05-093 CITY OF SHOREWOOD RESOLUTION NO. 05- 093 A RESOLUTION APPROVING A CHANGE ORDER 1 FOR THE BADGER WELL RECONSTRUCTION PROJECT, CITY PROJECT NO. 98-06 WHEREAS, on June 27, 2005, the City of Shorewood entered into a contract for construction with Encomm Midwest for the Badger Well Reconstruction Project, City Project No. 98-06; and WHEREAS, WSB and Associates has prepared Change Order 1 attached hereto as Exhibit A, for additional work outside of the original contract; and WHEREAS, the Director of Public Works has reviewed said Change Order and found it to be cost effective for the project. NOW, THEREFORE BE IT RESOLVED by the City of Shorewood to approve Change Order Number 1 with Encomm Midwest, that incorporates services outlined in Change Order 1, attached hereto as Exhibits A. ADOPTED by the City Council of the City of Shorewood this 10th day of September, 2005. /' (- I! I (l~ WOODY LOVE, MAYOR ATTEST: , CITY CLERK! ADMINISTRA TOR OCT, 5,2005 11:51AM ~ WSB 7632877180 NO, 2386 p, 2/8 & A,~sociates. Inc. Infrastructure I Engineering I Planning I Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel; 763-541-4Boo Fax: 763-541-1700 October 5, 2005 Mr. Larry Brown City of Shorewood 5755 Country Club Road Shorevvood,~ 55331 Re: Change Order No, 1 Badger Field Well House Improvements City of Shorewood Project No. 98-06 WSB Project Nos. 1074-87 Dear Mr. Brown: Please find enclosed Change Order No.1 for the Badger Field Well House Improvements. Change Order No.1 includes furnishing a new 75 horsepower (hp) vertical turbine pump in lieu of refurbishing the existing 50 hp pump. The new 75 horsepower pump will provide the well with a design pumping capacity of 675 gpm, which would be 225 gpm more than the existing pump capacity of 450 gpm. Change Order No, 1 also includes adjustments to several of the pay item quantities and prices in Schedule C of the bid proposal that are related to refurbishing the existing pump and would no longer be required as a result of the furnishing of the new 75 horsepower prnnp. Additionally, since no sand was found ill the well during video inspection, adjustments to the pay items in Schedule C of the bid Pl'oposalrelated to sand removal and disposal from the well are also included in this change order. The change in the contract price for Change Order No.1 is $15,307.00, The change order has been reviewed and agreed. upon by the contractor and we hereby recommend that the City of Shorewood approve Change Order No.1. If you have any questions or comments regarding the enclosed, please contact me at (763) 512- 5240. Sincerely, WSB & Associates, Inc. ~~ ;-: IftkvMe<.v Kevin F. Newman, P .E. Project Manager Enclosures Minneapolis I St Cloud Equal Opportunity Employer K:I01074-87IAdml/lIConstn,ciiflll Ad1fl1~V074-gJ co llitory,ao> EX~ ie-rr ~ OCT, 5, 2005511: 51 AM 7632877180;SOClATES OCt 05 05 10:Ha EnComm Midwest 7ENO, 23860 763444-8638 p, 3/8"03 p.2 uv,-~-~~~ G~.