota has, in Minnesota
Statutes Chapter 103F and (Zoninfl Enabling Statute) delegated the responsibility to
local government units to adopt regulations designed to minimize flood losses. Therefore, the
City Council of the City of Shorewood, Minnesota does ordain as follows:
.
Subd.2. Findings of Fact:
a. The flood hazard areas of Shorewood, Minnesota, are subject to periodic inundation which
results in potential loss of life, loss of property, health and safety hazards, disruption of
commerce and governmental services, extraordinary public expenditures or flood protection
and relief, and impairment of the tax base, all of which adversely affect the public health,
safety, and general welfare.
b. Methods Used to Analyze Flood Hazards. This Chapter is based upon a reasonable
method of analyzing flood hazards which is consistent with the standards established by the
Minnesota Department of Natural Resources.
-1-
c. National Flood Insurance Program Compliance. This Chapter is adopted to comply with
the rules and regulations of the National Flood Insurance Program codified as 44 Code of
Federal Regulations Parts 59 -78, as amended, so as to maintain the community's eligibility in
the National Flood Insurance Program.
Subd.3. Statement of Purpose: It is the purpose of this Chapter to promote the public health,
safety, and general welfare and to minimize those losses described in Subd. 2.c. ofthis
Section by provisions contained herein.
1101.02:
GENERAL PROVISIONS
Subd. 1. Lands to Which Chapter Applies: This Chapter shall apply to all lands within the
jurisdiction of the City of Shorewood shown on the Flood Insurance Rate Map as being
located within the boundaries of the F100dway and Flood Fringe Districts, as defmed in
Section 1101.03 of this Chapter.
Subd. 2. Establishment of Flood Insurance Rate Map. The Flood Insurance Rate Map, together
with all materials attached thereto, is hereby adopted by reference and declared to be a part of
this Chapter. The attached material shall include the Flood Insurance Study, Volume 1 of2
and Volume 2 of2, Hennepin County, Minnesota, All Jurisdictions and the Flood Insurance
Rate Map panels numbered 27053C0292 E, 27053C0295 E, 27053C0308 E, 27053C0309 E,
27053C0311 E, 27053C0312 E, 27053C0313 E, 27053C0314 E, 27053C0316 E, 27053C0317
E, 27053C0318 E, and 27053C0319 E for the City of Shorewood, dated September 2, 2004,
as developed by the Federal Emergency Management Agency. The Flood Insurance Rate
Map shall be on file in the office ofthe City Clerk.
.
Subd.3. Regulatory Flood Protection Elevation: The regulatory flood protection elevation shall be
an elevation no lower than one foot above the elevation of the regional flood plus any
increases in flood elevation caused by encroachments on the flood plain that result from
designation of a floodway.
Subd. 4. Interpretation:
.
a. In their interpretation and application, the provisions of this Chapter shall be held to be
minimum requirements and shall be liberally construed in favor of the City of Shorewood and
shall not be deemed a limitation or repeal of any other powers granted by state statutes.
b. The flood plain within the City of Shorewood is hereby designated as either Floodway
District or Flood Fringe District, as defined in Section 1101.03 Subd. 1. of this Chapter. The
boundaries of the flood plain districts shall be determined by scaling distances on the Flood
Insurance Rate Map. Where interpretation is needed as to the exact location of the boundaries
of the district as shown on the Flood Insurance Rate Map, as for example where there appears
to be a conflict between a mapped boundary and actual field conditions and there is a formal
appeal of the decision of the Zoning Administrator, the City Council, serving as the Board of
Adjustment and Appeals, shall make the necessary interpretation. All decisions will be based
-2-
on elevations on the regional (IOO-year) flood profile, the ground elevations that existed on the
site at the time the City adopted its initial floodplain ordinance, and other available technical
data. Persons contesting the location of the district boundaries shall be given a reasonable
opportunity to present their case to the Board of Adjustment and Appeals and to submit
technical evidence.
Subd.5. Abrogation and Greater Restrictions: It is not intended by this Chapter to repeal, abrogate,
or impair any existing easements, covenants, or deed restrictions. However, where this
Chapter imposes greater restrictions, the provisions of this Chapter shall prevail.
Subd. 6. Warning and Disclaimer of Liability: This Chapter does not imply that areas outside the
flood plain districts or land uses permitted within such districts will be free from flooding or
flood damages. This Chapter shall not create liability on the part of the City of Shorewood or
any officer or employee thereof for any flood damages that result from reliance on this
Chapter or any administrative decision lawfully made hereunder.
.
Subd. 7. Severability: If any section, clause, provision, or portion of this Chapter is adjudged
unconstitutional or invalid by a court of competent jurisdiction, the remainder of this Chapter
shall not be affected thereby.
Subd.8. Definitions: Unless specifically defined below, words or phrases used in this Chapter
shall be interpreted so as to give them the same meaning as they have in common usage and
so as to give this Chapter its most reasonable application.
a. ACCESSORY USE OR STRUCTURE: A use or structure on the same lot with, and of a
nature customarily incidental and subordinate to, the principal use or structure.
.
b. BASEMENT: Any area of a structure, including crawl spaces, having its floor or base
subgrade (below ground level) on all four sides, regardless of the depth of excavation below
ground level.
c. CONDITIONAL USE: A specific type of structure or land use listed in the official control
that may be allowed but only after an in-depth review procedure and with appropriate
conditions or restrictions as provided in the official zoning controls or building codes and
upon a finding that:
(1) Certain conditions as detailed in this Chapter exist.
(2) The structure and/or land use conform to the comprehensive land use plan if one
exists and are compatible with the existing neighborhood.
d. NO DEFINITIONS
e. EQUAL DEGREE OF ENCROACHMENT: A method of determining the location of
floodway boundaries so that flood plain lands on both sides of a stream are capable of
conveying a proportionate share of flood flows.
-3-
f. FLOOD: A temporary increase in the flow or stage of a stream or in the stage of a wetland
or lake that results in the inundation of normally dry areas.
FLOOD FREQUENCY: The frequency for which it is expected that a specific flood stage or
discharge may be equaled or exceeded.
FLOOD FRINGE: That portion of the flood plain outside of the floodway. For the purposes
of this Chapter, Flood Fringe shall be as defined in Section 1101.03 Subd.a.(2) of this
Chapter.
FLOOD PLAIN: The beds proper and the areas adjoining a wetland, lake or watercourse
which have been or hereafter may be covered by the regional flood.
FLOOD PROOFING: A combination of structural provisions, changes, or adjustments to
properties and structures subject to flooding, primarily for the reduction or elimination of .
flood damages.
FLOODW A Y: The bed of a wetland or lake and the channel of a watercourse and those
portions of the adjoining flood plain which are reasonably required to carry or store the
regional flood discharge. For the purposes of this Chapter, Floodway shall be as defined in
Section 1101.03 Subd. a.(l) of this Chapter.
g. NO DEFINITIONS
h. NO DEFINITIONS
i. NO DEFINITIONS
j. NO DEFINITIONS
k. NO DEFINITIONS
.
I. LOWEST FLOOR: The lowest floor ofthe lowest enclosed area (including basement). An
unfinished or flood resistant enclosure, used solely for parking of vehicles, building access, or
storage in an area other than a basement area, is not considered a building's lowest floor.
m. MANUFACTURED HOME: A structure, transportable in one or more sections, which is
built on a permanent chassis and is designed for use with or without a permanent foundation
when attached to the required utilities. The term "manufactured home" does not include the
term "recreational vehicle."
n. NO DEFINITIONS
-4-
o. OBSTRUCTION: Any dam, wall, wharf, embankment, levee, dike, pile, abutment,
projection, excavation, channel modification, culvert, building, wire, fence, stockpile, refuse,
fill, structure, or matter in, along, across, or projecting into any channel, watercourse, or
regulatory flood plain which may impede, retard, or change the direction of the flow of water,
either in itself or by catching or collecting debris carried by such water.
p. PRINCIPAL USE OR STRUCTURE: Means all uses or structures that are not accessory
uses or structures.
q. NO DEFINITIIONS
r. REACH: A hydraulic engineering term to describe a longitudinal segment of a stream or
river influenced by a natural or man-made obstruction. In an urban area, the segment of a
stream or river between two consecutive bridge crossings would most typically constitute a
reach.
.
RECREATIONAL VEHICLE: A vehicle that is built on a single chassis, is 400 square feet or
less when measured at the largest horizontal projection, is designed to be self-propelled or
permanently towable by a light duty truck, and is designed primarily not for use as a
permanent dwelling but as temporary living quarters for recreational, camping, travel, or
seasonal use. For the purposes of this Chapter, the term recreational vehicle shall be
synonymous with the term travel trailer/travel vehicle.
REGIONAL FLOOD: A flood which is representative of large floods known to have
occurred generally in Minnesota and reasonably characteristic of what can be expected to
occur on an average frequency in the magnitude of the 100-year recurrence interval. Regional
flood is synonymous with the term "base flood" used in a flood insurance study.
.
REGULATORY FLOOD PROTECTION ELEVATION: An elevation no lower than one
foot above the elevation of the regional flood plus any increases in flood elevation caused by
encroachments on the flood plain that result from designation of a floodway.
s. STRUCTURE: Anything constructed or erected on the ground or attached to the ground or
on-site utilities, including, but not limited to, buildings, factories, sheds, detached garages,
cabins, manufactured homes, recreational vehicles not meeting the exemption criteria
specified in Section 1101.09 Subd. 3.a. of this Chapter and other similar items.
SUBSTANTIAL DAMAGE: Damage of any origin sustained by a structure where the cost of
restoring the structure to its before damaged condition would equal or exceed 50 percent of
the market value of the structure before the damage occurred.
SUBSTANTIAL IMPROVEMENT: Within any consecutive 365-day period, any
reconstruction, rehabilitation (including normal maintenance and repair), repair after damage,
addition, or other improvement of a structure, the cost of which equals or exceeds 50 percent
of the market value of the structure before the "start of construction" of the improvement.
-5-
This term includes structures that have incurred "substantial damage," regardless of the actual
repair work performed. The term does not, however, include either:
(1) Any project for improvement of a structure to correct existing violations of state or
local health, sanitary, or safety code specifications which have been identified by the
local code enforcement official and which are the minimum necessary to assure safe
living conditions.
(2) Any alteration of an "historic structure," provided that the alteration will not
preclude the structure's continued designation as an "historic structure." For the
purpose of this Chapter, "historic structure" shall be as defined in Code of Federal
Regulations, Part 60.
t. NO DEFINITIONS
u. NO DEFINITIONS
.
v. VARIANCE: A modification of a specific permitted development standard required in this
Chapter to allow an alternative development standard not stated as acceptable in this Chapter,
but only as applied to a particular property for the purpose of alleviating a hardship, practical
difficulty or unique circumstance.
w. NO DEFINITIONS
x. NO DEFINITIONS
y. NO DEFINITIONS
z. NO DEFINITIIONS
1101.03:
ESTABLISHMENT OF FLOOD PLAIN DISTRICTS
.
Subd. 1. Districts:
a. Floodway District. The Floodway District shall include those areas designated as Zone AE
on the Flood Insurance Rate Map panels adopted in Section 1101.02 Subd. 2. of this Chapter
that are at or below elevation 929.4 feet above Mean Sea Level Datum, 1929 Adjustment,
which is the Ordinary High Water Elevation of Lake Minnetonka, and those that are at or
below elevation 943.14 which is the Ordinary High Water Elevation for Galpin Lake.
b. Flood Fringe District. The Flood Fringe District shall include those areas shown on the
Flood Insurance Rate Map panels adopted in Section 1101.02 Subd. 2. of this Chapter as
being within Zone AE and being located above elevation 929.4 feet above Mean Sea Level
Datum, 1929 Adjustment, which is the Ordinary High Water Elevation of Lake Minnetonka,
-6-
and those that are above elevation 943.14 which is the Ordinary High Water Elevation for
Galpin Lake.
c. District Application. The Flood Plain Districts shall be applied to and superimposed upon
the zoning districts identified in Chapter 1201 of the Shorewood City Code (Zoning
Regulations). The regulations and requirements imposed by the Flood Plain Districts shall be
in addition to those established for zoning districts and shall apply jointly.
Subd. 2. Compliance: No new structure or land shall hereafter be used and no structure shall be
constructedt locatedt extendedt convertedt or structurally altered without full compliance with
the terms of this Chapter and other applicable regulations which apply to uses within the
jurisdiction of this Chapter. Within the Floodway and Flood Fringe Districtst all uses not
listed as permitted uses or conditional uses in Sections 1101.04 and 1101.05 of this Chaptert
respectivelYt shall be prohibited. In additiont a caution is provided here that:
.
a. New manufactured homest replacement manufactured homes and certain travel trailers and
travel vehicles are subject to the general provisions of this Chapter and specifically Section
1101.09.
b. Modificationst additionst structural alterationst normal maintenance and repair". or repair
after damage to existing nonconforming structures and nonconforming uses of structures or
land are regulated by the general provisions of this Chapter and specifically Section 1101.11.
c. As-built elevations for elevated or flood proofed structures must be certified by ground
surveys and flood proofing techniques must be designed and certified by a registered
professional engineer or architect as specified in the general provisions of this Chapter and
specifically as stated in Section 1101.10.
.
11 01.04
FW, FLOODW AY DISTRICT
The following permitted uses and conditional uses shall only be allowed to the extent that they are
also permissible under any watershed districtt statet or federal laws or regulations applicable to the
floodway area as defined by Section 1101.03 Subd. 1. of this Chapter.
Subd. 1. Permitted Uses:
a. Commercial loading areast and parking areas.
b. Private and public golf coursest tennis courtst driving rangest archery rangest picnic
grounds, boat launching ramps, swimming areas, parks, wildlife and nature preserves, fishing
areas, and single or multiple purpose recreational trails.
c. Residential lawns, gardens, parking areas, and play areas.
-7-
Subd. 2. Standards for Floodway Permitted Uses:
a. The use shall have a low flood damage potential.
b. The use must be permissible in the underlying zoning district.
c. The use shall not obstruct flood flows or increase flood elevations and shall not involve
structures, fill, obstructions, excavations or storage of materials or equipment.
Subd. 3. Conditional Uses:
a. Structures accessory to the uses listed in Subd. 1., above and the uses listed in b. - h.,
below.
b. Extraction and storage of sand, gravel, and other materials.
c. Marinas, boat rentals, docks, piers, wharves, and water control structures.
.
d. Railroads, streets, bridges, utility transmission lines, and pipelines.
e. Storage yards for equipment, machinery, or materials.
f. Placement of fill or construction of fences.
g. Recreational vehicles accessory to residential uses, subject to the exemptions and
provisions of Section 1101.09 Subd. 3.a. of this Chapter.
h. Structural works for flood control such as levees, dikes and floodwalls constructed to any
height where the intent is to protect individual structures and levees or dikes where the intent
is to protect agricultural crops for a frequency flood event equal to or less than the 10-year .
frequency flood event.
Subd. 4. Standards for Floodway Conditional Uses:
a. All Uses. No structure (temporary or permanent), fill (including fill for roads and levees),
deposit, obstruction, storage of materials or equipment, or other uses may be allowed as a
conditional use that will cause any increase in the stage of the 100-year or regional flood or
cause an increase in flood damages in the reach or reaches affected.
b. All floodway conditional uses shall be subject to the procedures and standards contained in
Section 1101.04 of this Chapter.
c. The conditional use must be permissible in the underlying zoning district.
d. Fill:
-8-
~
oo.s
o 0
o I-<
t+:: 0
lO ~
.s I-<
0.
.S '1::
oobB
lO s::
ts:E
... 0
00......
I-< ::i
o 8
00 ft
.s ~
'm :>
o 0
0.0
lO lO
00 :>
00 '.&j
~~
. I:: lO
lO bll
'ii lO
S ~
~,.o
:;::: s::
8.9
._ 00
00 0
lo lo
.s 8
o 0
......cl:l
~oo
00 lO
m ~ .
ft _ 00
...... 0 0
.- I-<.s
8.o.lO
00 lO d
lO,.o I=<
bll...... lO
oo~......
lO,J:l~
.t3m...
s:: 0.
d'(i;j 8
.-...... 0
~ 0. ro
..-..
-
'-"
m
00
lO
lOOO
.s~
.S .S
00,J:l
lO:a
~ ~
......
~oo
lO
lO~
,.0 .-
... S
8.g
...... 00
~ .
,J:l .~ ;
me......
00 co 0.
s::...... lO
o o...d
.+:; - +J
ca ~ 0
lOd-
0.1=<j:l
o go lO
............S
lO ~ lO
~lO"""
1-<. 00 lO
blllOS::
00.~.9
mmj:l
008~
e lO lO
CO_I-<
00'0.
00 bll s::
e s:: 0
co ..9 .-
...
00 ro ro
Bmi:l
._ 00 lO
00 lO d
............1=<
'0 S:B
o.>-lO
00 ro 00
lO:>1:l
bll..e 0
00.....-
lO 0 00
I-< 0 8
Ot+::lO
..-..
N
'-"
lO
bll lO
lO~lO ,.0
bll 0 ..d >- ...
00 ... +J ca 00
lO m~ ~::i
.a.~ ~ 00 ~
lO~ f{l ~; g'8
:> e - 00 t+:: E: .
0000 lO lO lO ~
~ ~ lO .~,J:l 0. 00
>- a.s lO ... lO I-<
'OtsBe~~g
'ta 0. lO .1-< ...... ,.J
:Bd~~'I-lm~
lO~lO,J:l..!'!loC
8 ; g 13 .~ ~ S
8 0'- s:: lO .... 0
.- ...... ::i 'ta a U
~~muosolO
~ >- 00 lO ,J:l
s:: ro lO >- lO ,.s::: ...
.9 S ~.~ ~ ~ 1)
omcaUo .lO
lO e 0 lO lO 0
molO..d~"""!.l:l
,.o'.&j :> +J :> ~ I.i-i
::icacal-<O......O
(/) I-<,J:l lO . .-j
lO ~SCI:110
.s o.:g Cd lO ~.s
..... 0 ::i >- I-<
~ '0 ~ -a.s a'S
s::l~.,.o '.0>-
~5b.g"S~blli
.- 00 :E,.o !:i. s:: 0.
~e~00~88
oco Oro~o.
ooo.;~,J:l~lO
11 m'l:: _ .g 00 .s
co mlOCI:l",o.s
0' 00 'ta 5 ~ ~ .-
.~ m 8'6h ; lO ~
";:l......~lO........dOO
'"~ ro .., I-< 0. +J lO
S~.s I-< lO s:: lo
lO0.0 o'taoti
.:t:: 00 I-< ~. I:: 0.. ""'_
ro~olOo.::i~
s::l......::::l >-000 I-<
co ..... l+=l <::> I-< lO lO
00 o~o o.~......
< ~ 0 - ~,.o'S
..-..
M
'-"
ro
~
~
E
~
.s
~
o
~
:>
8
0.
~
lO
.s
lO
I-<
.....
S.
lO
I-<
......
]
00
lO
bll
s::
~
00
o .
00
t+::'B
lO 00
.s .....
s::O
:s-g
..... ,J:l
~ ~
gf'ta
:E~
l+=l~
>-lO
~~
..-..
~
.
00
lO
B
g
(/)
c
o
00
00
lO
o
<
a)
~
o
.....
'ii
...
~
,J:l
;
8
.a
I-<
tS
00
.~
.-
00
lO
00
lO
,.0
...
o
s::
......
~
,J:l
00
00
i
5
00
c
o
00
00
lO
o
o
<
bll
.S
00
......
'S
,.0
.s
5 ~
'ta
-g ~
~oo
...... 0
0.0
oot+::
m1)
-g ~
o 0
5~
~.s
o 0
0-
lO s::
,.0 .9
...... ...
~ 0
~5
00
ft,.o
-g 0
.~ ~
lO.....
o.s::
~.-
.- S
mft lO
~~
o~
5~
00 0
C'"
o ~
~ 0
lO 00
gB
< 'm
..-..
......
'-"
..-..
N
'-"
~
.S
00
.s
'6h
s::
o
......
.s
.s
.~
-g
...
~
5 ~
o 0
lOt+::
,.000
...... 0
] 0
mt+::
m~
lO 0
.a 5
0.....
5~
m.!:1
ftOO
lO lO
;:O,J:l
..... ...
00 0
~-
0.'0
1O......
a>]
~ 0.
~.~
~
'-"
lO
.s
s::
o
.?;-
lO
'ta
S
.~ .
o 00
I-< lO
~~
005
8 00
ro bll
...... s::
0.._
..8 .S
o
.......=
~oo
,J:l ro
m~
00 0
~ ~
o.s
5 00
00 ro
ft 00
lO lO
::0 . S
cO......
.~ ~
- 0
~t+::
1-<00
0.0
00 0
rot+::
cf! lO
o ~
(/) 00
..-..
e
.
.~ ts C lO -g
;.a ONm
...... M ~..... ::i
.S 'S p... lO 00 lO C
00 ~ ~ g.S,.o 0
tElOlOro...tim
o"tiS.slO~g~
8-0.stHI=<0
0. (/) ... lO lO 0
00 lO 00 -g ~ bll ro
o.stEOO::ielOO
o s:: 0';;= 0- tU tE
t+::.- 0 Om bll 0
>,.m~l-<Ooop'
1-0- s:: - 0. 0 lO ~
00 0 00 lO 1t"),J:l 0.
.?;-.~ g -g -g .M 0000
~ l+=l t+:: U 8 ~ t+:: ..
.a 'm..8 bllS ~ lO:= ~
g ~ :>':.0 - .s < ~
.t::...... ca...... 0 ft 00
00 ~ S'S s:: ~ a) ;
tss::le~~el~ti
l+=l~lOOtUl-<......
::::l 0 +:i "tiS 00 bll 0 ro
l+=l 8 g - ..r 00 ti 5
s:: 0.,J::j en s::l lO 00 .....
o 00 00 lO ~,J:l lO.~
00 0 >,..s .::: ~'a:g
lO 0 1-0- s:: 00 "l) !3 ro
"tiS t+:: ~.- ~ 00;"'" bll
:>N 00 s:: e roOO s::
lO . I lO 0..... e 'r::'
'0 P-4 0 ',p _ I-< co ~
~~roCl:ltSmO
lOl-< oS lO......
~ 0 m ~ 'S -g '0 ;:s
~..... ft ~':::l co:E
,J:l p... ~ ro ~ ft lO ~
00 ~ ',p '0 cO 5 :> +J
00 lO ca bll 00 '.;:1 ~ 1)
~ .s 5 tE ~ .~ _~ a
g~~ g..;:I 8:5a ti
t;~;~~.e-~g
>,. lO 00 8 ~ 0. I=<
1-0 - 0 u;J 0 bll I-< 00
~m<l'.;og~tSg
mOO .t+::~...... >-~
815~,.o~'Oo
og0P-45''':::'05
<roU~mcamm
..-..
M
'-"
lO
00
~lO
...... N
...... .....
0......
o ~
ft 0-
s:: lO
.9 0
"tiS...
-00
~ lO
_6b
s::l.....
lO 00
:> lO
lOoo
I-< lO
0.,.0
0......
...~
-g ~ rnft
tsoo::::l
,J:l e ro
o co ~
; lO I-<
>- .a .g
'Og.s
"tiS,J::j><
::i 00 lO
O-lOS::
lO.s 0
--g~~
lO 0 0
,.oj:lts
tilOtH
::idoo
S ~ 0
lO~~
.a 8.~
o~"tiS
5 lOti
00 ..... .tJo
lO ca
,J:l......
~tsE
I
0\
I
~
'-"
(b) Any mechanical and utility equipment in a structure must be elevated to
or above the regulatory flood protection elevation or properly flood
proofed; and
(c) To allow for the equalization of hydrostatic pressure, there must be a
minimum of two "automatic" openings in the outside walls of the
structure having a total net area of not less than one square inch for
every square foot of enclosed area subject to flooding. There must be
openings on at least two sides of the structure and the bottom of all
openings must be no higher than one foot above the lowest adjacent
grade to the structure. Using human intervention to open a garage door
prior to flooding will not satisfy this requirement for automatic
opemngs.
f. Storage of Materials and Equipment:
.
(1) The storage or processing of materials that are, in time of flooding, flammable,
explosive, or potentially injurious to human, animal, or plant life is prohibited.
(2) Storage of other materials or equipment may be allowed if readily removable from
the area within the time available after a flood warning and in accordance with a
plan approved by the City Council.
g. Structural works for flood control that will change the course, current or cross section of
protected wetlands or public waters shall be subject to the provisions of Minnesota Statute,
Chapter 103G. Community-wide structural works for flood control intended to remove areas
from the regulatory flood plain shall not be allowed in the floodway.
h. A levee, dike or floodwall constructed in the floodway shall not cause an increase to the
100-year or regional flood and the technical analysis must assume equal conveyance or .
storage loss on both sides of a stream.
11 01.05
FF, FLOOD FRINGE DISTRICT
Subd. 1. Permitted Uses: Permitted uses shall be those uses ofland or structures listed as permitted
uses in the underlying zoning use district. All permitted uses shall comply with the standards
for Flood Fringe District "Permitted Uses" listed in Subd. 2., below and the "Standards for all
Flood Fringe Uses" listed in Subd. 5., below.
Subd. 2. Standards for Flood Fringe Permitted Uses:
a. All structures, including accessory structures, must be elevated on fill so that the lowest
floor including basement floor is at or above the regulatory flood protection elevation. The
finished fill elevation for structures shall be no lower than one (1) foot below the regulatory
-10-
flood protection elevation and the fill shall extend at such elevation at least fifteen (15) feet
beyond the outside limits of the structure erected thereon.
b. As an alternative to elevation on fill, accessory structures that constitute a minimal
investment and that do not exceed 500 square feet at its largest projection may be internally
flood proofed in accordance with Section 1101.04 Subd. 4.e.(3) of this Chapter.
c. The storage of any materials or equipment shall be elevated on fill to the regulatory flood
protection elevation.
d. The provisions of Subd. 5 of this Section shall apply.
.
Subd.3. Conditional Uses: Any structure that is not elevated on fill or flood proofed in accordance
with Subd. 2.a. and 2.b. of this Section, or any use of land that does not comply with the
standards in Subd. 2.c. and 2.d of this Section, shall only be allowable as a conditional use.
The cumulative placement of fill where at anyone time in excess of one-hundred (100) cubic
yards of fill is located on the parcel shall be allowable only as a conditional use. An
application for a conditional use shall be subject to the standards and criteria and evaluation
procedures specified in Subd. 4. and Subd. 5. of this Section and Section 1101.04 of this
Chapter.
Subd.4. Standards for Flood Fringe Conditional Uses:
.
a. Alternative elevation methods other than the use of fill may be utilized to elevate a
structure's lowest floor above the regulatory flood protection elevation. These alternative
methods may include the use of stilts, pilings, parallel walls, etc., or above-grade, enclosed
areas such as crawl spaces or tuck under garages. The base or floor of an enclosed area shall
be considered above-grade and not a structure's basement or lowest floor if: 1) the enclosed
area is above-grade on at least one side of the structure; 2) it is designed to internally flood
and is constructed with flood resistant materials; and 3) it is used solely for parking of
vehicles, building access or storage. The above-noted alternative elevation methods are
subject to the following additional standards:
(1) Design and Certification. The structure's design and as-built condition must be
certified by a registered professional engineer or architect as being in compliance
with thegenera1 design standards of the State Building Code and, specifically, that
all electrical, heating, ventilation, plumbing and air conditioning equipment and
other service facilities must be at or above the regulatory flood protection elevation
or be designed to prevent flood water from entering or accumulating within these
components during times of flooding.
(2) Specific Standards for Above-grade, Enclosed Areas. Above-grade, fully enclosed
areas such as crawl spaces or tuck under garages must be designed to internally
flood and the design plans must stipulate:
-11-
(a) A minimum area of openings in the walls where internal flooding is to be
used as a flood proofing technique. There shall be a minimum of two
openings on at least two sides of the structure and the bottom of all openings
shall be no higher than one-foot above grade. The automatic openings shall
have a minimum net area of not less than one square inch for every square
foot subject to flooding unless a registered professional engineer or architect
certifies that a smaller net area would suffice. The automatic openings may
be equipped with screens, louvers, valves, or other coverings or devices
provided that they permit the automatic entry and exit of flood waters
without any form of human intervention; and
(b) That the enclosed area will be designed of flood resistant materials in
accordance with the FP-3 or FP-4 classifications in the State Building Code
and shall be used solely for building access, parking of vehicles or storage.
b. Basements, as defined by Section 1101.02 Subd. 8.b. of this Chapter, shall be subject to the .
following:
(1) Residential basement construction shall not be allowed below the regulatory flood
protection elevation.
(2) Non-residential basements may be allowed below the regulatory flood protection
elevation provided the basement is structurally dry flood proofed in accordance with
Section 5.43 of this Chapter.
c. All areas of non residential structures including basements to be placed below the regulatory
flood protection elevation shall be flood proofed in accordance with the structurally dry flood
proofing classifications in the State Building Code. Structurally dry flood proofing must meet
the FP-l or FP-2 flood proofing classification in the State Building Code and this shall require
making the structure watertight with the walls substantially impermeable to the passage of water
and with structural components having the capability of resisting hydrostatic and hydrodynamic .
loads and the effects of buoyancy. Structures flood proofed to the FP-3 or FP-4 classification
shall not be permitted.
d. When at anyone time more than 100 cubic yards of fill or other similar material is located on
a parcel for such activities as on-site storage, landscaping, sand and gravel operations, landfills,
roads, dredge spoil disposal or construction of flood control works, an erosion/sedimentation
control plan must be submitted and approved by the City Engineer. The plan must be prepared
and certified by a registered professional engineer. The plan may incorporate alternative
procedures for removal of the material from the flood plain if adequate flood warning time
exists.
e. Storage of Materials and Equipment:
-12-
(1) The storage or processing of materials that are, in time of flooding, flammable,
explosive, or potentially injurious to human, animal, or plant life is prohibited.
