Loading...
06-074 CITY OF SHOREWOOD RESOLUTION NO. 06- 074 A RESOLUTION APPROVING A CHANGE ORDER 1 FOR THE WEDGEWOOD DRIVE, TEAL CIRCLE, AND MALLARD LANE IMPROVEMENTS AND APPURTENANT WORK, CITY PROJECT NO. 02-02 WHEREAS, on July 24, 2006, the City of Shorewood entered into a contract for construction with Northwest Asphalt, Inc. for the Wedgewood Drive, Teal Circle, and Mallard Lane Improvements and Appurtenant Work, City Project No. 02-02; and WHEREAS, WSB and Associates has prepared Change Order 1 attached hereto as Exhibit A, for additional work outside of the original contract; and WHEREAS, the Director of Public Works has reviewed said Change Order and found it to be cost effective for the project. NOW, THEREFORE BE IT RESOLVED by the City of Shorewood to approve Change Order Number 1 with Northwest Asphalt, Inc., that incorporates services outlined in Change Order 1, attached hereto as Exhibit A. ADOPTED by the City Council of the City of Shorewood this 25th day of September, 2006. (2/ j ) W ATTEST: WOODY LOVE, MAYOR N, ITY ADMINISTRATOR/CLERK WEDGEWOOD DRIVE, TEAL CIRCLE, AND MALLARD LANE IMPROVEMENTS AND APPURTENANT WORK CITY OF SHOREWOOD, MN WSB PROJECT NO. 1074-73 SEPTEMBER 25, 2006 OWNER: CONTRACTOR: CITY OF SHOREWOOD 5755 COUNTRY CLUB ROAD SHOREWOOD, MN 55331 NORTHWEST ASPHALT, INC. 1451 STAGECOACH ROAD SHAKOPEE, MN 55379 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: CONTRACT QUANTITIES ARE MODIFIED AS SHOWN ON THE ATTACHED DETAIL. Storm Sewer Revisions IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: N/A CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: NET INCREASE OF THIS CHANGE ORDER: CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $1,053,041.82 $0.00 $1,053,041.82 $17,947.60 $1,070,989.42 ORIGINAL COMPLETION DATE (SUBSTANTIAL): 10/27/2006 NET CHANGE FROM PREVIOUS CHANGE ORDERS: NONE COMPLETION DATE PRIOR TO THIS CHANGE ORDER: 10/27/2006 NET INCREASE OF CHANGE ORDER: NONE COMPLETION DATE WITH APPROVED CHANGE ORDER~ 10/27/2006 RECOMMENDED BY: ER APPROVED BY: ~. ~~~NATURE WSB & ASSOCIATES, INC. ENGINEER NORTHWEST ASPHALT CONTRACTOR ~...~/5-~ (. PUBLIC WORKS DIRECTOR, CI Y OF SHOREWOOD .27.0~ DATE WEDGEWOOD DRIVE, TEAL CIRCLE, AND MALLARD LANE September 25, 2006 IMPROVEMENTS AND APPURTENANT WORK CITY OF SHOREWOOD, MN WSB PROJECT NO. 1074-73 ADDED ITEMS Item No. Mat. No. Description Qty Unit Price Extended Amount 63 2501.525 44" SPAN RC PIPE-ARCH APRON WITH T.G. AND 2 EACH $4,286.00 $8,572.00 SHEETPILED END SECTION 64 2503.521 44" SPAN RC PIPE SEWER DESIGN 3006 CLASS IIA 201 LI N FT $97.00 $19,497.00 65 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 72- 19.2 L1N FT $587.00 $11,270.40 4020 TOTAL ADDED ITEMS CHANGE ORDER NO.1 $39,339.40 DELETED ITEMS Item No. Mat. No. Description Qty Unit Price Extended Amount 66 2501.525 28" SPAN RC PIPE-ARCH APRON WITH T.G. AND -1 EACH $2,435.00 ($2,435.00) SHEETPILED END SECTION 67 2501.602 24" RC PIPE APRON WI PILING -1 EACH $1,850.00 ($1,850.00) 68 2503.521 28" SPAN RC PIPE-ARCH SEWER CLASS IIA -165 L1N FT $65.00 ($10,725.00) 69 2503.541 24" RC PIPE SEWER DESIGN 3006 CLASS III -35 L1N FT $45.00 ($1,575.00) 70 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 84- -7.88 L1N FT $610.00 -$4,806.80 4020 TOTAL DELETED ITEMS CHANGE ORDER NO.1 ($21,391.80) TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $17,947.60 Page 1