-. " ,:;.~ .~, . ';,; ;:i':',;' ;~ '.: ;~:,,' "~f~~'.;;~':".:~:~'~ '.~ . ", ~. .' ' . (",I~" l::J r .CHAMGEc:i~~1': ;:'-,;';~:'~..'.~<':<.:",: :..... i:"~.; ,.;,.;;:',"":, "," .' ocrOil~Fl 4, 2005 B,,~EFl:FIEL.O WEiLL HOUSE fl.il>~OVEMeNTS QTV OF SWJlilEWCKlO, IIlN Clt'( Pi'!QJj;CT NO. lJO,IJIS WEB PROJECT NO. 10(7-117 OWNi!.R: CITY OF StiQHe"NOOC ~ COUl'fl'R'i GL\JEl RQ~I) SHO~EWQOc,fl\N 1Il'l331 CONTRACTOR! ENCOMM MlOWeS-i 5112 N. 1ST AVE. ISAm1. MH SS04Q 'fOU AR~ CIRi:CTi:O TO IMKE TJ-IE 'fC1.I.OWJNG MOCIPICt\1'IONS IN THf;: cONrflAC'I' OOCUMENTS; - 1. ADO ale ,raM NO. 44. WHICH WI\.!.. INCLuDE PROVIDING A NEW 7B HI" VElirICA~ TUi'lElINf: PUMf' INOLU01NG D1SCHI\RGe HEW:l. SUB l:l4Sli. !>OWl. ASseMBLEY. sS ~L TS ANO COLl.EiTS, CemrFIED CUFWe, TOP COl.UWJ PIP!1:.INrEl'IMeOIAT!! COLUMN ?IF'!', BOTTOM COLl/llllN Pipe AND SUCTION Pl~E FOR A L~P SUM pFlICE or: ~6, 902.00. PE;R THE A.TIAOHEO LE;iTE:fl FROM ENCOMM MltlWE:si DATED AUGUST Zi!, 11IICI$ It. AEVlS51't'lE OflHllNAI. BID l'tGM QU",rfTJ'l1E;S IN smlEOULE C PEFl THt:; AlTACHEO LEiTER FROM ENCOMM MIDWEST DAT!!O AUOOST 22, 2COS, FORAN A'C..IUsrE.O IDTM. PRIOe: FOR SCHE;CUL6 0 OF $1 O,700.Cg IT IS \J~R51'OQD T~T TI-lIS CHANGE OR~F\ INCLIJDES All. ~ITIONALCOSTS ANP nMS EXTENSIONS WHICH Mt!lN ANV WAY, Sl'IflPIO, OR FORM ASSOC1ATE:P WITK THE;:WORK aE!MENTS OESCRIBED A'iloVE. CHANGl'I IN CO~ P'RICEI CHANGIO IN CONmACT TIME: ORIGINAl. cONTRAcr I"RIC!O: I"fll:'JlOUS CHANGE OiiOS!;S: NIA C~~ PRIOI! "fiI0R TO TH\S CHANOl:: Ol'lD~R NE;T INCREAse OF THIS CAANGeOADcR: (XJNTllI\Cr PtllCE WITH Ic1.L API"FlO"~ CHANG; ORDERS: ~!l1l,1lI34.00 W.QQ $498,e94.DO ~15.007,llO SSl...~Ol.l:JO QRr(;INI\L CONTI"IACT TIME: NET GHANGE F~OM PRl'ioVIOUiS CI'lANcm OACERS: CONTRACT TlM~ pt\lIOR TO '1:l1rSCl1ANGE OROER; Nt;T IIIIOI'lEASE OP cH.*oNGE. GRpER; CONTRACT TIMEi wm-t APPOOVI::O OHANG!t ORDeR~ 4{1:1.O12006 NONEi 4130/l!00tl o ~/:j1J/2llQ6 FlEOOfoMl,l!!NCI!D BY: A['lPFlOVEO BY: ~~r-#~~) t':i'llN F. Ne.W~N. P.~, p~J~CT MAN~~R p~ .-' wsa eo AS~OCIATES. INC. ENOOMM MIDWEST, It.IC. CONTA",cl0R /~\ ^' / tLCk--- M"YOR O~Te f'~IWPMHl1;231.f6laXca.UW~ C().'\C().1 OCT. 5, 2005 11: 52AM 7632877180 NO, 2386 p, 4/8 Attachment to Change Order No.1 Description of Changes CO Item Description of Change Prioe Change No. 1 Under pay item No. 31 change the lump sum amount from $5,000 to $4,050 to $ (1,400.00) adjust for a deduct to rebuild the existing well pump motor 2 Under pay itom No. 34 chQngc the quantity to O. ^ now top column pipQ I:Qotion $ (250.0U) will be provide as part of new pay item No. 44 3 Under pay item No. 35 change the quantity to O. New intermediate column pipe $ (3,950.00) sections wilt be provided as part of new pay item no. 44 4 Under pay item No. 36 change the quantity to O. A neW bottom column pipe $ (275.00) section will be provided as part of new pay item No. 44 5 Under pay item No. 37 change the quantity to from 250 LF to 150 LF. $ (2,950.00) 6 Under pay item No. 38 change the quantity to O. Mobilization/demobilization fo $ (2,350.00) sand removal equipment will not be required. 