(2) Storage of other materials or equipment may be allowed if readily removable from
the area within the time available after a flood warning and in accordance with a
plan approved by the City Council.
f. The provisions of Subd. 5 of this Section shall also apply.
Subd.5. Standards for All Flood Fringe Uses:
.
a. All new principal structures must have vehicular access at or above an elevation not more
than two (2) feet below the regulatory flood protection elevation. If a variance to this
requirement is granted, the Board of Adjustment and Appeals must specify limitations on the
period of use or occupancy of the structure for times of flooding and only after determining
that adequate flood warning time and local flood emergency response procedures exist.
b. Commercial Uses - accessory land uses, such as yards, and parking lots may be at
elevations lower than the regulatory flood protection elevation. However, a permit for such
facilities to be used by the employees or the general public shall not be granted in the absence
of a flood warning system that provides adequate time for evacuation if the area would be
inundated to a depth and velocity such that when multiplying the depth (in feet) times velocity
(in feet per second) the product number exceeds four (4) upon occurrence of the regional
flood.
.
c. Fill shall be properly compacted and the slopes shall be properly protected by the use of
riprap, vegetative cover or other acceptable method. The Federal Emergency Management
Agency (FEMA) has established criteria for removing the special flood hazard area
designation for certain structures properly elevated on fill above the 100-year flood elevation-
FEMA's requirements incorporate specific fill compaction and side slope protection standards
for multi-structure or multi-lot developments. These standards should be investigated prior to
the initiation of site preparation if a change of special flood hazard area designation will be
requested.
d. Flood plain developments shall not adversely affect the hydraulic capacity of the channel
and adjoining flood plain of any tributary watercourse or drainage system where a floodway
or other encroachment limit has not been specified on the Flood Insurance Rate Map.
e. Standards for recreational vehicles are contained in Section 1101.09 Subd. 3. of this
Chapter.
f. All manufactured homes must be securely anchored to an adequately anchored foundation
system that resists flotation, collapse and lateral movement. Methods of anchoring may
include, but are not to be limited to, use of over-the-top or frame ties to ground anchors. This
-13-
requirement is in addition to applicable state or local anchoring requirements for resisting
wind forces.
1101.06
RESERVED FOR FUTURE USE
1101.07
SUBDIVISIONS
Subd. 1. Review Criteria: No land shall be subdivided which is unsuitable for the reason of
flooding, inadequate drainage, water supply or sewage treatment facilities. All lots within the
flood plain districts shall be able to contain a building site outside of the Floodway District at
or above the regulatory flood protection elevation. All subdivisions shall have water and
sewage treatment facilities that comply with the provisions of this Chapter and have road
access both to the subdivision and to the individual building sites no lower than two feet
below the regulatory flood protection elevation. For all subdivisions in the flood plain, the
Floodway and Flood Fringe District boundaries, the regulatory flood protection elevation and
the required elevation of all access roads shall be clearly labeled on all required subdivision .
drawings and platting documents.
Subd. 2. Removal of Special Flood Hazard Area Designation: The Federal Emergency
Management Agency (FEMA) has established criteria for removing the special flood hazard
area designation for certain structures properly elevated on fill above the 100-year flood
elevation. FEMA's requirements incorporate specific fill compaction and side slope
protection standards for multi-structure or multi-lot developments. These standards should be
investigated prior to the initiation of site preparation if a change of special flood hazard area
designation will be requested.
1101.08
PUBLIC UTILITIES, RAILROADS, ROADS, AND BRIDGES
Subd. 1. Public Utilities. All public utilities and facilities such as gas, electrical, sewer, and water
supply systems to be located in the flood plain shall be flood proofed in accordance with the
State Building Code or elevated to above the regulatory flood protection elevation. .
Subd. 2. Public Transportation Facilities. Railroad tracks, roads, and bridges to be located within
the flood plain shall comply with Sections 1101.04 and 1101.05 of this Chapter. Elevation to
the regulatory flood protection elevation shall be provided where failure or interruption of
these transportation facilities would result in danger to the public health or safety or where
such facilities are essential to the orderly functioning of the area. Minor or auxiliary roads or
railroads may be constructed at a lower elevation where failure or interruption of
transportation services would not endanger the public health or safety.
Subd.3. On-site Sewage Treatment and Water Supply Systems: Where public utilities are not
provided: 1) On-site water supply systems must be designed to minimize or eliminate
infiltration of flood waters into the systems; and 2) New or replacement on-site sewage
treatment systems shall not be allowed, except where municipal sewer can not be extended to
the property. Where allowed, on-site sanitary sewer systems must be designed to minimize or
-14-
eliminate infiltration of flood waters into the systems and discharges from the systems into
flood waters and they shall not be subject to impairment or contamination during times of
flooding. Any sewage treatment system designed in accordance with the State's current
statewide standards for on-site sewage treatment systems shall be determined to be in
compliance with this Section.
11 01.09
MANUFACTURED HOMES AND AND PLACEMENT OF
RECREATIONAL VEHICLES.
Subd. 1. The placement of new or replacement manufactured homes on individual lots of record
that are located in flood plain districts will be treated as a new structure and may be placed
only if elevated in compliance with Section 1101.05 of this Chapter. If vehicular road access
for pre-existing manufactured homes is not provided in accordance with Section 1101.05
Subd. 5.a., then replacement manufactured homes will not be allowed until the property
owner(s) develops a flood warning emergency plan acceptable to the City Council.
.
a. All manufactured homes must be securely anchored to an adequately anchored foundation
system that resists flotation, collapse and lateral movement. Methods of anchoring may
include, but are not to be limited to, use of over-the-top or frame ties to ground anchors. This
requirement is in addition to applicable state or local anchoring requirements for resisting
wind forces.
Subd.2. Recreational vehicles that do not meet the exemption criteria specified in Subd. 3.a. below
shall be subject to the provisions of this Chapter and as specifically spelled out in Subd. 3.c. and
3.d. below.
a. Exemption - Recreational vehicles are exempt from the provisions of this Chapter if they
are placed in any ofthe areas listed in Subd. 2.b. below and further they meet the following
criteria:
.
(1) Have current licenses required for highway use.
(2) Are highway ready meaning on wheels or on an internal jacking system, are
attached to the site only by quick disconnect type utilities commonly used in
campgrounds and recreational vehicle parks and the recreational vehicle has no
permanent structural type additions attached to it.
(3) The recreational vehicle and associated use must be permissible in any pre-existing,
underlying zoning use district.
b. Areas Exempted For Placement of Recreational Vehicles:
(1) Individual lots or parcels of record.
(2) Existing condominium type associations.
-15-
c. New residential type subdivisions and condominium associations and the expansion of any
existing similar use exceeding five (5) units or dwelling sites shall be subject to the following:
(1) Any new or replacement recreational vehicle will be allowed in the Floodway or
Flood Fringe Districts provided said recreational vehicle and its contents are placed
on fill above the regulatory flood protection elevation and proper elevated road
access to the site exists in accordance with Section 1101.05 Subd. 5.a. of this
Chapter. No fill placed in the floodway to meet the requirements of this Section
shall increase flood stages of the 100-year or regional flood.
(2) All new or replacement recreational vehicles not meeting the criteria of (a) above
may, as an alternative, be allowed as a conditional use if in accordance with the
following provisions and the provisions of Section 1101.10 Subd. 4. of this Chapter.
The applicant must submit an emergency plan for the safe evacuation of all vehicles
and people during the 100 year flood. Said plan shall be prepared by a registered .
engineer or other qualified individual, shall demonstrate that adequate time and
personnel exist to carry out the evacuation, and shall demonstrate the provisions of
Subd. 3.a. and b., above will be met. All attendant sewage and water facilities for
new or replacement recreational vehicles must be protected or constructed so as to
not be impaired or contaminated during times of flooding in accordance with
Section 1101.08 Subd. 3. of this Chapter.
1101.10
ADMINISTRATION
Subd. 1. Zoning Administrator: A Zoning Administrator or other official designated by the City
Council shall administer and enforce this Chapter. Ifthe Zoning Administrator finds a
violation of the provisions of this Chapter, the Zoning Administrator shall notify the person
responsible for such violation in accordance with the procedures stated in Section 1101.12 of
this Chapter.
Subd. 2. Permit Requirements:
.
a. Permit Required. A Permit issued by the Zoning Administrator in conformity with the
provisions of this Chapter shall be secured prior to the erection, addition, modification,
rehabilitation (including normal maintenance and repair), or alteration of any building,
structure, or portion thereof; prior to the use or change of use of a building, structure, or land;
prior to the construction of a dam, fence, or on-site septic system; prior to the change or
extension of a nonconforming use; prior to the repair of a structure that has been damaged by
flood, fire, tornado, or any other source; and prior to the placement of fill, excavation of
materials, or the storage of materials or equipment within the flood plain.
b. Application for Permit. Application for a permit shall be made in duplicate to the Zoning
Administrator on forms furnished by the Zoning Administrator and shall include the following
where applicable: plans in duplicate drawn to scale, showing the nature, location, dimensions,
-16-
and elevations of the lot; existing or proposed structures, fill, or storage of materials; and the
location of the foregoing in relation to the stream channel.
c. State and Federal Permits. Prior to granting a permit or processing an application for a
conditional use permit or variance, the Zoning Administrator shall determine that the
applicant has obtained all necessary state and federal permits.
d. Certificate of Zoning Compliance for a New, Altered, or Nonconforming Use. It shall be
unlawful to use, occupy, or permit the use or occupancy of any building or premises or part
thereof hereafter created, erected, changed, converted, altered, or enlarged in its use or
structure until a certificate of zoning compliance shall have been issued by the Zoning
Administrator stating that the use of the building or land conforms to the requirements of this
Chapter.
.
e. Construction and Use to be as Provided on Applications, Plans, Permits, Variances and
Certificates of Zoning Compliance. Permits, conditional use permits, or certificates of zoning
compliance issued on the basis of approved plans and applications authorize only the use,
arrangement, and construction set forth in such approved plans and applications, and no other
use, arrangement, or construction. Any use, arrangement, or construction at variance with that
authorized shall be deemed a violation of this Chapter, and punishable as provided by Section
1101.12 of this Chapter.
f. Certification. The applicant shall be required to submit certification by a registered
professional engineer, registered architect, or registered land surveyor that the finished fill and
building elevations were accomplished in compliance with the provisions of this Chapter.
Flood proofing measures shall be certified by a registered professional engineer or registered
architect.
.
g. Record of First Floor Elevation. The Zoning Administrator shall maintain a record of the
elevation of the lowest floor (including basement) of all new structures and alterations or
additions to existing structures in the flood plain. The Zoning Administrator shall also
maintain a record of the elevation to which structures or alterations and additions to structures
are flood proofed.
h. Notifications for Watercourse Alterations. The Zoning Administrator shall notify, in
riverine situations, adjacent communities and the Commissioner of the Department of Natural
Resources prior to the community authorizing any alteration or relocation of a watercourse. If
the applicant has applied for a permit to work in the beds of public waters pursuant to
Minnesota Statute, Chapter 103G, this shall suffice as adequate notice to the Commissioner of
Natural Resources. A copy of said notification shall also be submitted to the Chicago
Regional Office of the Federal Emergency Management Agency (FEMA).
i. Notification to FEMA When Physical Changes Increase or Decrease the 100-year Flood
Elevation. As soon as is practicable, but not later than six (6) months after the date such
supporting information becomes available, the Zoning Administrator shall notify the Chicago
-17-
Regional Office ofFEMA of the changes by submitting a copy of said technical or scientific
data.
Subd.3. Board of Adjustment and Appeals:
a. Rules. The City Council, serving as the Board of Adjustment and Appeals, shall adopt
rules for the conduct of business and may exercise all of the powers conferred on such Boards
by State law.
b. Administrative Review. The Board of Adjustment and Appeals shall hear and decide
appeals where it is alleged there is error in any order, requirement, decision, or determination
made by an administrative official in the enforcement or administration ofthis Chapter.
c. Variances. The Board of Adjustment and Appeals may authorize upon appeal in specific
cases such relief or variance from the terms of this Chapter as will not be contrary to the
public interest and only for those circumstances such as hardship, practical difficulties or .
circumstances unique to the property under consideration, as provided for in the respective
enabling legislation for planning and zoning for cities or counties as appropriate. In the
granting of such variance, the Board of Adjustment and Appeals shall clearly identify in
writing the specific conditions that existed consistent with the criteria specified in this
Chapter, any other zoning regulations in the city, and in the respective enabling legislation
that justified the granting of the variance. No variance shall have the effect of allowing in any
district uses prohibited in that district, permit a lower degree of flood protection than the
regulatory flood protection elevation for the particular area, or permit standards lower than
those required by state law. The following additional variance criteria of the Federal
Emergency Management Agency must be satisfied:
(1 ) Variances shall not be issued within any designated regulatory floodway if any
increase in flood levels during the base flood discharge would result.
(2) Variances shall only be issued upon: (i) a showing of good and sufficient cause; (ii) .
a determination that failure to grant the variance would result in exceptional
hardship to the applicant; and (iii) a determination that the granting of a variance
will not result in increased flood heights, additional threats to public safety,
extraordinary public expense, create nuisances, cause fraud on or victimization of
the public, or conflict with existing local laws or ordinances.
(3) Variances shall only be issued upon a determination that the variance is the
minimum necessary, considering the flood hazard, to afford relief.
d. Hearings. Upon filing with the Board of Adjustment and Appeals of an appeal from a
decision of the Zoning Administrator, or an application for a variance, the Board of
Adjustment and Appeals shall fix a reasonable time for a hearing and give due notice to the
parties in interest as specified by law. The Board of Adjustment shall submit by mail to the
Commissioner of Natural Resources a copy of the application for proposed variances
-18-
o
.s
~
o
o
o
.....
...
g
en
~
-0
5
...
...
~
o
-
~
o
>
.....
o
o
e
-
-
.....
~
a
l:l
o
.....
en
.~
o
U
o
.s
~
.s
o
en
o
o
!a
.g
l:l
.....
>>
':;:l
l:l .
o 00
..... l:l
O'C
e (ij
~]
a; 0 ~ cd
o.s >> 0
p.. oo.s ~ .<;:: -g 0....
~.~ .~ .~ en $=l S en:: '0
..s::: en e .<;:: I:: l:l'::I a; :;j
g~c OMOtSO~..s:::~
en 'E ~ 0 tS ~ l:l..s::: ~ en 0
l:l .El sa;.:::::: en'l:: 8 ~ 0 fG en
o o-o,.o$=lp.. ~l:lo~
$=l ~ ~ tl 5. 0 e.S ~..8 !a-o
o '-" 0 0 ~ p.. 0 M Cd'C-"
..... . O...d MOp.. ~ cd - (ij 0
.~ M l:l ~ ~ M i:'d 5h .9 ......
~ -d..... >>~ 0 o..s::: 0 > > '-"
-0 .g .~ ~ ~.s ~ :E ~ cd gp 5
cd U) l:l 0 0 -0 0 :> en -0 ''::: ......
...... OdMcen>>>-oOC:m
CdO'\'.oQOtlSe ~cStIS.
00'! 0 M~""" p..~ tIS 0 5h...
> It) cd 0 J;j 0 ...... en 0 .....
.~ ........s::: ~ en ~ ~ 0 l:l -0 ~ ~
. 0 t '!j ~ d ...... 0 0 0 en
~ :;j (ij.s 0 Q l:l:-E,.o..... 0
::::l ... en p.. F; en ..... 0 "l:l _.~ 0
cd U) en l:l.g 00 l:l',::: l:l a; 0 ~
~ d ~.;: <(.El :g ~ 8 ~ ~ ~
enl:ll:lO ;.aJjU) _0
a;..... 0 >> 00 l:l en ..s::: -d' a; P:::
"'0::::'4__l:lt+:;:;jl:lO,,
.... ~ - '!j .=.....:;j.... ~ -
p..>>ooQo-O-oen~ocd
<',.0 en~~~.s~~~ k >>.8
-0 ~ ~ ~ o..s::: O'~ en OIl go Zcd
C -0 S ~ .s ~ -0 0 s.~ 0
tIS .s:..... ~ ~ ~ ~'.:;:l 0 <( ~
~ol:lti-<OOOO cdO
OMOcd$=l$=l"",~-!a .a
s:: p.. $=l 0 ..... - 0 0 0 s::
.t:l ~ ~ tl.+:/ i ~ .s > .~ c-i 0
en Q :;j 0 Cd en ~ > ...... .~
~''::: ~ ~.~ gp 8 ~ ri 0 5 .~en
....... ~ <( ~ 1::''::: C ..s::: ..... .s '.0
..... 0 ~ 0 O'J:: tIS 0 ;r..s::: 0
~ B 0 M~ l) ~.~ ~..s:::.o ~ 0
-ocd"Ea-o$=l>enU:EMU
ta ti ~ a tl..... cd].~ ~ ~ 0
o 0 c.Q i:'d r:: 5 bI):;j.s a l:l.s
c.Q ..s::: ..s::: 0..... s:: bI) ~ -0 ::l 0
o ..... 0 u..... en'-= 0 0 l:l 0 .....
,.s::l .~ .s .en 'n'~ ~ ~ en ::l:o ~
f-t~....-j~:E o~ k en ~ en ~ d
..... ca ..... -0 OIl "l:l 0 e - Q
~ ~ 8. ~ ....r.~ .El !a e. o'~ >>
oOp..enl:lo 13.....13,.0
..... 0 cd l:l O...!:d ui ~ p.. 0 p..-O
.~ !a C 0 S 'td $=l 0 o.s M ~
O'C tIS'~ 0 S o'.o..s::: ~ 0 M .
Q (ij S::'S:'s - .~ :.e ..... 0 a ca l:l
> 0 0 0" a;'~ l:l.s t i:'d ~.9
A' M p.. M o..s::: 0 0..... (ij..s::: r:; ...
.... O::l p..M en-o 0 ~ p..utS ~
o
,.0.
>>fG
cd:a
S Cd
en .....
a;U)
o cd
p.......
<'~
"l:l S
!a.....
.....::E
5 >>
E~
en en
:;j-
.= cd
~]
~
o 0
-0-0
ta 0
oU
c.Qgp
O'S
.s 0
~N
O"l:l
r:: 0
o 0
.~ ~
..... 0
o M
o 0
-o..s:::
:>,U)
!a-:5
S l:l
0.....
cl:l-o
en 0
-t+:;
cd.....
o 0
p..o
<'~
en
.cd
en-o
11 !a
p.. ~
<'i
4-< S
.
gp
]
]
.....
uf
r::
o
.....
.....
~
o
o
!a
.~
>
-
-
cd
~
o
'E
o
o
e
cd
l:l
'a3
-S
'a3
S
-
a;
..c
en
co
..... 0
U !a
o :;j
..s::: en
f-t .~
. .=
000
.S .s
g-M
otS
~ r::
"E .9
o~
o 0
Ot+:;
p:::'':::
en
':;j
00........
]
o
~ ~
r:: gp r::
8'S.9
M 0 ~
oN.....
~-:5~
.9 0 UO
~.....
o -0 00
..... 0 d
- ~.:::I
~'S ~
0,.0-
-o:;jp...
..... en 0
00...d
O,.o~
"l:l_o
-oa;'"
!a ~ 5
ta en'+:/
o l:l Cd
..s:::.9 .~
::::l1dP..
]] ~
en p.. 0
:-a <,.s
a .]
o a ~
U......r:;
C;r 0
..... ..c ~
uU5
o.~ .s
~.s::::l
M cd
ui~~
~ a 0
::~~
~~tld
o en ..... 0
',:::.~ cd.....
:.ae~~
$=l o'S 0
Uo p.......-O
en F;'~
o.g $=l
o::t~<(8
-d
.g
U)
en
o
ll,@
en 0
.!9 0
5 e
S p..
o 00
.!;:l .S
g.~
0.9
M -
a;tS
.@-:5
o ~
o l:l
o 0
M.....
p..;~
0-0
.s-g
.s.El
.....
o .
o 0
.="l:l
.g 0
enU
0.0
,.0 .....
-u
a;-o
~ 0
en 0
.~ ~
o..s:::
p..U)
o 0
~.s
a;~
l:l 0
o'<:t
'.0 ~
:.eO"
l:lC'l-O
0...... 0
Ur::3
.0-
0'.0 ~
,g~ti
cD U) 0
o d 0
o .:::1 ,.0
M"ā¬_
p... -
cd
cdtS~
.
~
o
a;c
l:l;.::::::
0.....
..::: ,.0
:.a~
-0 .....
tU ~
]-:5
r:: 00
o l:l
.~:s
e e
tS.8
l:l 0
..... -0
OOM
.~ tS
.9~
-ti
tSc
0.....
.su
~ 0
o.s CD
-5 :>, ~
:;j,.o-o
en i>> 0
..s::: a en
en 0
..... en p..
]enO
o M
~ p..
l:l 0
.9"l:l.s
d 0 M
tlSStS
o 0
..... 0 0
P.. -0 .~
p..enen
cd cd ~
o$=l-
.s.9 e
o ~.....
.!;:l $=l i
:;j I:: p..
0" tS 0
~.S .s
-..
......
'-"
~ 0
::::l.s
t+:;~
d'ufO
00p..
.+:/ ~.....
Cd~..c
o 0 ~
.9 E.9
o"en~
~-o-
~ 0 e
Cd (S 0
l:l p.. ...d
OO~
.sM-o
ooe!a-o
l:l 0 ~ C
.~ bI) fG ~
g..a ~'Q)
_enen~
en..... cd
o :< 0
_Od..c
cd ~ Q .-
o ..... 00 ....
s~tE~
p.s02
~ ~ e ti
cd 0 p..o
~r::-o...d
OO~
en'.:;:l 0 ~
!a Cd ~ 0
_ > ~ l:l
p..0 en 0
~ 'Q) a; '.g
o "l:l'1:: 0
.2 !a ~ .9
goufS~
or::~~
-...9 0 0
It) rI:l 0"'"
'-" r:l bI) 0
o 0 cd >
> S M 0
..... ~ .9 ,.0
~'1::Jencd
'2'
'-"
on>>
.S -
::::lp..
t+:;g.
oaen
l:l a
t+:;.....
o Cd
e ~
p.. en~
-0 a;
0'1::
o 0
~1d
ufS
a;~
'1:: 0
o 0
~OO
S e!
-0.9
!a en
r::'i
o 0
..... ~
t> ....
~ e
5 S-
o.....
OO'Q)
~ ~
's..c ui
,.0 c:.~
M 00;'::::::
tS.S .~
en"l:l~
l:l cd
.9 5h ~
Tj oa.~
:s.a 8
~ "l:l en
&.s]
I
0'\
......
I
-..
e
(2) Transmit one copy ofthe information described in subsection (a) to a designated
engineer or other expert person or agency for technical assistance, where necessary,
in evaluating the proposed project in relation to flood heights and velocities, the
seriousness of flood damage to the use, the adequacy of the plans for protection, and
other technical matters.
(3) Based upon the technical evaluation of the designated engineer or expert, the City
Council shall determine the specific flood hazard at the site and evaluate the
suitability of the proposed use in relation to the flood hazard.
d. Factors Upon Which the Decision of the City Council Shall Be Based. In passing upon
conditional use applications, the City Council shall consider all relevant factors specified in
other sections of this Chapter, and:
(1) The danger to life and property due to increased flood heights or velocities caused
by encroachments.
(2) The danger that materials may be swept onto other lands or downstream to the
injury of others or they may block bridges, culverts or other hydraulic structures.
.
(3) The proposed water supply and sanitation systems and the ability of these systems to
prevent disease, contamination, and unsanitary conditions.
(4) The susceptibility of the proposed facility and its contents to flood damage and the
effect of such damage on the individual owner.
(5) The importance of the services provided by the proposed facility to the community.
(6) The requirements of the facility for a waterfront location.
(7) The availability of alternative locations not subject to flooding for the proposed use. .
(8) The compatibility of the proposed use with existing development and development
anticipated in the foreseeable future.
(9) The relationship of the proposed use to the comprehensive plan and flood plain
management program for the area.
(10) The safety of access to the property in times of flood for ordinary and emergency
vehicles.
(11) The expected heights, velocity, duration, rate of rise, and sediment transport of the
flood waters expected at the site.
(12) Such other factors which are relevant to the purposes of this Chapter.
-20-
.
.
e. Conditions Attached to Conditional Use Permits. Upon consideration of the factors listed
above and the purpose of this Chapter, the City Council shall attach such conditions to the
granting of conditional use permits as it deems necessary to fulfill the purposes of this
Chapter. Such conditions may include, but are not limited to, the following:
(1) Modification of waste treatment and water supply facilities.
(2) Limitations on period of use, occupancy, and operation.
(3) Imposition of operational controls, sureties, and deed restrictions.
(4) Requirements for construction of channel modifications, compensatory storage,
dikes, levees, and other protective measures.
(5) Flood proofing measures, in accordance with the State Building Code and this
Chapter. The applicant shall submit a plan or document certified by a registered
professional engineer or architect that the flood proofing measures are consistent
with the regulatory flood protection elevation and associated flood factors for the
particular area.
1101.11
NONCONFORMING USES
Subd. 1. A structure or the use of a structure or premises which was lawful before the passage or
amendment of this Chapter but which is not in conformity with the provisions of this Chapter
may be continued subject to the following conditions. Historic structures, as defined in the
Code of Federal Regulations, Part 60, shall be subject to the following provisions:
a. No such use shall be expanded, changed, enlarged, or altered in a way that increases its
nonconformity.
b. Any structural alteration or addition to a nonconforming structure or nonconforming use
which would result in increasing the flood damage potential of that structure or use shall be
protected to the Regulatory Flood Protection Elevation in accordance with any of the
elevation on fill or flood proofing techniques (Le., FP-l thru FP-4 flood proofing
classifications) allowable in the State Building Code, except as further restricted in Subd. l.c.
and f. below.
c. The cost of any structural alterations or additions to any nonconforming structure over the
life of the structure shall not exceed 50 percent of the market value of the structure unless the
conditions of this Section are satisfied. The cost of all structural alterations and additions
constructed since the adoption of the Community's initial flood plain controls must be
calculated into today's current cost which will include all costs such as construction materials
and a reasonable cost placed on all manpower or labor. If the current cost of all previous and
proposed alterations and additions exceeds 50 percent of the current market value of the
-21-
structure, then the structure must meet the standards of Sections 110I.04 and 11OI.05 of this
Chapter for new structures, depending upon whether the structure is in the Floodway or Flood
Fringe District, respectively.
d. If any nonconforming use is discontinued for l2 consecutive months, any future use ofthe
building premises shall conform to this Chapter.
e. If any nonconforming use or structure is substantially damaged, as defined in Section
1101.02 Subd. 8.s. of this Chapter, it shall not be reconstructed except in conformity with the
provisions of this Chapter. The applicable provisions for establishing new uses or new
structures in Sections 11OI.04 and 110I.05 will apply, depending upon whether the use or
structure is in the Floodway or Flood Fringe District, respectively.
f. Ifa substantial improvement occurs, as defined in Section 110I.02 Subd. 8.s. of this
Chapter, from any combination of a building addition to the outside dimensions of the existing
building or a rehabilitation, reconstruction, alteration, or other improvement to the inside .
dimensions of an existing nonconforming building, then the building addition (as required by
Subd. Lb., above) and the existing nonconforming building must meet the requirements of
Section 1101.04 and 1101.05 of this Chapter for new structures, depending upon whether the
structure is in the Floodway or Flood Fringe District, respectively.
1101.12
12.0 PENALTIES FOR VIOLATION
Subd. 1. Violation of the provisions of this Chapter or failure to comply with any of its
requirements (including violations of conditions and safeguards established in connection
with grants of variances or conditional uses) shall constitute a misdemeanor and shall be
punishable as defined by law.
Subd. 2. Nothing herein contained shall prevent the City of Shorewood from taking such other
lawful action as is necessary to prevent or remedy any violation. Such actions may include .
but are not limited to:
a. In responding to a suspected ordinance violation, the City may utilize the full array of
enforcement actions available to it including but not limited to prosecution and fines,
injunctions, after-the-fact permits, orders for corrective measures or a request to the National
Flood Insurance Program for denial of flood insurance availability to the guilty party. The
City must act in good faith to enforce these official controls and to correct ordinance
violations to the extent possible so as not to jeopardize its eligibility in the National Flood
Insurance Program.
b. When an ordinance violation is either discovered by or brought to the attention of the
Zoning Administrator, the Zoning Administrator shall immediately investigate the situation
and document the nature and extent of the violation of this Chapter. As soon as is reasonably
possible, this information will be submitted to the appropriate Department of Natural
-22-
-
Resources' and Federal Emergency Management Agency Regional Office along with the
City's plan of action to correct the violation to the degree possible.
c. The Zoning Administrator shall notify the suspected party of the requirements of this
Chapter and all other official controls and the nature and extent of the suspected violation of
these controls. If the structure and/or use is under construction or development, the Zoning
Administrator may order the construction or development immediately halted until a proper
permit or approval is granted by the Community. If the construction or development is
already completed, then the Zoning Administrator may either: (1) issue an order identifying
the corrective actions that must be made within a specified time period to bring the use or
structure into compliance with the official controls; or (2) notify the responsible party to apply
for an after-the-fact permit/development approval within a specified period oftime not to
exceed 30-days.
.
d. If the responsible party does not appropriately respond to the Zoning Administrator within
the specified period of time, each additional day that lapses shall constitute an additional
violation of this Chapter and shall be prosecuted accordingly. The Zoning Administrator shall
also upon the lapse of the specified response period notify the landowner to restore the land to
the condition which existed prior to the violation of this Chapter.
