06-065 CITY OF SHOREWOOD RESOLUTION NO. 06- 065 A RESOLUTION APPROVING A CHANGE ORDER 2 FOR THE COUNTY STATE AID HIGHWAY 19 - SMITHTOWN ROAD INTERSECTION IMPROVEMENT PROJECT, CITY PROJECT NO. 97-07 WHEREAS, on November 8, 2004, the City of Shorewood entered into a contract for construction with Eureka Construction, Inc. for the County State Aid Highway 19 - Smithtown Road Intersection Improvement Project, City Project No. 97- 07; and WHEREAS, WSB and Associates has prepared Change Order 2 attached hereto as Exhibit A, for additional work outside of the original contract; and WHEREAS, the Director of Public Works has reviewed said Change Order and found it to be cost effective for the project. NOW, THEREFORE BE IT RESOLVED by the City of Shorewood to approve Change Order Number 2 with Eureka Construction, Inc, that incorporates services outlined in Change Order 2, attached hereto as Exhibit A. ADOPTED by the City Council ofthe City of August, 2006. ATTEST: WOODY LOVE, MAYOR C D WSON, CITY ADMINISTRATOR/CLERK Mn/DUT TP-2460-0 112-92 )(Revised _Hennepin _ 2004) Hennepin County Public Works Transportation" :t)epartment CHANGE ORDER # 2 Contractor: Address: Eureka Construction Inc. 8500 210th Street West Suite 130 Lakeville, MN 55044 State Project No.: 27-619-18 Federal Project No.: Contract No.: 9821 Location: CSAH 19/5mithtown Road Intersection Wall No.1 Sta. 104+90 to Sta. 108+60 LT Wall No.2 Sta. 116+65 to Sta. 119+10 LT Wall No.3 Sta. 119+00 to Sta. 119+45 RT Wall No.4 Sta.23+56 to Sta. 24+82 LT Wall No.5 Sta. 23+19 to Sta. 24+53 RT In accordance with the tenns of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions. Due to field modifications for retaining Wall No.1, 2,3,4, and 5, as authorized by the Engineer, concrete for the footing and stem, along with reinforcement plan quantities and architectural texture and color system, will be increased as shown below: Group No. 1 Item No. Description Unit Unit Price Quantity Amount 2401.501/01143 Structural Concrete (lA43) (P) CU.Yd. $420.00 22.9 $9,618.00 2401.501/03643 Structural Concrete 3Y43(P) Cu.Yd. $445.00 16.95 $7,542.75 2401.541/00010 Reinforcement Bars (P) Pound $1.05 664.50 $697.73 2401.541/00011 Reinforcement Bars (Epoxy Coated) (P) Pound $1.35 2589.5 $3,495.83 2411.511/00013 Structural Excavation Class U (P) Cu. Yd. $9.00 30.5 $274.50 TOTAL $21,628.81 Cost Distribution: S.A.P. 27-619-18 = 100% Hennepin County Group No.2 Item No. Description Unit Unit Price Quantity Amount 2411.618/00530 Architectural Concrete Texture Sq.Ft. $5.00 572 $2,860.00 2411.618/08010 Architectural Color System Sq.Ft. $4.00 572 $2,288.00 TOTAL $5,148.00 Cost Distribution: Group 2 - S.A.P. 27-619-18 = 100% (Streetscaping) Hennepin County G N 4 roup o. Item No. Description Unit Unit Price Quantity Amount 2401.501/01143 Structural Concrete (1A43) (P) Cu.Yd. $420.00 22.9 $9,618.00 2401.501/03643 Structural Concrete 3Y43(P) Cu.Yd. $445.00 16.95 $7,542.75 2401.541/00010 Reinforcement Bars (P) Pound $1.05 664.5 $697.72 2401.541/00011 Reinforcement Bars (Epoxy Coated) (P) Pound $1.35 2589.5 $3,495.82 2411.511/00013 Structural Excavation Class U (P) Cu. Yd. $9.00 30.5 $274.50 TOTAL $21,628.79 Cost Distribution: Group 4 - S.A.P. 216-020-02 = 100% Shorewood Total Increase of Change Order No.2 $48.405.60 SHEET 1 OF 2 SHEETS Exhibit A F..\WPW/M/388-0/\CHANGE C CHANGE IN CONTRACT TTh1E Due to this change the Contract Time: a. Is increased ( ) by _ Working Days Is decreased ( ) by _ Working Days Is increased () by _ Calendar Days Is decreased ( ) by _ Calendar Days b. Is not changed ( x ) c. May be revised if the work affected the controlling operation ( ) File: CE, FE, FO, Contractor SHEET 1 OF 2 SHEETS ~suedBy dJI /IJ~ Construction Project Engineer Approved by: City of Shorewood Engineer 1/6-~6 , I Date Date Approved By: Hennepin County Construction Engineer ,-,-"",,~.--,~ Accepted By: ..:'c.~ ~ Contractor's Authorized Representative Date z. - . .. Y b / ()6 Date F., WP WlM I 388-0!\CHANGE ORDERSIChange Ord" Edoe