7 Under pay item No. 39, ohange the quantity to O. No sand removal and disposal $ (450.00) will be required. 8 Under pay item No. 40, change the quantity to O. No sand analysis will be $ (50.00) required. Add pay item No. 44 to provide New 75 HP pump, including discharge head, sub 9 base, bowl assembly, ss bolts, ss collets, certified curve, top column pipe section, $ 26,982.00 intermediate column pipe sections, bottom column pipe section, suction pipe and electrical revisions. Net Change in Contract Price $ 15,307.00 OCT. 5, 2005 11: 52AM 7632877180 NO, 2386 p, 5/8 ... - ~~ ENCOMM .MIDWEST Commercial Construction & Remodeling · Municipal ...industrial Pre..engine.ered Metal Building Systems Facsimile Transmittal To: Kevin Newman Fax; 763-541~1700 Company: WSB & A~$Oclates PhiXle: 763-541-48CJO ~ From: Amy Washen~~:r Pate: August 31, 2Q05 Our Fax: 763-444-8638 Phone: 763-444-8637 Re: Badger Field Welll10use - ShoreWODd~: 2 cc: Emall: el1comm@el1ccmmmidwestc:om Notes: Revised cost for repairs Item 31. A deduct of $1400 for not rebuilding the existing 50 HP motor. Thank You. /J.my Wasoonberger EnCOmrn Mid1Nest, Inc. www.encommmidwest.com P .0. Box 52C. Isanti, 1'v1N 55040 . (763) 444-8637 . OCT, 5, 2005511: 52AM 76328771803S0CIATC:;;:, Au\) d. ve I u: loa t:n",omm lI!11awest 0S/~5/~~ 0g:34 EH RENNER & ~UN~ ~ .tbj4~~~QJ~ EDH~ Renner & Sons 'NO, 2386'0~ P. 6/83/04 763M4-8638 ,. .. NU. ~:.il~ Ui'!!~ 1~b>0ll WElJ. Pfm.t.1NG FOR RYE Q'l::!NERAT10~S 1!iS!l6 Jal"lri$ Slffi!t NW . ell!: R:'tIef. '-'nllEl5ata 5S33Q P~~~) <U7.tmll1 ' "'ax CTS3i .27..Q5~ ~ ToD FtM (SOOI' 4O'&-Wal 08'15105 City at ShONWVad LOll HtllUlSler EtIComm Mil;lwelrt 512 Norttl ~irsl AVMue lsanti, MN 55040 Subjec:t. 8aQQfJr Fidel HQU9.e WeI- FUlpo'IirB Proposed Rapal,. with New Pump 0flA1gft l7i GPftI at 315 F.-l Tt)H SUl!JtISt.ed Qn! , 1 1 a o D 150 NA NA NA 1 1 D6sClirA1rm 31 RerT'l(Ml an.. Install Pump and MaIDf 32 Video Tape Well 33 Plurnbness and A1lgnmenl Test 34 Top C;oI\.lrnn 6" x 4'11-1/4" TeE .280 35 Il:1tBrmediate Column 6" X 9' 1 MJ41t no .260 35 Botlom Column cr)C 4' 11-114" T&C .2BD 31 liJ'leShal't rDploiK:en1ent iooluciing remol"5 end a~ringll 38 MOl:l & Oernob 'To Re~ Sand J9 Sand Remaval and Dlspcsaf (If Re~uired) 40 ~nd I\nalysis & Reports 41 Chemical and e~riotogM:a'Malysfs 5. R,epcrt& 42 Racommendation and cosl for w~1 pllmp rehatl WG'k Tefl 1 SchlJdlW C' AddltiDnft' ~I to I~ above. , US Motor 75 Hp Type RUst ISO Volt 1 2 Oischarge Head 1 3 Sub Bas.e 1 .4 IklWI Assembly 12WALC - 6 Sb.lSe 1 5 SS aolt~ 1 6$~~ 1 7 CertifiGd C~e 1 8 T~ Colvl'rIn tr" x 4' 11-' W TeE ,322 1 9 IntennediateColUmn atoll: 9' 1V1l4"T&C .3~ 14 10 BottOm Column 8- x .... 