1101.13
AMENDMENTS
The flood plain designation on the Flood Insurance Rate Map shall not be removed from flood plain
areas unless it can be shown that the designation is in error or that the area has been filled to or
above the elevation of the regulatory flood protection elevation and is contiguous to lands outside
the flood plain. Special exceptions to this rule may be permitted by the Commissioner of Natural
Resources ifhe determines that, through other measures, lands are adequately protected for the
intended use.
.
All amendments to this Chapter, including amendments to the Flood Insurance Rate Map, must be
submitted to and approved by the Commissioner of Natural Resources prior to adoption. Changes
in the Official Zoning Map must meet the Federal Emergency Management Agency's (FEMA)
Technical Conditions and Criteria and must receive prior FEMA approval before adoption. The
Commissioner of Natural Resources must be given 10-days written notice of all hearings to
consider an amendment to this Chapter and said notice shall include a draft of the ordinance
amendment or technical study under consideration.
-23-
EFFECTIVE DATE: This Ordinance shall be in full force and effect from and after its passage
and approval and publication, as required by law.
Adopted by the Shorewood City Council
This 13th day of August, 2004
Attest:
Woody Love
, Mayor
Attest:
Craig W. Dawson
, City Administrator/Clerk
Stamp With Community Seal:
-24-
-
.
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOOD, MINNESOTA 55331-8927 · (952) 474-3236
FAX (952) 474-0128. www.cLshorewood.mn.us. cityhall@cLshorewood.mn.us
MEMORANDUM
Date: September 9, 2004
.
From:
Honorable Mayor and City Council Members ~_. ,.,~
Bonnie Burton, Finance Director/Treasurer ,/ ~
Larry Brown, Public Works Director ~
To:
Re: Capital Improvement Program (CIP) for Years 2005 - 2009
cc: Craig Dawson, City Administrator
.
INTRODUCTION
Enclosed for your review is the Capital Improvement Program (CIP) for the Years 2005 - 2009.
The CIP has been reviewed and revised by staff and Council during several work-sessions over
the past few months. The CIP is typically the first step in the budget process, with identification
of specific capital expenditures which will direct the efforts of the 2005 budget.
As Council will recall, the approach taken in developing the CIP is that it is intended to be a
flexible document, and an important physical as well as financial planning tool. The first year of
the CIP is most definite in terms of planning and implementation. The latter years of the CIP are
most subject to change. A recommended fiscal policy section has been added at the beginning of
the document to assist in setting priorities for projects.
CIP HIGHLIGHTS
Council will recall the following highlights: .
. Numerous water system enhancements are contemplated for 2005.
. A Document Retrieval System and other information technology upgrades are programmed
for the Public Facilities/Office Equipment fund for 2005.
. Funds have been allocated for City Hall maintenance and repair in 2005.
. The Municipal State Aid Roadway fund will be exhausted by the Smithtown Road
rehabilitation project in 2005 and an advance for the City's portion of the County Road 19
intersection. The CIP reflects the advance and repayment of these MSA funds.
#.
\,.1 PRINTED ON RECYCLED PAPER
tqA
. The Stormwater Management fund allocates $30,000 annually starting in 2006 for drainage
projects and it also reflects the Gideon Glen improvements.
. The Land and Open Space Acquisition fund is a new fund that was established at the
recommendation of the LCEC. Annual contributions of $5,000 will be transferred from the
General Fund.
The CIP does not automatically commit the Council to implement any of the projects listed in it;
it is a planning document to focus resources and a document for financial planning. Individual
projects are to be approved in the annual budget process and later authorized for purchase or
award of contracts according to standard operating procedures.
RECOMMENDED ACTION
Staff recommends that the City Council approve the attached resolution accepting the 2005-2009
Capital Improvement Program.
.
.
I
I
I
I
I
I
I,
I
I
I
I
I
I
1/
~I
I
I
I
I
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128. www.ci.shorewood.mn.us. cityhall@ci.shorewood.mn.us
CAPIT AL
IMPROVEMENT
PROGRAM
Calendar Years ,2005 - 2009
J
August 2004
n
~.1 PRINTED ON RECYCLEO PAPER
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CAPITAL IMPROVEMENT PROGRAM
2005-2009
TABLE OF CONTENTS
I. INTRODUCTION AND POLiCy............................................................. 1-3
II. TABLES
A. Department Summary ...........................................................................7
B. Projects by Department................................................................... 8-10
C. Sources of Revenue ...........................................................................11
D. Projects by Department and Funding Source ............................... 12-15
E. Projects by Funding Source with Balances................................... 16-19
III. CAPITAL IMPROVEMENT PLAN
A. Municipal Water System.................................................................... .23
B. Municipal State Aid Roadway System.................................................41
C. Local Street Reconstruction................................................................ 47
D. Stormwater Management.................................................................... 63
E. Sanitary Sewer System....................................................................... 71
F. Public Facilities and Office Equipment ................................................81
G. Equipment Replacement Fund........................................................... 95
H. Park and Recreation .........................................................................117
I. Trail System ......................................................................................121
J. Land and Open Space Acquisition ....................................................123
-
-
-
z
o
i=
o
::J
C
o
a:
I-
z
-
(ij.:!:"O
a. C
.- . CG
.2 CJ) en
cO_
::JOC
E~ E
..... 0) (I)
0:J>
(1)00
,-'-
- ..c a.
.g-E
(I) LO .-
..coo
~~.~
o
"OCJ)"'"
(I) ,-a.
_CG_
CG(I)CG
C >- :t::
.- a.
"O(I)CG
0= 0
0,-"0
00(1)
CG - C
en C
en(l)~
.- en a.
CG
-..c (I)
o..o..c
- '--
O::J,-
......... a. 0
-
E "0 >-
CGcCG
c,CGa.
o - 0
'-~-
o..C(I)
_(I)::J
cEc
(1)(1)(1)
E>>
(1)0(1)
,-'-
~ a.'O
,-E
a.'- en
E -(I)
-~~
_~::J
CG.-.O
:t::Oenen
a.'-en(l)
CG a. (I) en
o -.- CG
~:S..c
en'- C 0
.- a. (I) '-
..cCG"C:J
I- 0 ._ a.
.
-
-
-(I)
O..c
(I)....
E"O
-c
(l)CG
..c
-
en"C
(1)(1)
....-
CG :J
0"0
.- (I)
"O..c
.s: 0
en
a;
..cC
-(I)
-(I)
CG.o
en
oen
a.CG
e..c
a.
....(1)
0>-
(I) ::J
'o:t:: ai
'- "0 '-
a.c::J
(1)-
CG a.:.c
.....xc
0(1)(1)
en,-a.
""ox
.~ (I)
en__
COCG
O(l)..c
o .-.....
0>-
c>-o
CG a._
o..(I)~
_..co
c"" >-
(I)....:J
ECGo
(I)..c en
> - 0)
o'-c
>- CG'-
a.(I)"C
E >- 5
-
-""':-(1)
CGo_
:t::(I)CG
a..-. .-
CGO>-
O,-a.
a.o
>-
(I) (I) a.
..c ..c a.
I-_CG
-
-
(I) (I) "C "0 _en .~
.~.~ 5 5 ~-
en en \\1 \\1 .- .-
cCO)enog
(I)(I)c>-(I):J
-a3 -a3.c m = 00
'-'-c>-
a.a.CG ..c
E E a. (I) :t:: ~
o 0 .~ ~ .-
00 >-..... 0
o ....
(I)(I)=x~(I)
..c..cO(l)....:5
-_a.cCJ)
'0 '0 c (I) .~ E
(I)..c 0 CG
"E = (I).... 0 c, .
(I) enl!; >-eno en
EE(I)~-,-(I)
(l)e:!.oo~o..~
(j) g (I) (I) E "E is
_ '- 0) ~ (I) (I) en
C a. "'0 CG > E (I)
CG .C - 0 '-
- -.0 '- (1)_
>- en = a. > CG
8.."0 (I) ~ E e'o
E (I)..c .- a. c
.- -[.... ~ (ij E ~
c a..~ 0 :t:: - ;0:::
CG a.-
-.:!: (I) CG CG ..c
.~ ~ ..c 0 :t: :s:
CG ..... 0) ~ >
E-C\lccoen
a. 0 .- -
CG = (1)._ 0 '-'
'- 0) - C en (I)
0) .. CG 0 CG'- (I)
o"""o..~c:5c
>- a. --'- -
o..(I)c"O-:5~
-- 0 (I)-g5'-
~ en t:::6 CG:::> ~
E~~enO) --a
~ en 0 :: ~ ~ _en
o. -CG-~
'- en en t:: 0.. .-
a. en ~ . (I) (I) 0
E ~ 0 5."'Oc.~ (I)
o 0.- en ..c
-,-'-a;:Jc-
~ a. 0.. "E c (I) 0)
'i5.. 0) 0) (I) .- ..c .S:
CGccE"C~a;
o 'c .c (I) 5 a.E c,
(l)C~a..>- (I)
..c~-E(I)o"E
I- a. 0.. __ .0 0 --
-
-
-
(I) (I) ~:t:: 0
..c - .- -
-CGoenen
'- "0 CG (I)
(I) g- (I) .... 0
> ..cc'-
o -(I)::J
(l)S~Eg
0) \\1 ::J (I)
C "'0 0 '-
CG~(I)o(ij
..co (I) ..c "'0 ._
-- 0
a; _!a 0) C
enc '-.0 C CG
CG-- c
o ,.. _ c._
;;~enC"'"
0-- (I) CG
(I) ~ - en
.-'0 en a..~
-(I) .....
o..E;;(ij;;
CG.-.- c
"0'-00(1)
C 0)-- C "'0
o '- CG.-
CG '- a. c "0
u.ia.c;o:::c
(I) "'0 0 _ CG
0.- a. c
'- .2 :J CG en
::J- t::"'O
o CG"'O 0 (I)
en (I) a. (I)
~(I)~Ec
u.i.o .0 .- C
"'0 .9 "'0 ~ (l)E
(I) (1)(1)
(I) en a; > (I)
C "'0 "'0 >
_ (I) a. a:s 0
CG(I):Joo..
:5C enE
(I) 0.. -g a:s .-
-~ 0 CG en CG
C "0 .- :t:
g~~:::~
0-> 0
(I) (I)"::
'- a) -S; CG _en en
o '- (I) (I) >- "'0
_ 0 '- >-:t:: (I)
-<Den..cO(l)
c '- .- 0 c
a:s(l)-CG(I)(I)
t::..c-(I)..cCJ)
01- - .... 0
a. ~-en..c
E . (ij '0 "0 -
.- en ::J C (I) -
en ~ C ::J.-. (I)
.- Q) C 00 e (l)E
::: >- CG a.
-
-
~
o
(I)
..c
-
>-
.0
"'0
(I)
>
e
a.
a.
a:s
(I)
.0
-
en
::J
E
E
a:s
'-
0)
o
'-
a.
en
:c
-
C
"'0
(I) en
;0:::(1)
;;en
Cen
(1)(1)
:go
o
.~ 0..
..c(ij
.2 E
..c'-
~g
-'-
-(I)
0"'0
.~c
e ::J
a.=
o
..cC
0::J
CGO
wO
-
-
-
-
-
-
-
-
-
COMPREHENSIVE
PLANNING PROCESS
Planning Inventory
., ,
Planning Tactics
Physical - Economic - Social
I Land \ Transportation I Com~u.nity I Population Property Market \
Use Faclhtles Values Potentials
., ,
Policy Plan
Inventory Analysis Goals and Planning &
Objectives Development
Policies
~ ..
Plans, Projects, Programs
~ r
Implementation
I ., r ., .. ., , ~
2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
>
o
::i
o
Q.
...I
<C
o
en
i!
en
I-
z
W
~
W
>
o
a:
Q.
~
...I
<C
I-
-
Q.
<(
o
>
o
::::i
o
a..
..J
~
a:
w
z
w
CJ
c
o
~
"'0 0
0) -
"'0 en
O)c,,,-
.c........c
-....c0)
_o-E
0- ~
_ .~ 0 w
c:_ ~O)
0)-0)>
E en g.5
en_m~ .
~ccO)en
en 0) 0) >0)
en E c 0 .2
m 0) .- ~ ~
c: > Em.c 0)
me oen
en o......:-.c 3=
-ECo.O)
0.- 0) 0) c
~oE:::-
0) .- 0) 'u 0
~mo.cc
EEm...o
0. 'u .-
~ 0 O).c.~
0>- ~ en >
e~oene
a..o.-Eo.
en 0"'0$0)
E-~en-S
0) ~.3 ~ ~o
E"- 0-
=O)O>en
O).g~cE
> 'u .-
o -cWO)
~ en 0).- -
o.:t::: X en
E "'0 E 0) >-
c-_en
=menoo>
m O)>-c:
_ en > 0"-
.- "'0 c: -
0. 0).- c en
m 0) 0).-
O 0) '-.- x
c_oO)
~en ~en ~ ~ '0
"'0 ~- c
g.- >- "'0 0
:> C 0 0)"_
:>:J= en en
~~~~~
.coO)ox
CJ) 0 -:5.5 0)
en
w
i=
a:
o
a:
a..
CJ
z
C
Z
:J
LL.
.!!2
en
m
.c
>-
-
"C
o
.C
0.
0>
C
.~
.Q
o
-
0)
.c
-
c
o
"'0
0)
"'0
c:
:J
-
0)
.c
~
m
'-
0)
c
0)
0>
"~
en
m
en
o
0.
o
~
0.
0>
.5
"'0
c
0)
0.
en
as
:t:::
0.
m
o
0)
~
m
-
(j)
3=
"'0
c
m
.c
-
(ij
0)
.c
.2
::c
:J
0.
0)
.c
-
o
-
0>
c
+=-
:J
.c
"C
-
c
o
o
~
o
-
~.
m
en
en
0)
o
0)
c
en
'0
0)
.0
~
0.
0)
en
o
.c
I-
,...
E
0)
-
en
>-
en
0>
c
+=-
en
"x
0)
c
m
c
"(ij
-
c:
"(ij
E
o
-
0.
(jj
.c
"~
.c
o
:c
3=
en
-
o
0)
"0
'-
0.
0)
en
o
.c
I-
C\I
3=
0)
c:
~
o
-
....;
c
0)
"0
==
0)
0)
'-
o
E
E
0)
-
en
>-
en
0>
c
+=-
en
.x
0)
c
m
0)
~
m
E
.~
1a
.c
-
en
'0
0)
.0
'-
0.
0)
en
o
.c
I-
E
0)
-
en
>-
en
0>
c
+=-
en
.x
0) a>
c.2
m ~
-0)
oen
c~
00
"en >-
C:t:::
eel =
0.0
X eel
0)-
0).2
.c.c
-:J
0>0.
:S3=
c 0)
O)c
~~
c..$
~O)
0.
~E
00
.~o
o~
'- 0
0.0)
0)0
~.~
.cO)
I-en
"=t
en
w
..J
a..
(3
z
a:
a..
CJ
z
is
z
:J
LL.
0)
.c
-
-
o
c
o
1a
-
c
0)
E
0)
0.
E
0)
.c
-
c
(j;~
>,-
00>
0>0
- '-
asa..
.cen
en_
enc
0)0)
o..E
.0 ~
"e e
0.0.
o>E
c-
.~ .s
0--
_ 0.
-m
.Eo
0)"'0
:50)
~"'O
.=:c
:JO)
enE
~E
mo
enO
<(~
"'0
0)
-
0.
o
"'0
eel
0)
.c
-
.c
-
.~
0)
o
c
m
"'0
'-
o
o
fJ
c
en
-
c
0)
E
0)
>
o
'-
0.
EE
=e
.so>
.0.. e
ma..
oen
=-
eelC
~~
m 0)
E~
~
=0.
3=E
>--
--
o.s
0). .0..
.cm
1-0
,-
0)
-
m
"'0
0.
:J
"'0
C
m
en
-
c
<I>
E
0)
>
e
0.
E
(ij
-
.0..
eel
o
~
o
-
c
eel
0..
'-
m
0)
?-
E
:J
E
eel
0.
o
0)
>
0)
"'0
.~ :>.
~eel
.- :J
Oc
0) c
.cm
I-:t:::
C\J
E .s
m
~en"'O
0>_ 0)
o en "'0
~ 0 :J
0..015
en - c
_ m._
ffi6"g
Eam
~0"'O
00)0)
'-'--
o.:J~
E-.-
-a!e
- 0.
m .
:t:::-O)
0.0).c
m 0>_
0"'0=
0).5 3=
.c 0> ~
::::cC:
o +=- 0)
_mE
c:'-o)
0)0)>
EO. 0
o '-
0.- 0.
~ ~.s
> c_ .
O)cmen
"'Om:t:::w
O)O)g.m
_.coo
m- 0)
c-:>~
.- 0 0):> 0
"'0 -
~-c-
offi.cO)
8E:t:::~
=0.3=:J
.- 0 "'0 .c
3= (jj 0) c
>->1ao
:t::: 0).- +=-
O"'Oom
O).co(j;
.c:t:::~o.
1-3=mo
(t)
C":)
M
-------------------
CJ)
W
..J
ED
ct
I-
U)
.
-
-
-------------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
DEPARTMENT SUMMARY
2005 thru 2009
Total
2005 2006 2007 2008 2009 Total
358,357 281,n8 105,522 53,533 273,308 1,072,498
5,000 5,000 5,000 5,000 5,000 25,000
650,800 483,000 343,000 411,000 261,000 2,148,800
5,417,200 5,417,200
937,600 91,000 648,400 22,000 44,545 1,743,545
10,000 10,000 10,000 10,000 10,000 50,000
91,900 _ 2,603,750 10,000 10,000 10,000 2,725,650
196,800 131,000 123,000 116,000 25,000 591,800
296,300 30,000 30,000 30,000 30,000 416,300
7,963,957 3,635,528 1,274,922 657,533 658,853 14,190,793
Department
Equipment Replacement
Land & Open Space Acquisition
Local Street Reconstruction
Municipal State Aid Streets
Municipal Water System
Parks
Public FacilitieslOfflC9 Equip
Sanitary Sewer
Stormwaler Management
Wednesday. August 25, 2004
7
I Department Project# Priority 2005 2006 2007 2008 2009 Total
Star Circle Reconstruc\lon LR-OS-Ol 0 57,000 57,000
I Star Lane Reconstruc\lon LR-OS-<l2 0 265,000 265,000
Bever1y Dr Pavement Reclamation LR-07-01 0 82,000 82,000
Street Reclamation Projects LR-07-02 0 100,000 100,000 100,000 300,000
I Bracketts Rd Pavement Reclamation LR-OB-Ol 0 150,000 150,000
Local Street Reconstruction Total 650,800 483,000 343,000 411,000 261,000 2,148.800
I Municipal State Aid Streets
Vine HDl Road. Mill and Overlay MSA.03-05 0 104,000 104,000
I Yellowstone Trail. Bit Overlay MSA-04-01 0 72,000 72,000
CR 19 Intersection Realignment MSA03-06 0 5,241,200 5,241,200
Municipal State Aid Streets Total 5.417,200 5,417.200
I
Municipal Water System
I Amesbury Building Repair W-03-02 0 55,000 55,000
Badger Well House Reconstruc\lon W-03-D3 0 480,000 480,000
Woodhaven Well Interconnect W-03-OS 0 174,500 174,500
I Water Meter Radio Read Project W.03-06 0 70,000 70,000 140,000
Amesbury Submersible Well. Pull & Inspect W.04-01 0 21,000 21,000
SE Area Water Tower - painting W.Q4-06 0 50,000 50,000
I Amesbury Polyphosphate System W.04-08 0 12,100 12,100
Amesbury Well Controls Replacement W-05-D2 0 75,000 75,000
Boulder Bridge Submersible Well - Pull & Inspect W.OS-03 0 21,000 21,000
I S.E. Area Lineshaft Well - Pull & Inspect W-Q6-01 0 22,000 22,000
Interconnec\lon of Amesbury & SE Area Wells W-07-01 0 626,400 626,400
I Amesbury Lineshaft Well- Pull & Inspect W-07-02 0 22,000 22,000
Boulder Bridge Well #2 - Pull & Inspect W-09-01 0 21,045 21,045
Badger Field Llneshaft Well- pull & inspect W-D9-D2 0 23,500 23,500
I Municipal Water System Total 937.600 91,000 648,400 22,000 44,545 1.743,545
I Parks
Park Improvements P-D4-D3 0 10,000 10,000 10,000 10,000 10,000 SO,OOO
Parks Total 10.000 10,000 10.000 10.000 10,000 SO.OOO
I Public Facilities/Office Equip
Computer Upgrades PF-03-OS 0 10,000 10,000 10,000 10,000 10,000 SO,OOO
I Municipal Liquor Store PF-03-07 0 676,500 676,500
Public Works Building Remodel PF-04-03 0 15,000 15,000
I Document Retrieval System PF-05-01 0 30,000 30,000
City Hall Building Repairs PF-05-02 0 15,000 15,000
Public Works Copier PF.05-03 0 900 900
I City Hall Color Copier PF-05-04 0 10,000 10,000
Civil Defense Sirens PF-05-05 0 11,000 11,000
Network (Computer) Upgrade PF-Q6-Dl 0 17,250 17,250
I City Hall Project PF-06-02 0 1,500,000 1,500,000
I Wednesday. August 25. 2004
9
Department Project# Priority 2005 2006 2007 2008 2009 Total I
Public Works Addition (Bay w/lift) PF.Q6-03 0 400,000 400,000
Public Facilities/Office Equip Total 91,900 2,603.750 10,000 10,000 10,000 2.725,650 I
Sanitary Sewer I
Infiltration and Inflow Reduction SS-03-05 0 25,000 25,000 25,000 25,000 25,000 125,000
Lift Station 15 Rehabilitation SS-D3-06 0 81,000 81,000
Lift Station 17 Rehabilitation SS-04-D 1 0 22,000 81,000 103,000 I
Portable Generator for Lift Stations SS-D5-Dl 0 68,800 68,800
Lift Station 16 Rehabilitation SS-05-D2 0 25,000 79,000 104,000
Lift Station 12 Rehabilitation SS-D7 -Dl 0 19,000 91,000 110,000 I
Sanitary Sewer Total 196,800 131.000 123.000 116,000 25.000 591.800
Stormwater Mana~ement I
Gideon Glen Improvements STM-04-01 0 183,300 183,300
Glen Road Drainage STM-D4-02 0 25,000 25,000 I
Boulder Bridge Lift Station STM-04-D4 0 88,000 88,000
Mise Stormwater Projects STM-04-05 0 30,000 30,000 30,000 30,000 120,000
Stormwater Management Total 296,300 30,000 30,000 30,000 30,000 416,300 I
GRAND TOTAL 7.963.957 3.635,528 1.274,922 657.533 658,853 14,190,793 I
I
I
I
I
I
I
I
I
I
Wedllesday. August 25. 2004 I
10
I
I
I
I
Source
I Equipment Replacement Fund
G.O. Bonds - 2006
I General Fund
Henn County - Landscape
I Hennepin County
Liquor Revenue Bonds
Local Street Reconstruction Fund
I Minnehaha Creek Watershed Dist
MSA Advancel(Repay)
I MSA Funding
Municipal Water Fund
I Park Foundation Donations
Public Facllities/Office Equipment
I Sanitary Sewer Fund
Special Assessments
Stormwater Management Fund
I Water Revenue Bonds-2004
I
I
I
I
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
SOURCES OF REVENUE SUMMARY
2005 thru 2009
2005 2006 2007 2008 2009 Total
289,557 281,n8 105,522 53,533 273,308 1,003,698
1,900,000 1,900,000
5,000 5,000 5,000 5,000 5,000 25,000
100,000 100,000
3,842,200 3,842,200
676,500 676,500
1,190,800 483,000 343,000 411,000 261,000 2,688,800
183,300 183,300
759,000 -181,000 -181,000 -181,000 216,000
176,000 176,000
163,100 21,000 22,000 22,000 44,545 272,645
10,000 10,000 10,000 10,000 10,000 50,000
91,900 27,250 10,000 10,000 10,000 149,150
265,600 131,000 123,000 116,000 25,000 660,600
88,000 88,000
25,000 30,000 30,000 30,000 30,000 145,000
n4,500 70,000 626,400 1,470,900
Total 7,963,957 3,454,528 1,093,922 476,533 658,853 13,647,793
Wednesday, August 25, 2004
11
Capital Improvement Program I
City of Shorewood, Minnesota I
PROJECTS BY DEPARTMENT AND FUNDING SOURCE
2005 thru 2009 I
I
Department Project# Priority 2005 2006 2007 2008 2009 Total
I
Equipment Replacement
F350 4x4 Pickup w/plow E-02-53 0 30,285 30,285 I
Equipment Replacement Fund 30,285 30,285
F3504x4 Pickup w/plow E.Q2-55 0 30,285 30,285
Equipment Replacement Fund 30,285 30,285 I
Pump - 4' Discharge E-03-50 0 24,336 24,336
Equipment Replacement Fund 24,336 24,336
Asphalt Curb Machine E-05-01 0 13,000 13,000
Equipment Replacement Fund 13,000 13,000 I
Vactor Unit E-05-02 0 68,000 68,000
Equipment Replacement Fund 68,000 68,000
Gen Set Wastewater E-D5-03 0 68,800 68,800 I
Sanitary Sewer Fund 68,1W0 68,800
800 Mghz Radios - 2 Mobiles12 base stations E-D5-D4 0 7,000 7,000
Equipment Replacement Fund 7,000 7,000 I
Water Truck E-05-45 0 97,344 97,344
EquIpment Replacement Fund 97,344 97,344
Bobcat E-D5-63 0 19,307 19,307 I
Equipment Replacement Fund 19,307 19,307
Dump Truck - Ford L8000 E-06-33 0 123,735 123,735
EquIpment Replacement Fund 123,735 123,735 I
F350 & Flatbed E-06-49 0 36,558 36,558
Equipment Replacement Fund 36,558 36,558
Dump w/Plow and SND E-06-54 0 121,485 121,485
EquIpment Replacement Fund 121,485 121,485 I
Trail King Trailer E-07-21 0 8,189 8,189
Equipment Replacement Fund 8,189 8,189
Ford 555 Backhoe E-07-22 0 64,459 64,459 I
Equipment Replacement Fund 64,459 64,459
Tennant 240 Floor Sweeper E-07-46 0 12,401 12,401
Equipment Replacement Fund 12,401 12,401 I
Mower- Toro Groundsmaster 325D E.07-70 0 20,473 20,473
Equipment Replacement Fund 20,473 20,473
Tractor - Ford 3910 E-08-35 0 31,633 31 ,633 I
Equipment Replacement Fund 31,633 31,633
Speed Awareness Display E-08-51 0 21,900 21,900
Equipment Replacement Fund 21,900 21,900 I
Dump Truck E-09-65 0 136,654 136,654
Equipment Replacement Fund 136,654 136,654
Dump truck - Ford E-09-68 0 136,654 136,654 I
Wedllesday, August 25. 2004
12 I
I Department Project# Priority 2005 2006 2007 2008 2009 Total
Equipment Replacement Fund 136,654 136,654
I Equipment Replacement Total 358,357 281,778 105,522 53,533 273,308 1,072,498
Land & Open Space Acquisition
I Land ConselVation Easements LO-D4-D1 0 5,000 5,000 5,000 5,000 5,000 25,000
General Fund 6,000 5,000 5,000 5,000 5,000 25,000
Land & Open Space Acquisition Total 5,000 5,000 5,000 5,000 5,000 25,000
I Local Street Reconstruction
Brand Circle Pavement Reclamation LR.01.Q4 0 57,000 57,000
I Local Street Reconstruct/on Fund 57,000 57,000
Amlee Road Pavement Reclamation LR.01-06 0 85,800 85,800
Local Street ReconstrucUon Fund 85,800 85,800
I Bituminous Overlays LR.03.Q4 0 95,000 95,000 95,000 95,000 95,000 475,000
Local Street Reconstruct/on Fund 95,000 95,000 95,000 95,000 95,000 475,000
Bituminous Sealcoating LR-Q3.QS 0 66,000 66,000 66,000 66,000 66,000 330,000
I Local Street Reconstruct/on Fund 66,000 66,000 66,000 66,000 66,000 330,000
Wedgewood Drlve Overlay & Reconstruction LR.Q4.01 0 240,500 240,500
Local Street ReconstrucUon Fund 240,500 240,500
I Pavement Reclamation Wood Duck Circle LR-QS-01 0 96,500 96,500
Local Street Reconstruct/on Fund 96,500 96,500
County Road 19 Entry (Gateway) LR.QS.02 0 10,000 10,000
Local Street Reconstruction Fund 10,000 10,000
I Star Circle Reconstruction LR.06.01 0 57,000 57,000
Local Street Reconstruct/on Fund 57,000 57,000
Star L",e Reconstruction LR-06-02 0 265,000 265,000
I . Local Street Reconstruction Fund 265,000 265,000
Beverly Dr Pavement Reclamation LR.07 -01 0 82,000 82,000
Local Street Reconstruction Fund 82,000 82,000
I Street Reclamation Projects LR.07.02 0 100,000 100,000 100,000 300,000
Local Street ReconstructIon Fund 100,000 100,000 100,000 300,000
Bracketts Rd Pavement Reclamation LR-OB.01 0 150,000 150,000
I Local Street ReconstructIon Fund 150,000 150,000
Local Street Reconstruction Total 650,800 483,000 343,000 411,000 261,000 2,148,800
I Municipal State Aid Streets
Vine Hill Road - Mill and Overlay MSA-(l3.Q5 0 104,000 104,000
MSA Funding 104,000 104,000
I Yellowstone Trail. Bit Overlay MSA.04-D1 0 72,000 72,000
MSA Funding 72,000 72,000
CR 19 Intersection Realignment MSA03.06 0 5,241,200 5,241,200
I Henn County- Landscape 100,000 100,000
Hennepin County 3,842,200 3,842,200
Local Street ReconstrucUon Fund 540,000 540,000
MSA Advancel(Repay} 759,000 -181,000 -181,000 .181,000 216,000
I Municipal State Aid Streets Total 5,417,200 5,417,200
I Municipal Water System
Amesbury Building Repair W-03-02 0 55,000 55,000
Municipal Water Fund 55,000 55,000
I Badger Well House Reconstruction W-03-03 0 480,000 480,000
Wedllesday, AI/gust 25. 2004
I 13
Department Project# Priority 2005 2006 2007 2008 2009 Total I
Water Revenue Bonds-2004 480,000 480,000
Woodhaven WeUlnterconnect W-D3.05 0 174,500 174,500 I
Water Revenue Bonds-2004 174,500 174,500
Water Meter Radio Read Project W-03-D6 0 70,000 70,000 140,000
Wafer Revenue Bonds-2004 70,000 70,000 140,000
Amesbury Submersible Well. Pull & Inspect W.Q4..01 0 21,000 21,000 I
Municipal Water Fund 21,000 21,000
SE Area Water Tower - painting W-04-Q6 0 50,000 50,000
Water Revenue Bonds-2oo4 50,000 50,000 I
Amesbury Polyphosphate System W-Q4-08 0 12,100 12,100
Municipal Water Fund 12,100 12,100
Amesbury Well Controls Replacement W-D5-02 0 "5,000 75,000 I
Municipal Water Fund 75,000 75,000
Boulder Bridge Submersible Well- Pull & Inspect W.05-03 0 21,000 21,000
MunIcIpal Water Fund 21,000 21,000 I
S.E. Area LineshaftWell- Pull & Inspect W-D6-01 0 22,000 22,000
Municipal Water Fund 22,000 22,000
Interconnection of Amesbury & SE Area Wells W-07-01 0 626,400 626,400 I
Water Revenue Bonds-2004 826,400 826,400
Amesbury Lineshaft Well. Pull & Inspect W-07-D2 0 22,000 22,000
Munlc/paf Water Fund 22,000 22,000
Boulder Bridge Well #2 - Pull & Inspect W.09-01 0 21,045 21,045 I
Munic/pal Water Fund 21,045 21,045
Badger Field Llneshaft Well- pull & inspect W-09-02 0 23,500 23,500
Municipal Wafer Fund 23,500 23,500 I
Municipal Water System Total 937,600 91,000 648,400 22,000 44,545 1,743,545
Parks I
Park Improvements P-04-03 0 10,000 10,000 10,000 10,000 10,000 50,000
Park Foundation DonaUons 10,000 10,000 10,000 10,000 10,000 50,000
Parks Total 10,000 10,000 10,000 10,000 10,000 50,000 I
Public Facilities/Office Equip I
Computer Upgrades PF-03-06 0 10,000 10,000 10,000 10,000 10,000 50,000
Public FacilitieslOfflca Equipment 10,000 10,000 10,000 10,000 10,000 50,000
Municipal Liquor Store PF-03-07 0 676,500 676,500 I
LIquor Revenue Bonds 676,500 676,500
Public Works Building Remodel PF-Q4-03 0 15,000 15,000
Public FacilltleslOfffce EquIpment 15,000 15,000
Document Retrieval System PF.05-01 0 30,000 30,000 I
Public Facilities/Office Equipment 30,000 30,000
City Hall Building Repairs PF.05-02 0 15,000 15,000
Public Feclll/leslOffice EquIpment 15,000 15,000 I
Public Works Copier PF-05.03 0 900 900
Public Facili/leslOfffce Equipment 900 900
City Hall Color Copier PF-05'04 0 10,000 10,000 I
Public Facilities/Offfce Equipment 10,000 10,000
Civil Defense Sirens PF-OS-OS 0 11,000 11,000
Public facilities/Office Equipment 11,000 11,000 I
Network (Computer) Upgrade PF.06-01 0 17,250 17,250
Public FacilitleslOfllca Equipment 17,250 17,250
City Hall Project PF-06-02 0 1,500,000 1,500,000 I
Wednesday. August 25. 2004
14 I
I Department Project# Priority 2005 2006 2007 2008 2009 Total
G.O. Bonds. 2006 1,500,000 1,500,000
I Public Works Addition (Bay w/llft) PF-06-03 0 400,000 400,000
G.O. Bonds - 2006 400,000 400,000
Public Facilities/Office Equip Total 91,900 2,603,750 10,000 10,000 10,000 2,725,650
I Sanitary Sewer
Infiltration and Inflow Reduction Ss-oa-05 0 25,000 25,000 25,000 25,000 25,000 125,000
I Sanitary Sewer Fund 25,000 25,000 25,000 25,000 25,000 125,000
Lift Station 15 Rehabilitation SS.03-o6 0 81,000 81,000
Sanitary Sewer Fund 81.000 81,000
I Lift Station 17 Rehabilitation SS.()4-o1 0 22,000 81,000 103,000
Sanitary Sewer Fund 22.000 81,000 103,000
Portable Generator for Lift Stations SS-05-o1 0 68,800 68,800
Sanitary Sewer Fund 68,800 68,800
I Lift Station 16 Rehabilitation SS.05-o2 0 25,000 79,000 104,000
Sanitary Sewer Fund 25,000 79,000 104,000
Lift Station 12 Rehabilitation SS-07-o1 0 19,000 91,000 110,000
I Sanitary Sewer Fund 19,000 91,000 110,000
Sanitary Sewer Total 196,800 131,000 123,000 116,000 25,000 591,800
I Stormwater Mana~ement
Gideon Glen Improvements STM-04-01 0 183,300 183,300
Minnehaha Creek Watershed Dlst 183,300 183,300
I Glen Road Drainage STM-Q4..02 0 25,000 25,000
Stormwater Management Fund 25,000 25,000
Boulder Bridge Lift Station STM-04-04 0 88,000 88,000
I Special Assessments 88,000 88,000
Mise Stormwater Projects STM-04-o5 0 30,000 30,000 30,000 30,000 120,000
Stormwatar Management Fund 30,000 30,000 30,000 30,000 120,000
I Stormwater Management Total 296,300 30,000 30,000 30,000 30,000 416,300
GRAND TOT AI.. 7,963,957 3,635,528 1,274,922 657,533 658,853 14,190,793
I
I
I
I
I
I
I Wedllesday, AI/gllst 25. 2004
I 15
Capital Improvement Program I
City of Shorewood, Minnesota I
PROJECTS BY FUNDING SOURCE WITH BALANCES
2005 thru 2009 I
I
Source Project# Priority 2005 2006 2007 2008 2009 Total
Equipment Replacement Fund I
Beainnina Balance $361,816 $72,259 ($209,519) ($315,041) ($388,574) ($641,882)
F3504x4 Pickup w/plow E-Q2-53 0 30,285 30,285 I
F3504x4 Pickup w/plow E.o2-55 0 30,285 30,285
Pump - 4' Discharge E-D3-50 0 24,336 24,336
Asphalt Curb Machine E-D5-D1 0 13,000 13,000 I
Vactor Unit E-05-02 0 68,000 68;000
800 Mghz Radios - 2 Mobiles/2 base stallons E-D5.04 0 7,000 7,000
Water Truck E-Q5.45 0 97,344 97,344 I
Bobcat E-05-63 0 19,307 19,307
Dump Truck - Ford L8000 E.06-33 0 123,735 123,735
F350 & Flatbed E.06-49 0 36,558 36,558 I
Dump wlPlow and SND E-D6-54 0 121,485 121,485
TraU King Trailer E-07-21 0 8,189 8,189 I
Ford 555 Backhoe E.07.22 0 64,459 64,459
Tennant 240 Floor Sweeper E.07-46 0 12,401 12,401
Mower. Taro Groundsmaster 325D E-D7.70 0 20,473 20,473 I
Tractor- Ford 3910 E.08.35 0 31,633 31,633
Speed Awareness Display E-08.51 0 21,900 21,900
Dump Truck E.09-65 0 136,654 136,654 I
Dump truck . Ford E.Q9..68 0 136,654 136,654
Equipment Replacement Fund Total 289,557 281,778 105,522 53,533 273,308 1,003,698 I
G.O. Bonds - 2006
Beainnina Balance I
City Hall Project PF.06-02 0 1,500,000 1,500,000
Public Works Addition (Bay w/lift) PF.o6-03 0 400,000 400,000 I
G.O. Bonds - 2006 Total 1,900,000 1,900,000
General Fund I
Beainnina Balance $2,557,765 $2,552,765 $2.547,765 $2,542,765 $2,537.765 $2,532,765
Land Conservation Easements LO-04.01 0 5,000 5.000 5,000 5,000 5,000 25,000 I
General Fund Total 5,000 5,000 5,000 5,000 5,000 25,000
I
Wlulllesday, August 15. 1004 I
16
I Source Pro.iect# Priority 2005 2006 2007 2008 2009 Total
Reno County - Landscape
I Bealnnlna Balance
CR 19 Intersection Realignment MSA03-06 0 100,000 100,000
I Henn County - Landscape Total 100,000 100,000
Hennepin County
I Bealnnina Balance
CR 19 Intersection Realignment MSA03-06 0 3,842,200 3,842,200
I Hennepin County Total 3,842,200 3,842,200
I Liquor Revenue Bonds
Bealnnina Balance
Municipal Liquor Store PF-03-07 0 676,500 676,500
I Liquor Revenue Bonds Total 676,500 676,500
I Local Street Reconstruction Fund
Beainnina Balance $1,804,710 $813,910 $130,910 ($212,090) ($623,090) ($884,090)
Brand Circle Pavement Reclamation LR-01-04 0 57,000 57,000
I Amlee Road Pavement Reclamation LR-01-06 0 85,800 85,800
Bituminous Overlays LR-03-Q4 0 95,000 95,000 95,000 95,000 95,000 475,000
Bituminous Sealcoating LR-03-05 0 66,000 66,000 66,000 66,000 66,000 330,000
I Wedgewood Drive Overlay & Reconstruction LR-Q4-01 0 240,500 240,500
Pavement Reclamation Wood Duck Circle LR-05-Q1 0 96,500 96,500
County Road 19 Entry (Gateway) LR-05-Q2 0 10,000 10,000
I Star Circle Reconstruction LR-06-01 0 57,000 57,000
Star Lane Reconstruction LR.06-Q2 0 265,000 265,000
I Beverly Dr Pavement Reclamation LR-07-Q1 0 82,000 82,000
Street Reclamation Projects LR.07-02 0 100,000 100,000 100,000 300,000
Bracketts Rd Pavement Reclamation LR.OS-01 0 150,000 150,000
I CR 19 Intersection Realignment MSA03-06 0 540,000 540,000
Local Street Reconstruction Fund 1,190,800 483,000 343,000 411,000 261,000 2,688,800
I Total
Minnehaha Creek Watershed Dist
I Beainnina Balance
Gideon Glen Improvements STM-04-Q1 0 183,300 183,300
I Minnehaha Creek Watershed Dist 183,300 183,300
Total
I MSA Advance/(Repay}
Beainnlna Balance
CR 19 Intersection Realignment MSA03-06' 0 759,000 -181,000 -181,000 -181,000 216,000
I
I Wedllesday. August 25. 1004
17
I Source Pro.iect# Priority 2005 2006
Lilt Station 17 Rehabilitation SS-04-01 0 22,000 81,000
I Portable Generator for Lift Stations SS-05-o1 0 68,800
Lilt Station 16 Rehabilitation 88-0S-02 0 2S,OOO
Lilt Station 12 Rehabilitation 88-07-01 0
I Sanitary Sewer Fund Total
I Special Assessments
Bealnnlna Balance
Boulder Bridge Lift Station 8TM-04-04
I Special Assessments Total
I Stormwater Mana~ement Fund
Beainnina Balance
Glen Road Drainage STM-04-o2
I Mise Stormwater Projects 8TM-Q4.0S
Stormwater Management Fund Total
I
Water Revenue Bonds-2004
I
Beainnina Balance
Badger Well House Reconstruclion
Woodhaven Well Interconnect
Water Meter Radio Read Project
8E Area WaterTower. painting
Interconnection of Amesbury & SE Area Wells
W-03-03
W-os-OS
W-03-06
W-Q4-06
W-07-01
I
I
Water Revenue Bonds-2004 Total
I
GRAND TOTAL
I
I
I
I
I
I
I
2007
2008
2009
Total
103,000
68,800
104,000
110,000
79,000
19,000
91,000
265,600
131,000
123,000
116,000
660,600
25,000
o
88,000
88,000
88,000
88,000
$275,017 $250,017 $220,017 $190,017 $160,017 $130,017
0 25,000 25,000
0 30,000 30,000 30,000 30,000 120,000
25.000 30,000 30,000 . 30,000 30,000 145,000
o
o
o
o
o
$0
480,000
174,SOO
70,000
50,000
($844.500) ($1,470,900) ($1,470,900)
($1,470,900)
480,000
174,SOO
140,000
SO,OOO
626,400
($774,500)
70,000
626,400
774,500
626,400
1,470,900
70,000
7,963,957 3,454,528 1,093,922
476,533
13,647.793
658,853
Wednesday, August 25. 2004
19
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
III. CAPITAL IMPROVEMENT PLAN
This section of the Capital Improvement Plan explains proposed capital projects and
expenditures by function. Specifically, the CIP is broken down into the following sections:
A. Municipal Water System
B. Municipal State Aid Roadway System
C. Local Street Reconstruction
D. Stormwater Management Program
E. Sanitary Sewer System
F. Public Facilities and Office Equipment
G. Equipment Replacement Fund
H. Park and Recreation
I. Trail System
J. Land and Open Space Acquisition
21
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
A. MUNICIPAL WATER SERVICE
The City of Shorewood has 1,500 individual service connections to the municipal water
system. Other residents obtain water through individual residential wells.
The City of Shorewood operates and maintains five separate well houses, with a total of
seven wells to service the customers. For reference, the following table provides some
basic information of the City's systems.
Facility Well Aquifer Depth of Year Reserve
Name No. Well CFt) Installed
Badger 1 Shakopee- 372 1981 Minnewashta Water Tower
Jordan
Boulder 1 Franconia- 640 1981 Minnewashta Water Tower
Bridae Iron -Gale
2 Franconia- 640 1981 Minnewashta Water Tower
Iron -Gale
S.E. Area 1 Jordan 415 1987 Waterford Water
Tower
Amesbury 1 St. Peter- 528 1973 5000 Gal Hydro-
Jordan pneumatic Tank
2 Shakopee 326 1982 5000 Gal Hydro-
pneumatic Tank
Woodhaven 1 Shakopee- 480 1979 4000 Gal Hydro-
Jordan pneumatic Tank
The Amesbury and Woodhaven wells are what are known as hydro-pneumatic systems.
These types of systems are designed for a small neighborhood system. The Minnesota
Department of Health recommends that the number of connections served by these types
of systems should not exceed twenty-five. Currently the number of connections that are
served by this system exceeds this amount.
The Badger Field and Boulder Bridge well houses are interconnected via a trunk
watermain on Smithtown Road to the Minnewashta Water Tower. This tower is located at
26352 Smithtown Road. This site is located on the Minnewashta Elementary School
property by way of an easement. This structure has a capacity of 500,000 gallons. The
water servicing this area is not treated, with the exception of the addition of chlorine and
fluoride.
The Southeast area well is connected to the Waterford water tower located at 5500 Old
Market Road. This structure is located on City property, and has a capacity of 400,000
gallons. Water from this well is treated for iron removal, along with the addition of chlorine,
and fluoride prior to delivery to the distribution system.
What follows are individual project proposals, and overall project schedules. In addition, a
funding source summary has also been included for the municipal water system.
23
2005 - 2009 CAPITAL IMPROVEMENT PROGRAM
Section IIA. MUNICIPAL WATER - PROJECT SUMMARY
proj Description 2005 2006 2007 2008 2009
1 Amesbury Building Repair $ 55,000
2 Reconstruct Badger Well House $ 480,000
3 Woodhaven Well Interconnect $ 174,500
4 Radio Read Water Meter $ 70,000 $ 70,000
5 Amesbury Submersible Well - P& $ 21,000
6 SE Area Water Tower - Painting $ 50,000
7 Amesbury Polyphosphate Syste $ 12,100
8 Amesbury Well Controls Replace $ 75,000
9 Bldr Br Submersible Well - P&I $ 21,000
10 SE Area Lineshaft Well - P&I $ 22,000
11 Interconnect Amesbury/SE Wells . $ 626,400
12 Amesbury Lineshaft Well- P&I $ 22,000
13 Bldr Br Well #2 - P&I $ 21,045
14 Badger Field Lineshaft Well- P&I $ 23,500
. TOTAL $ 937,600 $ 91,000 $ 648,400 $ 22,000 $ 44,545
Notes:
P&I is defined as "Pull and Inspectll
24
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I Capital Improvement Program
I City of Shorewood, Minnesota
PROJECTS BY DEPARTMENT
I 2005 thru 2009
I
Department Project# Priority 2005 2006 2007 2008 2009 Total
I
Municipal Water System
I Amesbury Building Repair W-Q3-Q2 0 55,000 55,000
Badger Well House Reconstruction W-Q3.03 0 480,000 480,000
Woodhaven Well Interconnect W-D3-Q5 0 174,500 174,500
I Water Meter Radio Read Pro!ect W-DS-06 0 70,000 70,000 140,000
Amesbury Submersible Well- Pull & Inspect W-Q4-01 0 21,000 21,000
SE Area Water Tower - painting W-04-D6 0 50,000 50,000
I Amesbury Polyphosphate System W-04-Q8 0 12,100 12,100
Amesbury Well Controls Replacement W-iJs..o2 0 75,000 75,000
Boulder Bridge Submersible Well- Pull & Inspect W.OS-03 0 21,000 21,000
I S.E. Area Lineshalt Well- Pull & Inspect W-D6-01 0 22,000 22,000
Interconnection 01 Amesbury & SE Area Wells W-D7-D1 0 626,400 626,400
I Amesbury Lineshalt Well- Pull & Inspect W-07.02 0 22,000 22,000
Boulder Bridge Well #2 . Pull & Inspect W-Q9-01 0 21,045 21,045
Badger Field Lineshalt Well- pull & inspect W.09-02 0 23,500 23,500
I Municipal Water System Total 937,600 91,000 648,400 22,000 44,545 1,743,545
I GRAND TOTAL 937,600 91,000 648,400 22,000 44,545 1,743,545
I
I
I
I
I
I
I Wednesday, Augmt 25, 2004
25
Capital Improvement Program
City of Shorewood, Minnesota
Project # W -03..02
Project Name Amesbury Building Repair
Fund # 601
Description
Project includes siding, roof and eaves of well building.
Expenditures
Construction/Inspection
Contingencies
Total
Funding Sources
Municipal Water Fund
Total
2005
50,000
5,000
55,000
2005
55,000
55,000
2006
2005 tlIru 2009
2007
2008
2006
2007
2008
26
I
I
Contact Engineer
Department Municipal Water System
Type Improvement
Useful Life 5 yrs
Category Water: Wells
Priority nla
Total Project Cost $55,000
2009
2009
I
I
Total
50,000
5,000
55,000
I
I
I
I
Total
55,000
55,000
I
I
I
I
I
I
I
I
I
I
Wednesday, August 25. 2004
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
Project # W -03-03
Project Name Badger Well House Reconstruction
Fund# 601
I
I
2005 tlIru 2009
Contact Engineer
Department Municipal Water System
Type hnprovement
Useful Life 5 yrs
Category Water: Wells
Priority nla
Total Project Cost $480,000
Description
This project includes reconstruction of the Badger well house. A feasibility report has been completed in July, 1998 for this project
I
I
I
I
Expenditures
Planning/Design/Survey
Construction/Inspection
Contingencies
Total
I
I
I
I
I
I
Funding Sources
Water Revenue Bonds-2004
Total
I
I
I
I
I
2005
45,000
376,000
59,000
480,000
2005
480,000
480,000
2006
2006
2007
2007
27
2008
2009
Total
45,000
376,000
59,000
480,000
2008
2009
Total
480,000
480,000
Wednesday, August 25. 2004
Capital Improvement Program
City of Shorewood, Minnesota
Project # W -03-05
Project Name Woodhaven Well Interconnect
2005 thru 2009
Contact Engineer
Department Municipal Water System
Type Improvement
Useful Life
Category Water: Wells
Priority nla
I
I
Fund # 601
I
Total Project Cost $174,500
I
Description
This project proposes to interconnect the Woodhaven Well with the City of Excelsior's water system. The City ofChanhassen's
system was considered. however Chanhassen denied the request.
I
Expenditures
Planning/Design/Survey
Land Acquisition & Easements
Construction/lnspection
Contingencies
2005
20,000
10,000
126,500
18,000
174,500
2006
2007
2008
2009
Total
20,000
10,000
126,500
18,000
174,500
I
I
Total
I
Funding Sources
Water Revenue Bonds-2004
Total
2005
174,500
174,500
2006
2007
2008
2009
Total
174,500
174,500
I
I
I
I
I
I
I
I
I
Wedlle.\day, Augllst 25. 2004
I
28
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
Pro.lect # W -03-06
Pl."OjectName Water Meter Radio Read Project
Fund # 601
I
I
2005 thru 2009
Contact Engineer
Department Municipal Water System
Type Improvement
Useful Life
Category Water: Distribution
Priority nla
Total Project Cost $210,000
Description
This project includes conversion of one third of the water meters each year to a radio read system.
I
I
I
I
Prior
70,000 I
Total
I
Prior
70,000 I
Total
I
I
I
I
I
I
I
I
I
I
Expenditures
Water System Improvement
Total
Funding Sources
Water Revenue Bonds-2004
Total
2005
70,000
70,000
2005
70,000
70,000
2006
70,000
70,000
2007
2008
2006
70,000
70,000
2007
29
2009
2008
2009
Total
140,000
140,000
Total
140,000
140,000
Wednesday. August 25. 2004
Capital Improvement Program 2005 thru 2009 Contact Engineer I
City of Shorewood, Minnesota Department Municipal Water System I
Project # W-04-01 Type Improvement
Useful Life Syrs
Project Name Amesbury Submersible Well - Pull & Inspect Category Water: Wells
I
Fund # 601 Priority nla
Total Project Cost $21,000
Description I I
This project includes pulling, inspection and repair of the Amesbury submersible well. Pumps are to be pulled and inspected on a 5-
year rotation.
I
Expenditures 2005 2006 2007 2008 2009 Total I
Construction/Inspection 18,000 18,000
Contingencies 3,000 3,000 I
Total 21,000 21,000
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Municipal Water Fund 21,000 21 ,000
Total 21,000 21,000
I
I
I
I
I
I
I
I
I
Wednesday, August 25, 2004 I
30 I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
Project # W -04-06
Project Name SE Area Water Tower - painting
Fund# 601
2005 thru 2009
Contact Engineer
Department Municipal Water System
Type Improvement
Useful Life
Category Water: Towers
Priority nla
I
I
I
I
I
I
Total Project Cost $57,700
Description
This project includes preparation and painting of the exterior surface and painting of the S,E. Area Water tower. This structure has
not been painted since construction was completed.
Prior
7,700 I
Total
Expenditures
Construction/Inspection
2005
50,000
50,000
2006
2007
2008
2009
Total
50,000
50,000
Total
I
I
I
I
I
I
Prior
7,700 I
Total
Funding Sources
Water Revenue Bonds-2004
Total
2005
50,000
50,000
2006
2007
2008
2009
Total
50,000
50,000
I
I
I
I
I
Wedllesday, August 25, 2004
31
I
Capital Improvement Program 2005 thru 2009 Contact Engineer I
City of Shorewood, Minnesota Department Municipal Water System I
Project t# W -04-08 Type Improvement
Useful Life
Project Name Amesbury Polyphosphate System Category Water: Wells
I
Fund t# 601 Priority nla
Total Project Cost $12,100 I
Description I
The Minnesota Department of Health is mandating the addition of polyphosphates to the Amesbury system to sequester the lead in
the home piping. I
Expenditures 2005 2006 2007 2008 2009 Total I
Construction/Inspection 12,100 12,100
Total 12,100 12,100 I
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Municipal Water Fund 12,100 12,100
Total 12,100 12,100
I
I
I
I
I
I
I
I
Wednesday, AI/gust 25. 2004 I
32 I
I
I
I
I
I
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
Project # W -05-02
Project Name Amesbury Well Controls Replacement
Fund #
Description
Replace controls for Amesbury Well facility
Expenditures
Construction/Inspection
Total
I
I
I
I
I
I
I
I
I
I
I
Funding Sources
Municipal Water Fund
Total
2005
75,000
75,000
2006
2005
75,000
75,000
2006
2005 thru 2009
2007
2008
2007
33
Contact Engineer
Department Municipal Water System
Type Improvement
Useful Life
Category Water: Wells
Priority nla
Total Project Cost $75,000
2009
Total
75,000
75,000
2008
2009
Total
75,000
75,000
Wedllesday, Augllst 25. 2004
2005 thru 2009
Capital Improvement Program
City of Shorewood, Minnesota
Project # W -05-03
ProjectName Boulder Bridge Submersible Well- Pull & Inspect
Contact Engineer
Department Municipal Water System
Type Improvement
Useful Life Syrs
Category Water: Wells
Priority nla
Total Project Cost $21,000
Fund # 601
Description
This project includes pulling, inspection and repair of the Boulder Bridge Well # llineshaft well. Pumps are to be pulled and
inspected on a 5-year rotation.
Expenditures 2005
Construction/lnspection
Contingencies
2009
Total
18,000
3,000
21,000
2006
18,000
3,000
21,000
2007
2008
Total
Funding Sources
Municipal Water Fund
2009
Total
21,000
21,000
2005
2006
21,000
21,000
2007
2008
Total
W(!dllt!sday. August 25. 2004
34
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
Project # W-06-01
Project Name S.E. Area Uneshaft Well - Pull & Inspect
Fund # 601
2005 thru 2009
Contact Engineer
Department Municip\11 Water System
Type Improvement
Useful Life 5 yrs
Category Water: Wells
Priority. nla
Total Project Cost $22,000
Description
This project includes pulling, inspection and repair of theSE Area lineshaft pump. Pumps are to be pulled and inspected on as-year
rotation.
Expenditures 2005 2006 2007 2008 2009 Total
Construction/Inspection 19,000 19,000
Contingencies 3,000 3,000
Total 22,000 22,000
Funding Sources
Municipal Water Fund
2005
2006
2007
22,000
22,000
2008
2009
Total
22,000
22,000
Total
Wedllt!sday, August 25. 2004
35
Capital Improvement Program 2005 thru 2009
City of Shorewood, Minnesota
Pro.iect # W -07 -01
Project Name Interconnection of Amesbury & SE Area Wells
Contact Engineer
Department Municipal Water System
Type Improvement
Useful Life
Category Water: Wells
Priority nla
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Fund #
Total Project Cost $626,400
Description
Extend a 12-inch main along St. Alban's Bay Road and Manor Road approx 3200 feet. Assume a cost of $145 per lineal foot =
$464,000
Expenditures 2005
Construction/Inspection
Contingencies
2006
Total
Funding Sources
Water Revenue Bonds-2004
2005
2006
Total
2007
556,800
69,600
626,400
2007
626,400
626,400
38
2008
2009
Total
556,800
69,600
626,400
2008
2009
Total
626,400
626,400
Wedllesday, August 25, 2004
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Capital Improvement Program 2005 thru 2009
City of Shorewood, Minnesota
Project # W -07 -02
Project Name Amesbury Lineshaft Well- Pull & Inspect
Fund #
Contact Engineer
Department Municipal Water System
Type Improvement
Useful Life
Category Water: Wells
Priority nla
Total Project Cost $22,000
Description
Project includes pulling, inspection and repair of the Amesbury lineshaft pump. Pumps are to be pulled and inspected on a 5-year
rotation.
Expenditures 2005
Constructionllnspection
Contingencies
2006
2007
Total
Funding Sources 2005
Municipal Water Fund
2006
2007
Total
37
2008
19,000
3,000
22,000
2008
22,000
22,000
2009
Total
19,000
3,000
22,000
2009
Total
22,000
22,000
Wedllesday, August 25, 2004
Capital Improvement Program
City of Shorewood, Minnesota
Project # W -09-01
ProjectName Boulder Bridge Well #2- Pull & Inspect
Fundi 601
2005 thru 2009
Contact Bngineer
Department Municipal Water System
Type Improvement
Useful Life 5 yrs
Category Water: Wells
Priority nla
Total Project Cost $21,045
Description
project includes pulling, inspection and repair of Boulder Bridge well #2 lineshaft pump. Pumps are to be pulled and inspected on a
S-year rotation.
Expenditures 2005
Construction/Inspection
Contingencies
2007
2009
18,300
2,745
21,045
Total
18,300
2,745
21,045
2008
2006
Total
Funding Sources 2005
Municipal Water Fund
2006
2008
Total
21,045
21,045
2009
21,045
21,045
2007
Total
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Wednesday, August 25. 2004
I
38
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Capital Improvement Program 2005 thru 2009
City of Shorewood, Minnesota
Project # W -09-02
Project Name Badger Field Lineshaft Well - pull & inspect
Fund # 601
Contact Engineer
Department Municipal Water System
Type hnprovement
Useful Life 5 yrs
Category Water: Wells
Priority nla
Total Project Cost $23,500
Description
project includes pulling, inspection and repair of the Badger lineshaft pump. Pumps are to be pulled and inspected on as-year
rotation.
Expenditures 2005
Construction/Inspection
2006
2007
2008
2009
23,500
23,500
Total
23,500
23,500
Total
Funding Sources 2005
Municipal Water Fund
2006
2007
2008 .
2009
23,500
23,500
Total
23,500
23,500
Total
Wednesday, August 25.2004
39
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
B. MUNICIPAL STATE AID ROADWAYS
Municipal State Aid (MSA) roadways are collector routes throughout the City that
have been designated by the City, reviewed and approved by the State as MSA
eligible routes. The Minnesota Department of State Aid provides gas tax dollars,
collected at the gas pump, to municipalities that have a population in excess of
5,000. These funds are to build, reconstruct, and maintain MSA routes.