11-114" T&C .:322 1 11 Suction Pipe 8" ~ 10' TOE 1 Total Estimate fDr7S lip P~mp Ind Muler fnlblltK{ with Sc1nldll'Ji5 e Sid ~ 11!!im , L.S. 1 L.S. 1 LS. 't t:a. 10 E;a, 1 Ea. 250 L.F. 1 LS. 5 C.V. 1Ea 'f L.S. 1 La 1 Ea, 1 Ea. 1 Ea. 1 Ea. 1 LS. 1 I-.S. 1 LS. 1 ea. 14 Ea. 1 ea. 1 Ea. Pti~ $4,670.00- $1,350.00 $400.00 :ti21&.OO $33e,QO 1230,00 $25.19 $2pOD.OO $80.00 $30.00 $15.00 $100.00 $4,288.00 $1,646.00 $648.00 $f;i,156.00 $199.00 $513.00 $B2UlD S361. GO $545..00 $373,00 $498.00 Totll Coat for Well and 75 HP f1UI'Dp If yOIJ r,e.ed additional Information or have ql.lastlCM, ~ can be- c:onl.::ictBd !!It tI'1Y officii 763-427-6100 or on my cell phone at 651~75$-3200. ~-- I'I'~" ..,.~ jed. 'aTlager .. 5ons, I'll::. ~[J $4,610.00 11,350.00 S400.QO $0.00 $0.00 IIl.OQ $3,776.50 $0.00 $0.00 SO.lJO $76.00 $1 00. on S10,31'3.SO $4.289.00 $1.B48,OO $lM1/i.OO .$6.15$.00 $199.00 $513.00 $921.1:)0 S3d1.ao $1,544.00 .3~.OO $4913.00 $23.238,1Ml $31,81'1.50 OCT. 5, 2005 11: 53AM 7632877180 NO, 2386 P. 7/8 ENCOMM MIDWEST' General Contractor August 22, 2005 Kevin Newman WSB & Associates, Inc. 701 Xenia Avenue South Suite 300 M:iIUleapolis~:MN 55416 REVI~Eri - August 31 ~2(}05 - r Re: Badger Field We11house Shorewoo~ :MN We propose the fullowing repairs per the bid schedule itemS: 31. Remove & Reinstall Pump & Motor 32.. Video Tape Well 33. Plumbness & Allignment Test 37. Lineshaft Replacement 41. Chemical and Bacteriological Analysis 42. Recommendations Report $ 4~050.00 $ 1~550.00 $ 450.00 $ 4,425.00 $ 100.00 $ 125.00 $ 1O~ 700.00 Total proposed repairs: We propose the following changes to increase pump to 75 hp: Total to increase pump to 75 hp: $ 225.00 $ 23.231UlJl $ 23,463.00 ~ 3.519.45 $ 26,982.00 Electrical . Pump Subtotal ContractorPOH@ 15% Please contact our office if you need WIything further. Sincerely, 'I. Lon R. Hollister P.O. Box 520. Isantl. :MN 55040 ~ 763-444-8637 Tn"!'OI ~ (,l':) A OC,T, 2, 2005311: 53AM 7632877180;sOCIATES ~L u, IU.I~ !::[1vomm IIJlIlJWl;ol~' '",~.r,:; HI 05 09:27.01 HYMARK ELECTl'!JC, INC. 763-444-B63S7tNO. 23860 P. 8/8'04 fJ,'-:- S51-~62-37al p.l ~ m"'Un1l H.E.~. ~!l507t PnQI"I\! C51-41i1l4721 J fu: ~1-4l'1'211S4 I E.tmIl: h~ FAX Date: B/11105 To: encornm Midwest. From: Kurt Paddock Fax:7S3-444-8638 Re= Shorewood Badger field Well House. .Aitn: Lon Hollister LaI1, .as per your reqlX!St for tne cost to increase the well motor size from 50 fl.? to 7S h,p. with the incmased. wire feeder size and equipment size cttange:. HyN\arkE\et;:tJic has and added cost. of: $225.00 to make the required material and Labor changes as ck!scribed in Keading and essoc.. fax to WSB dated Ju~y 22. 2005. Any Questions Ple~a C4;lU... Thank You, Kurl: . Pages: 1 Com~ (~~ ~inlhe MD~lhrtel TOTAL P.04