The intent of the State Aid system is to insure a uniform network of roadways
exist, as a motorist travels throughout the metropolitan area. The amount of
MSA routes that a municipality may designation is a maximum of 20 percent of
City's total roadway length. For the City of Shorewood, this equates to just over
9.1 miles of roadway. Table 2 below lists the current designated MSA routes.
MSA Route From To Mileaae
Smithtown Rd. Victoria Border Country Club Rd. 1.91
Howards Point Rd Smithtown Rd. Edoewood Rd. 0.78
Edgewood Rd. Howards Point Rd Grant Lorenz Rd. 0.72
Country Club Rd. Yellowstone Trail Trunk Hiahway 7 0.44
Yellowstone Trail Country Club Rd. Lake linden Dr. 1.26
Lake linden Dr. Yellowstone Tr. Trunk Hiahwav 7 0.29
Old Market Rd. Trunk Hwy 7 Covinoton Rd. 0.45
Covington Rd. Old Market Rd. Vinehill Road 0.43
Vinehill Road Broms Boulevard Townline Road 1.38
Total 7.66
Table 2
It should be noted that the Department of State Aid allows municipalities to use
the dollars held in account at the State, on a reimbursement basis. In addition,
the Office of State Aid will allow cities to borrow a maximum of three times the
annual construction allotment received by the city to complete a project.
Designs, construction and documentation, must adhere to MSA rules to be
eligible for reimbursement.
The following are Project Proposals for each MSA Project, an overall Project
Schedule, and Funding Source Summary for the MSA System.
41
42
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
2005 - 2009 CAPITAL IMPROVEMENT PROGRAM
Section liB. MUNICIPAL STATE AID ROADWAYS - PROJECT SUMMARY
7 Description 2005 2006 2007 2008 2009
1 County Road 19 Intersection*** $5,241,200
2 Vinehill Road Mill and Overlay* $ 104,000
3 Yellowstone Trail Overlay** $ 72,000
TOTAL $5,417,200 $ - $ - $ - $ -
Notes:
* This is Shorewood's portion of the shared roadway with City of Minnetonka
** Recommended that MSA funds are to be utilized for that portion of
Yellowstone Trail disturbed by watermain construction (Minnetonka Dr
to Lake linden).
*** Includes $265,200 from Local Street Reconstruction Fund
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
PROJECTS BY DEPARTMENT
2005 thru 2009
Department Project# Priority 2005 2006 2007 2008 2009 Total
Municipal State Aid Streets
Vine Hill Road. MnJ and Overlay MSA-Q3-05 0 104,000 104,000
Yellowstone Trail- Bit Overlay MSA-Q4-01 0 72,000 72,000
CR 19 Intersection Realignment MSA03.06 0 5,241,200 5,241.200
Municipal State Aid Streets Total 5,417,200 5.417,200
GRAND TOTAL 5,417,200 5,417,200
Wednesday. Allgust 25, 2004
43
Capital Improvement Program
City of Shorewood, Minnesota
Project # MSA-03-0S
Project Name Vine Hill Road.. Mill and Overlay
2005 thru 2009
Contact Engineer
Department Municipal State Aid Streets
Type Improvement
Useful Life
Category State Aid Roadways
Priority nla
Fund #
Total Project Cost $104,000
Description
The City of Minnetonka has indicated that they would like to enter into a cooperative MSA project to mill and overlay Vine Hill
Road. Both Cities share Vine Hill Road as a common corporate boundary.
Expenditures
Planning/Design/Survey
Construction/Inspection
Contingencies
2005
3,000
88,000
13,000
104,000
2006
2008
2009
Total
3,000
88,000
13,000
104.000
2007
Total
Funding Sources
MSA Funding
2005
104,000
Total 104,000
2006
2008
2009
Total
104,000
104,000
2007
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Wednesday, August 25, 2004
I
44
I Capital Improvement Program
City of Shorewood, Minnesota
I Project # MSAoO040001
Project Name Yellowstone Trail. Bit Overlay
I Fund #
2005 tlzru 2009
Contact Engineer
Department Municipal State Aid Streets
Type hnprovement
Useful Ufe
Category State Aid Roadways
Priority nla
Total Project Cost $72,000
I
Description
This project includes the overlay of Yellowstone Trail from Minnetonka Drive to Lake Linden, due to watermain construction.
I
I
I
I
Expenditures
Planning/Design/Survey
Construction/Inspection
Right-of-way
2005
1,000
1,000
70,000
72,000
2006
2007
2008
2009
Total
1,000
1,000
70,000
72,000
Total
I
I
I
I
I
I
I
I
I
I
I
Funding Sources
MSA Funding
2005
72,000
Total 72,000
2006
2007
2008
2009
Total
72,000
72,000
Wednesday, AI/gust 25. 2004
45
Capital Improvement Program
City of Shorewood, Minnesota
Project # MSA03-06
Project Name CR 19 Intersection Realignment
Fund #
2005 thru 2009
Contact Engineer
Department Municipal State Aid Streets
Type hnprovement
Useful Life
Category. State Aid Roadways
Priority n1a
I
I
I
Total Project Cost $5,241,200
Description I
This project includes right of way acquisition, realignment of the County Road 19 intersection, stormwater design. and streets cape
construction.
Expenditures
Planning/Design/Survey
Land Acquisition & Easements
Construction/Inspection
Contingencies
Streetscape Improvements
Landscape Improvements
Total
Funding Sources
Henn County - Landscape
Hennepin County
Local Street Reconstruction Fu
MSA Advance/(Repay)
Total
2005
160,000
1,100,000
3,088,000
650,000
143,200
100,000
5,241,200
2005
100,000
3,842,200
540,000
759,000
5,241,200
2006
2007
2008
2006
2007
2008
-181,000
-181,000
-181,000
-181,000
-181,000
-181,000
46
I
2009
I
Total
160,000
1,100,000
3,088,000
650,000
143,200
100,000
5,241,200
I
I
2009
I
Total
100,000
3,842,200
540,000
216,000
4,698,200
I
I
I
I
I
I
I
I
Wedllesday, AI/g/lst 25. 2004
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
c. LOCAL STREET RECONSTRUCTION FUND
The Local Street Reconstruction Fund is established to build, reconstruct and
maintain all of the roadways within the City of Shorewood, excepting Municipal
State Aid (MSA) routes, State Trunk Highways, and County Roads.
The City of Shorewood maintains approximately 50 miles of local roadways.
Funds for such expenditures are derived form the General Fund. The City has
discussed the need to create and implement a roadway assessment policy for
public improvements to insure the longevity of the Local Roadway Fund.
The City Engineer evaluates all of the City's roadways on an annual basis.
Determinations are logged utilizing the PHASER Pavement Management System
to assist in evaluating the priority of construction projects.
The following are Project Proposals for each Local Roadway Project, an overall
Project Schedule, and Funding source summary for the local roadway system.
47
I
2005 - 2009 CAPITAL IMPROVEMENT PROGRAM I
Section lie. LOCAL ROADWAYS - PROJECT SUMMARY
Pro Description 2005 2006 2007 2008 2009 I
1 Brand Circle Reclamation $ 57,000 I
2 Amlee Road Reclaim $' 85,800
3 Wedgewood Drive $ 240,500
4 Wood Duck Circle Reclaim $ 96,500 I
5 County Rd 19 Entry(Gatewa $ 10,000
6 Star Circle Reconstruction $ 57,000
7 Star Lane Reconstruction $ 265,000 I
8 Beverly Drive $ 82,000
9 Street Reclamation Projects $ 100,000 $ 100,000 $ 100,000 I
10 Brackets Road $ 150,000
11 Bituminous Overlays $ 95,000 $ 95,000 $ 95,000 $ 95,000 $ 95,000
12 Bituminous Sealcoating $ 66,000 $ 66,000 $ 66,000 $ 66,000 $ 66,000 I
TOTAL $ 650,800 $ 483,000 $ 343,000 $ 411 ,000 $ 261,000 I
I
I
I
I
I
I
I I
I
I
48 I
I
I
I
I
I
I
I
I
I
Department
Local Street Reconstruction
Brand Circle Pavement Reclamation
Amlee Road Pavement Reclamation
Bituminous Overlays
Bituminous Sealcoating
Wedgewood Drive Overlay & Reconstruction
Pavement Reclamation Wood Duck Circle
County Road 19 Entry (Gateway)
Star Circle Reconstruction
Star Lane Reconstruction
Beverly Dr Pavement Reclamation
Street Reclamation Projects
Bracketts Rd Pavement Reclamation
I
I
I
I
I
Local Street Reconstruction Total
GRAND TOTAL
I
I
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
PROJECTS BY DEPARTMENT
Project#
LR-01-04
LR-01-06
LR.03-04
LR-03-05
LR-04-Q1
LR-OS-01
LR-OS-Q2
LR-06.01
LR-06-Q2
LR-07-01
LR-07-02
LR-OS-01
2005
2009
thru
Priority
2005
2006
2007
0 57,000
0 85,800
0 95,000 95,000 95,000
0 66,000 66,000 66,000
0 240,500
0 96,500
0 10,000
0 57,000
0 265,000
0 82,000
0 100,000
0
650,800 483,000 343,000
650,800
483,000
343,000
49
2008
95,000
66,000
100,000
150,000
411,000
411,000
2009
95,000
66,000
100,000
261,000
261,000
Total
57,000
85,800
475,000
330,000
240,500
96,500
10,000
57,000
265,000
82,000
300,000
150,000
2,148,800
2,148,800
Wednesday. August 25, 2004
Capital Improvement Program
City of Shorewood, Minnesota
Project # LR-OI-04
Project Name Brand Circle Pavement Reclamation
2005 thru 2009
Contact Engineer
Department Local Street Reconstruction
Type hnprovement
Useful Ufe
Category Roadways/streets
Priority nla
I
I
Fund #
I
Total Project Cost $57,000
Description
This project includes reclamation of Brand Circle from Mill Street to the cul-de-sac.
I
I
Expenditures 2005 2006 2007 2008 2009 Total
Planning/Design/Survey 7,000 7,000
Construction/Inspection 43,475 43,475
Contingencies 6,525 6,525
Total 57,000 57,000
I
I
I
Funding Sources
Local Street Reconstruction
2005
57,000
57,000
2006
2007
2008
2009
Total
57,000
57,000
I
Total
I
I
I
I
I
I
I
I
Wedllesday. August 25. 2004 I
50
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
Project # LR-OI-06
Project Name Amlee Road Pavement Reclamation
I
I
Fund #
2005 thru 2009
Description
This project includes Pavement Reclamation from Manitou Lane to the cul-de-sac.
I
I
I
I
I
I
I
I
I
I
Prior
6,000 I
Total
Prior
6,000 I
Total
I
I
I
I
I
Expenditures
Construction/Inspection
Contingencies
Total
Funding Sources
Local Street Reconstruction
Total
2005
75,600
10,200
85,800
2005
85,800
85,800
2006
2007
2006
2007
51
2008
2008
Contact Engineer
Department Local Street Reconstruction
Type hnprovement
Useful Ufe
Category Roadways/streets
Priority nla
Total Project Cost $91,800
2009
Total
75,600
10,200
85,800
2009
Total
85,800
85,800
Wednesday, Augltst 25. 2004
Capital Improvement Program 2005 thru 2009 Contact Engineer I
City of Shorewood, Minnesota Department Local Street Reconstruction I
Project # LR-03-04 Type Improvement
Useful Life
Project Name Bituminous Overlays Category Roadways/streets
I
Fund # Priority nla
Total Project Cost $655,000
Description I I
The City has traditionally allocated $80,000 per year towards bituminous overlay projects. It is recommended that this amount be
increased to $90,000 per year.
I
Prior Expenditures 2005 2006 2007 2008 2009 Total I
I 180,000 I Construction/Inspection 83,750 83,750 83,750 83,750 83,750 418,750
Total Contingencies 11,250 11,250 11 ,250 11,250 11,250 58,250 I
Total 95,000 95,000 95,000 95,000 95,000 475,000
I
Prior Funding Sources 2005 2006 2007 2008 2009 Total I
I 180,000 I Local Street Reconstruction 95,000 95,000 95,000 95,000 95,000 475,000
Total Total 95,000 95,000 95,000 95,000 95,000 475,000
I
I
I
I
I
I
I
I
W(!dllesda)'. Augl/st 25. 2004 I
52 I
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
Project it LR-03-05
Project Name Bituminous Sealcoating
Fund it
2005 thru 2009
Contact Engineer
Department Local Street Reconstruction
Type Improvement
Useful Life
Category Roadways/streets
Priority nla
Total Project Cost $445,000
I
Description
The City has traditionally allocated $55,000 per year towards bituminous sealcoating.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Prior Expenditures 2005 2006 2007 2008 2009 Total
115,000 I Construction/Inspection 60,500 60,500 60,500 60,500 60,500 302,500
TotaJ Contingencies 5,500 5,500 5,500 5,500 5,500 27,500
Total 66,000 66,000 66,000 66,000 66,000 330,000
Prior
115,000 I
Total
Funding Sources
Local Street Reconstruction
Total
2005
66,000
66,000
2006
66,000
66,000
2007
66,000
66,000
2008
66,000
66,000
2009
66,000
66,000
Total
330,000
330,000
Wednesday, Allgltst 25. 2004
53
Capital Improvement Program 2005 thru 2009 I
Contact Engineer
City of Shorewood, Minnesota Department Local Street Reconstruction I
Project # LR-04-01 Type Improvement
Useful Life
Project Name Wedgewood Drive Overlay & Reconstruction Category Roadways/streets
I
Fund # Priority nla
Total Project Cost $252,500
Description I I
Includes overlay from Smithtown to Mallard Lane and reconstruction from Mallard Lane to the cul-de-sac.
I
Prior Expenditures 2005 2006 2007 2008 2009 Total I
I 12,000 I Construction/Inspection 212,450 212,450
Total Contingencies 28,050 28,050 I
Total 240,500 240,500
I
Prior Funding Sources 2005 2006 2007 2008 2009 Total I
I 12,000 I Local Street Reconstruction 240,500 240,500
Total Total 240,500 240,500
I I
I
I
I
I
I
I
I
Wednesday. August 25. 2004 I
54 I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Capital Improvement Program 2005 thru 2009
City of Shorewood, Minnesota
Project # LR-05-01
Project Name Pavement Reclamation Wood Duck Circle
Fund #
Contact Engineer
Department Local Street Reconstruction
Type Improvement
Useful Life
Category Roadways/streets
Priority nla
Total Project Cost $96,500
Description
This project includes pavement reclamation from County Road 19 to the cul-de-sac.
Expenditures 2005 2006 2007 2008 2009 Total
Planning/Design/Survey 7,000 7,000
Construction/Inspection 78,700 78,700
Contingencies 10,800 10,800
Total 96,500 96,500
Funding Sources
Local Street Reconstruction
2005
96,500
96,500
2006
2007
2008
2009
Total
96,500
96,500
Total
Wednesday, August 25. 2004
55
Capital Improvement Program
City of Shorewood, Minnesota
Project I LR-OS-02
Project Name County Road 19 Entry (Gateway)
Fund I
Description
North end sign and landscape for County Road 19 improvement.
Expenditures
Construction/Inspection
Total
Funding Sources
Local Street Reconstruction
Total
2005
10,000
10,000
2005
10,000
10,000
2006
2006
2005 thru 2009
2007
2007
56
2008
2008
Contact Engineer
Deparbnent Local Stteet Reconstruction
Type Improvement
Useful Life
Category Roadways/srreets
Priority nla
Total Project Cost $10,000
2009
Total
10,000
10,000
2009
Total
10,000
10,000
Wednesday. August 25. 2004
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
Project # LR-06-01
Project Name Star Circle Reconstruction
2005 thru 2009
Contact Engineer
. Department Local Street Reconstruction
Type Improvement
Useful Life
Category Roadways/streets
Priority nla
Fund #
Total Project Cost $57,000
Description
Reconstruction
Total
2006
50,700
6,300
57,000
2007
2008
2009
Total
50,700
6,300
57,000
Expenditures 2005
Constructionllnspectlon
Contingencies
Total
2006
57,000
57,000
2007
2008
2009
Total
57,000
57,000
Funding Sources 2005
Local Street Reconstruction
Wednesday, August 25, 2004
57
Capital Improvement Program 2005 thru 2009 Contact Engineer I
City of Shorewood, Minnesota Department Local Street Reconstruction
Project # LR-06-02 Type Improvement I
Useful Life
Project Name Star Lane Reconstruction Category Roadways/streets
I
Fund # Priority n1a
Total Project Cost $265,000
Description I I
Reconstruction
I
Expenditures 2005 2006 2007 2008 2009 Total I
Construction/Inspection 235,000 235,000
Contingencies 30,000 30,000 I
Total 265,000 265,000
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Local Street Reconstruction 265,000 265,000
Total 265,000 265,000
I
I
I
I
I
I
I
I
Wednesday, August 25. 2004 I
i I
I 58
I Capital Improvement Program 2005 thru 2009 Contact Engineer
City of Shorewood, Minnesota Department Local Street Reconstruction
I Project # LR-07-01 Type Improvement
Useful Life
Project Name Beverly Dr Pavement Reclamation Roadways/streets
I Category
Fund # Priority nla
Total Project Cost $82,000
I Description I
This project includes pavement reclamation from Cathcart Drive to the cul-de-sac.
I
I Expenditures 2005 2006 2007 2008 2009 Total
Planning/Design/Survey 8,000 8,000
I Construction/Inspection 74,000 74,000
Total 82,000 82,000
I
I Funding Sources 2005 2006 2007 2008 2009 Total
Local Street Reconstruction 82,000 82,000
Total 82,000 82,000
I
I
I
I
I
I
I
I
I Wedllesda)'. August 25. 2004
I 59
Capital Improvement Program 2005 thru 2009 Contact Engineer I
City of Shorewood, Minnesota Department Local Street Reconstruction
Project # LR-07-02 Type Improvement I
Useful Life
Project Name Street Reclamation Projects Category Roadways/streets
I
Fund # Priority nla
Total Project Cost $300,000
Description I I
I
Expenditures 2005 2006 2007 2008 2009 Total I
Construction/Inspection 100,000 100,000 100,000 300,000
Total 100,000 100,000 100,000 300,000 I
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Local Street Reconstruction 100,000 100,000 100,000 300,000
Total 100,000 100,000 100,000 300,000
I
I
I
I
I
I
I
I
Wedllesday. August 25. 2004 I
60 I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
Project # LR-OS-Ol
Project Name Bracketts Rd Pavement Reclamation
Fund #
2005 thru 2009
Description
This project includes pavement reclamation from Mill Street to the cul-de-sac.
Expenditures 2005
Planning/Design/Survey
Construction/Inspection
Total
Funding Sources 2005
Local Street Reconstruction
Total
2006
2006
61
2007
2007
2008
11 ,000
139,000
150,000
2008
150,000
150,000
Contact Engineer
Department Local Street Reconstruction
Type Improvement
Useful Life
Category Roadways/streets
Priority nla
Total Project Cost $150,000
2009
Total
11,000
139,000
150,000
2009
Total
150,000
150,000
WedllesdCl~', August 25. 2004
c
z
:::)
LL
I-
Z
W
:E
w
CJ
<C
Z
<C
:E
a:
w
~
3:
:E
a:
o
?-
m
'0
.;:: >-
-0)
(/J_
00:
"00)
O).c
..c-
(/JC
"- .-
O).c
ca=:,....:..
~~o
~~:2
O):=~
0) -0
"-~
Oo_CO
00...
mO)e::
.c..c-
m - c
..c-O
0) 0._
c"--
cO)m
.- ,... N
:2 t::'2
0) 0 m
..cOO)
-enO
c m
.- 0)-
.c.cc
~_O)
~:JE
(/J00)
O)(/JO)
:=O)m
"O.cc
0- m
O.~ :2
~ -"0
0) C ...,
"-0....
0'- .c
..ct::(/J
enO"-
0.0)
- ~
o O)'u
>-.5: ~
~c~
O'as 0)
O)Ee
~eo
-0)-
0..c'5
~I-CO
.;::
O,....:..~
o<<r 0 0
E~ca
O)oe>
..c:2:J
I- _ 0...
-
"- 0
o m 0)
'O..c..c
.;:: 0) -
-.o(/J
.~ c m
"000
"O,,-~
~2~
(/Jmo
(j)~co
caEo...
~.9e::
m(/JO)
0)0).c
- 0).-
mm"O
CCC
.2> m m
~Eo
"O.9~
0_0
::::::>~
~ (!) 0)
-O::.c
0)--
>--"0
m~O)
E--
'2 m
~:::> C
._ 0)
(ij (ij '00
0.- 0)
.- C "0
og 0) (/J
cErn
:Jc.c
EQi"O
..c>o
000
m<!J~
0)0)0)
-- (;
~:9 ,...
.- (/J.....
ocen
.co-
- a. 0
:J(/J>-
mO)=:
~"-O
00)0)
_..c,...
:J-.....
'Cd(/JI-
_m
en(/J->-
- +-0- .
"- 0'- (/J
0) .;:: 0 :::>
-gtiO)<!J
:::>:0-50::
"OE
o 0
o "-
~::
O)m
"- >
o 0
.c"-
en&
m'5 m
"0 >- 0)
e.~ .5:
mO~
a.O)~
e:5iU
~>-.~
m.o"O
.c"Oc
"OO)m
o > -
oeo
~ a.~
0) 0.0
,,-m
o(/J~
t5mO)
~..c
---
om>-
~:5.o
.- "0
OCO)
0) ~ >
.co...o
--"-
- c a.
0)0)0.
'CdEm
"OO)C
CoO)
mmO)
Ec.o
0) m (/J
>~ m
+=,,,-.c
mO)c
--m
.~ m-
o~a.
~EO)
m......c:
01-
..c:-
~enci
~O)o
0) o~ 0
o (/J C\I .
cc....o
<<SO)<<S'"==
:=.c0).c::::;
a.e>-;:
Ea.O)O
oE..c:co
00-0...
oS 0 .5: 0::
0)
~O)~
.5::5 <<S
<<S _ .~
.... c <<S
"00....
a;:E"O
0"O~
.Q~o
0) cO::
>- C
o .0)
(/J'O-
eO)<!J
0'0' a)
-"-c
c 0... <<S
O)c...l
0)0)....
.c - '_n
(/J <!J .5:
<<Sc"E
..com
(/JO)):
0)"0
::J'- 0)
(/J<!J..c:
.~ 0) ::
_..c:o
c--
0)->-
EO"O
0) c ::J
0.2 ti
<<S'O,,-
C:JO)
<<S....ca
Een~
....cE
.m8,-
<<S....o
~.e(j)
E 0) <<S
....0 c c
.- 0)
ti"O~
O)cm
..c.2t::
-0)0)
-...."0
00- C
>-fr:J
~al>-
Eoc
--0)
0"00
(/Jce
::Jm(/J
o -...
o (/J"U .
_O)..c(/J
O):J~<<S
..c: (/J.- e
I- .~ 0 <<S
(]) 0)
~ a.
c ~~
.~ -.~
"0 -0-5
mcnO)t-
o-~O>
000>"0
- 0> 0- c
x 00 > ::J
._ .... 0>
-a.....(])
.9 - .~ ca
t- <<S 0... "-
... 0 0>
"u 0 - a.
0)-00
~.90>0
O>(/J~-
a. "0 (/J (/J
oc<(O>
0::J ..c:
o -....~
-O)o~
o(/JO)
C\I 0) '_=
0.c00
"- - 0."- c
0>0) :J
.0-"-0
E ~ ~O
::J =a ~
o 0) 0 0-
c.....oO
0)......0
oomO>
--0:5
"0"0"0"-
0>~0)0)
'0 .;:: 0) -5
0)000)
-..c:X..c:
0)-0):::-
(/J::J_:>
<<s<<S00)
.t:(/Jcca
<<S "0 ::J
'g ~:o (ij
::J"-->
00)00)
0>0)
o .5: 00.9
~O)"""O
.- c a. 0)
OW..c:O)
0) '>.. 0 C
.c +-0- <<S -
-(0)=
- - ~
-O)<<S_
(/J ..c: ..c: .-
<<SI-_ 0 .
a. O)SE
~ ..~ 0 0)
m(/J"OOd)
0) 0> .- >-
>-::Ji!)~(/J
(/J "- .- _
oS.~ 0.0 0
~
:J
"0
0)
..c:
o
en
-
o
0)
'e-
0...
(ij
....
0)
>
o
c
<<S
1:5
0)
00
"-
a..
"- E
.m0)
m-
~(/J
E~
"- ....
.9.m
(/J <<S
..c~
OE
<<s"-
0)0
"--
o(/J
-0)
(/J..c
ca::
(/J 0
0-
a.~
em
o...E
'OE
0) ::J
'0 (/J
.... 0)
0.0
..., ....
~ :J
<<S ~
g>o
.- c
~.-
0"0
_c
- :J
.eu...
0)"0
..c:c
I-<<S
C")
CD
c
-------------------
I
2005 - 2009 CAPITAL IMPROVEMENT PROGRAM I
Section 110. STORM WATER MANAGEMENT - PROJECT SUMMARY
proj Description 2005 2006 2007 2008 2009 I
1 Gideon Glen $ 183,300 I
2 Glen Road Drainage Improvement $ 25,000
3 Boulder Bridge Storm Lift Station $ 88,000
4 Stormwater Projects $ 30,000 $ 30,000 $ 30,000 $ 30,000 I
TOTAL $ 296,300 $ 30,000 $ 30,000 $ 30,000 $ 30,000
I
I
I
I
"
I
I
I
I
I
I
I
I
I
64 I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
PROJECTS BY DEPARTMENT
2005 thru 2009
Department Project# Priority 2005 2006 2007 2008 2009 Total
Stormwater Management
Gideon Glen Improvements STM-04-Q1 0 183,300 183,300
Glen Road Drainage STM-Q4-02 0 25,000 25,000
Boulder Bridge Lift Station STM-04-Q4 0 88,000 88,000
Mise Stormwaler Projects STM-Q4-05 0 30,000 30,000 30,000 30,000 120,000
Stormwater Management Total 296,300 30,000 30,000 30,000 30,000 416,300
GRAND TOTAL 296,300 30,000 30,000 30,000 30,000 416,300
Wedm'sdll)'. August 25. 2004
65
Capital Improvement Program 2005 thru 2009 Contact Engineer I
City of Shorewood, Minnesota Department Stonnwater Management I
Project # STM-04-01 Type. hnprovement
Useful Life
Project Name Gideon Glen Improvements Category Stonnwater Management
I
Fund# 631 Priority nla
Total Project Cost $183,300 I
Description I
The Gideon Glen project involves enhancement of an existing wetland, potential construction of storm water management facilities
and creating a public education program to study water quality and runoff characteristics. The City of Shorewood has key I
individuals seeking additional financial support for the project. Funding will be a combined effort from such organizations as
Minnehaha Creek Watershed District, Hennepin County Environmental Services, the Metropolitan Council and the City of
Shorewood.
Expenditures 2005 . 2006 2007 2008 2009 Total I
Planning/Design/Survey 30,000 30,000
Construction/Inspection 138,300 138,300 I
Contingencies 15,000 15,000
Total 183,300 183,300
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Minnehaha Creek Watershed 183,300 183,300
Total 183,300 183,300
I
I
! I
I
I
I
I
I
Wedllesday. August 25. 2004 I
66 I
I Capital Improvement Program 2005 thru 2009 Contact
I City of Shorewood, Minnesota Department Stonnwater Management
Project # STM-04-02 Type hnprovement
Useful Life
Project Name Glen Road Drainage Category
I
Fund # 631 Priority nla
Total Project Cost $25,000
I Description I
Involves installation of tile lines, catch basin structure and cross culvert across Glen Road. In addition, a swale will be constructed
to the north.
I
I Expenditures 2005 2006 2007 ,2008 2009 Total
Planning/Design/Survey 5,000 5,000
I Construction/Inspection 20,000 20,000
Total 26,000 26,000
I
I Funding Sources 2005 ,2006 2007 2008 2009 Total
Storrnwater Management Fund 25,000 . 25,000
Total 25,000 25,000
I
I
I
I
I
I
I
I
I
Wedllesda)'. August 25. 2004
I 67
Capital Improvement Program 2005 thru 2009 Contact Engineer I
City of Shorewood, Minnesota Department Stormwater Management I
Project # STM-04-04 Type Improvement
Useful Life
Project Name Boulder Bridge Lift Station Category Stormwater Managemen,t
I
Fund # Priority nla
Total Project Cost $88,000
Description I I
This project includes installation ofa small lift station and pipe discharge from the pond in Boulder Bridge. Currently, this pond
does not have an outlet.
I
Expenditures 2005 2006 2007 2008 2009 Total I
PlannlnglDesign/Survey 12,000 12,000
Construction/Inspection 66,250 66,250 I
Contingencies 9,750 9,750
Total 88,000 88,000
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Special Assessments 88,000 88,000
Total 88,000 88,000
I
I
I
I
I
I
I
I
Wedllesday. August 25. 2004 I
68 I
I Capital Improvement Program 2005 thru 2009 Contact Engineer
City of Shorewood, Minnesota Department Stormwater Management
I Project # STM-04-05 Type Improvement
Useful Life
Project Name Mise Stormwater Projects Category Stormwater Management
I Fund# 631 Priority nla
Total Project Cost $120,000
I Description I
Specific projects to be determined.
I
I Expenditures 2005 2006 2007 2008 2009 Total
Construction/Inspection 30,000 30,000 30,000 30,000 120,000
I Total 30,000 30,000 30,000 30,000 ,120,000
I
I Funding Sources 200S 2006 2007 2008 2009 Total
Stormwater Management Fund 30,000 30,000 30,000 30,000 120,000
Total 30,000 30,000 30,000 30,000 120,000
I
I
I
I
I
I
I
I
I Wednesday. August 25. 2004
I 69
:iE
w
I-
en
>-
en
a:
w
3:
w
en
>-
a:
<t
!::
z
<t
en
u.i
E
Q)
.....
en
>-
en
.....
Q)
3:
Q)
en
~
m
.....
.2
m
en
(ij
a.
:Q
c
::J
E
Q)
.s:::
.....
>-
.0
"0
Q)
c:
Q)
en
.~
"0
o
o
3:
Q)
.....
o
.s:::
(J)
13
~
o
Q)
.s:::
.....
-
o
<(
'O;f"C
,-m
..... .
.s:::=m
:!:oo
3: g- en
en.....Q)
Q)Q)~
coo::::: .-
=..::;~
..... Q) -
Q) .s::: Q)
3: ..... Q)
Q)0a.
en ..... 0
~en..lll::
s:.,.-C m
m .- .s:::
:!:e(J)
c "0 C
m >-._
en _ ~
_ Q) +-0-
0..... .-
m=
enE~
~+='-
.- - Q)
E::J..lIl::
C\lEm
(OQ).....J
>- 1;) Q)
- >-::J
Q)en-
..... OJ
m"O I
Eo
.- 0 en
X:>Q)
0:>0
..... Q)--
a......c:
a.0Q)
m.s:::(J)
en(J)_
Q)_m
"OoE
~ ~ Q)
0.- E
.!: U c
Q) 0
E .s::: .!::
Q)I->
..... c
~ .w
en en_
Co
~.Q=
.-..... 0
UJ9c
CJ)en::J
.s:::=o
I-=U
-.....
oc
C Q)
oE
.- .....
.....m
0Q)
::J ......
"0.....
Q).....CJ)
.....0
__ en
5enm
__...... L...
1\jeno
;t:: 8.5
= 0
.0 en en
~<((ij
Q) .....
..... .en
cE::J
OQ)E
.- .....
.....en3:
J9>-0
en en;;:::
:t; 0).5
-3:"0
cQ)c
oenm
~ ~5
Om+='
l:l=:!:m
Q)C':::
enm=
;t::en'E
0) Q) .0;
c.s:::.s:::
--..... .....
enoQ)
::J ..... 0
8.5 ::J
- "0
en3:Q)
.- 0.....
~;;:::.9
._ C
U.- en
Q) "0 -g
.s:::cl:l=
.....mQ)
~5a)
..... .- en
c1\jm
@.....CJ)
'- :!:::: '-
::J:;:::: 0
U.5.5
(ij.
.....E
Q) CJ)
>.....
Oen
c>-
moo
.....
.....- CJ)
o 3:
.~ Q)
200
o.~
.....m
Q):!:
3: C
Q)m
0000
~Q)
m:5
~ s.-
cO
m-
(J)~
.s:::m
oE
mE
Q)::J
000
-Q)
enO
- .....
m ::J
eno
O(J)
a. 0)
ec
0. --
"0
oC
Q)::J
._Ll.
e"O
c..c
m
@Q)
ms
0)"0
C Q)
.- .s:::
3: 0
000
=;,...
00
-Q)
Q) .-
.s:::2
I-a.
--------
-
-
.....
----------
72
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
2005 - 2009 CAPITAL IMPROVEMENT PROGRAM
Section 110. SANITARY SEWER - PROJECT SUMMARY
proj Description 2005 2006 2007 2008 2009
1 Lift Station 15 Rehabilitation $ 81,000
2 Lift Station 17 Rehabilitation $ 22,000 $ 81,000
3 Portable Generator for Lift station $ 68,800
4 Lift Station 16 Rehabilitation $ 25,000 $ 79,000
5 Lift Station 12 Rehabilitation $ 19,000 $ 91,000
6 Infiltration and Inflow Projects $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000
TOTAL $ 196,800 $ 131,000 $123,000 $ 116,000 $ 25,000
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Department
Capital Improvement Program
City of Shorewood, Minnesota
PROJECTS BY DEPARTMENT
2005 thru 2009
Project# Priority 2005 2006
2007
2008
2009 Total
Sanitary Sewer
Infiltration and Inflow Reduction
Uft Station 15 Rehabilitation
Lift Station 17 Rehabilitation
Portable Generator for Uft Stations
Lift Station 16 Rehabilitation
Lift Station 12 Rehabilitation
Sanitary Sewer Total
GRAND TOTAL
SS-03..()5
SS-03-o6
SS-04-o1
SS-05-o1
SS-05-o2
SS-07-01
0 25,000 25,000
0 81,000
0 22,000 81,000
0 68,800
0 25,000
0
196,800 131,000
25,000
79,000
19,000
25,000
91,000
25,000 125,000
81,000
103,000
68,800
104,000
110,000
123,000
116,000
25,000 591,800
196,800 131,000
25,000 591,800
123,000
116,000
73
Wedllesday. August 25, 2004
Capital Improvement Program 2005 thru 2009 Contact I
Engineer
City of Shorewood, Minnesota Department Sanitary Sewer I
Project # 88-03-05 Type Improvement
Useful Life Syrs
Project Name Inrlltration and Inflow Reduction Category Sanitary Sewer
I
Fund# 611 Priority nla
Total Project Cost $150,000
Description I I
This item is an annual project to reduce the costs of infiltration and inflow.
I
Prior Expenditures 2005 2006 2007 2008 2009 Total I
I 25,000 I Planning/Design/Survey 4,000 4,000 4,000 4,000 4,000 20,000
Total Construction/Inspection 21,000 21,000 21,000 21 ,000 21,000 105,000 I
Contingencies 0 0 0 0 0
Total 25,000 25,000 25.000 25.000 25,000 125.000
I
Prior Funding Sources 2005 2006 2007 2008 2009 Total I
I 25,000 I Sanitary Sewer Fund 25,000 25,000 25,000 25,000 25,000 125,000
Total Total 25,000 25.000 25,000 25,000 25,000 125,000
I
I
I
I
I
I
I
I
Wedllesday, Augflst 25, 2004 I
74 I
I Capital Improvement Program 2005 thru 2009 Contact
Engineer
I City of Shorewood, Minnesota Department Sanitary Sewer
Project # 88-03-06 Type Improvement
Useful Life Syrs
Project Name Lift 8tation 15 Rehabilitation Category Sanitary Sewer
I
Fund# 611 Priority nla
Total Project Cost $99,000
I Description I
This project involves reconstruction of the wet well, control panels, and installation of an autodialer system.
I
I Prior Expenditures 2005 2006 2007 2008 2009 Total
I 18,000 I Construction/Inspection 72,000 72,000
I Total Contingencies 9,000 9,000
Total 81,000 81,000
I
I Prior Funding Sources 2005 2006 2007 2008 2009 Total
I 18,000 I Sanitary Sewer Fund 81 ,000 81,000
Total Total 81,000 81,000
I
I
I
I
I
I
I
I
I
Wl'dllesday, Aug/lst 25. 2004
I 75
Capital Improvement Program 2005 thru 2009 Contact Engineer I
City of Shorewood, Minnesota Department Sanitary Sewer I
Project # 88-04-01 Type Improvement
Useful Life Syrs
Project Name Lift 8tation 17 Rehabilitation Category Sanitary Sewer
I
Fund # 611 Priority nla
Total Project Cost $103,000
Description I I
This project involves reconstruction of the wet well, control panels.
I
Expenditures 2005 2006 2007 2008 2009 Total I
Planning/Design/Survey 22,000 22,000
Construction/Inspection 72,000 72,000 I
Contingencies 9,000 9,000
Total 22,000 81,000 103,000
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Sanitary Sewer Fund 22,000 81,000 103,000
Total 22,000 81,000 103,000
I
I
I
i
I
I
I
I
I
Wedllesday, August 25. 2004 I
76 I
I Capital Improvement Program 2005 thru 2009 Contact Engineer
I City of Shorewood, Minnesota Department Sanitary Sewer
Project # S8-05-01 Type Unassigned
Useful Life
Project Name Portable Generator for Lift 8tations Category Sanitary Sewer
I
Fund # PrIority nla
Total Project Cost $68,800
I Description I
Portable generator set for lift stations.
I ,
I Expenditures 2005 2006 2007 2008 2009 Total
EqulpN ehicleslFumishings 62,900 62,900
I Contingencies 5,900 5,900
Total 68,800 68,800
I
I Funding Sources 2005 2006 2007 2008 2009 Total
Sanitary Sewer Fund 68,800 68,800
Total 68,800 .68.800
I
I
I
I
I
I
I
I
I
Wā¬!dnesday. August 25. 2004
I 77
Capital Improvement Program 2005 thru 2009 Contact Engineer I
City of Shorewood, Minnesota Department Sanitary Sewer I
Project # SS-05-02 Type Improvement
Useful Life Syrs
Project Name Lift Station 16 Rehabilitation Category
Sanitary Sewer I
Fund # 611 Priority nla
Total Project Cost $104,000
Description 1 I
This project involves reconstruction of the wet well and control panels.
I
Expenditures 2005 2006 2007 2008 2009 Total I
Planning/Design/Survey 25,000 25,000
Construction/Inspection 69,500 69,500 I
Contingencies 9,500 9,500
Total 25,000 79,000 104,000
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Sanitary Sewer Fund 25,000 79,000 104,000
Total 25,000 79,000 104,000
I
I
I
I
I
I
I
I
Wednesday. A/lgl/st 25. 2004 I
78 I
I Capital Improvement Program 2005 thru 2009 Contact Engineer
I City of Shorewood, Minnesota Department Sanitary Sewer
Project # SS-07-01 Type Improvement
Useful Life
Project Name Lift Station 12 Rehabilitation Category Sanitary Sewer
I
Fund# 611 Priority nla
Total Project Cost $110,000
I Description I
This project involves reconstruction of the wet well and control panels.
I
I Expenditures 2005 2006 2007 2008 2009 Total
Planning/Design/Survey 19,000 19,000
I Construction/Inspection 81,000 81,000
Contingencies 10,000 10,000
Total 19,000 91,000 110,000
I
I Funding Sources 2005 2006 2007 2008 2009 Total
Sanitary Sewer Fund 19,000 91,000 110,000
Total 19,000 91,000 110,000
I
I
I
I
I
I
I
I
I
Wednesday, Aug/lst 25. 2004-
I 79
I-
Z
W
:s
c.
-
::J
o
W
w
o
u::
u.
o
c
Z
<C
UJ
w
i=
::::i
(3
<C
u.
o
::::i
In
::J
C.
.2 <5
.0'-
::l (\1
o.E
-(I)
om
C "'0 .
o 0. (I)
~::l"'O
00(1)
.s-~
(I) "'0 Q)
Cco
8(\1C
ft(\1
"'O"'OC
cc~
(\1 .2 .~
C(I)(\1
.Q> 1a E
ClJL..=
(1)(\1(\1
"'0 o.:c
Q)m~
..c .-
-(\10
<5L-"'O
_(I)C
"'0(\1
~5~
"'0 ::l
'S; "'0 ;!:
oQ)C
a. 1a :i
c-
"'O.Q> B
C (/)._
::lQ):S::
-"'00
~ >....:
. - "'0 ffi
;!:(\1E
=(1)
OL-o.
(\1 (ij ._
IL ::l
- 0'"
OOQ)
=CL..
.0(/)(1)
::l(l)"5
a.. ;e 0.
(I)=E
..coo
I-~O
(1)0(1)
..c-L..
-(I)::l
(I)
(I) "'0 C
.- (\1.-
- 0> 0
~ 0.- .
. - ::l (/):s::
- 1:::(\1
(l)Co-
..c(\1_CJ)
-
I- .~ (I) '6
"'0 0> >.
. co
"'0 c: .- ,..
Q)oo....
to:: 0 O>.~
:';:::(I)CO
c (I) 05::
(I) (I) (I) Q)
"'0 ,..._
.- ...... (I)
cl-Ui-
(I) . (\1 0
(I)-E
(l)L-(I)O
.oo..cL-
(I) Ui I- 0.
> L- 0
(\1 0 .-
..c::lCIJ-
O"'.:ll::: (I)
1a=<5E
..c(ij>(I)
- 0.> L-
CIJ'- 0 (\1
- .2 = (I)
Oc.o"O
'~E~ m
a._I-C
.u O.:ll:::
c-- ....
.- 0 0> 0
(\1 c~
E C._.&::;
.Q 32 (I)
Q) '0 'S C
(I)::l.ol-
L-.... (I)
..c-(I)-
- CIJ..c ::l
c_o.
ClJo_E
(\1000
.c"'OI-0
"OcO
_.- (I)
C .U I- ~
::l Q)~
- cc'-
0>._ "
CIJ .- ...,
.- CIJ (I) (I)
..c(l)..c.c
1-"'0__
1a
..c
-
(I)
-
(I)
(I)
..c
CIJ
lti
CIJ
o
e.
e
0.
-
o
(I)
'0
l-
e.
(I)
..c
-
.~
"0
(I)
-
(\1
.2
"0
.5
(I)
....
(\1
CIJ
C
o
~
(\1
N
'E
(I)
;!:
--
CX)
u.:
"0
C
ttI
(I)
-
CIJ
o
o
-
o .
(I)~
...... 0
0-
I- -
a...E
-------------------
82
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
'I
I
I
I
2005 - 2009 CAPITAL IMPROVEMENT PROGRAM
Section IIF. PUBLIC FACILITIES AND OFFICE EQUIPMENT - PROJECT SUMMARY
proj Description 2005 2006 2007 2008 2009
1 Municipal Liquor Store $ 676,500
2 Public Works Building Remodel $ 15,000
3 Computer System Upgrades $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000
4 Document Retrieval System $ 30,000
5 City Hall Building Repairs $ 15,000
6 Public Works Copier $ 900
7 City Hall Color Copier $ 10,000
8 Civil Defense Sirens $ 11,000
9 City Hall Project $1,500,000
10 Public Works Addn (Bay w/lift) $ 400,000
11 Computer Network $ 17,250
TOTAL $ 91,900 $2,603,750 $ 10,000 $ 10,000 $ 10,000
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
PROJECTS BY DEPARTMENT
2005 thru 2009
Department
Project# Priority 2005 2006
2007
2008 2009 Total
Public Facilities/Office Equip
Computer Upgrades PF.03.06 0 10,000 10,000
Municipal Uquor Store PF.()3-07 0 676,500
Public Works Building Remodel PF.()4.03 0 15,000
Document Retrieval System PF-05-Q1 0 30,000
City Hall Building Repairs PF.05.02 0 15,000
Public Works Copier PF.05.03 0 900
City Hall Color Copier PF.05.04 0 10,000
Civil Defense Sirens PF.05.05 0 11 ,000
Network (Computer) Upgrade PF-06-01 0 17,250
City Hall Project PF.06.02 0 1,500,000
Public Works Addition (Bay w/lift) PF.06.03 0 400,000
Public Facilities/Office Equip Total 91,900 2,603,7SO
GRAND TOTAL 91,900 2,603,750
10,000
10,000 10,000 SO,OOO
676,500
15,000
30,000
15,000
900
10,000
11,000
17,250
1,500,000
400,000
10,000
10,000 10,000 2,725,650
10,000
10,000 10,000 2,725,650
83
Wednesday, August 25, 2004
Capital Improvement Program 2005 thru 2009 Contact Finance I
City of Shorewood, Minnesota Department Public Facilities/Office Equip
Project # PF -03-06 Type Equipment I
Useful Life 5 yrs
Project Name Computer Upgrades Category Facilities/equipment
Fund # 401 Priority nla I
Total Project Cost $60,000
Description 1 I
This project proposes to replace obsolete computer hardware and software systems (approximately three workstations per year).
I
Prior Expenditures 2005 2006 2007 2008 2009 Total I
I 10,000 I Computer workstations 10,000 10,000 10,000 10,000 10,000 50,000
Total Total 10,000 10,000 10,000 10,000 10,000 50,000 I
I
Prior Funding Sources 2005 2006 2007 2008 2009 Total I
I 10,000 I Public Facilities/Office Equipm 10,000 10,000 10,000 10,000 10,000 50,000
Total Total 10,000 10,000 10,000 10,000 10,000 50,000
I
I
I
I
I
I
I
I
Wednlisday, August 25. 2004 I
84 I
I Capital Improvement Program 2005 thru 2009 Contact Engineer
I City of Shorewood, Minnesota Department Public Facilities/Office Equip
Project # PF -03-07 Type hnprovement
Useful Life
Project Name Municipal Liquor Store Category Facilities/equipment
I
Fund # 641 Priority nla
Total Project Cost $696,500
I Description 1
This project proposes a space needs study in the year 2004 with anticipated construction in the year 2005.
I
I Prior Expenditures 2005 2006 2007 2008 2009 Total
I 20,000 I Plannlng/Design/Survey 75,000 75,000
I Total Construction/Inspection 540,000 540,000
Contingencies 61,500 61,500
Total 676,500 676,500
I
I Prior Funding Sources 2005 2006 2007 2008 2009 Total
I 20,000 I Liquor Revenue Bonds 676,500 676,500
Total Total 676,500 676,500
I
I
I
I
I
I
I
I
I Wednesday, AlIgllst 25. 2004
I 85
Capital Improvement Program 2005 thru 2009 Engineer I
Contact
City of Shorewood, Minnesota Department Public Facilities/Office Equip I
Project # PF -04-03 Type Improvement
Useful Life
Project Name Public Works Building Remodel Category Facilities/equipment
I
Fund # 401 Priority nla
Total Project Cost $15,000
Description I I
This project proposes reconstruction of interior walls of the Public Works Facility, furniture and audio visual improvements.
I
Expenditures 2005 2006 2007 2008 2009 Total I
Construction/Inspection 15,000 15,000
Total 15,000 15,000 I
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Public Facilities/Office Equlpm 15,000 15,000
Total 15,000 15,000
I
I
,
I
I
I
I
I
I
Wednesday. Augnst 25. 2004 I
86 I
I Capital Improvement Program 2005 thru 2009 Contact
I City of Shorewood, Minnesota Department Public Facilities/Office Equip
Project # PF -05-01 Type Equipment
Useful Life
Project Name Document Retrieval System Category Facilities/equipment
I
Fund # Priority nla
Total Project Cost $30,000
I Description I
Document storage and retrieval system
I
I Expenditures 2005 2006 2007 2008 2009 Total
Document Storage & retrieval 30,000 30,000
I Total 30,000 30,000
I
I Funding Sources 2005 2006 2007 2008 2009 Total
Public Facilities/Office Equlpm 30,000 30,000
Total 30,000 30,000
I
I
I
I
I
I
I
I
I Wc'dlJesday. August 25. 2004
I 87
Capital Improvement Program 2005 thru 2009 Finance I
Contact
City of Shorewood, Minnesota Department Public Facilities/Office Equip I
Project IF PF -05-02 Type Improvement
Useful Life
Project Name City Hall Building Repairs Category Facilities/equipment
I
Fund # Priority n1a
Total Project Cost $15,000
Description I I
I
Expenditures 2005 2006 2007 2008 2009 Total I
repairs and re-shlngle 15,000 15,000
Total 15,000 15,000 I
I
FUnding Sources 2005 2006 2007 2008 2009 Total I
Public Facilities/Office Equipm 15,000 15,000
Total 15,000 15,000
I
I
I
,
I
I
I
I
I
WedlJesday, August 25. 2004 I
88 I
I Capital Improvement Program 2005 thru 2009 Contact Engineer
I City of Shorewood, Minnesota Department Public Facilities/Office Equip
Project # PF -05-03 Type Equipment
Useful Life
Project Name Public Works Copier Category Facilities/equipment
I
Fund # Priority nla
Total Project Cost $900
I Description I
I
I Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles/Fumishlngs 900 900
I Total 900 900
I
I Funding Sources 2005 2006 2007 2008 2009 Total
Public Facilities/Office Equlpm 900 900
Total 900 900
I
I
I
I
I
I
I
I
I
Wednesday. Augllst 25. 2004
I 89
Capital Improvement Program 2005 thru 2009 Contact Finance I
City of Shorewood, Minnesota Department Public Facilities/Office Equip I
Project 1# PF .05.04 Type Equipment
Useful Life
Project Name City Hall Color Copier Category Facilities/equipment
I
Fund 1# Priority nla
Total Project Cost $10,000
Description I I
I
Expenditures 2005 2006 2007 2008 2009 Total I
EquipN ehlcles/Fumishings 10,000 10,000
Total 10,000 10,000 I
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Public Facilities/Office Equipm 10,000 10,000
Total 10,000 10,000
I
I
I
I
I
I
I
I
Wednesday. AI/gust 25. 2004 I
90 I
I Capital Improvement Program 2005 thru 2009 Contact Engineer
City of Shorewood, Minnesota Department Public Facilities/Office Equip
I Project # PF -OS-OS Type Improvement
Useful Life
Project Name Civil Defense Sirens Category Facilities/equipment
I
Fund # Priority nla
Total Project Cost $11,000
I Description I
I
I Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles/Fumishings 11,000 11,000
I Total 11,000 11 ,000
I
I Funding Sources 2005 2006 2007 2008 2009 Total
Public Facilities/Office Equipm 11 ,000 11,000
Total 11,000 11,000
I
I
I
I
I
I
I
I
I Wednesday, August 25. 2004
I 91
Capital Improvement Program 2005 thru 2009 I
Contact Engineer
City of Shorewood, Minnesota Department Public Facilities/Office Equip I
Project # PF -06-01 Type Improvement
Useful Life
Project Name Network (Computer) Upgrade Category Facilities/equipment
I
Fund # 401 Priority nla
Total Project Cost $17,250
Description I I
This project proposes to replace the computer network on a 5 year basis.
I
Prior Expenditures 2005 2006 2007 2008 2009 Total I
I o I Computer workstations 17,250 17,250
Total Total 17,250 17.250 I
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Public Facilities/Office Equipm 17,250 17,250
Total 17,250 17,250
I
I
I I
I
I
I
I
I
Wednesday, August 25. 2004 I
92 I
I Capital Improvement Program 2005 thru 2009 Contact Finance
City of Shorewood, Minnesota Department Public Facilities/Office Equip
I Project # PF -06-02 Type Improvement
Useful Ufe
Project Name City Ball Project Category Facilities/equipment
I Fund # Priority nla
Total Project Cost $1,500,000
I Description I
I
I Expenditures 2005 2006 2007 2008 2009 Total
Construction/Inspection 1,500,000 1,500,000
I Total 1,500,000 1,500,000
I
,
I Funding Sources 2005 2006 2007 2008 2009 Total
G.O. Bonds - 2006 1,500,000 1,500,000
Total 1,500,000 1,500,000
I
I
I
I
I
I
I
I
I Wedllesday, August 25. 2004
I 93
Capital Improvement Program
City of Shorewood, Minnesota
Project # PF -06-03
Project Name Public Works Addition (Bay wllift)
Fund #
Description
Expenditures 2005
Construction/Inspection
Total
Funding Sources
G.O. Bonds. 2006
2005
Total
2005 thru 2009
2006 2007
400,000
400,000
2008
2006 2007
400,000
400,000
2008
94
Contact Engineer
Department Public Facilities/Office Equip
Type Improvement
Useful Life
Category Facilities/equipment
Priority nla
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Total Project Cost $400,000
2009
Total
400,000
400,000
2009
Total
400,000
400,000
Wedllesday. Allgllst 25.2004
-
-
-
I-
Z
w
:E
0.
-
:::)
a
w
eCD .~ ~ -5 ~.~ ~ ~
o-roro-en-
E c en CD en'- 0 c
0. ro -CD .... en c 0 .-
.- c 0 CD CD
s- -.= CD - 0 s::. 15 0.
CDCDE.....~3:">..:::::J
s::. ..... .u.... ~. ....:
'0- tU.2 c::"o o~ ~
~:5 0. CD 5 1;) > 0
CD ._ ~ s::. >-.- 0 ....
~e1iien3:CDs::.Eo.
.- CD CD.- .c "0 c.
0."0;0:: CD"O (]) CD ro
.r:. .- en - (])"O........c en
" 0. :J (,) CD t= ~
....._~"O tU"O 0 =
tU (]) 0 (]) o.c (,) ~o
CD.c:>.cCDCDCDES
<ao::>o....-.... 0
s::.-OenCD><..... U
_ .- _ .c CD 'u CD
.... .~ .c c:: >- en 13 >-
roCD:J(])o.ctU:E:!::
CD-o...E-tUs::.CDU
>- -5 ca CD .~ c:: CD > CD
CDCD(,)g-O-......r:.
s::. ,..._ ~ c:: en 0 .u -
-..... E 0. CD ro'- -
eno (])ECD.r:....:tU
CDeno.... ....CDc::CD
.- CD co.> CD
:t::: 0 CD.- CD . E c::
"Es::.o.c:J.cro 0
(]) - CD - C"' CD "0
"015 -CDC::::!::(,)CD
.- a ro - ro ro ..0
CDCD :5~0 .0.
"'5 ~.s:"O - CD ~ ~ ,g
"0 0. tU C >-:t::: 0 CD
CD...."E ro 0-"0 >-....
s::. :J._ - = (]) 't: tU
Oo.tU~o13CDtUen
en = E CD 0.:E.c CD CD
"0 ~ 0 "0 ~en CD = en 0)
c:: CD - 5 ~ > .- CD c::
:J > ~ .- 3: <a ~
u..otUoutU:!::(,)(,)
- - - .-
c:: CD enen - CD - ~"O CD
CD s::. c:: s::. - c::-
E.... ~ ~ -; -0 a3 .- -5
CD . CD 0'- CD E.~ CD
o "0 c:: 0.::: "'5 CD en s::.
roCDCDE "Oo~(,)
a. 0 .c __ ~ CD ro tU en
CD ro _ en C.c a. C s::.
cc 0. =.- CD 0 CD ro 0
_~3::::Een....c::~
ffi CD <a ..9- c:: 0 ro en
E .c :5 ~ s-~ - "0 <(
0. 0 en CD CD 3:"0 a .
.S - (]) (]) - _ JQ JQ
C"'~eCOen:Jen:J
w ~ :J ~en CD.2. ~ '@ -g
CD = g ~ ~ _ s::. c..c
s::. en CD u.- .- 0 (,) CD (,)
.... ._.... 0. c:: en .... en
.
CJ
-
-
-
"O"O-~~"O
0.... 0.-.- CD
'C:: cd .2 .2 ~
(]) 0) C - - 'U
(])OCDCD"O
O'....~"O"O 0.
....s::.cdc-:J
cd :!:: ;0:: .- 0 en
~ 3: .s: en en .-
I .- "0 -
o en _ 0 .-
C\I C 0 "0 .- en
o c....cd
ro-- :J CD
15.. $ - 0."0
OE~CDCDS
-:J :5mu..
~~~~:51:
"0 cd - CD >- CD
~ c:: .~s::."O E
c:: ~ m 3: ~ .9-
CD CD 0 ~ (]) :J
(ijoaro....wO"
en - CD >-
<a CD.8 >- tU (])
s::.~ CDE.c
.... \U s- +-'
en E{ii ro en....
CD cdCD(])O
(,)eno....<a:!::
.... .00 CD 0 c::
:::::J >- s::..- 0
ocdc-~E
enc::o.....~
~tU"O~~,g
(])enCD-.....en
s::..- > CD c:: .-
......cCD(,)CD(])
$....:E~EE
..... . 0 0 0. --
o "0 tU C .- -
__ c:: :J en
"0 :J en = 0".-
.s: u.. $ '3: CD :5
0- ro--o-
c:: .....- tU
-CD (,)
15.. E - c:: g> "0
en :J ._ CD
ECDCDO="O
$~~U~ffi~
.....-c:: ~ Ero
cd 5}.- 1: ~ E CD
~ cc CD CD - >-
o -E....o3:
~ e .g .9- 0 ~ CD
oCDCD:Jen....-
.~ E CD 0" a s::.X
Oo.enCDooCD
0:5 ~ 0)- cd C
_ 0"0 C::"O e CD
ro w - .- c:: 0. s::.
.- en :J 0.-
o CD CD ro _ 'ro 0)
C::s::.s::..c..!., c::
ro _ - (,) CD CD.-
C .... ....
.- 0 0 :::::J e s::. :J
u.. _ _ 0._...."0
-
-
-
-
- -
-
-
-
-
-
-
IS)
m
-
Capital Improvement Program I
City of Shorewood, Minnesota I
PROJECTS BY DEPARTMENT
2005 thru 2009 I
I
Department Project# Priority 2005 2006 2007 2008 2009 Total
Equipment Replacement I
F350 4x4 Pickup w/plow E-02.53 0 30,285 30,285
F350 4x4 Pickup w/plow E-Q2.55 0 30,285 30,285 I
Pump. 4' Discharge E-03-50 0 24,336 24,336
Asphalt Curb MachIne E-05-01 0 13,000 13,000 I
Vactor Unit E.05-Q2 0 68,000 68,000
Gen Set Wastewater E.05-03 0 68,800 68,800
800 Mghz Radios - 2 Mobiles/2 base stations E-05-04 0 7,000 7,000 I
Water Truck E-05-45 0 97,344 97,344
Bobcat E-05.63 0 19,307 19,307
Dump Truck - Ford L8000 E-06-33 0 123,735 123,735 I
F350 & Ratbed E-06.49 0 36,558 36,558
Dump wlPlow and SND E-06-54 0 121,485 121;485 I
Trail King Trailer E-07-21 0 8,189 8,189
Ford 555 Backhoe E-07 -22 0 64,459 64,459
Tennant 240 Floor Sweeper E-07-46 0 12,401 12,401 I
Mower. Toro Groundsmaster 3250 E-07.70 0 20,473 20,473
Tractor - Ford 3910 E.08.35 0 31,633 31,633
Speed Awareness Display E-08-51 0 21,900 21,900 I
Dump Truck E-09-65 0 136,654 136,654
Dump truck - Ford E-09-68 0 136,654 136,654
I
Equipment Replacement Total 358,357 281,778 105,522 53,533 273,308 1,072,498
GRAND TOTAL 358,357 281,778 105,522 53,533 273,308 1,072,498 I
I
I
I
I
Wednesday. Augl/sf 25, 2004 I
96
I
I
I City of Shorewood
Equipment Replacement - 20'year Schedule
I Unit Model Acq Life Year of Cost
No Year Description Date (Vrs) Rplmt Basis 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
21 1987 Trailer 24' - Trail Kina 1987 20 2007 $ 7,000 $ . $ . b $ 8,189 $ - $ - $ . $ - I $ - ........ $ - $ - $ - $ - I.... $ - $ - I $ - ..' $ $ - $ -
22 1987 Backhoe - Ford 555 1987 20 2007 $ 55,100 $ - $ - b $ 64,459 $ - $ . I $ - $ - $ - ...... $ . $ - $ - $ - ...... $ - $ - 1 $ - $ - $ - $ -
I 32 1988 Roller - Beuthlinll 1988 15 2003 $ 24,850 $ - $ - $ - $ - $ . . $ - ". $ - $ . $ - $ - .,' $ - $ - $ . $ . $ . ........ $ - $ - ...... $ .
33 1988 Dump Truck - Ford L8000 1988 11 1999 $ 110,000 $ - b $ 123,735 . ..... $ . $ - $ .... $ - ....... $ - $ - $ . $ - .. $ . $ . b $ 190,484 $ . $ - ...... $ - $ - 'i
$ -
35 1988 Tractor - Ford 3910 1988 20 2008 $ 26,000 $ - I $ - $ - b $ 31,633 $ - .... $ $ - $ - i. $ - $ - $ - ........ $ - < $ - $ . . $ . ..' $ - $ - '. $ -
38 1990 Air Compressor -Inllersall Rand 185 1990 20 2010 $ 10,950 I, $ - I $ - ". $ - $ - $ - b $ 14,409 $ - ... $ - .. $ - $ - . $ - I $ - . $ $ - $ . I $ - . $ - I $
I 40 1990 AMT - John Deere 622 1990 10 2000 $ 12,500 $ - $ . ." $ - $ - . $ - "'i $ - I.' $ - $ - $ - b $ 19,243 $ - ' $ . $ . $ - $ - . $ - . $ - $ .
45 1989 Water Truck - Ford 7000 1992 20 2012 $ 90,000b $ 97,344 $ - ...... $ - I $ .. $ - < $ - $ - .,. $ - ... $ . .... $ - .' $ - .......... $ - . $ - ; $ . ... $ - $ . $ - I'.'
$ -
46 1982 Floor Sweeoer - Tennant 240 1992 15 2007 $ 10,600 . Y.. $ - I> $ - b $ 12,401 $ - ..' $ - $ - ........ $ . $ - $ - .......... $ - $ - ..... $ - '......... $ - U.. $ - $
. $ - .. $ - b $ 22,333
47 1992 Pickup - 4 x 2 Ford F150 1992 10 2002 $ 20,000 .. $ - $ - $ - I $ $ . $ - '. $ .. $ . b $ 38,486 $ . ........ $ - $ - $ - $ $ . ...., $ - $ - $ -
49 1993 Flatbed - 4 x 2 Ford F350 1993 10 2003 $ 32,500 I.... $ - b $ 36,558 $ - $ - $ - $ - $ . $ . $ - $ . $ - $ - .. $ - b $ 58,531 $ . $ - $ - $ .
I 50 1970 Pump - 4' Discharoe 1985 20 2005 $ 22,500b $ 24,336 ..... $ . ...... $ - $ - $ - $ . $ - $ - $ - I.... $ - ~ .. $ . $ . $ - . $ - $ . $ - $ - I', $ -
51 1993 Speed Awareness Display 1993 15 2008 $ 18,000 I....... $ - 1<.. $ . $ . b $ 21,900 $ - $ - $ . $ - " $ - Ii. $ - I' $ . $ . .> $ - '. $ - $ - $ - $ - $ -
52 1994 Dum~ Small - 4 x 2 Ford F350 1994 20 2014 $ 36,000 I. $ . I'.? $ $ - I'.' $ - $ - $ - $ - $ - $ . b $ 55,420 'X $ - $ - ..... $ - $ . $ - $ . $ - $ -
53 1995 Picku - 4 x 4 Ford F350 1995 10 2005 $ 22,500 b $ 30,285 ... $ - $ - $ - $ - $ - ','. $ - $ - $ . $ - b $ 44,829 $ . $ - .. $ - $ - $ - $ - $ -
54 1995 Dum~ Truck - Ford 8000 1995 11 2006 $ 108,000 ...... $ - 'b $ 121,485 $ - $ . $ $ - ......... $ - $ - $ . $ - .... $ $ . b $ 187,021 $ - $ - $ . $ - $ -
I 55 1995 Picku p . 4 x 4 Ford F350 1995 10 2005 $ 22,500b .. $ 30,285 $ - $ - $ . $ - $ . .i $ . $ - $ - $ 43,105 .,.... $ - $ . $ - $ - $ - $ . $ - $ -
56 1995 Loader - Cat IT28F 1995 20 2015 $ 102,500. $ - $ . $ - $ . $ - $ . . $ - $ - $ - $ . 'b $ 164,106 $ . ....... $ - $ - $ - $ - $ . $ -
57 1995 Mower. Toro Groundsmaster 3250 1995 7 2002 $ 17,500 $ . $ - $ - $ . $ - b $ 23,029 ...> $ - $ . $ - $ . $ . $ - b $ 30,304 $ - $ - $ - $ - $ -
60 1987 Sewer Jetter - Sereco Trailer mount 1996 20 2016 $ 36,500.. $ - $ - $ . $ . $ - [... $ - .... $ . $ . $ - $ - $ - b $ 60,n5 .... $ - $ . ". $ - $ - $ - $ -
62 1996 Van - Oldsmobile 1998 10 2008 $ 19,100 . $ - $ - I" $ - $ - $ - .. $ - ...;.' $ - ['. $ - $ . b $ 29,404 $ . $ . $ - $ . $ - $ - $ - $ -
63 1998 Skid Steer - Bobcat 753 1996 7 2003 $ 17,850 b $ 19,307 $ - I.. $ - $ - $ . $ - . $ - b. $ 25,406 $ - $ . - $ - $ . $ - . $ - b $ 33,433' $ . $ $ -
64 1997 Sand Pro 3000 . 1997 15 2012 $ 8,500.;: $ - $ - I;:. $ - $ - ., $ . $ . .. $ - .b' $ 12,098 $ $ - $ - $ - I',' $ . $ - I;: $ - ,'. $ $ . $ -
65 1998 Dump Truck. Ford 1998 11 2009 $ 108,000 ....... $ - $ - .., $ - $ - .b $ 136,654 1< $ . ';: $ - I.'c $ - $ - ...... $ - $ - $ - Ic' $ - $ - $ - b. $ 210,373 $ - $ -
67 1998 Mower -Toro Groundsmaster 3250 1998 7 2005 $ 17,500 L $ - $ - $ - $ - ..... $ - $ - b' $ 23,950 $ - $ - $ - $ . $ - . $ - b $ 31,517 $ . , $ - $ . $ -
I 68 1998 Dump Truck - Ford 1998 11 2009 $ 108,000 I' $ - $ - $ . $ - ,b' $ 136,654 $ - $ - $ - $ . $ - $ . $ - . $ - $ - $ - be' $ 210,373 c' $ - $ -
70 2000 Mower - Toro Groundsmaster 3250 2000 7 2007 $ 17,500 I $ - $ - .b $ 20,473 $ - ....... $ - $ - I' $ - $ - $ - b $ 26,940 $ - $ - ............ $ . $ - $ . $ . b $ 35.452
$ -
71 2000 Generator - Generac 200 KW 2000 20 2020 $ 50.000 . ...... $ - $ . $ - $ - """,: $ . " $ - 1'- $ - $ - $ - C'" $ - $ - $ - $ - $ - $ . b $ 97,395 $ . $ -
72 2000 Dump Truck - Friellhtliner FL80 2000 11 2011 $ 108,000 $ - $ - $ - $ - .,. $ - $ - b.. $ 147,805 $ - $ - .. $ . $ - I.. $ - i....... $ . $ - $ . $ - $ - b $ 227,540
73 2000 Roller - Beuthlina- B2000 Static 2000 20 2020 $ 24,850 1'- $ - $ - $ - $ - . $ - $ - . $ - $ - $ - $ . $ - I $ - i....:.. $ . $ - $ - $ $ - b $ 52,355
I 74 2000 Sweeper - Athev M9-D 2000 20 2020 $ 149,415 I.' $ - $ - $ - $ . $ - ... $ - .c. $ . $ - $ - $ . $ - I $ - '" $ - $ - $ - $ - $ - .b $ 314,795
2000 Trailer 12'. Fellina FT 3 2000 20 2020 $ 2,300 ....' $ . $ - $ - $ . ...... $ - .... $ - $ - $ . $ - $ - ... $ - I $ - $ - $ . $ - $ - $ . b $ 4,846
41 1990 Trailer 12' - Taos 1990 20 2010 $ 2,300 $ - $ . . $ - I $ - . $ - b $ 3,027 $ - $ . $ - $ - $ - I...... $ - $ - $ - $ - $ $ . $ -
59 1996 Trailer 18' - Fellino FT 18WD 1996 20 2016 $ 10,200 $ - $ $ - I' $ - $ - <;. $ . $ - $ - $ . $ - $ . b $ 16,984 .... $ - ". $ - $ - $ - $ - $ -
I 76 2003 Truck. Ford F450 w/crane, tool box 2003 12 2015 $ 56,000 $ - $ - ,'. $ - $ - , $ . .:' $ - $ - $ - $ . $ - b $ 91,259 .' $ - . $ - $ - $ - $ - $ - $ -
2003 Generator - Cat 35 KW 2003 20 2023 $ 35,000 $ - $ - .... $ - $ - $ . :; $ - $ . $ - $ - $ - $ . $ . ..... $ - .. $ . $ - $ - $ - $ -
1995 Mower - Toro Walk Behind Proline 44 1995 15 2010 $ 2,200 $ - $ - . $ - $ - .... $ . b $ 2,895 $ - ",1 $ - $ - $ . $ - $ - ...... $ . n....:" $ - $ - $ - $ - $ -
1985 Attach - Cabs for Groundsmaster 1985 14 1999 $ 4,000 $ - $ - $ - $ - $ . $ - , $ - $ - $ - $ . $ - ......... $ - b $ 6,927 $ - :. $ . $ - $ - $ -
1985 Attach - Cabs for Groundsmaster 1985 14 1999 $ 4,000 $ . $ - <;. $ - $ . $ - $ - $ - ., $ - $ - $ - $ - > $ - ":'. $ . $ . b $ 7,492 $ - $ - $ -
I 2000 Attach - Blower Groundsmaster 2000 15 2015 $ 4,560 $ . $ - .': $ - . $ - $ - $ - .' $ . : $ - I': $ - $ I:l $ 7,301 L' $ - ...... $ . $ - "". $ . $ - $ - $ -
1970 Snow Thrower - John Deere 826 1970 25 1995 $ 750 $ - $ .. $ - I' $ . $ . $ - ........ $ - ... $ - . $ - b $ 1,155 $ - $ - $ . $ - $ - $ - $ - $ -
1972 Snow Thrower - 1972 25 1997 $ 750 $ - $ . ...... $ . $ . $ . $ - [" $ - $ - I $ - I $ - b $ 1,201 $ - .... $ - I' $ - ...... $ . $ - $ - $ -
1988 Attach - Flail side mower 1988 15 2003 $ 12,800 $ . $ - .... $ - '. $ . $ . $ - :.. $ - $ - j.., $ . $ - j,' $ - $ - '-... $ - b $ 23,052:: $ - $ - $ - $ -
1988 Attach - Flail rear mower 1988 15 2003 $ 6.400 $ - ... $ - $ - . $ - $ - $ - $ - '" $ - '.,:' $ - $ - F $ . $ - ..... $ - b $ 11,5261'1 $ - $ . $ - $ .
I 2003 Dump Truck Box Replacement & Liahts 2003 15 2018 $ 8,750 I':" $ - $ - $ - $ . $ - $ . , $ - $ . I $ - $ - I. $ - $ - , $ . $ . " $ - $ - $ . $ .
2003 Engineffransmission Analvsis Station 2003 20 2023 $ 4,000 $ . $ - $ - .. $ - $ - $ . $ - $ - I: $ - $ - I- $ - $ - .. $ - $ - $ . $ - $ . I.' $ -
78 2003 Pickup-4 x 4 Ford F150 2003 10 2013 $ 26,000 $ . $ - $ - $ . $ . $ - ...... $ - $ . ." $ - $ - '.' $ - .: $ - 7 $ - $ - ...... $ . $ - $ - I. $ .
2005 Asphalt Curb Machine 2005 20 2025 $ 13.000 b $ 13,000 $ - $ - ., $ - $ - $ . I" $ - $ - $ - $ - $ - $ . ........ $ - $ . .' $ - $ - $ - $ .
I 2005 Gen Set Wastewater 2005 20 2025 $ 68,800 b $ 68,800 ........ $ - $ - $ . I $ - $ - $ - ". $ . ." $ . .. $ - $ - $ - " $ - $ - . $ . $ - $ - :. $ .
2005 800 Mahz Radios 12 bases/2 mobiles) 2005 10 2015 $ 7,000 b $ 7,000 ....... I..... .... I.. ...... ....... ". . .,' ...... ,.
2005 Vactor Unit 2005 20 2025 $ 68,000 b $ 68,000 $ - ." $ . $ - ...... $ . 1,- $ - $ - I..' $ - ..' $ - .b $ 40,026 $ - $ - $ . I' $ - ...... $ - I' $ - $ . $ -
10TALS $ 358.357 $ 281,778 $105,521 $ 53,533 $ 273,309 $ 43,360 $ 171,755 $ 37,504 $ 38,486 $ 215,293 $ 308,695 $ 77,759 $ 414.737 $ 124,626 $ 40,925 $ 518,142
$ 35,452 $ 621,868
I Notes:
(1) A "b" Indicates a purchase for that given equipment and year.
(2) This item is funded by a 25 % transfer from the water fund, and a 75% transfer from the sewer fund
I
I
I
.
-------------------
I Capital Improvement Program 2005 tltru 2009 Contact Engineer
City of Shorewood, Minnesota Department Equipment Replacement
I Project # E.02.53 Type Equipment
Useful Life
Project Name F350 4x4 Pickup w/plow Category PW: Vehicles
I
Fund # Priority nla
Total Project Cost $75,114
I Description I . .
I
I Prior Expenditures 2005 2006 2007 2008 2009 Total Future
I o I EqulpNehlcleslFumishings 30,285 30.285 I 44.8291
I Total Total 30,285 30,285 Total
I
I Prior Funding Sources 2005 2006 2007 2008 2009 Total Futul'e
I 01 Equipment Replacement Fund 30.285 30,285 I 44.8291
Total Total 30,285 30,285 Total
I
I
I
I
I
I
I
I
I Wednesday, August 25. 2004
I 97
Capital Improvement Program 2005 tltru 2009 Contact Engineer I
City of Shorewood, Minnesota Department Equipment Replacement I
Project # E-02-55 Type Equipment
Useful Life
Project Name F350 4x4 Pickup w/plow Category PW: Vehicles
I
Fund It Priority nla
Total Project Cost $73,390
Description I I
I
Priolo Expenditures 2005 2006 2007 2008 2009 Total Future I
I o I EquipN ehlcleslFumishings 30,285 30,285 I 43,1051
Total Total 30,285 30,285 Total I
I
Prior Funding Sources 2005 2006 2007 2008 2009 Total Future I
I o I Equipment Replacement Fund 30,285 30,285 I 43,1051
Total Total 30,285 30,285 Total
I
I
I
I
I
I
I
I
Wednesday, August 25. 2004- I
98 I
I Capital Improvement Program 2005 thru 2009 Contact Engineer
I City of Shorewood, Minnesota Department Ectuipment Replacement
Project It E-03-50 Type Equipment
Useful Life
Project Name Pump - 4' Discharge Category Facilities/equipment
I
Fund It Priority nla
I Total Project Cost $24,336
Description I
I
I Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles/Furnishin9s 24,336 24,336
I Total 24,336 24,336
I
I Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Replacement Fund 24,336 24,336
I Total 24,336 24,336
I
I
I
I
I
I
I
I
Wedllesday, AI/gl/st 25. 200./.
I 99
Capital Improvement Program 2005 thru 2009 Contact Finance I
City of Shorewood, Minnesota Department Equipment Replacement I
Project # E-OS-Ol Type Equipment
Useful Ufe
Project Name Asphalt Curb Machine Facilities/equipment
Category I
Fund # Priority nla
Total Project Cost $13,000 I
Description I
.
I
Expenditures 2005 2006 2007 2008 2009 Total I
EquipNehicles/Fumishings 13,000 13,000
Total 13,000 13,000 I
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Equipment Replacement Fund 13,000 13,000
Total 13,000 13,000
I
I
I
I
I
I
I
I
Wedllesday. August 25. 2004 I
100 I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
[ ProJ"" E-OS-02
Project Name Vactor Unit
I
I
Fund #
Description
I
Total Project Cost $68,000
I
I
I
I
I
2005 thru 2009
Contact Engineer
Department Equipment Replacement
Type Equipment
Userul Life
Category Facilities/equipment
Priority nla
Expenditures
EquipNehicles/Fumlshings
Total
Funding Sources
Equipment Replacement Fund
Total
I
I
I
I
I
I
I
I
I
I
2005
68,000
68,000
2006
2005
68,000
68,000
2006
2007
2008
2009
To~l
68,000
68,000
2007
2008
2009
Total
68,000
68,000
W(!dllesday, August 25. 2004
101
Capital Improvement Program 2005 tllru 2009 I
Contact Engineer
City of Shorewood, Minnesota Department Equipment Replacement I
Project ## E-OS-03 Type Equipment
Useful Life
Project Name Gen Set Wastewater Category Sanitary Sewer
I
Fund ## Priority nla
Total Project Cost $68,800
Description I I
I
Expenditures 2005 2006 2007 2008 2009 Total I
EqulpNehicles/Fumishings 68,800 68,800
Total 68,800 68,800 I
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Sanitary Sewer Fund 68,800 68,800
Total 68,800 68,800
I
I
I
I
I
I
I
I
Wednesday, AI/gnst 25. 2004 I
102 I
I Capital Improvement Program 2005 thru 2009 Contact Engineer
I City of Shorewood, Minnesota Department Equipment Replacement
Project ## E-OS-04 Type Equipment
Useful Life
Project Name 800 Mghz Radios - 2 Mobiles/2 base stations Category Facilities/equipment
I
Fund #; Priority nla
Total Project Cost $7,000
I Description I
I ,
I Expenditures 2005 2006 2007 2008 2009 Total
EqulpNehicleslFumishlngs 7,000 7,000
I Total 7,000 7,000
I
I Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Replacement Fund 7,000 7,000
Total 7,000 7,000
I
I
I
I
I
I
I
I
I Wednesday, Allgllst 25. 2004
I 103
Capital Improvement Program 2005 thru 2009 Contact Engineer I
City of Shorewood, Minnesota Department Equipment Replacement I
I......... E.OS-4S I Type Equipment
Useful Life
Project Name Water Truck Category PW: Vehicles I
Fund ## Priority nla
Total Project Cost $97,344
Description I I
I
Expenditures 2005 .2006 2007 2008 2009 Total I
EquipNehlcleslFumishings 97,344 97,344
Total 97,344 f11,344 I
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Equipment Replacement Fund 97,344 97,344
Total 97,344 97,344
I
I
I
I
I
!
I
I
I
Wednesday. August 25. 2004 I
104 I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
I ProJ<ct' E-OS-63
Project Name Bobcat
Fund If
Description
I
2005 thru 2009
Contact Engineer
Department Equipment Replacement
Type . Equipment
Useful Life
Category PW: Vehicles
Priority nla
Total Project Cost $78,146
Prior Expenditures
o I EquipNehicles/Fumishings
Total Total
2005
19,307
19,307
2006
2007
2008
2009
Total
19,307
19,307
.
Future
58,8391
Total
Prior Funding Sources
o I Equipment Replacement Fund
Total Total
2005
19,307
19,307
2006
2007
2008
2009
Total Future
19,307 58,8391
19,307 Total
105
Wednesday, August 25. 2004
Capital Improvement Program 2005 thru 2009 Contact Engineer I
. City of Shorewood, Minnesota Department Equipment Replacement I
Project # E-06-33 Type Equipment
Useful Life
Project Name Dump Truck - Ford L8000 Category Facilities/equipment
I
Fund # Priority nla
Total Project Cost $314,219
Description I I
I
Expenditures 2005 2006 2007 2008 2009 Total Future I
EquipNehicles/Fumishings 123,735 123,735 I 190,4841
Total 123,735 123,735 Total I
I
Funding Sources 2005 2006 2007 2008 2009 Total Future I
Equipment Replacement Fund 123,735 123,735 I 190,484 I
Total 123,735 123,735 Total
I
I
I
I
I
I
I
I
W('dllesday, August 25. 2004 I,
108 I
I Capital Improvement Program 2005 thru 2009 Contact Engineer
City of Shorewood, Minnesota Department Equipment Replacement
I Project # E-06-49 Type Equipment
Useful Life
Project Name F350 & Flatbed Category PW: Vehicles
I Fund # Priority nla
Total Project Cost $95,089
I Description I
I
I Expenditures 2005 2006 2007 2008 2009 Total Future
EquipN ehicleslFurnishings 36,558 36,558 I 58,531 I
I Total 36,558 36,558 Total
I
I Funding Sources 2005 2006 2007 2008 2009 Total Future
Equipment Replacement Fund 36,558 36,558 I 58,531 I
Total 36,558 36,558 Total
I
I
I
I
I
I
I
I
I W('dllesday. Augl!st 25. 2004
I 107
Capital Improvement Program
City of Shorewood, Minnesota
Project # E-06-54
Project Name Dump wlPlow and SND
Fund #
Description
Expenditures
EquipNehlcles/Fumishings
Total
Funding Sources
Equipment Replacement Fund
Total
2005
2005
2006
121,485
121,485
2006
121,485
121,485
2005 thru 2009
2007
2008
2007
2008
108
Contact Engineer
Department Equipment Replacement
Type Equipment
Useful Life
Category PW:Vehicles
Priority nla
Total Project Cost $308,506
2009
Total
121,485
121,485
2009
Total
121,485
121,485
I
I
Future
187,021 I
Total
I
I
I
I
I
I
I
I
I
I
I
I
Future
187,0211
Total
I
I
I
Wedllesday, August 25. 2004 I
I
I Capital Improvement Program 2005 thru 2009 Contact Engineer
City of Shorewood, Minnesota Department Equipment Replacement
I Project # E-07-21 Type Equipment
Useful Life
Project Name Trail King Trailer Category PW: Vehicles
I Fund # Priority nla
Total Project Cost $8,189
I Description I
I
,
,
I Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicles/Fumishings 8,189 8,189
I Total 8,189 8,189
I
I Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Replacement Fund 8,189 8,189
Total 8,189 8,189
I
I
I
I
I
I
I
I
I Wednesday, AI/gust 25. 2004
I 109
Capital Improvement Program 2005 thru 2009 Contact I
Engineer
City of Shorewood, Minnesota Department Equipment Replacement I
Project # E-07 -22 Type Equipment
Useful Life
Project Name Ford 555 Backhoe Category PW: Vehicles
I
Fund # Priority nla
Total Project Cost $64,459
Description I I
I
Expenditures 2005 2006 2007 2008 2009 Total I
EquipN ehicles/Furnishlngs 64,459 64,459
Total 64.459 64,459 I
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Equipment Replacement Fund 64,459 64,459
Total 64,459 64,459
I
I
I
I
I
I
I
I
Wednesday, August 25. 2004 I
110 I
I
I Capital Improvement Program 2005 thru 2009 Contact Engineer
City of Shorewood, Minnesota Department Equipment Replacement
I Pro,lect # E-07 -46 Type Equipment
Useful Life
Project Name Tennant 240 Floor Sweeper Category PW: Vehicles
I Fund # Priority nla
Total Project Cost $12,401
I Description I
I
I Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicleslFumishinQs 12,401 12,401
I Total 12,401 12,401
I
I Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Replacement Fund 12,401 12,401
Total 12,401 12,401
I
I
I
I
I
I
I
I
I W<'dllesday, August 25. 2004
I 111
Capital Improvement Program 2005 thru 2009 Contact Engineer I
City of Shorewood, Minnesota Department Equipment Replacement I
Project ## E-07-70 Type Equipment
Useful Life
Project Name Mower. Toro Groundsmaster 325D Category Facilities/equipment
I
Fund ## Priority nla
Total Project Cost $82,865
Description I I
I
Expenditures 2005 2006 2007 2008 2009 Total Future I
EquipN ehicleslFurnishings 20,473 20,473 I 62,3921
Total 20,473 20,473 Total I
I
Funding Sources 2005 2006 2007 2008 2009 Total Future I
Equipment Replacement Fund 20,473 20,473 I 62,3921
Total 20,473 20,473 Total
I
I
I
I
I
I
I
I
Wednesday. August 25. 2004 I
112 I
I Capital Improvement Program 2005 thru 2009 Contact Engineer
I City of Shorewood, Minnesota Department Equipment Replacement
Project ## E-08-35 Type Equipment
Useful Life
Project Name Tractor - Ford 3910 PW: Vehicles
I Category
Fund ## Priority nia
Total Project Cost $31,633
I Description I
I
I Expenditures 2005 2006 2007 2008 2009 Total
EquipNehicleslFumishings 31,633 31 ,633
I Total 31,633 31,633
I
I ,
I Funding Sources 2005 2006 2007 2008 2009 Total
Equipment Replacement Fund 31,633 31,633
Total 31,633 31,633
I
I
I
I
I
I
I
I
I Wednesday, Allgllst 25. 2004
I 113
Capital Improvement Program 2005 thru 2009 Contact Engineer I
City of Shorewood, Minnesota Department Equipment Replacement I
Project # E-08-51 Type Equipment
Useful Life
Project Name Speed Awareness Display Category PW: Vehicles
I
Fund It Priority nla
Total Project Cost $21,900
Description I I
I
Prior Expenditures 2005 2006 2007 2008 2009 Total I
I 01 EquipNehicles/Furnishings 21,900 21,900
Total Total 21,900 21,900 I
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Equipment Replacement Fund 21,900 21,900
Total 21 ,900 21,900
I
I
I
I
I
I
I
I
I I
Wednesday. AlIgllst 25, 2004
114 I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
I 1'<oJoct' E-09-6S
Project Name Dump Truck
2005 thru 2009
Contact Engineer
Department Equipment Replacement
Type Equipment
Useful Life
Category PW: Vehicles
Priority Dia
Fund It
Total Project Cost $347,027
Description
I
-:-
Expenditures
EqulpNehicles/Fumishings
Total
2005
2006
2007
2008
2009
136,654
136,654
Total
136,654
136,654
Future
210,3731
Total
Funding Sources
Equipment Replacement Fund
Total
2005
2006
2007
2008
2009
136,654
136,654
Total
136,654
136,654
Future
I 210,3731
Total
Wednesday. August 25. 2004
115
Capital Improvement Program 2005 thru 2009 Contact Engineer I
City of Shorewood, Minnesota Department Equipment Replacement I
Project # E.09-68 Type Equipment
Useful Life
Project Name Dump truck. Ford Category Facilities/equipment
I
Fund #: Priority nla
Total Project Cost $136,654 I
Description I
I
Expenditures 2005 2006 2007 2008 2009 Total I
EqulpNehicles/Fumishlngs 136,654 136,654
Total 136,654 136,654 I
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Equipment Replacement Fund 136,654 136,654
Total 136,654 136,654
I
I
I
I
I
I
I
I
Wednesday, August 25. 2004 I
116 I
en
~
IE:
<C
c.
:z::
Q)
C Cii J::::!
.- ttl :.;::;
en - ::I
CQ)_
o.!:en
:.;::;-Q)
o~.o
::IQ)O
"0>_
Q) 0
~a:"O"O
ttl (\)Q)
a. en (f) .~
c_ttlQi
O~~"o
"OE~~
mQ)"oc
::I>Q)Q)
00>Q)
o 0.. ttl .0
-E.!:(\)
~ .- .. ~
.!:Q)c.J::
~ (\)
C::IEen
;Q 1:5 a..~
~2.Qg>
.- Cii (\) -
E ttl > ttl
E':::~~
oc...,en
.- >>-
o~.oc
~g"OQ)
ttl.- Q) E
o..E1a~
Q) "0 ~ ttl
.!:cQ)c
_ttlcttl
ft Q) E
[!! 5 0) ai
ttlQ) ~ 0> 0>:0
\U ::I ~ ttl
>>oco=
~~~l~
_ ft'-.!: en
~cQ)l-Q)
o.Q).o ~
Ettlen::l
Q)Q)=(ij0
=~~Q)m
'- c ttl >>,-
~ttl(\)~Q)
OE=~:5
1:5
Q)
'0'
'-
0..
ca
'-
Q)
>
o
c:
ttl
13
(\)
'0'
'-
0..
.::t!.
'-
ttl
0..
.!:
o
ttl
(\)
o~
-ttl
~ E
enE
0::1
0. en
o(\)
'-0
o..~
::I
"00
(\)en
"- 0)
2c
0..:.0
Q)c
~ ::I
ttllJ..
0)"0
CC
._ ttl
~o>
="'5
0"0
-Q)
(\).!:
.J::O
l-U)
....
.-
.-
-------------------
I
2005 - 2009 CAPITAL IMPROVEMENT PROGRAM I
Section IIH. PARK AND RECREATION - PROJECT SUMMARY
proj Description 2005 2006 2007 2008 2009 I
1 Park Improvements $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 I
TOTAL $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 I
I
I
I
I
I
I
I
I
I
I
I
I
I
118 I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Department
Capital Improvement Program
City of Shorewood, Minnesota
PROJECTS BY DEPARTMENT
2005 thru 2009
Project# Priority 2005 2006
2007
2008
2009
Total
Parks
Park Improvements
Parks Total
GRAND TOT AI..
P-04-03 0 10,000 10,000
10,000 10,000
10,000
10,000
10,000
10,000
10,000
10,000
50,000
50,000
10,000 10,000
50,000
10,000
10,000
10,000
119
Wednesday, AlIgll.~1 25, 2004
Capital Improvement Program 2005 thru 2009 Contact Engineer I
City of Shorewood, Minnesota Department Parks I
Project ## P-04-03 Type hnprovement
Useful Life
Project Name Park Improvements Category Parldmprovements
I
Fund # Priority nla
Total Project Cost $50,000 I
Description I
I
Expenditures 2005 2006 2007 2008 2009 Total I
Construction/Inspection 10,000 10,000 10,000 10,000 10,000 50,000
Total 10,000 10,000 10,000 10,000 10,000 50,000 I
I
Funding Sources 2005 2006 2007 2008 2009 Total I
Park Foundation Donations 10,000 10,000 10,000 10,000 10,000 50,000
Total 10,000 10,000 10,000 10,000 10,000 50,000
I
I
I
I
I
I
I
I
Wednesday, Allgllst 25. 2004 I
120 I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I. TRAILS
The following is a summary of trail segments that have been completed in the past 5 years.
> Covington Road Trail from Silverwood Park to Vinehill Road
~ Vinehill Road Trail form Near Mountain Boulevard to Kensington Gate Road (Minnetonka)
> Eureka Road trail from Park Lane to Ruetiman Lane
Currently proposed is a trail segment along the west side of Lake Linden Drive. This trail is
being designed by the City's consultants, and is to be constructed by the developer of the
Shorewood Village Shopping Center, as part of the Cub Foods project approval. While this
improvement is noted here, this is not a City-funded project.
Currently, there are no Trail Improvements proposed (notwithstanding the Freeman Park
Walkway project).
121
.~
a>
"0 ~
a> .... to
"OoE
C"O
a>cc
EtOtO
-0
E- _
00.-
oC....
a>0a>
.....- .c
--
-.- a>
o .!Q .c
W::::J3:
o 8" a>
d,tO"O
.... .-
a>oo
a>_a>
:::: >- "0
.-- 0
Eca-
E::::J"O
Z o c a>
OCa>
0 toc M
i= caO= N
-0'- -
en Co 3:
a> -_
- EO'o
::::)
" c..-c
000-::::J
0 .!::: Q) 0
<C > 0)0
W C "0 a>
w::::J.c
0 "0..01-
<C c~
C. to._ en
UJ co-
Z o c
._ a> a>
W ca:5E
c. c:-a>
0 to en .
a>.ctOc
C ~-a>a>
Z o'l::cE
<C o 8.0~
C "Oa>+:;E
c....tOE
Z tOcaC:o
<C -1ca>o
...I a>'- en
-cen
. .c en 0'-
.., l-~o:5
-------------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Capital Improvement Program
City of Shorewood, Minnesota
PROJECTS BY DEPARTMENT
2005 thru 2009
Department Project# Priority 2005 2006 2007 2008 2009 Total
Land & Open Space Acquisition
Land Conservation Easements LO-<l4.01 0 5,000 5,000 5,000 5,000 5,000 25,000
Land & Open Space Acquisition Total 5,000 5,000 5,000 5,000 5,000 25,000
GRAND TOTAL 5,000 5,000 5,000 5,000 5,000 25,000
Wednesday. August 25. 2004
125
Capital Improvement Program 2005 thru 2009 Contact Finance I
City of Shorewood, Minnesota Department Land & Open Space Acquisitio I
Project # LO-04-01 Type hnprovement
Useful Life
Project Name Land Conservation Easements Land & Open Space Acquisitio
Category I
Fund # Priority n1a
Total Project Cost $30,000
Description I I
Annual appropriation for land acquisition or conservation easements.
I
Prior Expenditures 2005 2006 2007 2008 2009 Total I
I 5,000 I Land Acquisition & Easements 5,000 5,000 5.000 5,000 5,000 25,000
Total Total 5,000 5,000 5,000 5,000 5,000 25,000 I
.
I
Prior Funding Sources 2005 2006 2007 2008 2009 Total I
I 5,000 I General Fund 5,000 5,000 5,000 5.000 5,000 25,000
Total Total 5,000 5,000 5,000 5,000 5,000 25,000
I
I
I
I
I
I
I
I
W/!duesday. August 25. 2004 I
126 I
,
CITY OF SHOREWOOD
RESOLUTION NO. 04-
A RESOLUTION ADOPTING A CAPITAL IMPROVE:MENT PROGRAM
FOR THE YEARS 2005-2009
WHEREAS, the Shorewood City Council wishes to carefully plan and
coordinate City public capital purchases and projects over a five-year period matching
physical needs with financial resources; and
.
WHEREAS, City Staff has prepared and presented a proposal for a five-
year Capital Improvement Program to facilitate the planning and coordination of projects
for the years 2005,-2009.
NOW, THEREFORE BE IT RESOLVED that the City Council hereby
adopts the Capital Improvement Program for the period of 2005-2009.
ADOPTED BY THE CITY COUNCIL of the City of Shorewood this
13th day of September, 2004.
Woody Love, Mayor
.
Craig W. Dawson, City Administrator
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128 . www.cLshorewood.mn.us . cityhall@cLshorewood.mn.us
. MEMORANDUM
Date: September 3,2004
From:
Honorable Mayor and City Council Members '
Bonnie Burton, Finance Directorrrreasurer~
.
To:
Re: 2005 Proposed General Fund Ope!ating Budget
CC: Craig Dawson, City Administrator
INTRODUCTION
Enclosed is the 2005 Proposed Operating Budget for your review and approval. The proposed
budget and levy for Pay2005 must be certified to Hennepin County by September 15, 2004.
.
The general approach to the proposed budget has been to restore funding to traditional levels, to
address matters that have been deferred, and to make additions that will enhance productivity
and effectiveness. The budget requests included are the result of careful consideration by staff,
guided by the direction provided by the City Council at its budget work-sessions in June and
August. Shorewood provides essential services at a very reasonable cost, with a very lean
budget and small staff.
2005 BUDGET REVENUE HIGHLIGHTS
Levy Limits
The City is not subject to levy limits for Pay2005. However, the City Council requested that the
2005 levy be limited to a 12% increase from the 2004 amount of $3,420,229. Therefore, the
2005 Proposed Budget recommends a property tax levy of $3,830,656, an increase of $410,427.
A portion of the 2005 levy will include the debt service payments that are made annually to fund
the new public safety buildings. For 2005, Shorewood's share of this special levy amount is
estimated to be $496,000.
ft
~.1 PRINTED ON RECYCLED PAPER
:#98
2005 Budget Work Session
Page 2 of 4
Fund Transfers
Transfers to Capital Improvement Funds: The proposed 2005 budget includes the following
transfers, which are intended to restore the reductions that resulted from severe levy limits for
2004:
2005 2004 2003
Equipment Replacement 116,000 50,000 70,000
Street Reconstruction 311,000 183,500 200,000
Park Capital Improvement 10,000 10,000 30,000
Trail Capital Improvement 0 0 28,650
Public Facilities 50,000 50,000 35,000
Land & Open Space 5,000 5,000 0
Stormwater Management 25.000 25.000 30.000
517,000 323,500 393,650
Other Funding Sources .
In addition to the levy, the 2005 budget also contemplates other sources of funding such as fees,
licenses, and permits. For Pay2005, these amounts are expected to remain stable from last year.
2005 BUDGET EXPENDITURE HIGHLIGHTS
Most of the changes in the 2005 budget will be incremental for the continuing cost of doing
business. Significant changes in the proposed 2005 budget include:
Police
The City Council authorized funding of Shorewood's contribution to the 2005 South Lake
Minnetonka Police Department Budget at just under $700,000 and this is the amount used in the
proposed budget.
.
Fire
The budget for the Excelsior Fire District has been approved by the majority of cities and
Shorewood's resulting contribution will be $470,025, which includes $240,358 for operations
and $229,667 for the facility lease payments. Preliminary estimates for services from the Mound
Fire Department are $23,685 -- $16,060 for operations, and $7,625 for facilities.
Park & Recreation
The Park & Recreation proposed 2005 budget includes the following: a $30,000 allocation again
for a contract Park Coordinator position; $6,500 for Senior Community Services; $2,000 for
summer outdoor concerts; and a transfer of $10,000 to the Park Capital Improvement Fund.
Public W orkslEngineering
A major change in the Public Works department is proposed, and has already been discussed by
Council. The function of the Director of Public Works/City Engineer would be restructured to
have a separate City Engineer position reporting to the Director of Public Works.
2005 Budget Work Session
Page 3 of 4
The combination of the City taking responsibility for the water and sewer utilities in-house,
Homeland Security and NPDES Phase II requirements, and the ever-increasing federal and state
mandates that the City must perform, has created a span of responsibility that is beyond what one
position can handle effectively.
When the City assumed responsibility for services formerly provided by Munitech, Inc., one
position was added in public works maintenance for about the same cost. The position of public
works superintendent has been vacant for the past few years. Essentially, the proposed separate
City Engineer position brings the total number of positions in the Public Works Department to
what existed in 2001.
While the proposed budget includes approximately $90,000 for salary and benefits for this
position, this same amount would be needed under a contract engineer arrangement if such a
decision were made.
. Employee Pay Plan and Benefits
The proposed Employee Pay Plan provides for 2.00% salary adjustments in January and July,
Several employees are scheduled to receive "step" increases. Health insurance premiums are
estimated to increase 12% for 2005. In addition, staff has budgeted funds to upgrade the
employee short-term disability benefit and life insurance benefits. Therefore, for budget
purposes, the City's monthly maximum contribution for insurance costs would increase from
$600/month to $680/month per employee.
Information Technology
The 2005 proposed budget includes funds for technology and communications, including needed
replacement of three (3) computers based on a computer equipment replacement schedule. There
are funds designated for computer software upgrades. This budget continues the regular monthly
maintenance visits from Techies, Inc., for routine maintenance of the network computer system.
.
Document Retrieval System
Staff has been reviewing information technology that will bring a paper-less office closer to
reality. This system would allow all of the City's documents to be stored in an archival approved
digital form. The transition to this form will take a few years of scanning documents, but there is
an initial investment to set up the system in the right way. An amount of $30,000 is included in
the proposed 2005 budget.
City Council
The City Council will have at least two new members in 2005 as a result of changing to a ward
system of representation. Funds have been budgeted for all council-members to attend training
for elected officials put on by the League of Minnesota Cities. Funds are also included for a
Council/staff retreat with a facilitator.
Lastly, the 2005 budget contemplates a pay adjustment for the Mayor and Council-members.
The '2004 Elected Officials Salary Survey' , provided by the AMM, shows the average salary for
cities with less than 10,000 population to be about $3,000 annually for council-members and
~005 Budget Work Session
Page 4 of 4
$3,600 annually for the Mayor. Accordingly, funds were budgeted at this level. The City
Council would need to adopt an ordinance to set the new salary level prior to the November 2,
2004 general election.
TRUTH-IN- TAXATION
The truth-in-taxation process will follow the timetable and procedures in place prior last year.
This includes City Council approval of a Pay2005 Proposed Tax Levy to be certified no later
than September 15; final preparation of all City budgets, including utility and non-tax supported
budgets in the fall; holding special public hearings on the proposed budget and levy, scheduled
for December 6; and adoption and certification of the final budget and levy before year end.
CONCLUSION
The 2005 Proposed Budget and levy were prepared according to the priorities and direction from
the City Council. Staff believes the budget allocates the resources necessary to continue to
provide quality services to the residents of Shorewood.
RECOMMENDED ACTION
Staff recommends that the City Council approve the attached resolutions: "Setting the
2005 Proposed General Fund Budget and Approving the Proposed 2004 Property Tax
Levy, Collectible in 2005" and "Setting Truth-In-Taxation Public Hearing Dates".
.
Staff will then certify this budget and levy as required before the September 15 deadline.
The final 2005 tax levy and budget adoption will be scheduled for December 2004.
.
.
.
CITY OF SHOREWOOD
RESOLUTION NO. 04-
A RESOLUTION SETTING THE 2005 PROPOSED GENERAL
FUND BUDGET AND APPROVING THE PROPOSED 2004
PROPERTY TAX LEVY, COLLECTIBLE IN 2005
WHEREAS, the City staff has presented to the City Council the proposed 2005 General Fund
Budget and the 2004 property tax levy collectible in 2005; and,
WHEREAS, the City Council has met to review the proposed budget and property tax levy; and,
WHEREAS, the City Council must approve and certify its proposed 2005 budget and
preliminary property tax levy for the current year, collectible in 2005, to the County Auditor by
September 15 of each year.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Shorewood that:
1. The 2005 Proposed General Fund budget is hereby set at $4,371,021.
2. The following sums be levied for the current year, collectible in 2005, upon taxable
property in the City of Shorewood, for the following purposes:
General Fund Levy
Special Levy
$3,333,864
496.792
Total 2004 Levy:
$3.830.656
3. That the City Clerk-Administrator is hereby instructed to transmit a certified copy of
this resolution to the County Auditor of Hennepin County, Minnesota.
ADOPTED by the City Council of the City of Shorewood this 13th day of September, 2004.
Woody Love, Mayor
Craig W. Dawson, City Administrator
#qB
CITY OF SHOREWOOD
RESOLUTION NO. 04-
A RESOLUTION SETTING TRUTH-IN-TAXATION PUBLIC HEARINGS ON
THE PROPOSED 2005 BUDGETS AND THE 2004 PROPERTY TAX LEVY
COLLECTIBLE IN 2005
WHEREAS, Minnesota State Law requires local governments to hold public
hearings on their proposed budgets and property tax levies, and to publish notice of said
public hearing to achieve truth in taxation, and,
WHEREAS, the Minnesota Department of Revenue has issued guidelines for
local governments to follow in implementing truth in taxation requirements, and,
WHEREAS, it is the intention of the City Council to comply with such
guidelines,
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Shorewood that a public hearing on the proposed 2005 Municipal Budgets and the
property tax levy for 2004, collectible in 2005, be held on Monday, December 6,2004, at
7: 15 p.m., or as soon thereafter as possible, and a continuation hearing, if necessary be
held on Monday, December 13, 2004, at 7:15 p.m., or as soon thereafter as possible, at
the City Hall, and that notice of such public hearing shall be published in accordance with
Minnesota State Law and guidelines set forth by the Minnesota Department of Revenue.
ADOPTED by the City Council of the City of Shorewood this 13th day of
September, 2004.
Woody Love, Mayor
Craig W. Dawson, City Administrator
.
.
-#9B
t
.
.
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD. SHOREWOOD, MINNESOTA 55331-8927. (952) 474-3236
FAX (952) 474-0128. www.cLshorewood.mn.us 'cityhall@cLshorewood,mn,us
MEMORANDUM
TO:
FROM:
DATE:
SUBJECT:
City Council ^ '\\
Craig W. Dawson, City Administrator ()lJ
September 9,2004
Amending Dates of Terms for Park and Planning Commission Members
Earlier this year, the City Council held work-session discussions regarding the terms of members of
its advisory commissions. While the discussions were wide-ranging and some items were
unresolved, there was general agreement with the idea that the end-date for the terms of
commissioners should be later than January 31. Another month on their terms would be helpful for
the Council appointment-making schedule, especially when there are new councilmembers.
Appointments are very important actions, and having to make appointments in the fIrst weeks of a
new councilmember's fIrst term may lack a desired level of deliberation for the Council as a whole.
It is not uncommon in other cities for commissioners' terms to start on March 1.
Terms currently run for three years, from February 1 to January 31. An ordinance has been drafted
forCouncil's consideration to amend terms from March 1 to the last day of February.
Council also had discussion about changing the current requirement in the Code that the Council
appoint the Planning Commission chair and vice-chair and the Park Commission chair. In practice
for the past several years, the commissions themselves have selected these offIcers. If so directed by
the Council, staff will prepare an ordinance to remove the appointment by Council and require that
the respective commissions select their offIcers.
RECOMMENDATION:
Staff recommends that the Council adopt the Ordinance amending the terms of Park and
Planning Commission members.
Staff also requests direction regarding amendments in the appointment of offIcers of the
commissions.
n
~J PRINTED ON RECYCLED PAPER
=#=-9C-
CITY OF SHOREWOOD
.,
ORDINANCE NO.
AN ORDINANCE AMENDING CHAPTERS 201 AND 202
OF THE SHOREWOOD CITY CODE
RELATING TO THE PLANNING COMMISSION AND PARK COMMISSION
THE CITY COUNCIL OF THE CITY OF SHOREWOOD, MINNESOTA, ORDAINS AS
FOLLOWS:
Section 1. Section 201.03, Subd. 1, of the Shorewood City Code shall be amended to read as
follows:
Subd. 1. Term of Appointment: The City Council shall by resolution appoint the Planning
Commissioners to serve three- (3-) year terms and the terms shall be staggered. All
appointments shall be made by resolution. Terms of appointment commence on February 1
March 1 and shall terminate on January 31 the last day of February. or until the vacancy is
fIlled.
.
Exception: Those appointments made in January, 1999, shall be effective immediately upon
passage of the appointment resolution.
Section 2. Section 202.02, Subd. 1, of the Shorewood City Code shall be amended to read as
follows:
Subd. 1. Membership in the Commission: Membership shall consist of up to seven (7)
residents of the City appointed by the City Council. Terms of all members shall be for three
(3) years, and the terms shall be staggered. All appointments shall be made by resolution.
Terms of appointment commence on Febnlary 1 March 1 and terminate on Jafiaary 31 the last
day of February, or until the vacancy is fIlled.
Exception: Those appointments made in January, 1999, shall be effective immediately upon .
passage of the appointment resolution.
The City Council shall designate one of its members as its liaison to meet with the Park
Commission, and it shall direct the Park Commission to designate one member of its body as
a liaison person to meet with the Planning Commission, and the Planning Commission shall
designate one member of its body as a liaison to meet with the Park Commission.
Section 3. This ordinance shall be in full force and effect following its passage and publication.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 13th day of
September, 2003.
Attest:
Woody Love, Mayor
Craig W. Dawson, City Administrator/Clerk
f
.
.
CITY OF SHOREWOOD
ORDINANCE NO. 04-
AN ORDINANCE AMENDING CHAPTERS 201 AND 202
OF THE SHOREWOOD CITY CODE
RELATING TO THE PLANNING COMMISSION AND PARK COMMISSION
THE CITY COUNCIL OF THE CITY OF SHOREWOOD, MINNESOTA, ORDAINS AS
FOLLOWS:
Section 1. Section 20L03, Subd. 1, of the Shorewood City Code shall be amended to read as
follows:
Subd. 1. Term of Appointment: The City Council shall by resolution appoint the Planning
Commissioners to serve three- (3-) year terms and the terms shall be staggered. All
appoin1:Ir1ents ~hall be made by resollltion. Terms of appointment comrnence on March 1
and shall terminate on the last day of February, or until the vacancy is filled.
Exception: Those appointments made in January, 1999, shall be effective immediately upon
passage of the appointment resolution.
Section 2. Section 202.02, Subd. 1, of the Shorewood City Code shall be amended to read as
follows:-------------d---------- - n_____
Subd.l. Membership in the Commission: Membership shall consist of up to seven (7)
residents of the City appointed by the City Council. Terms of all members shall be for three
(3) years, and the terms shall be staggered. All appointments shall be made by resolution.
Terms of appointment commence on March 1 and terminate on the last day of February, or
until the vacancy is filled.
Exception: Those appointments made in January, 1999, shall be effective immediately upon
passage of the appointment resolution.
The City Council shall designate one of its members as its liaison to meet with the Park
Commission, and it shall direct the Park Commission to designate one member of its body
as a liaison person to meet with the Planning Commission, and the Planning Commission
shall designate one member of its body as a liaison to meet with the Park Commission.
Section 3. This ordinance shall be in full force and effect following its passage and publication.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF SHOREWOOD this 13th day
of September, 2004.
Attest:
Woody Love, Mayor
Craig W. Dawson, City Administrator/Clerk
4
CITY OF EXCELSIOR
339THIRD STREET
EXCELSIOR, MINNESOTA 55331
TEL: 952-474-5233
FAX: 952-474-6300
September 8, 2004
Coordinating Committee
South Lake Minnetonka Police Department
24150 Smithtown Road
Shorewood, Minnesota 55331
. Re: Police Issues
Dear Committee Members:
Weare writing to respond to the letters we have received from the cities of Shorewood, Greenwood,
and Tonka Bay responding to our proposal for resolving the on-going SLMPD dispute. The letters raise a
variety of issues regarding the process. While we respect the issues raised by each of the cities, we worry that
prolonged discussion of the process will seriously threaten the chances of resolving the dispute.
Accordingly, in an effort to initiate the process, we propose that the Blue Ribbon Panel meet on September 22,
2004 at 7:00 p.m. at a mutually-acceptable location.
.
We were pleased to see that Tonka Bay has appointed a representative to the Panel. At our last meeting, we
appointed Council Member Greg Miller to be an Excelsior representative. We anticipate that those two
representatives and representatives from Greenwood and Shorewood will attend the meeting. We set no
preconditions for the meeting. The participants can decide whether it should be open or closed, led by a
mediator, or not, with or without staff. As an additional attempt to resolve the current dispute and as an
additional incentive to partidpate in the Blue Ribbon Panel, Excelsior would like you to consider the following
proposal.
We believe that all member cities in the Joint Powers Agreement have the following common objectives:
. Obtain excellent public safety services as a top priority for each community
. Obtain excellent public safety services at an affordable cost
. Provide a Joint Powers Agreement that is acceptable to all member cities
In recognition of these objectives, Excelsior extends the following offer:
. Enclosed is a check in the amount of $6,250 for restoration of full police services for the final quarter of
2004. This amount represents one-fourth of Excelsior's $25,000 budget reduction for 2004 and
therefore provides funds to allow full services from the SLMPD for the remainder of 2004. By cashing
the check, we understand that the SLMPD will restore full service to Excelsior for 2004.
4/::-CJb
.
. Excelsior will provide a one-time budget supplement of $26,159 for 2005. This coupled with the
SLMPD budget resolution 2004-38 for $416,400 that was passed on August 30th by the Excelsior City
Council provides the funds necessary to fully fund the SLMPD budget for 2005. The $26,159 payment
does not raise the baseline budget above $416,400, it is intended as a one-time budget supplement for
the year 2005.
This offer is contingent upon the following:
. Acceptance of the Excelsior SLMPD budget resolution 2004-38 passed by the Excelsior City Council on
August 30th for $416,400.
. Restoration of full police services for Excelsior for the last quarter of 2004 through all of2005.
. Successful completion of the Blue Ribbon Panel process. Successful completion is defined as
discussing the issues identified by the panel members and making consensus recortunendations to the
four city councils regarding those issues. Successful completion does not require that the consensus
recommendations be implemented by the city councils. .
. Presumably, the Blue Ribbon Panel will make consensus recommendations that will allow Excelsior
move the baseline budget to the required level of $442,559. In the event that the Blue Ribbon Panel
process fails or that the recommendations made by the Blue Ribbon Panel are not implemented by the
four City Councils, the baseline budget for Excelsior would remain at $416,400 as defined by the
Excelsior SLMPD budget resolution 2004-38. At this time, Excelsior insists on retaining the one right
provided in the current JP A that protects all cities from long-term financial distress, namely, the ability
to approve a lower level of funding for the SLMPD budget.
. Contracting with a consulting firm to analyze the current Joint Powers Agreement from top to bottom
and to make recommendations to improve the Joint Powers Agreement between member cities. The
consulting firm would be selected and directed by the Blue Ribbon Panel and would address all issues
identified by the Blue Ribbon Panel in addition to other issues the consulting firm may recognize. This
provides a truly objective view of the JP A from a neutral third party, the consulting firm, in order to
resolve the current dispute and to help the Blue Ribbon Panel arrive at consensus recommendations.
The cost of this contract would be equally shared by the four member cities.
.
Excelsior views the success of the Blue Ribbon Panel as a crucial element in resolving the current dispute.
We make this enhanced offer as a gesture of good will and a gesture of financial support so that we can
begin to resolve our outstanding issues and achieve the JPA common objectives outlined above. The
Excelsior City Council recognizes that the additional payments outlined above will be a financial burden for
Excelsior and will further strain Excelsior's long term financial situation, however, we also believe that
these are necessary steps to move aggressively toward resolution of the current dispute.
This proposal gives all parties strong financial incentives to enter into discussions to identify issues for all
four cities and to produce sound recommendations for the four city councils to consider. All member cities
have expressed sincere desire to discuss the issues regarding the Joint Powers Agreement; this proposal
removes any financial barriers from participating. We view all elements of this proposal as essential
elements to resolve the current dispute.
2
.
.
We would view support for this proposal as support for the long-term viability of the Joint
Powers Agreement and we would view the lack of support for this proposal as a
corresponding lack of support for the long-term viability of the Joint Powers Agreement. We
strongly encourage all cities to accept this proposal.
~
&
Council Member Bob Bolles
~?111-
Coun' e er Greg Miller
Sincerely,
Excelsior City Council
~~
Counc ember TIm Caron
~
'"
.)
CITY OF
SHOREWOOD
5755 COUNTRY CLUB ROAD · SHOREWOOD, MINNESOTA 55331-8927 · (952) 474-3236
FAX (952) 474-0128 . www.cLshorewood.mn.us . cityhall@cLshorewood.mn.us
Mayor and City Council
Craig Dawson, City Administrator
Larry Brown, Director of Public Works Ifr'
September 9, 2004
MEMORANDUM
TO:
FROM:
.
DATE: '
RE: Approve Revised Plans and Specifications, Authorize Advertisement for Bids
County Road 19 Improvement Project
On August 23rd, 2004, the Shorewood City Council, as the lead agency for the County Road 19
Improvement Project, rejected the bids received. This action was taken by the City Council, based
upon recommendations from Hennepin County.
Council may recall that the bids received for the project were 28.7 percent over the budgeted amount
for the project. Representatives from the City, County, and consultant group have analyzed the bids to
determine if any cost cutting measures can be made to reduce the cost of construction. Bid items that
were inordinately high were the excavation costs, costs for hauling material off site, and the asphalt
prices. Therefore, the County has directed WSB to perform the following revisions to the plan set:
.
Revision
Reduce the granular sub-base by 8 inches
on the County Road pavement sections.
Pet EP AlMPCA standards; allow the
contractor to utilize soils that are under the
levels of specific contamination levels to be
utilized under im ervious areas.
Revise type of oil utilized in pavement
'sections.
Revise type of bituminous wear course.
Result
Reduces volume of excavation, volume of
material to be hauled off site, and amount of
backfill material re uired.
Reduces vohime of contaminated material to be
hauled off site, and amount of backfill required.
Reduces cost of bituminous. This same measure
was erformed on Smithtown Road.
An alternative to theMN/DOT State Aid Standard
has been ro osed and a roved.
Table 1
ft
~~ PRINTED ON RECYCLED PAPER
it lOA
Mayor and City Council
Accept P &S - Authorize Ad
for Bids - County Road 19 Project
September 9, 2004
Page 2 of2
The "footprint," retaining walls and visual items of the project remain unchanged. Staff could not
include the plans with this memo, due to the fact that the final revisions to the plans are still being
completed. Since items are consistent with the previous set of approved plans, Staff is recommending
that the Council approve the revisions, as documented in this memorandum, such that publications
deadlines can be met.
Scheduline:
The County has proposed the following revised schedule for the project:
. Project Bidding. . . . .. . . . . . . . . . . . . .. . . . . . . . . .. . . . . . . . . . . . .. . . . . .. . . . . . . . . .. . . . . . . . . .. . . . .. .09/24/04 to 10/20/04
. Open Bids. . . . . . . . . . . . . . . .. .. . . . . . .. . . . . .. . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. .. . . . . . .. . . . ..10/20/04 .
. Award Project.......................................................................... ...10/25/04
. RIW Fully Acquired. ....... ..... ........ ..... ..... ... ......... ................. ..........11/04/04
. Begin Construction............................. ........ ............................... ...11/08/04
. Stage I-Phase 1 Construction (Pond Construction/Foundation Removal).. .. .. ..12/03/04
. Stage I-Phase 2 to Stage 4 Construction Completion............................. ..04/15/05 to 10/31/05
. Final Road Construction Completion. . . . . . . .. . . . . . . . . . . . .. . .. .. . . . . . . .. .. . . . . . . .. . ... .11/15/05
. Final Landscape Completion... ........ ... ....... ..... ........ .... ..... ... .... ... ..... ..04/27/06
As noted above, bids are to be opened on October 20, 2004, at the Shorewood City Hall.
.
It should also be noted that plans will also be revised to include a bid item for the building and
foundation removal of that portion ofthe shopping center that is currently under eminent domain
proceedings. This revision was directed by Hennepin County, since the right of way negotiations for
the owners of the shopping center have not proceeded in a timely manner. The County has stated that
this item has been added to insure that the project will be able to proceed on the revised time schedule.
Since this parcel is within the City of Tonka Bay, demolition and right of way costs for this parcel are
to be paid for by Hennepin County.
Recommendation
Staff is recommending approval of the resolution that accepts the revised plans and specifications and
authorizes advertisement of bids for the County Road 19 - Smithtown Road Improvement Project.